Norah`s Vintage Afghan

Norah’s Vintage Afghan
Berroco - Norah’s Vintage Afghan
Designed by Norah Gaughan
skill level: Intermediate
One size
finished measurements
Approximately 48" wide x 60" long
materials
4 Hanks each BERROCO VINTAGE
(100 grs), #5104 Mushroom (A),
#5192 Chana Dal (B), #5107
Cracked Pepper (C), #5105 Oats (D)
and #5177 Douglas Fir (E)
Or 4 balls each BERROCO
COMFORT (100 grs), #9703 Barley
(A), #9785 Falseberry Heather (B),
#9713 Dusk (C), #9720 Hummus (D)
and #9792 Hackberry Heather (E)
Straight knitting needles, size 7
(4.50 mm) OR SIZE TO OBTAIN
GAUGE
Cable needle (cn)
Crochet hook, size 4.50 mm (G)
Tapestry needle
gauge
20 sts and 27 rows = 4" in St st
TO SAVE TIME, TAKE TIME TO CHECK
GAUGE
Vintage ®
Berroco Comfort ®
Love Berroco patterns?
Sign up for our KnitBits® newsletter.
Berroco, Inc., 1 Tupperware Dr, Suite 4, N. Smithfield, RI 02896-6815
1
Copyright 2015 in USA and Canada
Berroco - Norah’s Vintage Afghan
NOTE: We recommend using yarns called for in our instructions.
Every effort has been made to ensure that directions contained in
this book are accurate and complete, however errors do occur. We
cannot be responsible for variance of individual knitters, human or
typographical errors.
All pattern PDFs are updated when corrections are made. In the
event of finding an error, please make sure you've downloaded the
most recent version.
NOTE
This afghan is made up of 20 different squares.
They are all made individually, then sewn together
following diagram in the direction shown by
arrows. Cast on for all squares using long-tail
method.
SQUARE 1
With A, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1
– 86 sts.
Beg on WS, work Rows 1 – 16 of Chart 1 four times,
then work Rows 1 – 5, end with a WS row (69 rows
total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
Rows 6 – 9: Knit.
Inc Row (RS): (K2, M1) 27 times, k3 – 84 sts.
Beg on WS, work 69 rows of Chart 3, end with a WS
row.
Dec Row (RS): (K1, k2tog) 27 times, k3 – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 2
With B, cast on 59 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) 3 times, (k1, M1, k2, M1) 17
times, (k1, M1) 3 times, k2 – 99 sts.
Beg on WS, work Rows 1 – 12 of Chart 2 five times,
then work Rows 1 – 11, end with a WS row (71 rows
total).
Dec Row (RS): K1, (k2tog) 3 times, (k1, k2tog,
k2tog) 17 times, (k2tog) 3 times, k1 – 59 sts. Rep
Rows 1 – 9 as for beginning of square, end with a
WS row. Bind off knitwise.
SQUARE 4
With D, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 16 of Chart 4 four times,
then work Rows 1 – 7, end with a WS row (71 rows
total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
SQUARE 3
With C, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
www.berroco.com
2
[email protected]
Berroco - Norah’s Vintage Afghan
SQUARE 5
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 6 of Chart 8 eleven
times, then work Rows 1 – 3, end with a WS row (69
rows total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
With D, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1
– 86 sts.
Beg on WS, work Rows 1 – 8 of Chart 5 eight times,
then work Rows 1 – 5, end with a WS row (69 rows
total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 9
With B, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 16 of Chart 9 four times,
then work Rows 1 – 7, end with a WS row (71 rows
total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
SQUARE 6
With E, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 11 of Chart 6 once, then
work Rows 12 – 21 six times, end with a WS row (71
rows total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
SQUARE 10
With C, cast on 59 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 28 times, k2 – 88 sts.
Beg on WS, work Rows 1 – 4 of Chart 10 seventeen
times, then work Row 1 once more, end with a WS
row (69 rows total).
Dec Row (RS): K1, (k1, k2tog) 29 times – 59 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 7
With B, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1
– 86 sts.
Beg on WS, work Rows 1 – 12 of Chart 7 five times,
then work Rows 1 – 9, end with a WS row (69 rows
total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 11
With D, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 24 of Chart 11 twice,
then work Rows 1 – 21 once, end with a WS row (69
rows total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
SQUARE 8
With A, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
www.berroco.com
3
[email protected]
Berroco - Norah’s Vintage Afghan
SQUARE 12
work Rows 1 – 16 three times, then work Rows 1 –
15, end with a WS row (71 rows total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
With E, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k2 – 85 sts.
Beg on WS, work Rows 1 – 16 of Chart 12 four times,
then work Rows 1 – 7, end with a WS row (71 rows
total).
Dec Row (RS): K1, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 16
With B, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 1 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k2 – 85 sts.
Beg on WS, work Rows 1 – 69 of Chart 16, end with
a WS row (69 rows total).
Dec Row (RS): K1, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 13
With C, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) twice, (k2, M1) 26 times, (k1,
M1) twice, k1 – 87 sts.
Beg on WS, work Rows 1 – 8 of Chart 13 eight times,
then work Rows 1 – 7, end with a WS row (71 rows
total).
