NUV071977
010
4II85SW9432 8 .2528 BALDWIN
REPORT ON
ISAAC BURNS AND ASSOCIATES, CLAIM GROUPS
BALDWIN TOWNSHIP
ONTARIO
PROJECTS UNH
INTRODUCTION
At the request of Mr. Isaac Burns and on behalf of his Associates,
Mr. A. Weiraeir and Mr. R. Charron, an airborne Radiometric Survey was
flown over an area covering the west half df Baldwin Township. This
area covered claim groups 469776 to 469778, 469857 to 469862, 461533 to
461541, 469773 to 469775 and 461902 to 461921 inclusively. The survey
was flown on September 5, 1977.
The present report summarizes the
interpretations and conclusions of the survey.
PROPERTIES
The properties are located as three separate claim groups situated
in the western half of Baldwin Township.
Baldwin Township is located
approximately 40 miles west of Sudbury and due north of the town of
Espanola.
Access is by Highway l? West.
They are covered by thin
coniferous vegetation and in some instances by farm lands.
are numerous.
Out crops
Agnew Lake crosses the area flown from east ot west at
the northern boundary.
GEOLOGY
As applied to Radiometric Interpretations and Conclusions.
Baldwin Township has a complex structure of closely folded and
faulted structures,
together with many intrusives.
Patches of
m
conglomerate and quartzite, correlated as mississage quartzite, exist
within the surveyed area.
Occasionally the quartzites are remnants
isolated within the basic intrusives.
Both the major Cameron Creek
fault and the Baldwin anticline cross the surveyed area from east to
west.
More particular geology can be obtained from the Ontario
Department of Mines #VOL. LXI - Part k 1952, Geology of Baldwin
Township.
INSTRUMENTS USED
The instruments used were a SCINTREX CIS - 2 Gamma Ray Integrating
Spectrometer, Serial # 801128; Threshold control (energy discrimination)
setting: 0.9.
The instrument constant was 2 counts per second.
The sensor probe
used was a type ASP - 5, serial # 805113, which contains 5" x V NAI TI
crystals.
The ASP - 5 is connected to an amplifier, and to a continuous
recorder making a permanent profile graph of the traverse which is thus
automatically plotted on graph paper.
Angus type AW 12*00 Ohms.
This recorder is an Easterline
THE SURVEY
The Survey consists of Flight Lines flown from south to north and
north to south.
They are spaced at 660 foot intervals with flying
altitude of 250 feet and line O being taken on the east boundary.
A total of 60 continuous miles were flown over tne properties.
Line
10 south, expressed on map as extension A, was an off scale reading and
was re-flown on the higher scale.
pilot - Gyro Compass.
Directions were controlled by auto
Numerous topographical features^ features such as
hydro lines, Highway l? and Agnew Lake with its many bays, etc., provided
excellent VFL Control as well as Gyro Control.
no drift.
Winds were light, hence
Results are plotted on attached maps at a scale of 660 feet
to the inch.
RESULTS
Background of 40-45 cps was established after many traverses in the
area. Anomalies of significance were noted.
All of the anomalous areas
tested should be located on the ground, and samples for U~08 content.
LOCATIONS
As these anomalies are located within a complex geological structure,
f*
I
there still remains areas of ndssissage quartzite that may alineate with
the anomalous areas.
This can only be done by a follow up program of
line cutting, ground scintillometer survey and perhaps some geological
mapping.
This work would only be carried out in the areas of interest
established by the airborne results.
RECOMMENDATIOSS
Due to the widespread known occurrences of uranium associated with
the pebble conglomerates in the north-east section of Shakespeare Town
ship , and because reconnaissance flight lines over these occurrences gave
similar anomalous results as Baldwin Township , we would recommend a
follow-up program of ground radiometric work , as well as a geological
mapping and sampling of the radioactive areas .
All three anomalous areas from one and one-half times background
to over three times background should be examined , as heavy overburden
and swamp may have lowered the results in the second and third priority
readings .
A/o O
- . . , , . ...... J
T"-
-.
- - -
-
it
- • Ti:li:-fi-.::\ir
- ; - ——-f r7 -; V/ -~—;
y :; . . .,'
-/:: A . ; ' Y
i.
-
•l .
v .
