Additions and Renovations to Upper Bucks County Technical School SECTION 01 27 50 – UNIT PRICES AND QUANTITY ALLOWANCES PART 1 – GENERAL 1.1 SUMMARY A. This Section includes: 1. Administrative and procedural requirements governing unit prices and quantity allowances. 2. Schedule(s) of Unit Prices and Quantity Allowances. Specification Sections that may be referenced in unit price and quantity allowance schedules contain requirements for products necessary to achieve the unit price work. No unit prices or quantity allowances are required for Contracts not listed in Part 3. 1.2 DEFINITIONS A. A unit price is an amount proposed by bidders stated on the Form of Proposal as a price per unit of measurement for materials or services added to, or in some instances deducted from, the Contract Sum by appropriate modification if the quantities of Work required by the Contract Documents are increased or decreased, or if additional Work not included in the Base Bid is added. Additional work based on unit prices will occur only within the Contract limits for the Project. 1. Unit prices may be used only as elected and authorized by the Owner. Having an established unit price does not mean the Work will be authorized. For each type of unit price work, the Owner reserves the right to perform the work with its own forces or to seek pricing from and award such work to other contractors or sources. B. A quantity allowance is, unless otherwise specified herein, a stipulated quantity of work to be included in the Base Bid, or if so stated, in an Alternate Bid for areas or locations not indicated to receive such work. All quantity allowances have a corresponding unit price. The unit prices are to be inserted in the bid form. 1.3 ADMINISTRATIVE REQUIREMENTS AND PROCEDURES A. Unit prices and quantity allowances shall include all costs for the specified Work including as applicable, cost of materials, delivery, installation, demolition, cutting and patching, equipment rental, insurance, taxes, overhead and profit, etc. B. Unit price descriptions include requirements for each type of Work. Additional requirements and related information for materials and/or assemblies described under each unit price are included by reference to Specification Sections of Division 2 through 33 and in some instances to Drawings. C. Quantity allowances are, unless otherwise specified, established for unidentified or undesignated areas or locations of certain types of Work where conditions or scope are not fully known at the time of bid and to defer locating the actual performance of UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-1 Additions and Renovations to Upper Bucks County Technical School such Work to a later date when additional information is available for evaluation. Use each quantity allowance only as directed and for Owner’s purposes. 1. Be advised that identical or similar Work to the type(s) included in each quantity allowance may be required if and where indicated in the Contract Documents for specific locations or areas of construction. Such specifically identified or designated areas of Work are included in the scope of work, but NOT as part of the quantity allowances unless so specified in the schedule(s) of unit prices and quantity allowances in this Section 01 27 50. 2. When extra work arises of a type that could be charged to a quantity allowance, the Owner may in its discretion, elect instead to authorize a different method of pricing for the extra work. D. No cash allowances are included in this Project. E. Measurement and Payment: Methods of measurement and payment for unit prices are specified in referenced Specification Sections if such methods need clarification or vary from the following: 1. Measurement: Unless otherwise indicated, the Contractor is responsible for making accurate measurement of the actual unit price based work-in-place by means acceptable to the Architect and Construction Manager. 