Dec Row (RS): (K2tog) twice, (k1, k2tog) 27 times,
k2tog – 57 sts. Rep Rows 1 – 9 as for beginning of
square, end with a WS row. Bind off knitwise.
SQUARE 17
With E, cast on 59 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K1, M1) 3 times, (k1, M1, k2, M1) 17
times, (k1, M1) 3 times, k2 – 99 sts.
Beg on WS, work Rows 1 – 12 of Chart 17 six times,
then work Row 1 once, end with a WS row (73 rows
total).
Dec Row (RS): K1, (k2tog) 3 times, (k1, k2tog,
k2tog) 17 times, (k2tog) 3 times, k1 – 59 sts. Rep
Rows 1 – 9 as for beginning of square, end with a
WS row. Bind off knitwise.
SQUARE 14
With A, cast on 59 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 28 times, k2 – 88 sts.
Beg on WS, work Rows 1 – 24 of Chart 14 twice,
then work Rows 1 – 23, end with a WS row (71 rows
total).
Dec Row (RS): K1, (k1, k2tog) 29 times – 59 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 18
With D, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): (K2, M1) 27 times, k3 – 84 sts.
Beg on WS, work Rows 1 – 71 of Chart 18, end with
a WS row (71 rows total).
Dec Row (RS): (K1, k2tog) 27 times, k3 – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
SQUARE 15
With E, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1
– 86 sts.
Beg on WS, work Rows 9 – 16 of Chart 15 once,
www.berroco.com
4
[email protected]
Berroco - Norah’s Vintage Afghan
SQUARE 19
FINISHING
With A, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 27 times, k1, M1, k1
– 86 sts.
Beg on WS, work Rows 1 – 38 of Chart 19, then
work Rows 1 – 35, end with a WS row (73 rows
total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
Using tapestry needle and left-over yarn and whip
st, sew squares together following diagram. Turn
squares as you work so that they go in the direction
shown by arrows (bound-off edge should be at
point of arrow).
Edging: With RS facing, using crochet hook, join
D with a sl st in any corner of afghan. Work in sc
around entire afghan, working 3 sc’s in each corner,
join with a sl st in first sc. Working from left to right,
work in reverse sc around entire edge, join with a sl
st in first sc. Fasten off. Weave in all ends and block
as desired.
SQUARE 20
With C, cast on 57 sts.
Rows 1 – 4: Knit.
Row 5 (WS): K1, * p1, k1, rep from * across.
Rows 6 – 9: Knit.
Inc Row (RS): K1, M1, (k2, M1) 28 times – 86 sts.
Beg on WS, work Rows 1 – 20 of Chart 20 three
times, then work Rows 1 – 9, end with a WS row (69
rows total).
Dec Row (RS): K2tog, (k1, k2tog) 28 times – 57 sts.
Rep Rows 1 – 9 as for beginning of square, end with
a WS row. Bind off knitwise.
NORAH’S AFGHAN DIAGRAM
1
A
5
D
E
5
15
D
E
16
B
E
19
18
17
12
D
A
C
A
B
C
14
D
8
11
10
13
7
E
B
4
C
B
6
9
www.berroco.com
3
2
20
A
C
[email protected]
Berroco - Norah’s Vintage Afghan
CHART 1
CHART 1
.
15
hold in BACK, k2, p2 from cn
hold in FRONT, p2, k2 from cn
p between
.
.
11
14
12
.
10
9
7
p between
.
.
13
16
.
5
.
3
.
.
.
8
.
6
4
2
1
D
C
B
A
CHART 1
KEY TO CHART 1
knit on RS; purl on WS
.
purl on RS; knit on WS
.
.
15
.
13
Sl 2 sts on cn and hold in BACK, k2, p2 from cn
Sl 2 sts to cn and hold in FRONT, p2, k2 from cn
CHART 1 NOTES
On RS, beg at A, work to C, rep between
B and C, end at D
On WS, beg at D, work to B, rep between
C and B, end at A
.
.
11
9
7
.
5
.
3
.
.
.
1
D
www.berroco.com
6
C
[email protected]
B
Berroco - Norah’s Vintage Afghan
CHART 2
CHART 2
.
11
9
1, p1 from cn
7
from cn
5
, p1, k1, p1,
and purl it,
.
3
.
. .
..
.
.
. .
..
.
.
. .
..
12
.
10
8
.
6
4
.
2
1
NT, p1, k1,
purl it,
D
C
B
A
KEY TO CHART 2
knit on RS; purl on WS
.
.
11
purl on RS; knit on WS
9
Sl 1 st to cn and hold in BACK, p1, k1, p1, p1 from cn
. Sl 3 sts to cn and hold in FRONT, p1, k3 from cn
..
7
5
..
Sl 4 sts to cn and hold in BACK, p1, k1, p1,
sl last st from cn to LH needle and purl it,
then k3 from cn
.
3
.
1
Sl 4 sts to cn and hold in FRONT, p1, k1,
p1, sl last st to LH needle and purl it,
then k3 from cn
D
CHART 2 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D
On WS, beg at D, work to B, rep
between C and B, end at A
www.berroco.com
. .
