Loulo-Gounkoto site visit… January 2015 Overview… Morila Gold Mine Mali Equity Total reserves Total resources 2013 production 40% 0.3Moz 0.6Moz 141 822oz Loulo-Gounkoto Mine Complex, Mali Equity Loulo: Total reserves Total resources Gounkoto: Total reserves Total resources Loulo-Gounkoto 2013 production AFRICA 80% 5.3Moz 9.7Moz 2.3Moz 4.4Moz Mali Senegal 580 364oz Massawa Feasibility Project, Senegal Equity Total Reserves Total Resources 83% 2.0Moz 4.7Moz Côte d’Ivoire Tongon Gold Mine Côte d’Ivoire Equity Total reserves Total resources 2013 production 89% 2.2Moz 3.6Moz 233 591oz 2 Fiscal parameters summary… LOULO PARAMETERS GOUNKOTO Royalty on gold sales 6% 6% Corporate tax rate 30% 30% Corporate tax minimum 0.75% of revenue 0.75% of revenue Corporate tax holiday 5 years 2011-2013 can extend on further investment from first production 2 years Import duty holiday 2000-2005 from first production 3 years 3 years Fuel and lubricants exempted for LOM Fuel and lubricants exempted for LOM none none Dividend withholding tax 20% 20% State participation financed by RRL 10% preferred dividend State participation Not free Tax stabilisation Indefinite Indefinite validity of convention validity of convention 3 Discovery and development of Loulo-Gounkoto Complex... 2011 2011 2012 2014 2014 Gounkoto first gold from open pit Gara UG first gold Loulo plant expansion Gounkoto UG feasibility commences Production exceeds 600 000oz 2010 Gounkoto incorporated as separate company Gounkoto First dividend paid to shareholders 2009 Gounkoto discovery resource - 1997 Yalea discovery resource - 1996 2006 Loulo UG development starts 2008 2005 Yalea UG first gold Loulo UG feasibility approved 2003 BHP Mali acquired Updated feasibility study Gara resource – 659koz Total reserve 1.28Moz 2004 2005 Construction begins on Loulo mine Loulo mine opening 4 Loulo-Gounkoto...organogram GM Loulo Chiaka Berthe Operations Mngr Tahirou Ballo Mine Mngr Gounkoto Thomas Frempong Human Resources Samba Diallo Health & Safety Dr Mama Kanta Financial & Admin Daouda Dembele Open pit Mining Thomas Frempong Security Harry Jooste Engineering Abbas Coulibaly Mineral Resources Amadou Famanta Environment /Community Hilaire B Diarra UG Mining Mamou Toure Supply Chain Cheikna Konare Processing Drissa Arama 5 Safety and Health… Loulo-Gounkoto… safety, health, environment 0.4 Improving safety due to proactive identification and management of H&S risks Decreasing malaria rate No major environmental incident reported Both operations are certified OHSAS 18001: 2007 and ISO 14001:2004 m3 Fresh water/tonne of ore milled m3 0.3 0.30 0.2 0.20 0.1 0.10 0.0 0.00 2011 2012 2013 2014 Addressing EBOLA threat through an integrated prevention programme 2012 2013 2014 LTIFR 2 2 1 1 0 0 Improved natural resources management – water, biodiversity and energy 2011 3 3 2010 2011 2012 2013 YTD 2014 2011 2012 2013 YTD 2014 Malaria 80 incidence rate 60 50 40 30 20 10 0 60 40 20 0 2010 2011 2012 2013 YTD 2014 Mineral Resources… 2011 2012 2013 YTD 2014 7 Reserves and resources… Yalea deposit… 2003 2013 2.7Km Planned drilling 900m <0.7 g/t 0.7 - 3.0 g/t 3.0 - 4.0 g/t 4.0 - 8.0 g/t > 8.0 g/t Reserves…..3.3Moz @ 5.96g/t Resources…5.9Moz @ 5.12g/t 10 Gara deposit…reserve and resource envelopes 2003 2013 1.8Km 750m <0.5 g/t 0.5 - 3.0 g/t Previously drilled intercepts Planned drilling Reserves…..1.6Moz @ 4.32g/t Resources…2.7Moz @ 4.18g/t 3.0 - 5.0 g/t 5.0 - 8.0 g/t > 8.0 g/t 11 Opportunities… Three world class orebodies: Yalea Gara Gounkoto Multiple ore sources which give flexibility for feeding the plant Several satellite orebodies on Loulo and Gounkoto leases Very prospective groundholding Exploration… Randgold…controlling West Africa’s most prospective gold belts Legend JV Reconnaissance mapping completed along 17km strike 9 anomalous lithosample results return between 0.23g/t and 5.9g/t N Bambadji Permit 10km Loulo Bena Permit SENEGAL MALI Gounkoto Permit reissued south of Gounkoto permit 2km Massawa Bakolobi JV Loulo Gounkoto Permit reissued 5km Main Transcurrent Zone Senegal Malian Shear 1km Multiple mineralised intersections: 14m @ 2.47g/t incl 5m @ 4.56g/t 8m @ 3.05g/t incl 2m @ 4.58g/t 14 Loulo District…a proven world class destination Waraba Apparent Resistivity Residual 1 6 4 Brownfields Exploration Yalea and Gara structural models