Road Cost Worksheet Existing Paved Roads to be repaired Importance Road 1 Doane 2 Fieldcrest 3 4 5 6 7 8 9 10 11 12 Fieldcrest Marshall Whitmore Lake Rd Whitmore Lake Rd Silverside Rickett Lee Rd 9 Mile Leman Winans Lk Vehicle Trips per Length Paving cost Day Destination Water Structure Cost from Rushton to Silverside from Silver Lake to Lee Rd. from intersection of us 23 ramp to Silver Lake Rd. 9 mile to Silver Lake Rd from Winans Lake to M-36 from M-36 to 8 Mile Rd Doane to Silver Lake Rd n Township line s to Lee Rd Rickett to Robin Ridge US 23 east to Marshall Rd. 8 Mile to M-36 Twp line east to Whitmore Lake Rd 5,832 13,835 583,200 1,383,500 3,690 2,120 9,302 9,241 8,452 6,400 3,677 2,753 3,072 8,396 4,787 8,961 930,200 924,100 845,200 640,000 367,700 275,300 307,200 839,600 478,700 896,100 560 1,830 1,700 2,610 2,990 11,920 4,560 6,440 790 9,150 Doane to Silver Lake Rd Silverside to Rushton Rd 8,216 11,056 821,600 1,105,600 1700 1,070 Whitmore Lk to M-36 Silver Lake Rd to 11 Mile Rd Marshall to Dixborro 10 Mile Rd to 8 Mile Rd 9 Mile to 8 Mile Rd 10,286 10,426 15,773 10,744 5,266 308,580 312,780 473,190 322,320 157,980 480 540 520 Possible Path Yes / No Non Motorized path yes 262,440 yes 418,590 yes yes 380,340 288,000 Chip Seal 7Total Cost 10 years 586,890 1,648,060 49,689 117,874 1,349,350 925,930 1,227,240 930,610 370,690 287,220 311,760 846,040 479,490 905,250 79,253 78,733 72,011 54,528 31,328 23,456 26,173 71,534 40,785 76,348 1,648,300 1,106,670 70,000 94,197 Existing Gravel Roads to be Paved 1 Rushton Rd 2 Silver Lake Rd 825,000 Existing Gravel Roads to gravel 1 2 3 4 5 1 Spicer Dixborro 8 Mile Dixborro Marshall 520 F:\Roads\Road Cost Wookbook 8 15 2012 Website Version 309,060 313,320 473,710 322,320 158,500 7:43 PM Road Cost Worksheet Importance Vehicle Trips per Length Paving cost Day Road Destination 10 Mile Silver Lake 9 Mile Rickett Rushton to Dixborro Fieldcrest east to Marshall Marshall to Rushton Winans n to lee Rd Water Structure Cost Possible Path Yes / No Non Motorized path Chip Seal 7Total Cost 10 years Roads to Chip Seal 7,979 7,264 7,961 15,950 Dixborro 10 to 8 up grade to pavement 67,981 61,889 67,828 135,894 9,760 7,110 2,020 9,150 77,741 68,999 69,848 145,044 752,080 752,080 Sub Total Cost Total all project cost Chip seal with Fog sealer gravel Paving taxable value 2012 Subdivision Rds. 1,349,370 15,314,122 1,219,502 17,882,994 45,000 per mile/8.52 per ft 30.00 per ft 8",drainage&cl 100.00 per ft. 761,458.00 45 miles X 5,280 assuming 50% of sub roads in need assuming 50% curb & gutter assuming 50% open ditch 2 67,981 61,889 67,828 135,894 237,600 118,800 17,820,000 11,880,000 F:\Roads\Road Cost Wookbook 8 15 2012 Website Version 7:43 PM
© Copyright 2026 Paperzz