..
7
[email protected]
C
.
Berroco - Norah’s Vintage Afghan
CHART 3
CHART 3
69
68
.
67
66
65
.
63
61
.
.
59
..
57
.
.
.
.
64
.
62
60
58
..
56
55
.
53
54
.
52
51
.
49
.
47
.
50
48
.
46
45
44
43
42
41
40
39
38
37
36
35
34
33
32
KEY TO CHART 3
31
.
29
27
.
..
28
purl on RS; knit on WS
..
25
23
..
.
26
.
Sl 1 st to cn and hold in BACK,
k3, k1 from ch
Sl 3 sts to cn and hold in FRONT,
k1, k3 from cn
21
.
19
17
.
15
13
.
..
..
KEY TO CHART 3
..
.
knit on RS; purl on WS
.
11
Sl 1 st to cn and hold in BACK,
k3, k1 from ch
7
5
Sl 1 st to cn and hold in BACK,
k3, p1 from cn
..
61
Sl 3 sts to cn and hold in FRONT,
p1, k3 from cn
KEY TO CHART 3
knit on RS; purl on WS
69
purl on RS; knit on WS
67
Sl 3 sts to cn and hold in FRONT,
k1, k3 from cn
65
..
..
61
Sl 1 st to cn and hold in BACK,
k3, p1 from cn
59
Sl 3 sts to cn and hold in FRONT,
p1, k3 from cn
Sl 2 sts to cn and hold in
57
55
.
BACK, k3, k2 from cn
www.berroco.com
Sl 3 sts
to cn and hold in
FRONT, k2, k3 from cn
63
53
51
Sl 2 sts to cn and hold in
BACK, k3, k2 from cn
Sl 3 sts to cn and hold in
FRONT, k2, k3 from cn
Sl 2 sts to cn and hold in
BACK, k3, p2 from cn
Sl 3 sts to cn and hold in
FRONT, p2, k3 from cn
Sl 3 sts to cn and hold in
BACK, k3, k3 from cn
Sl 3 sts to cn and hold in
FRONT, k3, k3 from cn
8
Sl 3 sts to cn and hold in
BACK, k3, p3 from cn
..
..
14
4
.
2
Sl 3 sts to cn and hold in
FRONT, k3, k3 from cn
..
.
CHART 3
Sl 3 sts to cn and hold in
BACK, k3, p3 from cn
Sl 3 sts to cn and hold in
FRONT, p3, k3 from cn
3 NOTES
.CHART
On WS, work from left to right.
On RS, work
. from right to left.
.
..
49
16
Sl 3 sts to cn and hold in
BACK, k3, k3 from cn
55
51
18
6
Sl 3 sts to cn and hold in
FRONT, p2, k3 from cn
57
53
20
8
Sl 2 sts to cn and hold in
BACK, k3, p2 from cn
59
.
22
10
FRONT, k2, k3 from cn
65
24
12
..Sl 3 sts to cn and hold in
67
63
Sl 1 st to cn and hold in BACK,
k3, p1 from cn
1
Sl 2 sts to cn and hold in
BACK, k3, k2 from cn
69
Sl 3 sts to cn and hold in FRONT,
k1, k3 from cn
3
Sl 3 sts to cn and hold in FRONT,
p1, k3 from cn
.
.
purl on RS; knit on WS
9
Sl 1 st to cn and hold in BACK,
k3, k1 from ch
30
knit on RS; purl on WS
.
.
47
45
43
41
[email protected]
39
.
.
dle, then
LH needle
in FRONT,
in FRONT,
n FRONT,
in BACK,
in BACK,
in BACK,
Berroco - Norah’s Vintage Afghan
CHART 4
CHART 4
. . ..
. .
. .
..
.
15
13
11
9
7
5
3
.. . .
. .
. .
.. ..
. .
KEY TO CHART 4
. .
purl on RS; knit on WS
RT - k2tog, leaving sts on LH needle, then
k the first st again, slipping sts off LH needle
..
.
.
.
.
.. .
.
13
Sl 4 sts to cn and hold in FRONT,
k1, p1, k4 from cn
11
9
Sl 4 sts to cn and hold in FRONT,
p1, k1, k4 from cn
7
Sl 2 sts to cn and hold in BACK,
k4, p2 from cn
5
Sl 2 sts to cn and hold in BACK,
k4, p1, k1, from cn
.
.
.
. ..
3
13
4
Sl 4 sts to cn and hold in FRONT,
k1, p1, k4 from cn
11
9
2
Sl 4 sts to cn and hold in FRONT,
p1, k1, k4 from cn
B
7
A
Sl 2 sts to cn and hold in BACK,
k4, p2 from cn
5
Sl 2 sts to cn and hold in BACK,
k4, p1, k1, from cn
.
.
.. .
.
3
1
Sl 2 sts to cn and hold in BACK,
k4, k1, p1 from cn
.
. . . ..
.
. .
. .
. ..
..
.
