Decision 2013-349 (Errata) EPCOR Distribution and Transmission Inc. Errata to Decision 2013-349 Decommission and Salvage Celanese Substation and Transmission Line 761L October 3, 2013 The Alberta Utilities Commission Decision 2013-349 (Errata): EPCOR Distribution and Transmission Inc. Decommission and Salvage Celanese Substation and Transmission Line 761L Application No. 1609763 Proceeding ID No. 2731 October 3, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: 403-592-8845 Fax: 403-592-4406 Website: www.auc.ab.ca The Alberta Utilities Commission Calgary, Alberta EPCOR Distribution and Transmission Inc. Celanese Substation and Transmission Line 761L 1 Decision 2013-349 (Errata) Application No. 1609763 Proceeding ID No. 2731 Introduction 1. On September 13, 2013, the Alberta Utilities Commission (AUC or the Commission) issued Decision 2013-349 to EPCOR Distribution and Transmission Inc. (EPCOR) regarding the Celanese substation and transmission line 761L. 2. In paragraph one of Decision 2013-349, the description of EPCOR’s portion of transmission line 761L to be decommissioned and salvaged was incorrectly stated as going from Celanese substation to East Edmonton 38S substation. EPCOR’s portion of transmission line 761L to be decommissioned and salvaged is approximately 805 metres in length and goes from EPCOR’s Celanese substation to a point where it connects with the AltaLink Management Ltd. portion of transmission line 761L in the Edmonton area. Also in paragraph one, transmission line 7L61 should be designated as 761L. 3. The decision states in paragraph four that “In 2013, a portion of the site upon which the substation is located, was sold to Keyera”. EPCOR advised that the Celanese substation is located on property owned by Eco-Industrial Park Inc. Section 48 of AUC Rule 001: Rules of Practice indicates that “the Commission may correct typographical errors, errors of calculation and similar errors made in any of its orders, decisions or directions.” Accordingly, this errata decision has been issued to correct the errors. 4. Paragraphs one and four of Decision 2013-349 have been amended to include the correct information outlined above and is attached to this Decision 2013-349 (Errata). Dated on October 3, 2013. The Alberta Utilities Commission (original signed by) Neil Jamieson Commission Member AUC Decision 2013-349 (Errata) (October 3, 2013) • 1 Decision 2013-349 EPCOR Distribution and Transmission Inc. Decommission and Salvage Celanese Substation and Transmission Line 761L September 13, 2013 The Alberta Utilities Commission Decision 2013-349: EPCOR Distribution and Transmission Inc. Decommission and Salvage Celanese Substation and Transmission Line 761L Application No. 1609763 Proceeding ID No. 2731 September 13, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place, Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Telephone: 403-592-8845 Fax: 403-592-4406 Website: www.auc.ab.ca The Alberta Utilities Commission Calgary, Alberta EPCOR Distribution and Transmission Inc. Decommission and Salvage Celanese Substation and Transmission Line 761L 1 Decision 2013-349 Application No. 1609763 Proceeding ID No. 2731 Introduction 1. EPCOR Distribution and Transmission Inc. filed Application No. 1609763, on July 16, 2013, pursuant to Section 21 of the Hydro and Electric Energy Act. In the application EPCOR requested approval to: decommission and salvage EPCOR’s portion of existing 138-kilovolt transmission line 761L (Permit and Licence No. U2000-0371) from EPCOR’s Celanese substation to a point where it connects with the AltaLink Management Ltd. portion of transmission line 761L in the Edmonton area decommission and salvage existing Celanese substation. (Permit and Licence No. U2000-0122) Permits and Licences No. U2000-012 and No. U2000-037 were issued to Edmonton Power Transmission Inc.; now EPCOR Distribution and Transmission Inc. (EPCOR). 2. EPCOR owns and operates the Celanese substation and transmission line 761L, located in the south west quarter of Section 17, Township 53, Range 23, west of the Fourth Meridian. 3. The Celanese substation is located on property owned by Eco-Industrial Park Inc. (EcoIndustrial). Eco-Industrial has leased the property to Keyera Corporation. Transmission line 761L is located on property owned by Keyera and Eco-Industrial. 4. The Celanese substation and transmission line 761L were originally commissioned in 1977 to provide service to the operations of Celanese Canada Inc. In 2004, Celanese ceased operations and, in 2007, sold the property to Eco-Industrial. 5. In April 2013, Eco-Industrial requested that EPCOR discontinue electrical service to the site and remove all equipment. Eco-Industrial made the request as a safety precaution while ongoing demolition activities are being carried out in the vicinity of the transmission line facilities. 6. On May 31, 2013, EPCOR and the Alberta Electric System Operator terminated the electric service agreement. 1 2 Transmission Line Permit and Licence No. U2000-037, Application No. 990478, February 29, 2000. Substation Permit and Licence No. U2000-012, Application No. 990478, February 29, 2000. AUC Decision 2013-349 (September 13, 2013) • 1 Decommission and Salvage Celanese Substation and Transmission Line 761L 7. EPCOR Distribution and Transmission Inc. EPCOR conducted public consultation programs regarding the project including: delivery of information packages to local area occupants, residents and landowners situated within 800 metres of the proposed project personal consultation with occupants, residents and landowners of land that are directly adjacent to the Celanese substation an open house was held on June 26, 2013 8. EPCOR indicated that there are no outstanding objections or concerns related to the project. 9. EPCOR committed to undertake a phase 1 environmental site assessment and a soil sampling program based on Alberta Environment and Sustainable Resource Development (AESRD) guidelines to determine the extent of any potential contamination from EPCOR’s activities on the site. 2 Findings 10. The Commission finds EPCOR’s participant involvement program satisfactory pursuant to AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines and Industrial System Designations. 11. Due to the fact the application is for the decommissioning of transmission facilities and no one is objecting to the project, the Commission considered its decision or order would not directly and adversely affect the rights of a person, pursuant to Section 9 of the Alberta Utilities Commission Act. Therefore, a notice of application was not issued and a hearing was not required. 12. The Commission finds that there are no outstanding technical, routing or noise concerns associated with the decommission and salvage of the substation and transmission line. 13. Prior to salvaging the Celanese substation, EPCOR shall fulfill a commitment to complete a phase 1 environmental site assessment in accordance with AESRD guidelines and use the findings of that investigation to design and implement a soil sampling program, also in accordance with AESRD guidelines. EPCOR shall submit to AESRD’s environmental site assessment repository, complete copies of the phase 1 environmental site assessment and soil sampling report, endorsed by qualified members in good standing of a professional organization of Alberta. 14. Based on the foregoing, the Commission considers the application to be in the public interest in accordance with Section 17 of the Alberta Utilities Commission Act. 2 • AUC Decision 2013-349 (September 13, 2013) Decommission and Salvage Celanese Substation and Transmission Line 761L 3 EPCOR Distribution and Transmission Inc. Decision 15. Pursuant to Section 21 of the Hydro and Electric Energy Act, the Commission approves the application and grants to EPCOR the approvals set out in Appendix 1– EPCOR Celanese Substation – Approval No. U2013-423, September 13, 2013 (Appendix 1 will be distributed separately) and Appendix 2 – EPCOR Transmission Line 761L - Approval No. U2013-424, September 13, 2013 (Appendix 2 will be distributed separately). Dated on September 13, 2013. The Alberta Utilities Commission (original signed by) Neil Jamieson Commission member AUC Decision 2013-349 (September 13, 2013) • 3
© Copyright 2026 Paperzz