Review Changes (RFQ 575775,3 RFQ 575775,4) 1 of 4 https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_... Metro iSupplier Portal Access Navigator RFQ: 575775,3 > Favorites Home Logout Preferences Help Amendment History (RFQ 575775) > Review Changes (RFQ 575775,3 RFQ 575775,4) View RFQ 575775,3 View RFQ 575775,4 Header Label Amendment Description RFQ 575775,3 RFQ 575775,4 Add proposal format requirement Add response to online discussion questions; extend proposal due date; add for evaluation criteria revised cost breakdown; provide clarification in scope concerning alternate 1. Requirements Action Requirement Updated Scope and Functional Requirements The construc on work planned for this project includes the demoli on of defined exis ng site features and pavement and subsequent construc on and installa on of landscape and gardens, water features, plaza and hardscape, historic wall reconstruc on, paths, parking, roads, u li es, site furnishings and all other plan components as defined in the plans and specifica ons; as well as all permits and temporary facili es as needed. Section Scope Detail and Functional Requirements Target Value . The project is composed of separate zones within the park with the following main components: 1. Cockrill Spring Zone. This is a 6.5‐acre area fron ng on West End Avenue. Work includes the reconstruc on of the historic perimeter wall, dayligh ng of exis ng Cockrill Spring and crea ng a surface pool and water feature, Cockrill spring plaza, permanent sea ng for Musicians Corner integrated into the landscape, construc on of mul ple pedestrian paths and bridges, gardens, trees and landscaping, u li es, site furnishings, irriga on, stormwater systems, and other enhancements. 2. Parthenon Parking Zone. The Parthenon Parking Zone is defined in the plans and project manual as alternate 1 and should not be included in the guaranteed maximum price. The proposed cost for alternate 1 should be entered into the appropriate sec on of the revised cost breakdown spreadsheet. This is a 6.8‐acre area immediately north and east of the Parthenon. Works includes the development of new pedestrian paths, parking, an entry plaza space, events lawn, gardens, trees, landscaping, u li es, site furnishings, irriga on, stormwater systems, and other enhancements. If Metro elects to issue a no ce to proceed for the Parthenon Parking Zone add/alternate, we an cipate that such no ce will be issued in September of 2014. Added The attached Construction Documents and Project Manual contain technical specifications which Scope Detail establish minimum qualifications for the general contractor and sub-contractors. Please be sure that and Functional all construction team members meet the minimum qualifications stated in the technical Requirements specifications. . Metro reserves the right to issue multiple purchase orders for various phases of work contingent upon available funding. The entire project, including any accepted alternates, should be completed by Summer 2015. Notes and Attachments RFQ 575775,3 6/4/2014 1:22 PM Review Changes (RFQ 575775,3 RFQ 575775,4) 2 of 4 Title Type Description Subcontractor File Form File Substitution Request Form File 2014 Sustainable Sites Initiative (SSI) Checklist Project Manual File Construction Plans Cost Breakdown File File Pre-proposal File Sign-In Sheet Pre-Proposal File Powerpoint Complete the spreadsheet and submit Excel file back with response. Name file "Subcontractor Form" Must be completed and submitted by the Prime Contractor by the deadline shown in the solicitation. Please completed and submit back as part of Methodology and Approach https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_... Category Last Updated By Last Updated Usage To Supplier [email protected] 30-May-2014 One-Time To Supplier [email protected] 30-May-2014 One-Time To Supplier [email protected] 30-May-2014 One-Time To Supplier To Supplier Completed and To submit back with Supplier quote. File should be in excel format and named "Cost Breakdown" Amendment #1 To Supplier Amendment # 1 To Supplier [email protected] 30-May-2014 One-Time Publish to Update Delete Catalog [email protected] 30-May-2014 One-Time [email protected] 30-May-2014 One-Time [email protected] 30-May-2014 One-Time [email protected] 30-May-2014 One-Time RFQ 575775,4 Title Type Description Subcontractor File Form Substitution File Request Form Complete the spreadsheet and submit Excel file back with response. Name file "Subcontractor Form" Must be completed and submitted by the Prime Category Last Updated By Last Updated Usage To Supplier [email protected] 04-Jun-2014 One-Time To Supplier [email protected] 04-Jun-2014 One-Time Publish to Update Delete Catalog 6/4/2014 1:22 PM Review Changes (RFQ 575775,3 RFQ 575775,4) 3 of 4 File 2014 Sustainable Sites Initiative (SSI) Checklist Project Manual File Construction Plans Cost Breakdown File Pre-proposal Sign-In Sheet Pre-Proposal Powerpoint Online Discussion Questions and Responses Revised Cost Breakdown Spreadsheet File File File File File https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_... Contractor by the deadline shown in the solicitation. Please completed To and submit back Supplier as part of Methodology and Approach To Supplier To Supplier DO NOT USE. See To revised Cost Supplier Breakdown Spreadsheet Amendment #1 To Supplier Amendment # 1 To Supplier Amendment # 4 To Supplier Amendment # 4; To Completed and Supplier submit back with quote. File should be in excel format and named "Revised Cost Breakdown" [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time [email protected] 04-Jun-2014 One-Time Lines No changes exist. Controls Schedule Label RFQ 575775,3 RFQ 575775,4 Preview Date Open Date Close Date 30-May-2014 09:12:26 05-Jun-2014 14:00:00 04-Jun-2014 12:51:44 12-Jun-2014 10:00:00 Contract Terms No changes exist. View RFQ 575775,3 View RFQ 575775,4 Home Logout Preferences Help Privacy Statement Copyright (c) 2006, Oracle. All rights reserved. 6/4/2014 1:22 PM Review Changes (RFQ 575775,3 RFQ 575775,4) 4 of 4 https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_... 6/4/2014 1:22 PM
© Copyright 2026 Paperzz