- ; —-.---f-nrr:-* 7 - .—-~-7--;
^.^
•.'-~
T: 'iiltl
-.2-
. /' . . . . l'.ji.
'
.1
l'.' U.S A.
v,0
t .
O.S.A.
C HART No. 43
. .
'~~-r~r~*-~ -*- -
l : ; - -
:
- v^--^
- /--'
,.... . .
*
.
#
. '-S '
^^ '_-
-"
jr^-
" A -" ;
-
v.....
.
- - * - -* " ~ '
7 -T- ;---- -f--/E-
o
A.
R i
•c
vi
z
t*
o
.i.J*
•T-
o
"i
Wd8
- 4
**
'
J
'
l
.. r --. ^.i x i
t
t .-vvf.'
*?j3
.
t
-
-
-
:
^.y.——.... ." -. rV ;
- * —' —-- -'- - -t- l — "'
- l--*~ - ' l :
"-i- --•- - ' ;
' "'
^J———.———.———r, -•~-
l
--.
-i '
-;
'
-
*
~-————"-
: .---
.
^
.
,
^
,
. .M
r:: ..t-*--*—1
"ri ;i:
:f —
—
.* .- ,
-
-r- - - - \\ -:
_: ^..^.AI ..".-—"
t
Ministry of Natur
O
41I85SW9432 2 .2528 BALDWIN
300
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL
TECHNICAL DATA STATEMENT
Ontario
^
f? .
** A.
5-: .;'J
*B
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT
FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
'
Page 1,
"* Type of Survey(s Airborne Gamma-ray Spectrometer
Baldvrin
Township or Areai
Isaac Burns, A. Weirmeir, R.Charron
Claim Holderfsl
1
MINING CLAIMS TRAVERSED
List numerically
|
S
469778
S
469777
S
469776
S
469857
S
S
469858
S
469860
,
S
469861
, .
S
469862
S
469773
S
469774
e.
1*69775
Erana Mine a Ltd
Ed Blanchard
Author of Report
Address of Autho r Site 38 Box 5 ,RH# 2, Sudbury Ont.
Survey Company
Covering Dates o r Survey
CTotal Miles of Lir
Sept * 1977
*" '{tinccutfini'to office)
1C Cut
SPECIAL PRO VISIONS
CREDITS RECQUESTED
r,
DAYS
per claim
i
— Mapnrtomrtrr
— Riidi^mririr
— Olhfr
(Special provuion credit* do not apply to airborne lurveyi)
.
.v^
- 7
Rlertrnmatmrlir
*9 ' R nrliom^frir
(enter dayi pet claim)
HATR^ AJO \) t /-J f
Sir.NATIIRF.-
TJt; ^Q-L.^. t" k VLi)
Author of Report or Agent "
LO
Qualification*
Res. Geol.
Previous Surveys
File No.
Type
469859
-Fl^rlromagnrlir
ENTER 20 days for each
additional survey using
same grid.
Magnetometer
.
Geophysical
ENTER 40 days (includes
line cutting) for-first
survey.
At v IRBORNE CREDITS
*r ————— ———————
i
(number)
Claim Holder
Date
,....,.........S..........
A63L533
.................3..........
461534
461535
S
................*..........
1
0
—i-
y
.
.5
4.61538
S
461539
s
46154.0
461541
s
1
461536
461537
.
.
jmjt
TOTAL CLAIM*
'91
1
SELF POTENTIAL
fi
. ,,.- -.
-
.
^Instrument——______________________________.___ Range.
Survey Method _____________________________.
————.
Corrections made.
i
^RADIOMETRIC
Instrument.
Vahies measured.
yuigy windows (levels).
Height of instrument.—-^—.-..——.—.————^—-.—...——— Background Count
Size of detector-——...———.——...—--——-——.—-..——.-—.————.—.———
Overburden ——-^————...-..—-—————————-——-—-—....^———.—.————
(type, depth - include outcrop imp)
OTHERS (SEISMIC, DRILL WtLL LOCiC.lNG KIC.)
Type of survey——!———————————————————
Instrument......—...—-———-—---————————
Accuracy.————————————————————————
Parameters measured.
j
pdditional information (for understanding results).