generate new targets along strike New IP Targets 12 potential targets being field validated 9 8 N 7 10 3 Geochemical Orientation Study New targets generated in district; further interpretation in Q4 11 5 PQ10 Gara 12 Loulo 2 P129 Deposit High resistivity Medium resistivity Low resistivity Loulo 3 2 Structural Mapping Widespread “Gara Style” fold related mineralisation potential P125 Yalea 2km 15 Loulo – Yalea…drill results show high grade extension to orebody Intersection Yalea Structure (upper strand) Yalea long section looking west Intersection Yalea Structure (lower strand) Dip change (Yalea Shear) N 2.7Km YaDH11 6.30m @ 1.99g/t 60o dip 80o dip Open Exploration Targets Conversion Targets Open Gold g/t >8g/t 5–8g/t 3–5g/t 0.5–3g/t <0.5g/t YaDH13 41.0m @ 3.56g/t YaDH15 30.7m @ 6.42g/t Drilling intersected dilational structures giving increased grade and width, exceeding expectations High grade open to the south as well as at depth below the block model, generating several new exploration targets 16 Loulo - Gara…focus on extending high grade mineralisation Gara long section looking east N L0CP176 8.50m @ 6.74g/t L0CP180 26.40m @ 4.49g/t 2Km L0CP174 11.0m @ 5.88g/t L0CP175 16.20m @ 5.96g/t L0CP185 9.30m @ 10.48g/t L0CP184 16.20m @ 5.96g/t Open L0CP178 9.20m @ 4.05g/t Conversion Target L0CP183 2.30m @ 8.33g/t L0CP179 8.40m @ 3.15g/t Gold g/t >8g/t 5–8g/t 3–5g/t 0.5–3g/t L0CP177 4.50m @ 5.63g/t Open L0CP186 12.80m @ 1.08g/t Warp Fold Axis Exploration Targets ‘S’ Fold Axis High grade mineralisation open down plunge 17 Processing… Processing… Simplified metallurgical flow sheet… PRIMARY CRUSHER TAILINGS DISPOSAL DAM 8km Upgraded pipeline Thickener and Clarifier Secondary Crushing Tertiary Crushing Cyclones Knelson Concentrators Yalea and Gara Paste Plant Intermediate Plant Primary Mill CIL Tank Farm SOFT ORERegrind Mills Stockpile Mineral Sizer Primary Mill Stockpile Conveyor AARL Ball Mills Ball Mills Elution Smelt-house Accounting Sampling points Gravity concentrate Eluate Gold Bullion 20 Processing projects underway… TSF elevated toe drain Intermediate plant Intermediate plant Cyclone pumps and cluster Oxygen plant upgrade New Elution Circuit Gravity circuit upgrade ILR Gekko 21 Engineering… Achieved in 2014… Commissioning of paste fill plants at Gara and Yalea Upgraded secondary crushing plant Commissioning of additional medium speed generators (7 MW capacity) Installation and commissioning of primary fans Upgraded the oxygen plant by adding additional 10 tonnes per day Projects 2014 … Intermediate plant Paste plant cement silo. New secondary crusher Power plant extension CM 9 & CM10 2014… All CM’s Start & Stop in LFO & run in HFO The two CM’s were commissioned and they are in operation. The fire suppression system for the 2 additional generators will be completed early in 2015 25 New UG primary fan and 10tpd oxygen plant… Gara Installation and commissioning of primary fans Upgrade oxygen plant to Yalea improve the recovery Focus for 2015… Secure the mine medium voltage power distribution Elution and regeneration upgrades Improve oxygen distribution Upgrade the Yalea underground crushing and conveying system Upgrade gravity circuit Finalize refrigeration design for underground in 2015 Underground mining… Loulo mining… Yalea transverse area 15m wide with footwall development Gara design in full retreat dependent on backfill Primary and secondary stopes – reserves available vs backfill Yalea Developed reserves 2 Mt 1.5 1 0.5 0 Yalea Transverse Secondary stopes Longitudinal Secondary stopes 0.8 Gara Mt Gara Backfill reserves 0.6 0.4 0.2 0 Longitudinal Secondary stopes Full-Retreat Yalea Gara 29 Underground fill implementation… CAF production continues in both mines until paste is in full production 30 Loulo UG mining shows a steady improvement… Yalea and Gara achieved record production in Q3 2014 800 Tonnes mined Gara UG Yalea UG 700 600 500 400 300 200 100 0 Q1 - 2013 Q2 - 2013 Q3 - 2013 Q4 - 2013 Q1 - 2014 Q2 - 2014 Q3 - 2014 31 Procurement… Supply routes to West African operations… Abidjan to Tongon Abidjan to Morila Dakar to Loulo-Gounkoto Massawa Loulo Dakar 800 km Morila 1000 km Gounkoto 625 km Tongon Abidjan 33 Achievements 2014… Integrated supply chain and finance SAP system successfully implemented Stock value as at December 31, compared to 2013, excluding