Gas Network Team Leader– UnitSMLAOSW6 Reinstatement in Cold-lay Bituminous Materials This unit is designed to allow the candidate to demonstrate the skills and knowledge required to carry out reinstatement using cold-lay bituminous surfacing material. The candidate will be able to prepare the pavement layer to receive cold-lay surfacing materials, to identify and select materials to be used for the reinstatement, and to construct the cold-lay bituminous surfacing layer, using the correct equipment. They will also be able to identify and dispose correctly and safely of surplus materials, and materials that cannot be re-used What does this specification look like? Gas Network Team Leaders need to be able to: RCLBM1 RCLBM2 RCLBM3 RCLBM4 RCLBM5 Prepare the layer of pavement structure to receive permanent cold-lay surfacing materials Construct a cold-lay bituminous surfacing layer Dispose of surplus materials Follow safe working practices Understand relevant health and safety guidance and legislation What do I need to take this module? Prior to taking this module, candidates should have completed all the following units: SMLMSW1, SMLMSW2, SMLMSW3. Consideration should be made for the completion of SMLAOSW4 and SMLAOSW5 Candidates to be assessed as competent in this area must successfully meet the criteria listed below or have other unitary evidence demonstrating an equivalent level of competence. Evidence should be gathered from the workplace on at least one occasion Page 1 Performance Criteria To achieve this unit you will need to be able to: Prepare the layer of pavement structure to receive permanent cold-lay surfacing materials P1. Remove loose and unacceptable materials from the area to be reinstated using suitable equipment P2. Identify and rectify any pavement layer surface contamination or defect P3. Use suitable equipment to trim back edges where damage has occurred P4. Use suitable equipment to re-position displaced ironwork, kerbs and edge restraints in accordance with established levels P5. Confirm against the specifications that the correct depth is left for the cold-lay surface material. Construct a cold-lay bituminous surfacing layer P6. Check that imported bituminous material complies with the specification P7. Select compaction equipment and ensure that it is both suitable for the operation and in working condition and safe to use P8. Spread and level cold-lay bituminous material in binder course and surface course layers P9. Handle cold-lay bituminous material correctly P10. Store cold-lay bituminous material to prevent contamination, oxidation and wetting P11. Reinstate around highway iron work according to the specification P12. Seal edges of the cavity using specified edge sealant P13. Compact the bituminous material according to the specification. Dispose of surplus materials P14. Identify materials that are unsuitable for re-use or surplus to requirements P15. Store surplus materials and those unsuitable for reuse in safe temporary storage P16. Ensure materials for disposal are loaded safely for transportation. Follow safe working practices P17. Identify and follow current relevant health and safety regulations, standards and other legislation relating to working practices within the construction environment and specific to any practical task that they are required to carry out P18. Leave the site in a clean and safe condition P19. Identify Materials used for reinstating a cold-lay bituminous surfacing layer including; permanent cold-lay binder and surfacing materials, deferred set mixtures for reinstatement and cold edge sealant P23. Identify materials for disposal including, unsuitable surplus materials surplus materials that are suitable for re-use P24. Demonstrate the use of appropriate hand tools P25. Demonstrate the use of appropriate powered equipment P26. Demonstrate the safe use of tools and equipment Page 2 P27. Demonstrate the correct use of appropriate PPE (including, as necessary: high visibility jacket or waistcoat, hard hat, ear defenders, gloves, protective footwear, waterproof clothing, eye protection visor or goggles, and respiratory protective equipment P28. Use risk assessment methods to identify and control hazards on site P29. Use all necessary precautions to minimise danger or inconvenience to road users P30. Use all necessary precautions to minimise danger or inconvenience to site personnel P31. Use all necessary precautions to minimise damage to equipment or apparatus. Knowledge and understanding To achieve this unit, you will need to know and understand how to: Prepare the layer of pavement structure to receive cold-lay surfacing materials K1. Explain why loose and unacceptable materials are removed from the area to be reinstated K2. Explain how surface and ground water should be controlled from excavations K3. Explain the implications of pavement layer surface contamination or defects K4. Explain how to identify and rectify pavement layer surface contamination or defects K5. Explain how to identify and rectify edge damage and undercut K6. Describe how to re-position displaced ironwork, kerbs and edge restraints K7. Explain how to check and confirm that the pavement layer construction is correct K8. Explain the implications of incorrect pavement layer construction Construct a cold-lay bituminous surfacing layer K9. Explain the factors that influence the selection of equipment for the prescribed operation K10. Explain how to check equipment is in working condition and safe to use K11. Describe handling and storage procedures for cold-lay bituminous material K12. Explain the reasons for sealing cavity edges before placing surface layers K13. Explain how to determine required surcharge prior to compaction of cold-lay surfacing materials K14. Explain compaction procedures for cold-lay bituminous material K15. Describe how to confirm that the compacted layer thickness meets specifications. Dispose of surplus materials K16. Explain how to identify materials that are unsuitable for re-use or surplus to requirements K17. Explain the importance of storing unsuitable and re-usable materials separately K18. Describe how to load materials safely for transportation K19. Explain when surplus materials should be removed from site K20. Understand the Specification for the Reinstatement of Openings in Highways K21. Understand the requirements of HSG47, Avoiding Danger from Underground Services K22. Understand the requirements of HSG150 Health and safety in construction Page 3
© Copyright 2026 Paperzz