Sl 2 sts to cn and hold inCHART
BACK,
4
p1, RT, p1, k2 from cn
Sl 4 sts to cn and hold in FRONT,
k2, then p1, RT, p1 from cn
Sl 2 sts to cn and hold in BACK,
p1, RT, p1, then p2 from cn
Sl 4 sts to cn and hold in FRONT,
p2, then p1, RT, p1 from cn
CHART 4 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
. .
D
.. .
. .
. .
..
.
1
Sl 2 sts to cn and hold in BACK,
k4, k1, p1 from cn
D
C
Sl 2 sts to cn and hold in BACK,
p1, RT, p1, k2 from cn
Sl 4 sts to cn and hold in FRONT,
k2, then p1, RT, p1 from cn
Sl 2 sts to cn and hold in BACK,
p1, RT, p1, then p2 from cn
www.berroco.com
15
Sl 4 sts to cn and hold in FRONT,
p2, k4 from cn
.
..
.
.
C
..
.
.
15
Sl 4 sts to cn and hold in FRONT,
6
p2, k4 from cn
knit on RS; purl on WS
n FRONT,
m cn
10
RT - k2tog, leaving sts on LH needle, then
k the first st again, slipping sts off LH8needle
KEY TO CHART 4
in BACK,
m cn
12
purl on RS; knit on WS
in BACK,
in FRONT,
m cn
14
knit on RS; purl on WS
1
D
16
Sl 4 sts to cn and hold in FRONT,
9
[email protected]
nt
sts
n
Berroco - Norah’s Vintage Afghan
KEY TO CHART 5
CHART 5
CHART 5
7
5
1
purl on RS; knit on WS
5
8
k1tbl
3
6
1
4
,
knit on RS; purl on WS
7
purl on RS; knit on WS
5
k1tbl
3
Make Knot - k in front, back, then front
of next st (3 sts made in 1), sl these 3 sts
back to LH needle and knit them, then
sl second and first st over third st
CHART 5
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
Sl 1 st to cn and hold in FRONT, k1,
k1 from cn
Sl 1 st to cn and hold in BACK, k1,
k1 from cn
1
CHART 5 NOTES
On RS, beg at A, work to C, rep between B
and C, end at D.
On WS, beg at D, work to B, rep between C
and B, end at A.
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
C
2
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
KEY TO CHART 5
K,
d in FRONT,
7
Make Knot - k in front, back, then front
of next st (3 sts made in 1), sl these 3 sts
back to LH needle and knit them, then
sl second and first st over third st
3
NT,
ld in BACK,
knit on RS; purl on WS
Sl 1 st to cn and hold in FRONT, k1,
k1 from cn
CHART 6
Sl 1 st to cn and hold in BACK, k1,
k1 from cn
21
CHART 6
20
19
CHART 5 NOTES
On RS, beg at A, work to C, rep between B
and C, end at D.
On WS, beg at D, work to B, rep between C
and B, end at A.
17
15
13
11
9
18
16
KEY TO CHART 6
14
purl on RS; knit on WS
7
5
k1tbl on RS; p1tbl on WS
3
1
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
KEY TO CHART 6
knit on RS; purl on WS
purl on RS; knit on WS
k1tbl on RS; p1tbl on WS
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
www.berroco.com
CHART 6 NOTES
On WS, work from left to right.
12
knit on RS; purl on WS
21
19
17
15
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
CHART 6 NOTES
On WS, work from left to right.
On RS, work from right to left.
Work Rows 1 - 11, then rep Rows
12 - 21 six times.
10
21
19
6
4
17
15
13
11
9
7
5
13
3
1011
8
[email protected]
1
2
,
d
m cn
d
cn
Berroco - Norah’s Vintage Afghan
CHART 7
CHART 7
11
12
9
10
7
8
KEY TO CHART 7
11
knit on RS; purl on WS
5
6
9
purl on RS; knit on WS
3
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
1
D
C
Sl 4 sts to cn and hold
in FRONT, k4, k4 from cn
11
knit on RS; purl on WS
Sl 4 sts to cn and hold
in FRONT, k4, k4 from cn
Sl 4 sts to cn and hold
in BACK, k4, k4 from cn
D
6
KEY TO CHART 8
knit on RS; purl on WS
purl on RS; knit on WS
KEY TO CHART 8
knit on RS; purl on WS
5
purl on RS; knit on WS
3
RT - k2tog, leaving sts on LH needle,
then k the first st again, slipping sts
off LH needle
5
3
1
D C
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
1
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
On RS, beg at A, work to C, rep between
2
CHART 8 NOTES
C beg at A, work to C, rep between
OnDRS,
B and C, end at D.
On WS, beg at D, work to B, rep between
C and B, end at A.
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
CHART 8 NOTES
www.berroco.com
4
RT - k2tog, leaving sts on LH needle,
B
A
then k the first st again, slipping sts
off LH needle
CHART 8
D C
C
CHART 8
1
between
D
CHART 8
3
etween
1
1
5
ld in FRONT,
3
CHART
7 NOTES
7
On RS, beg at A, work to C, rep
between
B and C, end at D.
5
On WS, beg at D, work to B, rep
between
C and B, end at A.