2. Basis for Payment: Unless otherwise indicated, payment will be made on actual net quantity of authorized unit price based work in place and approved. Adjustments will be made based on net variation of total installed quantity from the estimated or allowed quantity, if any, required by the Contract Documents. a. No additional compensation will be made for costs due to unauthorized work. b. No payment will be made for rejected work. F. Owner reserves the right to reject Contractor’s measurement of work in place that involves use of established unit prices and to have this work measured at the Owner’s expense by an independent surveyor acceptable to the Contractor. G. After actual installed quantity of Work covered by each allowance and unit price is measured and verified, a Change Order will be issued based on the unit price established in the Form of Proposal to adjust the Contract Sum (add or deduct) for the difference between the allowance quantity and the installed quantity. H. List each quantity allowance on the Schedule of Values as its own line item to enable tracking of the used and unused allowance amounts. 1. The unit prices provided in the Contractor’s completed bid form multiplied by the quantity allowance provided in this section shall equate to the dollar value of the base bid schedule of values provided by the Contractor for that quantity allowance item. 2. At Project closeout, if a quantity allowance has not been used or is only partially used, the remaining unused value shall be deducted from the Contract Sum by Change Order. UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-2 Additions and Renovations to Upper Bucks County Technical School 1.4 SCHEDULING A. At the earliest practical date after award of the Contract, notify the Owner, Construction Manager and Architect of the date when specific areas of work described by each quantity allowance must be completed to avoid delaying the Work. PART 2 – PRODUCTS 2.1 MATERIALS A. Obtain new materials in the quantity needed for the specific areas of work which are identified and for which authorization is given to proceed. Purchase of more materials than the quantity necessary for the actual work is at the Contractor’s own risk. PART 3 – EXECUTION 3.1 EXAMINATION A. Examine products promptly on delivery for damage or defects. Return damaged or defective products to manufacturer for replacement. 3.2 PREPARATION A. Coordinate materials and their installation for each allowance and unit price with related materials and installations to ensure that each item is completely integrated and interfaced with related work. 3.3 GENERAL CONSTRUCTION – SCHEDULE OF UNIT PRICES AND QUANTITY ALLOWANCES A. UNIT PRICE G-1: TRENCH ROCK EXCAVATION: 1. Description: Where authorized below design Subgrade elevations for buildings and structures due to unsuitable bearing, provide removal of existing trench rock and replacement with compacted structural fill or other approved material, in accordance with Division 2 Section “Earthwork” and Drawings. Bidders are reminded that all excavation down to design Subgrade elevations is UNCLASSIFIED. Authorized over excavation will be on a CLASSIFIED basis. 2. Unit of Measurement: Per 1 cubic yard. 3. Quantity Allowances: a. Include 10 cubic yards. B. UNIT PRICE G-2: EARTH EXCAVATION 1. Description: Where authorized below design Subgrade elevations for buildings and structures due to unsuitable bearing, provide removal and disposal of existing earth off site in accordance with Division 2 Section “Earthwork” and Drawings. Bidders are reminded that all excavation down to design Subgrade UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-3 Additions and Renovations to Upper Bucks County Technical School elevations is UNCLASSIFIED. Authorized over excavation will be on a CLASSIFIED basis. 2. Unit of Measurement: Per 1 cubic yard 3. Quantity Allowances: a. Include 20 cubic yards C. UNIT PRICE G-3: IMPORTED STRUCTURAL FILL DUE TO UNSUITABLE BEARING: 1. Description: Where authorized below design Subgrade elevations for buildings and structures due to unsuitable bearing, provide imported compacted structural fill from off site in accordance with Division 2 Section “Earthwork” and Drawings. Bidders are reminded that all excavation down to design Subgrade elevations is UNCLASSIFIED. Authorized over excavation will be on a CLASSIFIED basis. 2. Unit of Measurement: Per 1 cubic yard. 3. Quantity Allowances: a. Include 20 cubic yards. D. UNIT PRICE G-4: ADDITIONAL SELF-LEVELING FLOORING UNDERLAYMENT: 1. Description: Provide additional self-leveling, cement-based, flooring underlayment in accordance with Section 03 54 20 at an average depth of 1/2”. 2. Unit of Measurement: Per 1 square foot. 3. Quantity Allowances: a. Include 1,000 square feet. E. UNIT PRICE G-5: ADDITIONAL BRICK REPAIR WORK: 1. Description: Provide additional repairs (other than repairs that are strictly repointing which are covered under another unit price) of existing exterior brick veneer in accordance with Section 04 72 00. 