\1RBORNE SURVEYS
Type of survey (s)—————G*
nstrument(s) _____Srin*-**** m-q - ? ^""^-^y Integrating Spectrometer A" x 5" crystal
(ipecify for each type of turvey)
Accuracy_________Wtt^-1 " s gammqa
aircraft
(ipecify fot each type of turvey)
Ce,3na C-F PKL deasna 180-—^
ensor altitude
3S9
Navigation and flight path recovery method ———Gyre contrrel——out tt pilfft j ft a 1m
anM i**1 VW. Rnntrol
lin. Spring ^60 feet J/ ' ^ O
.ircraft altitude————————
tiles rtttWrt over total area———————^0——————————————Over claims only
2?"
File.
Ministry of Natural Resources
o Ontario
^
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL
TECHNICAL DATA STATEMENT
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT
FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION. CONCLUSIONS ETC.
Page 2.
Airborne Gamma-ray Spectrometer
Type of Survey(s
Township or Area
Toa&f* RMSPTH
Claim Holder (s)
c
'
MINING CLAIMS TRAVERSED
List numerically
461502...............
VA RI an r hard
Author of Report
Sita "58 Box 5. RR# 2. Sudbury Ont.
Address of Authc r
s,iq77
Sept
Covering Dates o r Siirvry
(linccuttini to office)
4
Total Miles of Lir\f r.iit
SPECIAL PROVISIONS
CREDITS REQUESTED
1
A
Charron
^ ^Wairmeir
'
9 R
j i-wUii
•••-jii
Krana Minaa Ltd.
Survey Company
c
9
DAYS
*™ c *""
Geophysical
ENTER 40 days (includes
line cutting) fox first
survey.
-H^Hmrn^irir
., . .
r.corhrmiral
AIRBORNE CRI1D1TS (Special provi)lion crediu do not apply lo airborne •urvcyi)
, , U^Hjnrnrtrir V
Magnetometer —~___ Elcctromagitrt'ic
(enter ( ayi per claim)
^
Author of Report or Agtnl
MMIIBIIIII
Res. Geol.
Previous Surveys
File No.
Type
S
S
461905
S
461906
S
4.61907
s
1
461909
S
461911
S
461912
s
461913
S
4619U
S
461915
Q
4.61916
A6.12X2
Qualifications
.......^61918.............
Date
i
1
:
................S........... .......461910.. ............
-O.hrr
firn loo ir:il .
......461.903...............
461904
..3. .
-M:ignrtnmi*lrr . ,,
ENTER 20 days for each
additional survey using
same grid.
(number)
Claim Holder
i AT 01 Q
..................s........
a
TOTAL CLAIM *
461920
t ^Ll OOT
UD-JrTflC^
20
i
1
a
o
)
SELF POTENTIAL
Range.
Instrument.———~
Survey Method.
Corrections made.
RADIOMETRIC
Instrument,—-—
Values measured.
Energy windows (levels).
Height of instrument ——
.Background Count.
Size of detector—————
Overburden —,^———
(type, depth - include outcrop map)
) Type of survey—i—————————————————————————————
OTHKRS {SEISMIC, DRILL WELL LOGGING KTC.)
Instrument ————————————————————————————————
Accuracy——————-—————————————————————————
Parameters measured.
Additional information (for understanding results).
AIRBORNE SURVEYS
Type of lurvey(s).
Instrument(s)
Scintr*x G1S -3 Cama-ray inteartting spectroMtar k" x 5" eryttal
(specify (or each type of wrvcy)
Vithin S
(apecify for eich type of •urvey)
.. Aircraft used.
Sensor altitude—2SQ t
ICT.
Ga anna IflQ,^—————--———
Navigation and flight path recovery method
v-1 Aircraft altitude
-i
, Miles ftoWn over totai area.
Gyro control - auto pilot c*Ua wind*
Line Spacing.
.Over claims only
JVL drt-ksiA- -fechrM^A. cW5~^UjL^^
TECHNICAL ASSESSMENT WORK REPORTS
ONTARIO
Ministry
of Natural
Resources
APR 2 *-19/8
TO GEOLOGICAL BRANCH
Mr. P. Barlov——
DATE J A PPROVA , .......^........*....... ) 9...
SIGNATURE -... ——— ——————————.-~—
COMMENTS: ——.—————...————...———— — ———.————.——........
