Astrolabe Park stormwater renewal Community newsletter – October 2015 From 12 October 2015 Sydney Water will be renewing the stormwater pipes at Astrolabe Park, Daceyville. Under Astrolabe Park are two large stormwater pipes that direct stormwater into Botany wetlands. Wetlands act as natural filters, treating stormwater run-off from property and streets. These pipes are deteriorating so we’re replacing them. This work will improve the reliability of the stormwater system and water quality in the wetlands. What does the work involve? We will be excavating and installing new stormwater pipes along the existing internal access road, then through Eastlake Golf Course to the wetland. See the map on the next page. A new outlet to the wetlands will also be built. This includes a new gross pollutant trap and some small changes to the wetland. Why is the new alignment different to the old? Astrolabe Park was used as a landfill during the 1960s and 1970s. As a result our early assessments identified low levels of contaminants on the site. Our new alignment minimises the disturbance of contaminated materials and impacts on residents. Astrolabe Park stormwater renewal | October 2015 SW85 09/15 © Sydney Water. All rights reserved. Will it impact access to the park? A large section of Astrolabe Park will be closed during the work. This includes closing the park's internal access road and carparks. A permanent section of the park will remain open during the work. We are working closely with the City of Botany Bay Council and the community to ensure minimal impacts on residents. This includes the potential for providing a replacement temporary carpark off Isaac Smith Street. The proposed location of this carpark is shown on the map on the next page. What does it mean for the local community? Enviropacific, Sydney Water’s contractor, is qualified and highly experienced in safely remediating contaminated sites. We will implement a range of measures and adhere to Australian Standards, Office of the Environment and Heritage and WorkCover requirements to ensure the safety of the local community, our workers, and the environment. We'll also minimise the impact of construction work on the local area by using measures to reduce dust, noise and vehicle traffic. How long will it take? Work will start mid October 2015 and be completed by about mid-2017, weather permitting. Page | 1 What are work hours? Work hours will be Monday to Friday 7 am to 6 pm. No work will be done on weekends or public holidays. Need more information? We will keep you informed during the project and welcome community feedback. We’ll be holding a community information session about the project and changes to the park: Contact us Call us on 1800 076 683 Email: [email protected] Send a letter to: Sydney Water, Community Relations - Stormwater Program, PO Box 399, Parramatta NSW 2124 Thank you for your patience and cooperation during this essential work. When: Thursday 8 October 2015, drop-in any time between 5.30 and 7.30pm Where: Eastlake Golf Club, Gardeners Road (cnr Isaac Smith Street), Kingsford. Site map Astrolabe Park stormwater renewal | October 2015 Page | 2
© Copyright 2026 Paperzz