3
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
ld in BACK,
A7
CHART
Sl 4 sts to cn and hold
in BACK, k4, k4 from cn
9
purl on RS; knit on WS
LH needle,
ipping sts
2
5
B
KEY TO CHART 7
CHART 7 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
4
7
11
[email protected]
Berroco - Norah’s Vintage Afghan
CHART 9
CHART 9
...
15
d hold in
1, k3 from cn
..
13
..
12
10
9
d hold in
p1, k1, p1 from cn
. ..
..
7
5
d hold in
om cn
3
. ..
..
..
. ..
..
...
C
knit on RS; purl on WS
13
Sl 3 sts to cn and hold in
BACK, p1, k1, p1, k3 from cn
Sl 3 sts to cn and hold in
BACK, p1, k1, p1, p3 from cn
Sl 3 sts to cn and hold in
BACK, k3, then p1, k1, p1 from cn
Sl 3 sts to cn and hold in
BACK, k3, p3 from cn
CHART 10
CHART 9 NOTES
On RS, beg at A, work to C, rep
3 between B to C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
..
...
5
3
D
knit on RS; purl on WS
..
3
1
. ..
..
C
4
2
Sl 2Bsts to cn and hold inABACK,
k2, k2 from cn
KEY TO CHART 10
...
5
D
purl on RS; knit on WS
C
7
. ..
..
7
1
KEY TO
CHART 10
1
9
Sl 3 sts to cn and hold in
CHART 9
BACK, k3, then p1, k1, p1 from cn
CHART 9 NOTES
On 11RS, beg at A, work to C, rep
between B to C, end at D.
9
On WS,
beg at D, work to B, rep
between C and B, end at A.
CHART 10
11
B and hold
A in
Sl 3 sts to cn
BACK, p1, k1, p1, p3 from cn
Sl 3 sts to cn and hold in
BACK, k3, p3 from cn
3
1
D
Sl 2 sts to cn and hold in FRONT,
CHART 10
k2, k2 from cn
knit on RS; purl on WS
3
CHART
10 NOTES
On RS, beg at A, work to C, rep
1
between
B and C, end at D.
On WS,
beg
D
C at D, work to B, rep
between C and B, end at A.
purl on RS; knit on WS
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
B
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
www.berroco.com
CHART
10 NOTES
On RS, beg at A, work to C, rep
12
..
13
2
Sl 3 sts to cn and hold in
BACK, p1, k1, p1, k3 from cn
15
purl on RS; knit on WS
15
4
purl on RS; knit on WS
KEY TO CHART 9
D
6
knit on RS; purl on WS
D
..
. ..
..
...
8
KEY TO CHART 9
1
hold in FRONT,
14
11
d hold in
1, p3 from cn
old in BACK,
...
16
[email protected]
C
Berroco - Norah’s Vintage Afghan
CHART 11
CHART 11
24
23
22
21
and hold in BACK,
ts from cn to LH needle
m, then k3 from cn
and hold in FRONT,
ts from cn to LH needle
m, then k3 from cn
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
D
C
B
A
KEY TO CHART 11
knit on RS; purl on WS
23
purl on RS; knit on WS
21
Sl 6 sts to cn and hold in BACK,
k3, sl last 3 sts from cn to LH needle
and purl them, then k3 from cn
Sl 3 sts to cn and hold in FRONT,
k3, sl last 3 sts from cn to LH needle
and purl them, then k3 from cn
CHART 11 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
19
17
15
13
11
9
7
5
3
1
www.berroco.com
13
D
[email protected]
C
Berroco - Norah’s Vintage Afghan
CHART 12
CHART 12
n WS
16
15
n WS
. .
13
l on WS
cn and hold in
p2 from cn
. .
14
12
11
10
9
8
cn and hold in
, k2 from cn
7
.
5
to cn and hold in
k2, sl last st on cn to
dle and k1tbl, k2
n
to cn and hold in
, k2, sl last st on cn to
dle and k1tbl, k2
n
. .
.
6
4
3
2
1
D
C
B
A
KEY TO CHART 12
CHART 1
knit on RS; purl on WS
purl on RS; knit on WS
to C, rep
at D.
to B, rep
at A.
.
k1tbl on RS; p1tbl on WS
.
Sl 2 sts to cn and hold in
BACK, k2, p2 from cn
Sl 2 sts to cn and hold in
FRONT, p2, k2 from cn
15
. .
13
11
9
7
.
5
Sl 3 sts to cn and hold in
BACK, k2, sl last st on cn to
LH needle and k1tbl, k2
from cn
Sl 3 sts to cn and hold in
FRONT, k2, sl last st on cn to
LH needle and k1tbl, k2
from cn
. .
3
1
D
C
CHART 12 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
www.berroco.com
14
[email protected]
Berroco - Norah’s Vintage Afghan
CHART 13
CHART 13
to cn and hold in
, k4, k4 from cn
7
8
5
6
3
4
1
2
D
C
p
B
A
CHART 13
KEY TO CHART 13
7
knit on RS; purl on WS
5
purl on RS; knit on WS
Sl 4 sts to cn and hold in
FRONT, k4, k4 from cn
CHART 13 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
www.berroco.com
15
3
1
D
C
[email protected]
Berroco - Norah’s Vintage Afghan
CHART 14
CHART 14
on WS
.