2. Unit of Measurement: Per 1 square foot a. Include 50 square feet F. UNIT PRICE G-6: REPLACE EXISTING METAL ROOF DECK: 1. Description: Remove existing metal roof deck where found to be of unsound condition; patch with new metal roof deck to match adjoining deck to remain; all in accordance with Division 5 Section “Steel Deck.” For purposes of bid, assume new decking to be 1-1/2 inch, 20 gage, Type B galvanized roof deck; field verify existing deck profile. 2. Unit of Measurement: Per square foot. 3. Quantity Allowance: a. Include 200 square feet. G. UNIT PRICE G-7: STRUCTURAL STEEL 1. Description: Furnish and install one ton of structural steel, fully fabricated, shopprimed and erected within the existing building, in accordance with the applicable Division 5 Section. 2. Unit of Measurement: Per Ton 3. Quantity Allowance: a. Include 2 tons of this work in the Base Bid for locations not otherwise indicated. UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-4 Additions and Renovations to Upper Bucks County Technical School H. UNIT PRICE G-8: INTERIOR CLASSROOM DOOR AND FRAME: 1. Description: Provide new door and frame assembly similar to Door 206. Include associated hardware set; remove existing door and frame assembly as necessary; cut and patch masonry and other adjoining surfaces/finishes as necessary; provide reinforced masonry lintel as necessary; grout in frame; paint door frame; all in accordance with the various applicable Specification Sections. There is no corresponding quantity allowance. 2. Unit of Measurement: Per assembly 3. Quantity Allowance: Include 2 assemblies I. UNIT PRICE G-9: GENERAL LABORER: 1. Description: Provide a general laborer for the Owner’s use for work as directed by the Construction Manager and at his discretion: 2. Unit of Measure: Per Man-hour 3. Quantity Allowance: a. Include 300 man-hours. J. UNIT PRICE G-10: CARPENTER JOURNEYMAN LABOR: 4. Description: Provide a general laborer for the Owner’s use for work as directed by the Construction Manager and at his discretion: 5. Unit of Measure: Per Man-hour 6. Quantity Allowance: b. Include 200 man-hours. K. UNIT PRICE G-11: JOURNEYMAN PAINTER CLASS 2 LABOR: 1. Description: Provide a journeyman painter for Owner’s use for work as directed by the Construction Manager and at his discretion: 2. Unit of Measure: Per Man-hour 3. Quantity Allowance: a. Include 100 man-hours. L. UNIT PRICE G-12: CARPENTER JOURNEYMAN LABOR FOR REPLACING DAMAGED CEILING TILE: 1. Description: Provide a journeyman carpenter for replacing damaged ceiling tile as directed by the Construction Manager and at his discretion. 2. Unit of Measure: Per Man-hour 3. Quantity Allowance: a. Include 40 man-hours. M. UNIT PRICE G-13: TEMPORARY FENCE: 1. Description: Provide 6’ high chain link fence for temporary use where directed by the Construction Manager and at his discretion. Include the rental for one year. 2. Unit of Measure: Per Lineal Foot 3. Quantity Allowance: a. Include 200 lineal feet. N. UNIT PRICE G-14: ½” GYPSUM WALL BOARD LAMINATE: 1. Description: Provide ½” thick gypsum wall board laminated over existing construction, screwed, taped and finished (level 5 finish), ready to paint. 2. Unit of Measure: Per square foot 3. Quantity Allowance: UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-5 Additions and Renovations to Upper Bucks County Technical School a. Include 500 square feet. A. UNIT PRICE NO. G-15: EXISTING EXTERIOR WALL INFILL. 1. Description: Provide masonry wall infill with 4 inches of new or salvaged brick, 2 inches of rigid insulation and 8 inch concrete masonry units toothed into existing wall and in accordance with Division 04 Section “Unit Masonry” and Section 07 Section “Insulation”. Infill area shall be no larger than 10 square feet. 2. Unit of Measurement: Per square foot of wall area when facing wall. 3. Allowance Quantity: 250 square feet. B. UNIT PRICE NO. G-16: EXISTING INTERIOR WALL INFILL. 1. Description: Provide masonry wall infill with 8 inch concrete masonry units toothed into existing wall per wall type A and in accordance with Division 04 Section “Unit Masonry” and Division 09 Section “Painting”. Infill area shall be no larger than 10 square feet. 2. Unit of Measurement: Per square foot of wall area when facing wall. 3. Allowance Quantity: 250 square feet. C. UNIT PRICE NO. G-17: FIRESTOPPING. 