The northeast Seattle Tunnel length is 12 miles (18Km) The Mill Creek tunnel length is 12 miles (18Km) Reason for tunneling is surface land availability, noise and general environmental impact. Tunnels have crown elevation for natural draining purposes. This tunneling will prevent surface from destruction and allow speedy train service. Des. By R.N. HSR_Seattle to Everett Legend CHSR Stations x Commuter Stations Flyovers Cuts Fills Tunnels Roadway over or under passes Revised Roadways Generally on ground Freight Railroads (BNSF) (UPRR) = Closed RR Crossings Elv. = Rail Elevation E = Ground surface Elevation R = Radius HSR_Legend E 384' E 386' E 111' HSR_SE_01 E 381' E 360' HSR_SE_02 E 203' To Lake Forest Park Adit 6 miles (9 Km) E 109' CHSR Elv. 10' TBM assembly cavern Elv. 10' Adit Shaft 1400' (450m) E 40' CHSR Elv. -50' Grade 0.75% Muck via conveyor to Barges for possible artificial Island building HSR_SE_03 To SEA ST 6 miles (9 Km) E 213' E 180' HSR_SE_04 E 300' E 158' E 386' E 230' E 85' HSR_SE_05 E 398' Mill Creek Tunnel Section CHSR Elv. 40' Possible Commuter Subway Station E 325' E 257' TBM assembly cavern Elv. 40' Muck via conveyor to Barges Adit Tunnel 0.54 miles (0.86Km) long NE Seattle Tunnel Section Tunnel length 11.5 Miles E 280' HSR_SE_06 E 350' E 560' HSR_SE_07 E 140' E 405' E CHSR enters Transmission Line corridor (300' wide) E 377' HSR_SE_08 E 252' E 397' E 338' CHSR Tunnel center point Elv. 90' Drainage grade 0.15% E 334' HSR_SE_09 E 432' Existing Transmission Line corridor E 445' CHSR is departing Transmission Line corridor HSR_SE_10 Fill area Material from Tunnel excavation E 7' Main CHSR Service Area 80 acres (33 Hectares) Elv. 40' Provide underpass for Farming E 8' Causeway, fill from Tunnel excavation Tunnel entrance elv. 40' E 160' Mill Creek Tunnel length 12 Miles (18Km) HSR_SE_11 E 410' CHSR Elv. 52' BNSF Elv. 26' Provide underpass for Farming E 7' Causeway Elv. 46' HSR_SE_12 Existing BNSF Elv. 69' E 7' CHSR Flyover Elv. 46' Flyover length to Everett Station 4.5 Miles HSR_SE_13 CHSR Elv. 55' I-5 Elv. 29' Jct. Elv. 77' Everett Station Area + new Road Platform Elv. 44' Also end of the Amtrak Empire E 18' HWY 2 Elv. 19' HSR_SE_14 New access Road to Everett Station Elv. 40' CHSR Elv. 81' BNSF with swing bridge Pacific HWY Elv. 55' Turnaround for Amtrak Empire Builder HSR_SE_15
© Copyright 2025 Paperzz