ASX Announ ncement 2nd Septtember 2016 Oxleyy Potaassium m Pro oject Canad dian Pottash En ngineerring Speecialistts Appoointed To T Oxley Highlights Can nadian potash h engineering specialists Noovopro appointed to Oxleyy Potassium PProject Prefea asibility Stud dy Novvopro have co ompleted eng gineering from m study phasee through to construction oon numerous potash projjects and opeerations aroun nd the globe Novvopro to analyyse and recom mmend optim misations of th he Oxley hydro ometallurgicaal circuit deve eloped in the previously co ompleted Scoping Study baased on their extensive pottash project kknowledge Go-fforward optio on recommen nded by Novoopro will feed into Prefeasib bility Study tesstwork progra am Scoping Study co onsidered a sttart-up high vvalue potassiu um nitrate spe ecialty fertiliseer operation based b on currrent Inferred Mineral M Resou urces that inc ludes 38 million tonnes at 10% K2O (9% % cut-off), from m the total of 155 million ton nnes at 8.3% K2O (6% cut-ooff) Resources to datte defined from m just a 3km ssection of thee 32km striking rare ultrapootassic lava flo ow Hugge expansion potential into o bulk potassiium fertiliserss to also be co onsidered in PPrefeasibility Study S Summary Centrex Metals Limited (““Centrex”) hass appointed C Canadian bassed potash en ngineering exxperts Novopro to analysee and recomm mend optimissations of its Oxley O Potassi um Project hydrometallurrgical circuit ddeveloped in a Scoping Study comp pleted last mo onth. This work forms partt of the comm mencement off a Prefeasibi lity Study for the project. The Prefeasiibility Study will w consider not only a staart-up potassium nitrate (““NOP”) speciaalty fertiliser operation, o but also covver second staage expansion into the bu lk potassium fertiliser marrket. A start-up NO OP operation n and associated cost estim mates in the previous Scoping Study w were based on n only a fraction of th he current Infferred Mineral Resources tthat includes 38 million tonnes at 10% K2O (9% cut-o off), from the total of 155 m million tonnees at 8.3% K2O (6% cut-off)). Inferred Min neral Resourcces to date coover just 3kmss of the overall 32km m striking raree ultrapotassiic lava flow thhat forms the basis of the project. p For full details of the Inferred Mineral Resource pleease see anno ouncement 8tht March 20166: 0308/pdf/435 nrchjm48mjxx.pdf http://www.asx.com.au/aasxpdf/20160 The results w were reported d under JORC C 2012 and Ceentrex is not aware a of any new informa tion or data that t materially afffects the info ormation contained withinn the release. All material assumptions a and technica al parameters underpinningg the estimattes in the annnouncement continue c to apply and havve not materially changed. Preliminary engineering studies s includ ding by Novoopro, will furth her review the e numerous ddesign option ns considered aand costed in n the Scoping g Study. Based d on these studies the go-forward optioon will be cho osen that will be undeerpinned by a small-scale pilot p testworkk program du uring the Prefeasibility Studdy. The Prefe easibility Study is targgeted for com mpletion by th he end of 20177. Novopro will w review the hydrometalllurgical sectio on of the project whicch includes leeaching and purification p off potassium chloride c from the molten ssalt roast circuit that extracts potaassium from feldspar. A simplified production process p flow is shown beloow. FIGURE: Sim mplified NOP production process flow w. For further in nformation, please p contacct: Ben Hamm mond Chief Executtive Officer Centrex Metals Limited Ph (08) 821333100 David Taskeer/ Professional Public Relattions Ph: (08) 93888 0944/ 0433 112 936 E: [email protected] m.au Gavvin Bosch Chi ef Financial Officer O & Com mpany Secretaary Cenntrex Metals Limited L Ph (08) 82133100
© Copyright 2026 Paperzz