Appendix B Respondent is required to complete the following table

_________________
__________________________
Procurement
&
‫אגף רכש והתקשרויות‬
Contracting
Division
Appendix B
Respondent is required to complete the following table:
Table II: Information Concerning Respondents Past Experience
Please specify respondent's past experience in manufacture and supply On-Track Railbound Vehicle
with Rail Surface Defects Elimination System (NOT HI-RAILS).
Please specify for each Vehicle, the following information:
Customer No. [
]:
Name of
Customer:
Address of
Customer:
Customer's Contact person (name,
title):
Contact's person
E-Mail:
Telephone No.
Quantity and Type of vehicles supplied to the costumer
The supplied vehicle includes:
Surface Defects Elimination System (please circle the supplied technology):
Grinding
Milling
Planing
Other:
.
Vehicle comply with 14033-1; 2; 3
YES
NO
Driving cabin from both side
YES
NO
Maximum travelling speed self-propelled
_________ [km/h]
Maximum travelling towed
_________ [km/h]
Engine capacity
Engine EURO emission level
_________ [hp]
___________
Wheel size
[mm]
Maximum track gradient
[‰]
Minimum curve radius
[m]
Maximum track superelevation
Longitudinal measurement system
[mm]
YES
NO
Longitudinal measurement system accuracy
[mm]
Longitudinal measurement system resolution
[mm2]
Transverse measurement system
YES
Transverse measurement system accuracy
NO
[mm]
[mm2]
Transverse measurement system
Head check measurement system
YES
NO
Head check measurement system accuracy
[mm]
Head check measurement system resolution
[mm2]
Roughness measurement system
YES
NO
Roughness measurement system accuracy
[mm]
Roughness measurement system resolution
[mm2]
Fire protection system
YES
NO
Odometer
YES
NO
Onboard Database Computer Server;
YES
NO
Synchronization Unit;
YES
NO
Off-board software provided with the system
YES
NO
DGPS/RTK System
YES
NO
Interface to SAP
YES
NO
Support GIS functionality
YES
NO
Operate in tunnels
YES
NO
Number of workers required during a shift
_________
Number of the total Metal Removal Elements (grinding stones,
planning tools milling tools, others)
_________
Total track length before the need to replace the total Metal
Removal Elements (grinding stones, planning tools milling tools,
_________ [km]
others)
Time to replace the total Metal Removal Elements (grinding
stones, planning tools milling tools, others)
_________ [min]
Metal Removal Elements (grinding stones, planning tools milling tools, others)
replacement process
(please circle the supplied technology):
Manual
Automatic
Semi-Automatic
2
The Rail Surface Defects Elimination System have the capabilities of eliminate rail head
defects in angles from _____ degrees on gauge side, to _____ degrees on field side,
(please fill the blanks)
Defect elimination operation speed
_________ [km/h]
Vehicle maximum speed during Measurement operation (all
measurement systems together)
_________ [km/h]
Minimum metal removal layer (the entire rail head) in one pass
_________[mm]
Maximum metal removal layer (the entire rail head) in one pass
__________[mm]
Number of passes to perform Initial Reprofiling, with depth up to
_________
0.20 [mm]
Time to perform 2[km] of Initial Reprofiling, depth up to 0.20
[mm]
_________ [hours]
Number of passes to perform Preventive Cycle Reprofiling, with
_________
depth equal or greater than 0.20 [mm] and up to 0.30 [mm]
Time to perform 2[km] of Preventive Reprofiling equal or greater
than 0.20 [mm] and up to 0.30 [mm]
_________ [hours]
Number of passes to eliminate Corrective Reprofiling equal or
_________
greater than 0.3 [mm] and up to 1 [mm]
Time to perform 2[km] of Corrective Reprofiling equal or greater
than 0.3 [mm] and up to 1 [mm]
_________ [hours]
Capability to perform Wear Reducing Profiles
YES
NO
Capability to perform Gauge Widening Profile
YES
NO
Water tank (Capacity
YES
NO
YES
NO
YES
NO
[liters])
The measurement systems synchronize with one another and with
the odometer/ DGPS/RTK System
The RSDEV was designed to operate efficiently near high voltage
electrical wire line, on electrified track with 25k VAC and on nonelectrified track with CWR and jointed track. Please attach
relevant technical documents and certificates approving it
3
does axle counters, rail lubricator and other equipment assembled
near to the rail head, need to be disassembled before defects
YES
NO
eliminate operation
Seats arrangement in the
cabin

Please specify____________________________________
Please duplicate this table II as applicable
Table III: Information concerning the System
Please submit any relevant technical
information in regards to the RSDEV
Table IV: Information concerning manufacture
Time to manufacture and supply a Railbound Vehicle with Rail Surface
Defects Elimination System
______
[month]
Table V: Information concerning Training
Please specify All relevant Information
regarding the required training (number of
days etc)
Table VI: Reports
Please specify All relevant Information
regarding the System on screen and generated
reports capabilities including examples
4