Distribution Integrity Management Program Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. NGA Fall Operations Conference - Oct 8-9th, 2015 Saadat Khan, P.E. 1 Operating Regions Boston Gas 538,382 Svc 7,206 mi Mains Colonial Gas 188,854 Svc 3,857 mi Mains Niagara Mohawk 555,686 Svc 8,643 mi Mains Narassangett Gas 193,615 Svc 3,188 mi Mains Brooklyn Gas 568,913 Svc 4,134 mi Mains Keyspan Gas-LI 535,580 Svc 7,931 mi Mains 2 2014 MAIN INVENTORY U.S. COMPARATIVE SUMMARY National Grid - US 34,960 MILES 2013 PHMSA Average 867 MILES 3 2014 SERVICE INVENTORY U.S. COMPARATIVE SUMMARY National Grid - US 2,581,030 SERVICES 2013 PHMSA Average 46,414 SERVICES 4 Key DIMP Elements 5 Risk Management Asset Based Risk Management Pressure Regulation Facilities Mains & Services Mains & Services Ranked Separately Each Asset Sub-Class Was Separately Evaluated For Each Primary Threat Category All Risk Rankings Were Evaluated, Validated & Adjusted By SME Panel Program Based Risk Management 6 Risk Management Mains & Services Risks are ranked independently within each LDCs e.g. Boston/Essex, colonial, etc. Mains Include Pipeline Appurtenances Services Include Customer Connection Equipment Risk = Likelihood x Consequence of incident Likelihood of Incident Likelihood of failure/release Likelihood of Ignition Consequence Health & safety (60%) Customer interruption (20%) Regulatory and reputational impact (10%) Asset impact (10%) 7 RISK MITIGATION • Asset Management (PAS-55) • Damage Prevention Programs • Gas Emergency Procedures • Incident Analysis • Leak Management Programs • Material Standards & Testing • Operator Qualifications • Personnel & Job Site Safety • Plastic Pipe Data Collection (PPDC) • Failure Database & Analysis for Emerging Systemic Issues • Pipeline Public Awareness Program (PPA) • Proactive Main & Service Replacement Programs (expanded to include “DIMP Factor”) • Process Safety • Process Ownership • QA/QC • System Integrity Reporting • Corrosion Control • Special Patrols • System Design • Flooding Improvements • Storm Hardening 8 Performance Measurement DIMP-Required Performance Measures In PHMSA Annual Distribution Report Hazardous Leaks Repaired (main & service) by CAUSE Total Leaks Repaired (main & service) by CAUSE Excavation Damages Excavation Tickets Workable Backlog Excess Flow Valves (EFVs) Installed Mechanical Fitting Failures Not In PHMSA Annual Distribution Report Network Data Analysed and Tracked in Annual System Integrity for Macro & Micro Trends Hazardous Leaks Repaired By MATERIAL Additional Performance Measures in National Grid DIM Plan Excavation Damages / 1000 Tickets Main Leak Repairs / Mile (excluding excavation damage) Service Leaks / 1000 (excluding excavation Damage) Total Leak Receipts Response Time Performance 9 DIMP Factor DIMP factor bridges Ngrid’s risk management to asset replacement programs Based on past asset performance history and incidents Dynamically driven based on relative risk Accelerated attrition of mains that belong to asset group known to have higher likelihood of incidents Effective risk management with evolving systematic issues 10 DIMP Driven Prioritization Algorithm START No review N 1 break or Grapht’n repairs within 400ft CI Y Pres.> 6in WC Y Replace CI or UPST leak UPST Main Segment < 50ft Replace DIMP Factor N Calculate Prioritization Collect corrosion leak data on segment for 10 years Make adjustments to Pr using “engineering judgment”, public works & reinforcement Y Pr > 12 N Prioritize and replace according to resources & replacement level recommendations 11 Risk Management – Program Based 12 Distribution Capital Investment $1400 Investment in millions $ 1,299 1,231 $1200 1,161 $1000 1,197 1,207 16‐17 17‐18 945 782 $800 751 666 659 682 08‐09 09‐10 10‐11 $600 $400 $200 $0 11‐12 Growth 12‐13 Mandated 13‐14 14‐15 Reliability 15‐16 18‐19 Other 13 Questions? [email protected] 14
© Copyright 2026 Paperzz