fuel, decreased by 34% or USD 24.4 million Successful year end stock take with a negative variance of 0.8% Negotiated new contracts for key reagents resulting in a reduction to 2012 prices Opportunities… Increase consignment agreements for more high volume consumables, reagents, spares, etc in order to reduce inventory holding (Current value of consignment stock at Loulo mine = USD 6.4 M) Target to double over 2 years Reduce stores further through continued effective demand planning and optimisation of supply routes Continued contract negotiation for group fixed pricing contracts to reduce input costs Gounkoto… Gounkoto…exploration opportunities Gounkoto North Area Soil Geochemistry with EM (AdTau) Gounkoto NW / P64 New P64 geologic model applied in north, generates new targets Gounkoto Resource Advanced grade control drilling completed at MZ4 and P64 Gounkoto MZ3 Conversion drilling confirmed high grade, did not deepen $1000/oz pit shell. N Potential targets Interpreted structure Toronto Trenching to test model and oxide resource potential Cover Mapping Depth to saprock map over project is underway Toronto MZ3 Deep New target, down plunge of MZ3 Extension P64 Gounkoto SW Mapping target structure. Geophysics identifies untested potential MZ2 Gounkoto MZ1 Faraba North Gold in soil (ppb) >100 30 – 100 1km 37 Gounkoto…MZ3 extension highlights upside potential Gold g/t >8g/t 5–8g/t 3–5g/t 1–3g/t 0.5-1g/t Reserves….. 2.3Moz @ 4.30g/t Resources… 4.4Moz @ 4.28g/t MZ1 MZ2 MZ3 GKDH430 6.60m @ 3.25g/t MZ4 P64 GKDH428 6.75m @ 2.75g/t P64 Open GKDH424 16.95m @ 11.03g/t GKDH418 14.50m @ 31.59g/t GKDH423 5.70m @ 0.69g/t MZ3 GKDH422 11.70m @ 0.85g/t extension open High grade open at depth, new targets down plunge of controlling structures GKDH421 6.50m @ 4.49g/t GKDH426 37.50m @ 3.29g/t 38 Gounkoto UG Feasibility Low capital design Decline from pit CAF plant on surface No underground crushing Vent raises to hole into the pit Updated UG mine design Potential ~1Moz reserve potential Plan to start decline in 2018 and be at full production when pit completes in 2020 Extends Loulo-Gounkoto plan to achieve close + 600koz for 10 years 39 Financial… Mali, Loulo standalone… operating results 9 months ended 30 Sep 2014 12 months ended 31 Dec 2013 31 Dec 2012 Mining Tonnes mined (000) 2 141 4 251 9 825 Ore tonnes mined (000) 2 036 2 541 1 964 1 948 2 432 1 837 5.1 4.5 4.2 90.4 88.0 88.6 Ounces produced 288 299 308 420 219 745 Ounces sold 285 073 312 748 214 739 1 287 1 397 1 664 Cash operating costs* ($/oz) 606 692 684 Total cash costs* ($/oz) 683 776 781 3 924 - 7 212 Profit from mining activity* ($000) 172 026 194 190 189 588 Gold sales* ($000) 366 760 436 950 357 224 Milling Tonnes processed (000) Head grade milled (g/t) Recovery (%) Average price received ($/oz) Gold on hand at period end# ($000) 41 Refer to Q3 2014 quarterly report for footnotes Mali, Gounkoto standalone… operating results 9 months ended 30 Sep 2014 12 months ended 31 Dec 2013 31 Dec 2012 Mining Tonnes mined (000) 17 960 28 936 28 706 1 419 2 624 2 492 1 373 2 032 2 518 5.4 4.7 3.9 90.3 88.8 89.7 Ounces produced 214 790 271 943 283 479 Ounces sold 213 165 274 802 287 712 1 287 1 351 1 651 Cash operating costs* ($/oz) 521 541 607 Total cash costs* ($/oz) 598 622 706 1 977 - 4 749 Profit from mining activity* ($000) 146 904 200 444 272 112 Gold sales* ($000) 274 333 371 361 475 126 Ore tonnes mined (000) Milling Tonnes processed (000) Head grade milled (g/t) Recovery (%) Average price received ($/oz) Gold on hand at period end# ($000) 42 Refer to Q3 2014 quarterly report for footnotes Loulo-Gounkoto complex… operating results 9 months ended 30 Sep 2014 12 months ended 31 Dec 31 Dec 2013 2012 Mining Tonnes mined (000) 20 101 33 188 38 531 3 454 5 165 4 456 3 321 4 463 4 354 5.2 4.6 4.0 90.4 88.4 89.2 Ounces produced 503 090 580 364 503 224 Ounces sold 498 238 587 550 502 451 1 287 1 376 1 657 Cash operating costs* ($/oz) 570 621 640 Total cash costs* ($/oz) 647 704 738 5 901 - 11 961 Profit from mining activity* ($000) 318 930 394 633 461 700 Gold sales* ($000) 641 094 808 311 832 350 Ore tonnes mined (000) Milling Tonnes processed (000) Head grade milled (g/t) Recovery (%) Average price received ($/oz) Gold on hand at period end# ($000) 43 Refer to Q3 2014 quarterly report for footnotes Loulo-Gounkoto…5 year