_________________ __________________________ Procurement & אגף רכש והתקשרויות Contracting Division Appendix B Respondent is required to complete the following table: Table II: Information Concerning Respondents Past Experience Please specify respondent's past experience in manufacture and supply On-Track Railbound Vehicle with Rail Surface Defects Elimination System (NOT HI-RAILS). Please specify for each Vehicle, the following information: Customer No. [ ]: Name of Customer: Address of Customer: Customer's Contact person (name, title): Contact's person E-Mail: Telephone No. Quantity and Type of vehicles supplied to the costumer The supplied vehicle includes: Surface Defects Elimination System (please circle the supplied technology): Grinding Milling Planing Other: . Vehicle comply with 14033-1; 2; 3 YES NO Driving cabin from both side YES NO Maximum travelling speed self-propelled _________ [km/h] Maximum travelling towed _________ [km/h] Engine capacity Engine EURO emission level _________ [hp] ___________ Wheel size [mm] Maximum track gradient [‰] Minimum curve radius [m] Maximum track superelevation Longitudinal measurement system [mm] YES NO Longitudinal measurement system accuracy [mm] Longitudinal measurement system resolution [mm2] Transverse measurement system YES Transverse measurement system accuracy NO [mm] [mm2] Transverse measurement system Head check measurement system YES NO Head check measurement system accuracy [mm] Head check measurement system resolution [mm2] Roughness measurement system YES NO Roughness measurement system accuracy [mm] Roughness measurement system resolution [mm2] Fire protection system YES NO Odometer YES NO Onboard Database Computer Server; YES NO Synchronization Unit; YES NO Off-board software provided with the system YES NO DGPS/RTK System YES NO Interface to SAP YES NO Support GIS functionality YES NO Operate in tunnels YES NO Number of workers required during a shift _________ Number of the total Metal Removal Elements (grinding stones, planning tools milling tools, others) _________ Total track length before the need to replace the total Metal Removal Elements (grinding stones, planning tools milling tools, _________ [km] others) Time to replace the total Metal Removal Elements (grinding stones, planning tools milling tools, others) _________ [min] Metal Removal Elements (grinding stones, planning tools milling tools, others) replacement process (please circle the supplied technology): Manual Automatic Semi-Automatic 2 The Rail Surface Defects Elimination System have the capabilities of eliminate rail head defects in angles from _____ degrees on gauge side, to _____ degrees on field side, (please fill the blanks) Defect elimination operation speed _________ [km/h] Vehicle maximum speed during Measurement operation (all measurement systems together) _________ [km/h] Minimum metal removal layer (the entire rail head) in one pass _________[mm] Maximum metal removal layer (the entire rail head) in one pass __________[mm] Number of passes to perform Initial Reprofiling, with depth up to _________ 0.20 [mm] Time to perform 2[km] of Initial Reprofiling, depth up to 0.20 [mm] _________ [hours] Number of passes to perform Preventive Cycle Reprofiling, with _________ depth equal or greater than 0.20 [mm] and up to 0.30 [mm] Time to perform 2[km] of Preventive Reprofiling equal or greater than 0.20 [mm] and up to 0.30 [mm] _________ [hours] Number of passes to eliminate Corrective Reprofiling equal or _________ greater than 0.3 [mm] and up to 1 [mm] Time to perform 2[km] of Corrective Reprofiling equal or greater than 0.3 [mm] and up to 1 [mm] _________ [hours] Capability to perform Wear Reducing Profiles YES NO Capability to perform Gauge Widening Profile YES NO Water tank (Capacity YES NO YES NO YES NO [liters]) The measurement systems synchronize with one another and with the odometer/ DGPS/RTK System The RSDEV was designed to operate efficiently near high voltage electrical wire line, on electrified track with 25k VAC and on nonelectrified track with CWR and jointed track. Please attach relevant technical documents and certificates approving it 3 does axle counters, rail lubricator and other equipment assembled near to the rail head, need to be disassembled before defects YES NO eliminate operation Seats arrangement in the cabin Please specify____________________________________ Please duplicate this table II as applicable Table III: Information concerning the System Please submit any relevant technical information in regards to the RSDEV Table IV: Information concerning manufacture Time to manufacture and supply a Railbound Vehicle with Rail Surface Defects Elimination System ______ [month] Table V: Information concerning Training Please specify All relevant Information regarding the required training (number of days etc) Table VI: Reports Please specify All relevant Information regarding the System on screen and generated reports capabilities including examples 4
© Copyright 2026 Paperzz