Mr. C. R. Kustra D ATE OF APPROVAL-—••—————————19SIGNATURE ——————————————.-—
COMMENTS "————..-..™———..........................,............-.........
D
Dr.
I..G.
Closs
DATE Oh APPROVAL --—--——......——-——--—- —19-
SIGNATURE —-—-————-————————————'
COMMENTS:..——.—.-.—---—.——"—————————"-—"——"——"™-
RETUKN TO F.W. MATTHEWS,
SUPERVISOR, PROJECTS UNIT
Ontario i
Ministry of
Natural
Resources
Lands
Administration
Branch
Recorded Holdet
Projects
Unit
Technical Assessment
Work Credits
Reginald Charron et al
Township or Area
Baldwin Township
Type ol survey and number ol
Assessment days credit per claim
Mining Claims
Geophysical
Electromagnetic
.days
Magnetometer.
.days
Radiometric —-
.days
Induced polarization .
.days
Section 86 (18) ——
.days
Geological ——
.days
Geochemical.
.days
Man days O
Airbcrne G3
Special provision CD
Ground Q
S. 461533
461902
469773
469857
to
Co
to
to
41 inclusive
19
"
78
"
62
"
Notice of Intent to be Issued:
O Credits have been reduced because of partial
coverage of claims.
ffi Credits have been reduced because of corrections
to vKdflf8Mscsncl figures of applicant.
O No credits have been allowed for the following
mining claims as they were not sufficiently
covered by the survey:
The Mining Recorder may reduce the above credits if necessary in order that the total number of approved assessment days recorded on
each claim does not exceed the maximum allowed as follows: Geophysical — BO; Geological — 40: Geochemical — 40;
S
File.
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHKM1CAL
TECHNICAL DATA STATEMENT
Ontario
TO BE ATTACHED AS AN APPEND! X TO TECHNICAL REPORT
1
FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
!
TECHNICAL REPORT MUST CONTAIN INTERPRETATION. CONCLUSIONS ETC. |
Type of Survey(s)
Township or Area
MININd CLAIMS TRAVERSED
List numerically
/?.
Claim Mo
Survey D)mpuny —
(prcfl*)
Author of Report f-jfr
Address of Author.
Covering Dales of Survey.
(linccullfi* lo office)
Total Miles of IJne Cut —
SPECIAL PROVISIONS
CREDITS REQUESTED
DAYI
Geophysical
• Electromagnetic.
ENTER 40 days (includes
line cutting) for first
survey.
-Riidiometric.
ENTER 20 days for each
additional survey using
same grid.
Geological.
AIRBORNE CREDITS
Magnetometer.
.Electromagnetic.
M •IA*rM Mtrvvyi)
((MOT 4*yt DOT dal*)
DATE:.
Res. Gcol..
Previous Surveys
file No.
SIGNATURE:.
Author *f lU^ori or Aftnt
..^._Qualifications.._... ., .
Date
Quim Holder
TOTAL CLAIMS.
(number)
N.i.,1 1 i"ii.\:j .\ i.
Kungr,
Instrument————
Survey Method,
Corrections made.
fp/
/AS
ln.tr..mrn.
Values matured
Knergy windows (Ifvt-h)
rt
Height of
Siitri
Background
t
A/A/
"r/
Overburden
(lypf, 4tfttk - inclu4* outcrop IM|))
*
..; l VC Vi i.:.
Type of survey
Instrument ^
Accuracy..
Parameters measured.
AddJUomJ information (for undemanding results).
Type of sum-y(0
Instmnii-nt(s)
Accuracy ^
' ft j
for cith ifJK ut utrwv)
(•prcify fur t**h type "' lurvi-y)
Aircraft used.—
Ji Sensor altitude.
i Navigation and flij-ht path recovery inclluxl.
Aircraft altitude.
i Miles flown over toiiil urea.
.Line Spacing———/f.
.Over il.iiin* only.
Douglas Street West
Sudbury, Ontario
P3E IGl
Ontario
Ministry of
Natural
Resources
Notification of recording
P,—ir.,, ^
sr?' 9
PROJECTS mi
of assessment work credits
Supervisor, Projects Unit
Mining Lands Section
Ministry ol Natural Resources
Room 1617, Whitney Block
Queen's Park, Toronto
M7A 1W3
September 6. 1977
Date of recording of work:.