23
on WS
21
and hold in
1 from cn
n and hold in
k2 from cn
.
17
15
and hold in
1 from cn
.
.
22
.
.
20
.
18
.
16
14
13
n and hold in
k2 from cn
o cn and hold in
2, k2 from cn
k to C, rep
d at D.
k to B, rep
d at A.
.
19
.
24
11
9
7
5
.
3
.
.
.
.
KEY TO CHART 14
.
.
purl on RS; knit on WS
21
.
.
Sl 1 st to cn and hold in
BACK, k2, p1 from cn
Sl 2 sts to cn and hold in
FRONT, p1, k2 from cn
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
21
2
19
A
.
17
15
Sl 1 st to cn and hold in
BACK, k2, p1 from cn
13
Sl 2 sts to cn and hold in
FRONT, p1, k2 from cn
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
.
.
19
9
.
3
9
1
.
.
1
11
3
7
5
13
5
CHART 14
11
CHART 14 NOTES
On17RS, beg at A, work to C, rep
between B and C, end at D.
On15WS, beg at D, work to B, rep
between C and B, end at A.
7
CHART 14 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
www.berroco.com
On WS, beg at D, work to B, rep 16
between C and B, end at A.
23
4
Sl 2 sts to cn and hold in
FRONT, k1, k2 from cn
23
Sl 2 sts to cn and hold in
FRONT, k1, k2 from cn
6
Sl 1 st to cn and hold in
BACK,
k2, k1 from cn
B
knit on RS; purl on WS
Sl 1 st to cn and hold in
BACK, k2, k1 from cn
8
purl on RS; knit on WS
C
KEY TO CHART 14
10
knit on RS; purl on WS
1
D
.
.
.
.
12
.
.
.
.
.
D
[email protected]
nd hold in
om cn
Berroco - Norah’s Vintage Afghan
CHART 15
CHART 15
16
15
14
13
12
11
10
9
d hold in
rom cn
8
7
6
ep
5
rep
3
4
2
1
D
C
B
A
CHAR
KEY TO CHART 15
knit on RS; purl on WS
15
purl on RS; knit on WS
13
Sl 2 sts to cn and hold in
BACK, k2, k2 from cn
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
CHART 15 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
11
9
7
5
3
1
D
www.berroco.com
17
C
[email protected]
next
se 5 sts
Rep
and 1
D to
C to
Berroco - Norah’s Vintage Afghan
CHART 16
CHART 16
69
68
67
66
65
64
63
62
61
59
.
57
.
.
60
.
58
56
55
.
53
.
54
52
51
50
49
47
.
45
.
.
.
.
. .
.
.
.
.
48
.
46
44
43
.
41
.
.
.
.
.
42
40
39
38
37
.
35
33
. .
.
.
.
.
. .
.
36
34
32
31
.
29
.
.
.
27
.
30
28
KEY TO CHART 16
25
.
23
21
. .
knit on RS; purl on WS
.
.
15
13
KEY TO CHART 16
knit on RS; purl on WS
67
purl on RS; knit on WS
7
3
1
F
E
D
KEY TO CHART 16
Sl 2 sts to cn and hold in
BACK, k2, k2 from cn
69
knit on RS; purl on WS
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
67
purl on RS; knit on WS
Bobble - knit in front and back of next
st twice (5 sts made in 1); * sl these 5 sts
back to LH needle and knit them. Rep
from * once more. Slip sts 4, 3, 2 and 1
over 5th st - 1 st remains
.
Bobble - knit in front and back of next
st twice (5 sts made in 1); * sl these 5 sts
back to LH needle and knit them. Rep
from * once more. Slip sts 4, 3, 2 and 1
over 5th st - 1 st remains
5
.
65
63
61
.
Sl 2 sts to cn and hold in
BACK, k2, p2 from cn
Sl 2 sts to cn and hold in
FRONT, p2, k2 from cn
59
CHART
16 NOTES
Sl 2 sts to cn and hold in
On RS, beg at A, work to C, rep from
BACK, k2, k2 from cn
18
www.berroco.com
B57 to C once more; work to E, rep from D to
Sl 2 sts to
cn and hold in
E once, end at F.
20
61
.
65
63
61
14
12
10
59
57
8
55
6
Sl 2 sts to cn and hold in
BACK, k2, p2 from cn
Sl 2 sts to cn and hold in
FRONT, p2, k2Cfrom cn
67
16
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
65
63
18
Sl 2 sts to cn and hold in
BACK, k2, k2 from cn
69
11
9
22
Bobble - knit in front and back of next
st twice (5 sts made in 1); * sl these 5 sts
back to LH needle and knit them. Rep
from * once more. Slip sts 4, 3, 2 and 1
over 5th st - 1 st remains
.
69
24
purl on RS; knit on WS
19
17
26
4
2
B
A
59
CHART 16 NOTES
On RS, beg at A, work to C, rep from
57
B to C once more; work to E, rep from D to
E once,55 end at F.