1. Description: Provide through penetration protection of 1 hour wall equivalent to 8 inch concrete masonry for wiring with combustible insulation in accordance with Division 07 Section “Penetration Firestopping”. Unit price shall be based on average opening size of 20 square inches, 20 percent full of wiring. 2. Unit of Measurement: Per square inch of penetration opening including penetrating item. 3. Allowance Quantity: 500 square inches. D. UNIT PRICE NO. G-18: FIRE RESISTIVE JOINTS. 1. Description: Provide through top of existing wall fire resistive joint for 1 hour wall equivalent to 8 inch concrete masonry abutting 1-1/2-inch B-deck. Division 07 Section “Fire Resistive Joint Systems”. 2. Unit of Measurement: Per lineal foot of joint. 3. Allowance Quantity: 200 lineal feet. E. UNIT PRICE NO. G-19: MOISTURE TOLERANT UNDERLAYMENT. 1. Description: Provide average thickness of 1-1/2 inch of cementitious floor underlayment including shot blasting of existing surface and moisture tolerant primer in accordance with Division 03 Section “Hydraulic Cement Underlayment and Topping”. Topping area shall be no smaller than 100 square feet. 2. Unit of Measurement: Per square foot of floor. 3. Allowance Quantity: 2500 square feet. F. UNIT PRICE NO. G-20: CUT AND PATCH SLAB ON GRADE. 1. Description: Provide saw cutting of existing wire mesh reinforced 5 inch thick slab on grades, breaking up, removal and disposal. Infill with new 5 inch 4000 psi concrete slab on grade, reinforced with wire mesh and pinned to existing slab with 1/2-inch rods at 12 inches on center drilled into existing slab. Provide vapor barrier under new slab. Provide steel troweled concrete and VCT finish. Demolition and replacement shall be in sizes approximately 5 feet wide and 10 feet long. Comply with Division 01 Section “Cutting and Patching”, Division 03 Section “Concrete” and Division 09 Section “Resilient Tile Flooring”. 2. Unit of Measurement: Per square foot of floor. UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-6 Additions and Renovations to Upper Bucks County Technical School 3. Allowance Quantity: 500 square feet. G. UNIT PRICE NO. G-21: STITCH REPAIR FOR SLAB ON GRADE. 1. Description: Provide concrete slab on grade stitch repairs in accordance with Detail 3 on Sheet A1.1a and Specification Section 03 54 16 “Hydraulic Underlayment and Topping”. Work shall include gel fill of crack between re-bars cut into existing slab. 2. Unit of Measurement: Per lineal foot. 3. Allowance Quantity: 250 lineal feet. 1.4 SCHEDULE OF UNIT PRICES AND ALLOWANCES FOR PLUMBING CONTRACT A. UNIT PRICE P-1: ADDITIONAL 2” BALL VALVE: 1. Description: Provide additional 2” ball valve in existing copper water pipe and insulate fitting in accordance with the applicable Division 22 Sections. 2. Unit of Measurement: Per assembly 3. Quantity Allowance: a. Include 5 assemblies. B. UNIT PRICE P-2: ADDITIONAL 1” BALL VALVE: 1. Description: Provide additional 1” ball valve in existing copper water pipe and insulate fitting in accordance with the applicable Division 22 Sections. 2. Unit of Measurement: Per assembly 3. Quantity Allowance: b. Include 5 assemblies. C. UNIT PRICE P-3: ADDITIONAL 2” COPPER PIPING: 1. Description: Provide additional 2” Type L copper piping as replacement for existing or extension of new water pipe, including insulation, hangers, one coupling and one tee for each 10’-0” of length in accordance with the applicable Division 22 Sections. 2. Unit of Measurement: Per linear foot. 3. Quantity Allowance: a. Include 100 linear feet. D. UNIT PRICE P-4: ADDITIONAL 1” COPPER PIPING: 1. Description: Provide additional 1” Type L copper piping as replacement for existing or extension of new water pipe, including insulation, hangers, one coupling and one tee for each 10’-0” of length in accordance with the applicable Division 22 Sections. 2. Unit of Measurement: Per linear foot. 3. Quantity Allowance: b. Include 100 linear feet. E. UNIT PRICE P-5: 4” SANITARY PIPING – BELOW GRADE: 1. Description: Furnish and install below grade 4” cast iron sanitary piping including saw cutting, removal and replacement of concrete floor slab, trenching, bedding and backfill (assume 30” wide by 36” deep trench and 6” concrete slab thickness) in accordance with the applicable Division 22 Sections. 