Isaac Burns
Recorded holder: -—^—
1073 Stafford St.. Sudbury. Ont.
Address: ————
Baldwin Township
Township or Area: ————
Type ol survey and number of
Assessment days credit per claim
Mining claims
Geophysical
S.U61533 to 41 inclusive
Electromagnetic.
-days
Magnetometer.
Jays
Radiometric —
5UQ
-days
Induced polarization.
Jays
Section 86 (18)—
-days
Geological ———.
_____ ile/s
Geochemical.
i ays
Man days Ll
Airborne 5s
Special provision CJ
Ground O
Notice to recorded holder:
CkSurvey reports and maps in duplicate must be sub
mitted to the Projects Unit, Toronto within 60 days
from the date of recording of this work.
O Reports and maps are being forwarded to the Projects
Unit with this letter.
Form LA. 065 (03/74)
Mining recorder
c.c. isaac Burns, Sudbury, Ont.
^-
Douglas Street West
Sudbury, Ontario
P3E 161
Ontario
a ta
Ministry of
Natural
Resources
Notification of recording
of assessment work credits
Supervisor, Projects Unit
Mining Lands Section
Ministry of Natural Resources
Room 1617. Whitney Block
Queen's Park, Toronto
M7A 1W3
September 6. 1977
Date ol recording of work:.
Reginald Charron
Recorded holder:^———
9SQ SUP?. Drive
Address: ————
Township or Area: ____
Ra 1 fi win Trmnshi'
Type of survey and number o(
Assessment days credit per claim
Mining claims
Geophysical
S.H61902 to 919 inclusive
Electromagnetic.
-days
Magnetometer.
-days
Radiometric _
i?nn
-days
Induced polarization.
-days
Section 86 (18)_
-days
Geological ——^—
-days
Geochemical.
-days
Man days D
Airborne B
Special provision 5J
Ground D
Notice to recorded holder:
Q Survey reports and maps In duplicate must be sub
mitted to the Projects Unit, Toronto within 60 days
from the date ol recording ol this work.
D Reports and maps are being forwarded to the Projecis
Unit with this letter.
Form LA. 068 (03/74)
Mining
c-c-
Reginald Charron
UN/];
174 Douglas Street West
Sudbury, Ontario
P3E 1G1
Ontario
Ministry of
Natural
Resources
Notification of recording
of assessment work credits
Supervisor, Projects Unit
Mining Lands Section
Ministry of Natural Resources
Room 1617, Whitney Block
Queen's Park, Toronto
M7A 1W3
K, 1977
Dale of recording ol work:.
Recorded holder:,^———
C/O F. Ross t R. Ri #3 1 Sudbury, Ontario
Address: ————
Baldwin Township—————^—————————
Township or Area: ———,
Type of survey and number of
Assessment days credit per claim
Mining claims
Geophysical
S.469773 to 778 inclusive
Electromagnetic-
-days
Magnetometer.
-days
Radiometric —
720
days
Induced polarization.
.days
Section 86 (18)—-
-days
Geological -^——-
-days
Geochemical.
-days
Man days D
Special provision De
S.469857 to 862 inclusive
Airtx:ne H
Ground D
Notice to recorded holder:
B Survey reports and maps In duplicate must be sub
mitted to the Projects Unit, Toronto within 60 days
from the date of recording of this work.
D Reports and maps are being forwarded to the Projects
Unit with this letter.
Form LA. CS3 (03/74)
Mining i
c-c-
Archie Weirmeir
Sudbury, Ontario
Ontario
Ministry of
Natural
Resources
SEP 2 11977
A •••eret* form li
r*qulr*4 lor **ch
ly** of work lo fee
record**1.
THE MINING ACT REPORT OF WORK
To the Recorder ol.............5!jC/.**?/?.*/
.............Mining Division
x- I '^f-S^czS
,?n:fn~*l.^t.*(—
rtome of Recorded Holder
Prospector's Licence
s /"/4/"/?/?^ s' s ^atftvA!/ ., a*'*".
io**efto*o*rt r***t*ft * ***f****t*i *i**** • un*Xoj)AA('felr**itl*^ * * j* e e***** t ••••e** *i
Post Office Address
Gfc OF/Vy^/C-ALdo hereby report the performonce of ...........5T.V?4J.................. doys of . ffjtff/3/i..............
