1/18/17 WOODEN WHISPER PLAY SYSTEMS Heavy Duty Hardware Kit 15' x 14 1/2' Kit Includes: 1 Illustrated Plans/Blueprint 1 Maintenance Info/Warranty Card 2 Sling Swings 125 lb. 6 3/8" Swing Hangers/Fasteners 2 Trapeze Rings 2 8' Poly Ropes 5 3/8x7 1/2” Carriage Bolt 4 3/8 x 7" Carriage Bolt 4 3/8 x 5 1/2" Carriage Bolt 14 3/8x5” Carriage Bolt 4 3/8 x 4" Carriage Bolt Material Needed: 2 4x4x10' 8 4x4x8' 2 3x4x8’ 1 2x6x12' 3 2x6x10' 1 2x4x8’ 3 2x4x10” 2 5/4x6x10' 11 5/4x6x8' 1 1x4x8' 6 1 2 4 2 4 14 8 12 24 4 20 Poly Hanger Clamps Vinyl Shade Wall 56 1/2 oz. Gusset 20 1/2 oz. Beam Stiffener 16" Tubular Steel Brace 13 1/2" Tubular Steel Brace #14x 2 1/2” Pan Head Screw #14x1” Pan Head Screw #10 x 3/4" Pan Head Screw #10 x 1 1/2" Pan Head Screw 3/8x5 1/2” Lag Screw 3/8 x 1 1/2" Lag Screw 4 8 2 33 2 34 76 150 8 25 29 8 5/16x3 1/2” Lag Screw 5/16 x 1 1/2" Lag Screw 3/8 x 3/4" Hex Head Bolt 3/8 Lock Washer #10x4” Deck Screw #8 or #9x 3" Deck Screw #8 or #9x 2 1/2" Deck Screw #8 or #9x 2" Deck Screw 3/8” Acorn Nut-Stainless 3/8 Hex Nut 3/8 USS Washer Cable Ties 8“ 4 20 8 3 3 2 4 2 2 6 8’ 6 5/16” USS Washer 3/8” Small SAE Washer 5/16” Small SAE Washer 6” Joining Plate 4” Corner Brace 3” Corner Brace 54 1/2” Chain 800 lb. 21 1/2” Chain 800 lb. 2 1/2” Finish Nail Spring Clips Webbing S Hook Cut two into 9'5" lengths to be used for the Beam NOTE: Select crowned lumber for additional strength Legs NOTE: Do NOT cut four Clubhouse Legs and four A-Frame Legs Landscape Timber for A-Frame Anchors———-*Note 4x4 stock also acceptable Cut one 66 3/4" Joist and one 61 3/4" Mid Joist Cut three 66 3/4" Joist and three 41" Joist Cut one 41" Brace and one 5 3/8" Deck Support Block plus one 34” Railing Tip: 2x6 Stock ripped in halfworks for 5 3/8” Block Cut six 38 1/2” Rafter, four 24” Rafter Support and two 21 3/4” Mid Rafter support Cut two 65 3/4" Sandbox and two 40" Sandbox Cut ten 43 7/8" Decking , eight 41” Baluster, and four 37” Baluster Cut two 34" Decking , four 3 1/2" Tube Support Block & four 2 1/4" Deck Support Block Tip: 5/4x6 Stock ripped in half works for these components and is especially “Recommended” for the 3 1/2” Tube Support Block 2 1 7 2x2x8' Cut three 16" Rope Ladder Rungs plus four 16” or longer Anchor Stake, if going into sand, etc. (2x4 Stock ripped is stronger) 3/4x10' Sch. 40 PVC Cut two 33 3/4" Shade Wall Tube 1x6x12’ Cut fourteen 71 3/4” Roof Board Optional Materials Needed: Tools Required: Two 12" Bar Clamps 6' Steel Fence Post (& Driver) Carpenters Square 8' Timber (s) for bracing Wrench (5/8”, 9/16", 1/2") 2 4x4x12’ Tape Measure Phillips Bits #2 & #3 Metal File (or 1/4" round-over bit) Hammer + Sledge Hammer Shovel To make a 12’ Beam 1/2" Drill Bit (omit if using Ladder) 3/8" Extended 12" Drill Bit 1/4" Extended 12" Drill Bit 7/32 or 1/4" Drill Bit 11/64" Drill Bit Vice Grip or Bolt Gripping Tool (above) 1 3/8" Spade or Forstner Bit 1 1/16" or 1 1/8" Spade or Forstner Bit 7/8" Spade or Forstner Bit 3/16” Drill Bit 1/8" Drill Bit 5/16” Drill Bit Drill Tape Level Bungee Cord Saw Ladder
© Copyright 2026 Paperzz