Tender No.SPL-201704-0014 for invites offers

Published in SPL Tender No.SPL-201704-0014 dated 28.04.2017
Saraswaty Press Limited invites offers from civil contractor having ESI,PF & others
statutory compliances for repairing of Road at SPL-III, Madhyamgram, 3/1, Nadibhag,
Mollapara, 24 North Pgs. Work description for Tender is available in our website. Offer
may be sent to Purchase Committee, 11, B.T.Road, Kolkata – 700 056 by 05.05.2017. The
company reserve the right to accept, negotiate or reject any or all offer with any vendor at
its own discretion.
Description of Work
Sl.No.
Unit
QuantitY
Amount
Rate
2-193,it 12(bi
Labour fcr tack coat including cost of
[1.25x5=6.25
material (caonic emulsion)
i0x6.4=352.00
i.20x54=280.80
16.50x18.60=305.90
!
26.A0x1,2.60=321 .60
5.00+3.60X2 1.90=105. 12
L428.67
i428.67 sqm.
Analysis Rate
Labour for lpreading and consolidating
lhama metal to a requisite thick in layer
2
16.50x18.60x.075=23.01
26.00x12.60x.07 5=24.57
41.58
g...of bats/ch i llY.
@ Jhama metals/later one metals
includi
n
(size 63 mm to 45 mm) of comPacted
47.58 Cum
Ithick 75 mm.
Analysis Rate
3
Bituminous Macadum(as base/binder
coursei including thorough cleaning of the
surface,applying tack coat(except when
11.25x5x0.05 =2.81
60x6.4x0.05=19.20
preceeded by a bituminous levelling
5.20x54x0.05=14.O4
course)
16.50x18.60x0.05=15.34
screening.cleaning and pre heating the
stone materials and fully precoating the
26.00x12. 60x0.05=16. 38
the same with requisite quantity of hot
i*rtri*
6.00+3.60X2 1.90x0.05=5.25
+-
I
t
73.02
@ 65 kg. Per Cum. Of stone
I materials in Miller Mixer Machine and
I
llaying premixed materials over the suface,
.ost of fuels,PaY and allowance
I
lof workmen etc. in this connection.
lof capacity 3-5 Tons/hour.
l(.)on w.B.M surface
co!!eg1eq-!h!!kles::| (i) so *rn.nominal
I
I
73.07 Cum.
I
Araiysis Ra:e
,*ar:lg Jfi:'ii:t lh Prgrir:;E,:arp=i(ci:err
;5 -3:: -,;'le r.El:- .l,i 13.2:i:e;nJ
i,; 9t'. Jf i:)r.rrn Size stcne aggreg.3tes
I
.1.''r^Lr
f-ia ....i-.-
,-.-
-^oppi,
iitg iJok :cst
1
isciten;ng chips and fuiiy precoating ihe
.:f r-r-:€ r;iti-. hci n-,atrix 5.1 kg. prem
lciner cost and charges in this connection.
8,,'rniiier rnisture.
l ri un 5,ach. I op 5urtace.
Analysis Rate
i428.57
iayrng premixes seal coat (Type-B) using
C.6m cf grit or sand passrng 2.3ornm size
and retained on 180 micron per. 100 Sq.nr.
incld.The cosi and carriage cf grit/sand and
b'r rniiier mixed/suitable
pans.........and aii other costs and charges
rn this ccnnection (The rate provided is
inclusive of the cost and carrige of grit or
sand).
1428.67 5qm.
Total
Rs.
Say Rs.
'a