plan Cash cost Production $/oz Oz 000 900 Capex $m Grade g/t Total cash cost/oz 800 7 Grade g/t 6 700 5 600 4 500 400 3 Capex $m 300 2 200 1 100 0 0 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 Actual production Total cash cost/oz Capex Grade 44 Contribition to Malian economy…to date Gounkoto Loulo Local suppliers, local salaries, community investment Royalties $158m Direct and indirect taxes Royalties $69m Dividends paid Local suppliers, local salaries, community investment $60m $407m $243m $1 526m Direct and Indirect taxes Total payment $2.1 billion $60m Total payment $425 million 45 Disclaimer… CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: Except for the historical information contained herein, the matters discussed in this presentation are forward-looking statements within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934, and applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the future price of gold, the estimation of mineral reserves and resources, the realisation of mineral reserve estimates, the timing and amount of estimated future production, costs of production, reserve determination and reserve conversion rates. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ‘will’, ‘plans’, ‘expects’ or ‘does not expect’, ‘is expected’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’ or ‘does not anticipate’, or ‘believes’, or variations of such words and phrases or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’ or ‘be achieved’. Assumptions upon which such forward-looking statements are based are in turn based on factors and events that are not within the control of Randgold Resources Limited (‘Randgold’) and there is no assurance they will prove to be correct. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Randgold to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to mining operations, including political risks and instability and risks related to international operations, actual results of current exploration activities, conclusions of economic evaluations, changes in project parameters as plans continue to be refined, as well as those factors discussed in Randgold’s filings with the US Securities and Exchange Commission (the ‘SEC’). Although Randgold has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Randgold does not undertake to update any forward-looking statements herein, except in accordance with applicable securities laws. CAUTIONARY NOTE TO US INVESTORS: The SEC permits companies, in their filings with the SEC, to disclose only proven and probable ore reserves. We use certain terms in this release, such as ‘resources’, that the SEC does not recognise and strictly prohibits us from including in our filings with the SEC. Investors are cautioned not to assume that all or any parts of our resources will ever be converted into reserves which qualify as ‘proven and probable reserves’ for the purposes of the SEC’s Industry Guide number 7. Randgold reports its mineral resources and mineral reserves in accordance with the JORC 2012 code. As such numbers are reported to the second significant digit. They are equivalent to National Instrument 43-101. Mineral resources are reported at a cut-off grade based on a gold price of US$1 500/oz. The reporting of mineral reserves is also in accordance with Industry Guide 7. Pit optimisations are carried out at a gold price of US$1 000/oz, except for Morila which is reported at US$1 300/oz. Mineral reserves are reported at a cut-off grade based on US$1 000/oz gold price within the pit designs. Underground reserves are also based on a gold price of US$1 000/oz. Dilution and ore loss are incorporated into the calculation of reserves. Cautionary note to US investors: The United States Securities and Exchange Commission (the SEC) permits mining companies, in their filings with the SEC, to disclose only proven and probable ore reserves. Randgold uses certain terms in this annual report such as ‘resources’, that the SEC does not recognise and strictly prohibits the company from including in its filings with the SEC. Investors are cautioned not to assume that all or any parts of the company’s resources will ever be converted into reserves which qualify as ‘proven and probable reserves’ for the purposes of the SEC’s Industry Guide number 7. 46
© Copyright 2026 Paperzz