Grand Nicaragua Canal 13/02/2015 Who are we International Marine & Dredging Consultants nv Foundation year 1982 Offices Antwerp Bogota 12-Feb-15 / Grand Nicaragua Canal / slide 2 Personnel (Jan 2015) Turnover 2014 Quality certificate 103 15,6 Mio Euro ISO 9001-2008 Our Mission IMDC provides expert advice for a sustainable management and development of our natural waters 12-Feb-15 / Grand Nicaragua Canal / slide 3 Our Market Home Market 60-70 % World wide 30-40 % 12-Feb-15 / Grand Nicaragua Canal / slide 4 Offshore, Dredging & Environment Offshore construction works Offshore cables & pipelines Techniques & execution Measurements Dredging & Environment Operational Forecasting 12-Feb-15 / Grand Nicaragua Canal / slide 5 Coast, Estuaries & Ports Coastal zone management Coastal structures 12-Feb-15 / Grand Nicaragua Canal / slide 6 Coastal & estuarine processes Ports & marine facilities Inland Waters Flood Risk and Flood Forecasting 12-Feb-15 / Grand Nicaragua Canal / slide 7 Navigation and Nautics Safety Analysis Inland Waters Channel Design Water Management and Climate Change TYPICAL SERVICES Hydraulic Modelling Ports & (Coastal) Structures Dredging Expertise 12-Feb-15 / Grand Nicaragua Canal / slide 8 Design of a new Channel – France Client VNF Study Design of new Canal Seine-Nord Europe (2011 – 2012) Objective Design of a new canal Preliminary design • Alignment • Watertightness of canal • Bank protection 12-Feb-15 / Grand Nicaragua Canal / slide 9 Inland Waterways Improvement – Upper Sea Scheldt Study Objective Integrated Plan of Upper-Sea Scheldt Improve navigation with respect for estuarine nature and ecosystem and safety – Preliminary Design, System modelling, EIA • Sustainable maintenance and monitoring • Integrated system study • EIA 12-Feb-15 / Grand Nicaragua Canal / slide 10 Inland Waterways Improvement – Deûle Lys (Seine-Scheldt linking Channel, France) Study Objective Client Trajectography Seine-Scheldt France Identify bottlenecks for Class Va+, recommendations for navigation. Nautical check of preliminary design, nautical simulations, recommendations VNF 12-Feb-15 / Grand Nicaragua Canal / slide 11 Impact of climate change Impact on rainfall Sea level rise of the North Sea historische gegevens Vlissingen 450 100 440 90 430 70 410 60 400 50 390 40 380 370 1890 30 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 jaar jaarlijkse gemiddeld HW 10-jaarlijks gemiddeld HW lineaire trend + nodaal getij HW jaarlijks gemiddeld LW 10-jaarlijks gemiddeld LW lineaire trend + nodaal getij LW lineaire trend 10-jaarlijks gemiddeld LW lineaire trend 10-jaarlijks gemiddeld HW 12-Feb-15 / Grand Nicaragua Canal / slide 12 2000 LW [cm TAW] HW [cm TAW] 80 420 Hydraulic Modelling – Waves and Sediment transport Analysis of Turbidity. Esclusas Canal de Panamá en el Atlantico Maasvlakte 2: Impact of the structure on navigation conditions London Gateway: Monitoring during Construction 12-Feb-15 / Grand Nicaragua Canal / slide 13 Evaluation of Density and discharge currents Locks at the Panama Canal (Pacific side) Port Studies Damietta (Egypt) Design LPG Terminal Deurganckdok (Bélgium) Environmental impact of dredging operations 12-Feb-15 / Grand Nicaragua Canal / slide 14 Doha Port (Qatar) Wave Study Manappad (India) Master Plan Port structures Ostende, Belgium, Breakwater design Marroco – Expert control 12-Feb-15 / Grand Nicaragua Canal / slide 15 Breakwater & Jetty Montevideo (Uruguay) Hammamet (Tunisia) – Design and supervision Dredging Studies LNG terminal Channel Alignment Antifer, France, Technical Specifications BoQ – Budget Estimates Samuel de Champlain, expertise France Method Statement Supervision Cutter Dredger, outfall supervision Ghana 12-Feb-15 / Grand Nicaragua Canal / slide 16 Thank you for your attention!
© Copyright 2026 Paperzz