UNLESS OTHERWISE NOTED, ALL WORK IN THIS WRITE-UP TO FOLLOW THE STANDARDS AND GUIDELINES SET IN BID SPECIFICATIONS 2011 SPEC # DESCRIPTION OF THE WORK LOCATION COST EXTERIOR WORK 8 MASONARY WALLS Repair damaged masonry wall cracks. Remove all loose stucco and install new stucco textured finish to match existing. Saw-cut/grind ½” deep and 3/16” wide groove in existing masonry cracks and fill with a premium two-part concrete epoxy. (Wire repaired masonry cracks, span wire a minimum of 8” on all sides). Provide a masonry finish to match existing finish applied directly to prepped surface to meet 2011 Bid spec. Exterior 37 45 72 EXTERIOR DOORS Install new lock sets on front door, rear door, garage side and living space door. Locks to match existing style door locks. Drill garage access door for dead bolt. Finish to match interior lock finish. (4) Remove and replace exterior garage entry door with a pre hung with the same style and design. All material and labor included. Jamb to be composite with fiberglass door. Garage Side Door/ Rear Door/ Front Door/ Garage Door Garage Remove and replace door lock on sliding glass door with same style and design. Sliding Glass Door EXTERIOR SIDING – MASONRY FINISH Repair the existing masonry finish to match existing. At all areas that need repaired. Entire House. See Spec. 8 Exterior Info Only GARAGE DOOR AND FRAMING Remove the existing garage door operator, supply and install a new garage door operator that is compatible with existing garage door (2 transmitters and 1 keyless entry pad). Garage Door 78 Convert existing outlets to weather proof GFCI. To code. Field verify. Use bubble covers. See interior spec. #78 for re-lamping. ELECTRICAL Exterior Info Only Info Only Rear Patio PAGE TOTAL: PAVING OF DRIVEWAY(S), WALKWAY(S) AND PARKING AREA(S) Saw cut driveway 24’ back from street and remove existing concrete from driveway. Furnish and install new concrete driveway at this same location and foot print. Approximant sq. ft. 400 To Code. Install new blank cover on j box in ceiling at rear patio. 86 CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 1 REVISED 3/10/11 SPEC # DESCRIPTION OF THE WORK 87 88 LOCATION Include all labor and material to complete this task. Driveway PAINTING- GENERAL SPECIFICATIONS Pressure clean, scrape and prepare exterior for painting. Paint the entire exterior of the house including all exposed wood, concrete, stucco, masonry and ferrous metal. All newly installed wood shall receive one coat of primer or undercoat and two coats of semi-gloss paint. Color to be selected by owner. Assume two colors and an accent paint. Exterior Include all exterior doors, soffit and fascia and rain gutters if any(entire house). Info Only Info Only Pressure clean all sidewalks, walkways, slabs, aprons, etc. Use acid at severe stained areas to clean better. Info Only Info Only LANDSCAPING Install landscaping as directed by the Housing Specialist. The allowance for this item. Exterior $300.00 Provide a professional inspection report for the existing irrigation system by a qualified firm detailing any deficiencies and associated cost of repairs. Include all control valves, irrigation lines, time clock, sprinkler heads, etc. required for a fully functioning system. This is an allowance item. Exterior $100.00 Prep and install St. Augustine sod at front yard area . New sod to be installed to property line. 90 COST______ Exterior Trim all shrubs away from house far enough away to paint exterior. Exterior MAIL BOX Furnish and install a new flag on mail box, paint color of flag to match all surrounding mail boxes. Include all labor and material for this task. Exterior PAGE TOTAL: CUM TOTAL: 94 MISCELLANOUS Remove all trash on this property, see interior spec. 94 Info Only PAGE TOTAL: Info Only PROJECT EXTERIOR TOTAL: __________________________________________________________________________________________ CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 2 Revised 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION COST______ INTERIOR WORK 19 FLOOR COVERING / CARPET After the removal of existing flooring, install new carpeting to manufactures instructions. The carpet shall be (30) ounce, stain resistant over a minimum of 1/2 inch re-bond, FHA approved. The installation shall be in an approved manner. All tack strips, metal accessories, etc., are included in this specification. The carpet shall be first quality, no seconds will be accepted. Product approval documentation will be provided by the contractor prior to installation. Included are all closets opening into newly carpeted areas. 