On WS, beg at F, work to D, rep from
E to D 53once more; work to B, rep from C to
B once, end at A.
53
51
49
CHART
47
45
43
41
51
49
47
. .
. .
[email protected]
45
39
37
35
Berroco - Norah’s Vintage Afghan
CHART 17
CHART 17
12
11
10
nd hold in BACK, k3,
sts from cn back to
purl them, then k3
9
8
7
6
5
nd hold in FRONT, k3,
sts from cn back to
purl them, then k3
4
3
2
1
D
C
B
A
KEY TO CHART 17
knit on RS; purl on WS
11
purl on RS; knit on WS
Sl 6 sts to cn and hold in BACK, k3,
slip left-most 3 sts from cn back to
LH needle and purl them, then k3
from cn
Sl 6 sts to cn and hold in FRONT, k3,
slip left-most 3 sts from cn back to
LH needle and purl them, then k3
from cn
9
7
5
3
1
D
CHART 17 NOTES
On RS, beg at A, work to C, rep
between B and C, end at D.
On WS, beg at D, work to B, rep
between C and B, end at A.
www.berroco.com
19
[email protected]
C
T,
Berroco - Norah’s Vintage Afghan
CHART 18
.
71
.
.
.
70
69
.
67
.
65
.
.
.
.
.
.
.
.
.
68
.
66
64
63
.
61
.
.
.
.
.
62
60
59
T,
FRONT,
m cn to
then
CHART 18
.
57
.
55
.
.
.
.
.
.
.
.
.
58
.
56
54
53
.
51
.
.
.
.
.
52
50
49
47
45
.
.
.
.
.
.
.
.
.
.
.
48
.
46
44
43
41
.
.
.
.
.
.
42
40
39
38
37
35
.
33
.
.
.
.
.
.
.
.
.
.
.
36
34
32
31
29
.
.
.
.
.
.
30
28
27
.
25
.
.
23
.
.
.
.
.
.
.
.
.
26
24
22
21
.
19
.
.
.
17
.
15
13
.
.
.
.
.
KEY TO CHART 18
. .
.
.
.
.
.
knit on RS; purl on WS
20
18
.
16
71
.
.
.
.
purl on RS; knit on WS
.
7
.
5
3
.
.
.
1
KEY TO CHART 18
.
71
knit on RS; purl on WS
69
purl on RS; knit on WS
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
.
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
.
Sl 2 sts to cn and hold in BACK,
k2, p2 from cn
Sl 2 sts to cn and hold in FRONT,
p2, k2 from cn
Sl 4 sts to cn and hold in FRONT, 20
www.berroco.com
k2, slip left-most 2 sts from cn to
LH needle and purl them, then
67
65
.
.
.
.
10
67
Sl 2 sts to cn and hold in BACK,
k2, k2 from cn
.
.
6
4
2
63
61
Sl 2 sts to cn and hold in BACK,
k2, p2 from cn
59
Sl 2 sts to cn and hold in FRONT,
p2, k2 from cn
.
57
Sl 4 sts to cn and hold in FRONT,
k2, slip left-most 2 sts from cn to
LH needle and purl them, then
k2 from cn
.
.
55
53
63
51
.
59
49
47
57
53
8
65
Sl 2 sts to cn and hold in FRONT,
k2, k2 from cn
CHART 18 NOTES
On61 WS, work from left to right.
On RS, work from right to left.
55
12
69
11
9
14
.
.
45
43
[email protected]
41
.
.
needle,
ng sts
Berroco - Norah’s Vintage Afghan
CHART 19
CHART 19
38
37
36
35
34
33
31
hold in
hen
29
old in
1, RT,
25
old in
n p1,
old in
n p1,
..
.. .
.
.. .
.. .
..
.
.. .
.. .
.. .
..
.. .
27
23
21
19
17
15
13
11
9
7
. . .. .
.
. . .
. .
. .
.
.. .
.. .
.
.. .
. .
..
.
.. .
.. .
. .. .
..
.. . .
3
1
C
KEY TO CHART 19
37
knit on RS; purl on WS
35
purl on RS; knit on WS
..
.
.
.
33
RT - k2tog, leaving sts on LH needle,
then k the first st again, slipping sts
off LH needle
.
. .
. .
..
31
Sl 2 sts to cn and hold in
BACK, p1, RT, p1, then
p2 from cn
29
Sl 4 sts to cn and hold in
FRONT, p2, then p1, RT,
p1 from cn
25
27
23
Sl 4 sts to cn and hold in
FRONT, k1, p1, then p1,
RT, p1 from cn
www.berroco.com
Sl 4 st to cn and hold in
FRONT, p1, k1, then p1,
30
28
26
24
22
20
18
16
14
KEY TO CHART 19
5
D
.
.. .
.. . .
.. .
.. .
. .
. . .. . .
. . .
.
. ..
. .
.. .
.. .
.. .
.. .
.. .
.
.. .
. .
32
21
17
12
35
10
33
8
31
6
purl on RS; knit on WS
..
.
.
.
RT - k2tog, leaving sts on LH needle,
then k the first st again, slipping sts
off LH needle
.
. .
. .
..