....
type of work
not before reported to be applied on the following contiguous claims
Claim No.
Days
5
Claim No.
Days
Day*
Claim No.
2
S
S #
s
^
S
i
.M
All the work was performed on Mining Claim (s) ,.....................................................................................
(In the cose of geological ond/or geophysical survey (s) where more than 18 claims ore involved attach o schedule)
READ CAREFULLY: THE FOLLOWING INFORMATION is REQUIRED BY THE MINING RECORDER.
For Monuol Work, Stripping or Opening up of Mines, Sinking Shafts or Other Actual Mining Operations — Nome t ond
addresses of the men who performed the work ond the dates ond hours of their employment.
For Diamond ond other Core Drilling - Footage, No. ond angle of holes ond diameter of core. Nome ond address of
owner or operator of drill. Dates when drilling was done. Signed core log ond sketch in duplicate.
For Compretjied Air or Other Power Driven or Mechonicol Equipment
Type of drill or equipment. Names and addresses of men engaged in operating equipment ond the dates ond hours of
their employment.
For Power Stripping - Type of equipment. Name ond address of owner or operotor. Amount expended. Dotes on which
work was done. Proof of actual cost must be submitted within 30 days of recording.
With each of the above types of work sketches ore required to show the location and extent of the work in relation
to the nearest claim post. In the cose of diamond or other core drilling the sketch must be submitted in duplicate.
For Geophyiicol, Geological, Gaochernicol Surveys ond Expenditure Credits - the name of author of report. Covering
dates of survey (linecutting i office). Type of instrument used. Totol amount of expenditure. Technical reports,
mops,expenditure breakdown, receipts must be filed in duplicate with the Minister within 60 days of recording.
For Land Survey - the name ond address of Ontario Land surveyor.
The Required Information is os Follows:
r PM
• ****eex* * * e e * MjjTVr* **T* * *T* eV* |TT*N *|^X* tt t* e* 11
Signature of Recorded Holder or Agent
The Mining Act
Certificate Verifying Report of Work
. ....T.......AM.... .....v...........* t .f.Ti.t, ^ . ..............................i................
..............
(Post Office Address)
'
hereby certify:
1. Thoi l hove o personal ond intimate knowledge of the facts set forth in the report of work annexed hereto, having performed the work or witnessed tome during ond/or oft or its completion.
2. That the annexed report is true.
Mje^^
Ul
S
IU
U
I
i
s*
{Attach o list if this space is insufficient)
l/il-rnj-r
X
91
i2
s
fs
<
i
i
•NJ
^
^,
L
:
i1*-
—
l?
30 •w
S
:
lder i* *
O
*:pi ^
^J
n
J,
ssi
"IDS
I 25
OHo
n3Ca
Ssg
5gs
jjjoj g
^ tp '
522,
Q. "g
5S
r?S
71*
V4
v.
i
0- 0
.
sk
work
of
must
cost
M
O.
a o
9
z
o
l l
l s
~*
2.
~
•7* 5
a-rTs
dio tch be 'z S:
of
cose
Geochemic the
i *
2 Sf
?--"
O—
li "1 ?o||
O
t/vc Ei
?. *a r"
s"
s.-?* •oom
C— 3 * C
0*0 "0
o o n
^n
r
V*
fi? 2-812.8. If
?fC;
insuf
ac
•l
o
3
o
8-
* l
lo* ?
o
•i
o.
S-l
s. "
S- 2,
i*
?
i*
Iso I Cg-r l- S"
5 2. o i'^
Q.O r
JS"
S
o ; o r.
f 5?S
g-s
3
- * 3
O5* i*
III"
o
r:
"S
o. ?- 3
--53
X
i.
f-'H
2
K
5i- *-l
-. -
? Li
g-n
*
2,
i
S.
M*
z- *
"2. ? '
o J —
i 3-5
o g 5g. 3-!
c.
fr :
K- o t
o
L
MiOpeuol
nroitnonsg
5" s a. Other
Si
' * ^8
2.:
l"- J.?
el^-s
s?
ir
m^g:
ri*. I :
jSog"*-2 3 i 5 5-5 z~
a8
rg- 9 ? 5'
•!l*
9-0=5
2.-S o. t l
Fo
S -,
g Es
eT rtl
HI
i?