2. Unit of Measurement: Per linear foot 3. Quantity Allowance: UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-7 Additions and Renovations to Upper Bucks County Technical School a. Include 100 linear feet F. UNIT PRICE P-6: JOURNEYMAN PLUMBER LABOR: 1. Description: Provide a journeyman Plumber for Owner’s use for work as directed by the Construction Manager and at his discretion. 2. Unit of Measure: Per Man-hour 3. Quantity Allowance: a. Include 100 man-hours. G. UNIT PRICE NO. P-7: COMPRESSED AIR PIPE. 1. Description: Provide 1” schedule 40 black steel pipe above ceiling including removal and reinstallation of ceiling, new pipe hangers and one coupling per 10’0” length of pipe. Comply with Division 22 Section “General Service Compressed - Air Piping”. 2. Units of Measurement: Per linear foot. 3. Allowance Quantity: 100 lineal feet. H. UNIT PRICE NO. P-8: GAS PIPING. 1. Description: Provide 2” schedule 40 black steel pipe above ceiling including removal and reinstallation of ceiling new pipe hangers and one coupling per 10’0” length of pipe. Comply with Division 22 Section “Liquefied Petroleum Gas Piping”. 2. Unit of Measurement: Per linear foot. 3. Allowance Quantity: 150 lineal feet. I.UNIT PRICE NO. P-9: GROUND PENETRATING RADAR INVESTIGATION. 1. Description: Provide one half day of Ground Penetrating Radar service. Comply with Division 01 Section 01 12 00 – Multiple Contract Summary. 2. Unit of Measurement: Per Half Day. 3. Allowance Quantity: 4 half days. 1.5 SCHEDULE OF UNIT PRICES AND ALLOWANCES FOR HVAC CONTRACT A. UNIT PRICE H-1: ADDITIONAL 2” BALL VALVE: 1. Description: Provide additional 2” ball valve in new or existing copper water pipe and insulate fitting in accordance with the applicable Division 23 Sections. Include removal and reinstallation of ceiling. 2. Unit of Measurement: Per assembly 3. Quantity Allowance: a. Include 5 assemblies. B. UNIT PRICE H-2: ADDITIONAL THERMOSTATS: 1. Description: Provide additional line voltage thermostats installed with 50 ft. of wiring in accordance with the applicable Division 23 Sections. 2. Unit of Measurement: Per assembly 3. Quantity Allowance: a. Include 3 assemblies C. UNIT PRICE H-3: ADDITIONAL DUCTWORK: 1. Description: Provide additional galvanized steel ductwork including fiberglass duct liner and steel hangers in accordance with the applicable Division 23 Sections. UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-8 Additions and Renovations to Upper Bucks County Technical School 2. Unit of Measurement: Per pound 3. Quantity Allowance: a. Include 500 pounds. D. UNIT PRICE H-4: ADDITIONAL STEEL PIPE: 1. Description: Provide additional 4” diameter steel pipe including insulation and hangers in accordance with the applicable Division 23 Sections. Pipe has welded joints and one 90 elbow per 20’-0’ length. 2. Unit of Measurement: Per linear foot 3. Quantity Allowance: a. Include 100 linear feet. E. UNIT PRICE H-5: ADDITIONAL COPPER PIPE: 1. Description: Provide additional 2” diameter copper pipe including insulation and hangers in accordance with the applicable Division 23 Sections. Include one coupling and one 90 elbow per 20’-0” length. 2. Unit of Measurement: Per linear foot 3. Quantity Allowance: a. Include 100 linear feet. F. UNIT PRICE H-6: JOURNEYMAN SHEET METAL WORKER LABOR: 1. Description: Provide a journeyman sheet metal worker for Owner’s use for work as directed by the Construction Manager and at his discretion: 2. Unit of Measure: Per Man-hour a. Include 100 man-hours. G. UNIT PRICE H-7: JOURNEYMAN PIPEFITTER LABOR: 3. Description: Provide a journeyman sheet metal worker for Owner’s use for work as directed by the Construction Manager and at his discretion: 4. Unit of Measure: Per Man-hour b. Include 100 man-hours. H. UNIT PRICE NO. H-8: EXHAUST FANS. 1. Description: Provide one rooftop centrifugal exhaust fans, spun aluminum, nominal 1000 cfm capacity, including roof curb, damper, framed roof opening, cutting and patching of existing roof construction, and installed in accordance with Division 23 Section “ Power Ventilators”. 2. Unit of Measurement: Per Unit. 3. Allowance Quantity: 2 units. I.UNIT PRICE NO. H-9: DIFFUSERS. 1. Description: Provide one 12” x 12” supply air diffusers including 10” diameter by 15’-0” long galvanized sheet metal branch ductwork, insulated and installed in accordance with Division 23 Section “Diffusers, Registers, and Grilles”. 2. Unit of Measurement: Per Unit. 3. Allowance Quantity: 5 units. J. UNIT PRICE NO. H-10: FIRE DAMPERS. 