Sl 4 sts to cn and hold in
FRONT, p2, then p1, RT,
p1 from cn
.. .
..
.
..
.
.
. .
..
.
.
CHART 19 NOTES
On RS, beg at A, work to C, rep
between B and C once, end at D.
On WS, beg at D, work to B, rep
between C and B once, end at A.
..
2
27
B
25
A
CHART 19
23
Sl 4 sts to cn and hold in
FRONT, k1, p1, then p1,
RT, p1 from cn
Sl 4 st to cn and hold in
FRONT, p1, k1, then p1,
RT, p1 from cn
4
29
Sl 2 sts to cn and hold in
BACK, p1, RT, p1, then
p2 from cn
19
21
37
knit on RS; purl on WS
21
19
. . ..
. . .
.
..
. .
.. .
.. .
.
..
. .
17
.
.
.
.
.
.
15
13
11
9
7
5
3
[email protected]
nd hold in
om cn
nd hold in
rom cn
nd hold in
om cn
nd hold in
rom cn
rep
at D.
rep
at A.
Berroco - Norah’s Vintage Afghan
CHART 20
CHART 20
19
17
15
.
13
.
.
.
.
20
.
18
.
16
.
14
12
11
.
9
7
5
.
.
.
3
.
.
.
.
10
8
6
4
2
1
D C
B A
KEY TO CHART 20
knit on RS; purl on WS
19
purl on RS; knit on WS
17
Sl 2 sts to cn and hold in
BACK, k2, k2 from cn
.
Sl 2 sts to cn and hold in
FRONT, k2, k2 from cn
.
Sl 2 sts to cn and hold in
BACK, p2, k2 from cn
Sl 2 sts to cn and hold in
FRONT, p2, k2 from cn
CHART 20 NOTES
On RS, beg at A, work to C, rep
between B and C once, end at D.
On WS, beg at D, work to B, rep
between C and B once, end at A.
www.berroco.com
22
15
.
13
.
.
.
11
.
9
7
5
3
1
D C
[email protected]
.
.
.
Berroco - Norah’s Vintage Afghan
ABBREVIATIONS & TERMS
sl: slip
sm: slip marker
SSK: Slip 2 stitches knitwise, insert point of left hand
needle through fronts of these 2 stitches and knit 2
together.
SSP: Slip 2 stitches knitwise, transfer these 2 stitches
back to left hand needle, purl 2 together through the
back loops.
st(s): stitch(es)
TBL: through back loop(s)
tog: together
w&t: wrap and turn, a method of concealing a hole
created in short row shaping. With yarn held in back,
slip stitch to be wrapped purlwise, then bring yarn
between needles to the front. Slip that same stitch
back to the left needle, then bring the yarn to the back
again. Turn your work. Unless otherwise indicated,
each time you come to a wrapped stitch when
working subsequent rows, slip the wrap back over
stitch and onto needle, then work the wrap together
with its accompanying stitch.
WS: wrong side
wyib: with yarn in back
wyif: with yarn in front
yo: yarn over
end on WS: end having just completed a Wrong Side
row.
end on RS: end having just completed a Right Side
row
Stockinette stitch (St st): Knit 1 row, purl 1 row
alternately when working on straight needles. The knit
side is the right side of work. Knit EVERY round when
working in the round on a circular needle.
Reverse St st (Rev St st): Purl 1 row, knit 1 row
alternately when working on straight needles. The purl
side is the right side of the work. Purl EVERY round
when working in the round on a circular needle.
GARTER ST: Knit EVERY row when working on
straight needles. Knit 1 round, purl 1 round when
working on a circular needle.
beg: beginning
CC: contrasting color
cdd (centered double decrease): Slip 2 together (as if
to k2tog), knit 1, pass the 2 slipped stitches over.
cn: cable needle
cont: continue
dec: decrease
dpn: double pointed needles
est: established
inc: increase
K: knit
k tbl: knit through the back loop(s)
k2tog: Knit 2 stitches together
k3tog: Knit 3 stitches together
LH: left hand
MC: main color
M1: Pick up horizontal strand between stitch just
worked and next stitch from front to back, place on
left hand needle, knit this stitch through the back (1
stitch increased).
M1L: Work as for M1.
M1p: Pick up horizontal strand between stitch just
worked and next stitch from front to back, place on
left hand needle, purl this stitch through the back (1
stitch increased).
M1pL: Work as for M1p.
M1pR: Pick up horizontal strand between stitch just
worked and next stitch from back to front, place on left
hand needle, purl this stitch through the front (1 stitch
increased).
M1R: Pick up horizontal strand between stitch just
worked and next stitch from back to front, place on left
hand needle, knit this stitch through the front (1 stitch
increased).
p: purl
p tbl: purl through the back loop(s)
pat(s): pattern(s)
pm: place marker
psso: pass slip stitch over knit stitch
p2tog: purl 2 stitches together
p2sso: pass 2 slip stitches over knit stitch
p3tog: purl 3 stitches together
rem: remaining
rep: repeat
RH: right hand
rnd(s): round(s)
RS: right side
sc: single crochet
www.berroco.com
23
[email protected]