1
C
30
OD
2.
*
3
s |.9
m
5
C
m
J"
O*5
*"
w*
Of**
S 1
—
s ?s
'
h? 1?
-
X/A
f
F
|.3
Q
b- b- S "
'
c, u
TNE PENALTY FOR MAKING A FALSE STATEMENT IN THIS REPORT AND/OR CERTIFICATE IS S500. OR SIX MONTHS IMPRISONMENT OR BOTN
SJ ?
3"
•2..
^
e
2. Lo-
" * 5S- S*- 2.
1-8
- 25.
?
* *-
-S
lil
w
f
f
--.i-' i
Ir:
a ra
r li
? t?
r
3*o a — 2
J f
:
^51i
n
p
i'
O
o*
x
o
f
o
THE PENALTY FOR MAKING A FALSE STATEMENT IN THIS REPORT AND/OR CERTIFICATE IS S500. OR MX MONTHS IMPRISONMENT OR BOTH
r
8
^f
n J
o
*
9 Sx^sj
I?S
it
**
S*
V*
S:8-
o
e
3-
o
S
•g re
i^
f
a V
:r s r* u 8^
^ P
3 r
l
S
^
tf
i'
:^ fr
F i Ulr
•Ti^i
Q
o
•c
i t '**kl
:/' : i ;
r
o
JA
5* ^
:*
ri- IS
se
l*
Lil
5^*
L l-II
H
f
•7
:
S- s. si
K
o
n
S
JO
m
•o
O
K
Z
H
S
w
l
^
i
0
-*
o 5 w
5 S5
O
S8
S. ' *~
O
-S
:
*
r, o P
1
2.
!N
*
fK
ni
o
n
sg g
05 ™a
s
Follow
"
* 3
li
o
2
li
l
L
Sm l<
i s
s8 is-
2.
2.
S
ac
eo
m
l;
s i.1
e
1
m
ti
JO
?-
s•t? f*
'
2,*
P s* '
S tt l
K i
f
o
o
i'
a
4
THE PENALTY FOR MAKING A FALSE STATEMENT IN THIS REPORT AND/OR CERTIFICATE IS SSOO. OR SIX MONTHS IMPRISONMENT OR BOTH
f
8
t
^**
t
3
?
*
ia
S3
8*
Jr
K
li
3 *
*o
P
N 1 5i:
y " rs-
—
"
:
I?!
fit
r .
ci
^
,
iM
19771114
Mr.. R. M. Charaeeky
Mlnlag Recorder
Mlalatry of Natural Reaourcea
174 Douslaa Street Heat
Sudbury, Ontario
P3E 1C1
2.2528
Dear Mr*. Charuaskyt
Va hav) received report* and mape for Alrboroa Geophysical
(Rndiotaetric) surrey, oa aialng claims S. 461533 at al, in
the Township of Baldwin.
Thin material vlll be exa0i.ned and asnewsed and n Btatenent of as0es*rent vork credita vi 11 be issued.
Tours truly,
J. R. KcGina, Director
Leads Adaiaistration Branch
Whitney Block, Room 1617
Queen'a Park
Toronto, Ontario
X7A 1Z1
Phone; 416-965-6918
TW/nv
cc:
cct
ccl
cet
Hr. Inane Burns
Sudbury, Ontario
Mr. Reginald Charroo
Banwr, Ontario
Hr. Archie Velrmelr
c/o 7. Roes
Sudbury, Ontario
Mr. Ed Blanchard
Sudbury, Ootario
i, ^tv
THE TOWNSH'P
OF
376266 iJ7G26S 378264 | 3
DISTRICT O
SUDBURY
SUDBURY
MINING DIVISION
.,.-
: ,,, SCALE: HNCh-40 CHAINS
Merritt Twp.-;IV
*
o
"
i'^iZ^'u s i" s - s
P^r? /iS?-5
^::\.!4A,.-i{
i .i
i s ,n JT S i o:
! Ml f filti
31^
(x")
A//
339
© Copyright 2026 Paperzz