22 FLOOR COVERING / CERAMIC Clean all ceramic tile floor and grout with an approved tile and grout cleaner. Remove and replace broken tile in kitchen. Tile is in garage for the replacements. Include all labor and material for this task. All Carpeted Areas/ Study-Office Dinning Room/ Living Room/ Hallway/ Bedrooms (3) Tiled Areas Kitchen 58 INTERIOR WALL AND CEILING FINISH-PLASTER/DRYWALL REPAIR Repair all ceiling and wall damage to match existing surfaces. Install texture on ceilings and walls after repairs to match existing surfaces surrounding repair. Note; all textures to be professionally applied Entire House/ through a spray texture machine, not a hand held hopper. Interior/ Include all garage walls and garage ceiling. Garage 63 INTERIOR WALL FINISH-CERAMIC TILE (THIN SET) Repair grout on all tub walls and shower areas in each bathroom. Re-grout walls if needed to bring back to an expectable finish. Bathrooms (2) Remove and install new towel bar in main bath. Towel bar to be same design and style. Include any wall repair after removal of old towel bar. Main Bathroom PAGE TOTAL: 69 INTERIOR DOORS Adjust all interior doors to open and close to proper working order. Include all closet doors. 75/76 Interior Remove and install new closet doors in rear bedroom and middle bedroom. Doors are to be same design and style. Include all new track and hardware. Bedrooms CABINETS - KITCHEN/ COUNTER TOP Remove all door catches on drawers and cabinet doors. Fill holes with a putty that is close in color. Kitchen CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 3 Revised 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION Remove and install new hinges on cabinet door, lower cabinet. (1) 78 ELECTRICAL Re-lamp all new and existing fixtures with standard energy efficient bulbs. Recessed lights to receive energy efficient bulbs r-30’s. Replace all broken or painted receptacles and switches. Include all receptacle covers, switch covers and all cable and telephone jacks. Also all blank covers. Remove existing ceiling fans. Supply and install new ceiling fans and light kit. Assume the cost of fan and light kit to be $75.00. Install new j box for fan. Include all extension down rods. To Code (5). Install new hardwired smoke detectors and combination smoke/carbon monoxide to code. Kitchen Entire House Study-Office/ Bedrooms/ Living Room Entry Way Remove and install new light fixture in main bath, light to be of same design and style. Furnish and install new toilet seats (2) CUM TOTAL: PLUMBING-GENERAL SPECIFICATIONS All Bathrooms Main Bathroom All Bathrooms Install new kitchen faucet, new shut offs and new supply lines. Faucet to be of same design and style. Kitchen . Remove and install new garbage disposal. Disposal to be Kitchen ½ hp. 82 Interior/ Exterior PAGE TOTAL: Furnish and install new shower rods. (1) Main Bathroom 79 H.V.A.C. Provide standard maintenance/service to the existing air handler & condensing unit. Include coil cleaning and new filters in price. Contractor to provide documentation. 80/81 PLUMBING FIXTURES Furnish and install new low flow shower head. (2) Entire House To Code Remove and install new ceiling light in front entry way. Assume the cost of light at $60. n COST______ MAJOR APPLIANCES CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 4 Revised 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION Furnish and install a new 30" electric range/oven. The cost of the stove to be $450.00 Kitchen Furnish and install a new 21 cubic foot refrigerator. The cost of the refrigerator to be $750.00. Include icemaker and hook up. Kitchen Furnish and install a new vent-less over-the range microwave. The cost of the new microwave to be $275.00 Kitchen Furnish and install a new dish washer. The cost of the dish washer to be $250.00. All appliances to be of the same brand. Kitchen Information Only 85 PEST EXTERMINATION Inspect house for termite and/or other insect infestation. If active infestation is found, treatment will be completed by change order. Contractor to furnish an inspection report. 87 94 COST______ PAINTING- GENERAL SPECIFICATIONS Plug, patch and paint the entire interior of the building including all walls, ceilings, doors, trim, and baseboard in accordance with the requirements of this section. Stained ceilings are to be prepared properly to insure coverage of final coat. All wallpaper to be removed, walls properly prepared and painted. Include the painting of garage floor, patios, and porches, and screen porch. MISCELLANEOUS Furnish and install new heavy duty spring door stops (All Doors). Furnish and install 3” PVC vertical blinds. (1) Entire House Interior PAGE TOTAL: CUM TOTAL: Interior Sliding Door Remove existing window treatments before painting and reinstall after painting. Supply all parts for this task. All Windows Remove valance above sliding glass door to paint and reinstall after painting. Supply all parts for this task Sliding Door Clean up Remove all trash and debris left by previous occupants. Clean house completely ready for re-sale. Entire House PERMITS AND FEES CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 5 Revised 3/10/11 SPEC # DESCRIPTION OF THE WORK LOCATION COST______ PAGE TOTAL: TOTAL INTERIOR AMOUNT: TOTAL EXTERIOR AMOUNT: TOTAL PROJECT AMOUNT: THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING ANY ENGINEERING REQUIRED TO OBTAIN THE PROPER PERMITS OR TO COMPLETE THE WORK IN THIS WRITE-UP. CASE #: 10-6494 3612 OLDE LANARK DR. DATE: 03/26/12 PAGE: 6 Revised 3/10/11
© Copyright 2026 Paperzz