1. Description: Provide one 1 rated Type B duct fire dampers, nominal 24” x 24”, including cutting and patching of existing wall construction including access door, UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-9 Additions and Renovations to Upper Bucks County Technical School masonry lintel and installed in accordance with Division 23 Section “Duct Accessories”. 2. Unit of Measurement: Per Unit. 3. Allowance Quantity: 5 units. 1.6 SCHEDULE OF UNIT PRICES AND ALLOWANCES FOR ELECTRICAL CONTRACT A. UNIT PRICE NO. E-1: DISCONNECT SWITCHES. 1. Description: Provide an additional 480V, 100/3 fused safety switch according to Division 26 Section "Enclosed Switches and Circuit Breakers,” including 100/3 feeder circuit breaker, 4 #2 & #8 ground in 1.5” EMT & 100’ one-way circuit distance. 2. Unit of Measurement: Per Unit. 3. Allowance Quantity: 5 units. H. UNIT PRICE E-2: DUPLEX RECEPTACLE & WIRING: 1. Description: Provide an additional duplex receptacle assembly. Include 20A, 120V duplex receptacle, back box, cover plate, ¾” conduit/raceway with 2, #12 conductors and 1, #12 Ground wire to a point of authorized connection, necessary wall penetration cutting and patching, terminations and labeling. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 35 feet 4. Quantity Allowance: a. Include 10 assemblies. I. J. UNIT PRICE E-3: EXIT SIGN & WIRING: 1. Description: Provide an additional exit sign assembly (luminaire type F14) including appropriate mounting equipment, ¾” conduit/raceway with 2, #10 conductors and 1, #12 ground wire, necessary wall penetration cutting and patching, terminations and connections. Connect to closest normal/emergency “Exit Sign” circuit. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 35 feet 4. Quantity Allowance: a. Include 2 assemblies. UNIT PRICE E-4: 2’ X 4’ LIGHT FIXTURE & WIRING: 1. Description: Provide an additional 2’ x 4’ light assembly, consisting of luminaire type L or L3 (Architect’s choice), appropriate mounting equipment, ¾” conduit with 2, #12 conductors and 1 #12 ground wire to a point of authorized connection, necessary wall penetration cutting and patching, terminations and connections. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 30 feet 4. Quantity Allowance: a. Include 5 assemblies. K. UNIT PRICE E-5: HEAT OR SMOKE DETECTOR & WIRING UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-10 Additions and Renovations to Upper Bucks County Technical School 1. Description: Provide an additional heat or smoke detector assembly consisting of detector of type required for application, appropriate backbox (as applicable) and mounting equipment, cabling, conduit, necessary wall penetration cutting and patching, terminations, connections to fire alarm system and programming required. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 100 feet 4. Quantity Allowance: a. Include 3 assemblies. L. UNIT PRICE E-6: FIRE ALARM PULL STATION &WIRING: 1. Description: Provide an additional pull station assembly consisting of pull station device, backbox, cabling, conduit, necessary wall penetration cutting and patching, terminations, connections to fire alarm system and programming required. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 100 feet 4. Quantity Allowance: a. Include 3 assemblies. M. Unit Price E-7: Fire Alarm Audible/Visual Device & Wiring: 1. Description: Provide an additional fire alarm A/V device assembly, consisting of A/V device, backbox, cabling, conduit, necessary wall penetration cutting and patching, terminations, connections to fire alarm system, programming, and additional power supplies required. Perform in accordance with applicable Division 26 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum Distance: 100 feet 4. Quantity Allowance: a. Include 5 assemblies. N. UNIT PRICE E-8: DATA OUTLET ROUGH-IN: 1. Description: Provide an additional B1 computer outlet rough-in as detailed on the Drawings consisting of backbox and conduit. Perform in accordance with applicable Division 26 and 27 Sections and Drawing requirements for similar work. 2. Unit of Measurement: Per assembly 3. Maximum distance: N/A 4. Quantity Allowance: a. Include: 10 assemblies O. UNIT PRICE E-9: JOURNEYMAN ELECTRICIAN LABOR: 1. Description: Provide a journeyman electrician laborer for Owner’s use for work as directed by the Construction Manager and at his discretion. 2. Unit of Measurement: Per Man-hour 3. Quantity Allowance: a. Include 200 man –hours. END OF SECTION UNIT PRICES AND QUANTITY ALLOWANCES 01 27 50-11
© Copyright 2026 Paperzz