Amendment 4 - Rock City Construction Co., Inc.

Review Changes (RFQ 575775,3 RFQ 575775,4)
1 of 4
https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_...
Metro iSupplier Portal Access
Navigator
RFQ: 575775,3 >
Favorites
Home Logout Preferences Help
Amendment History (RFQ 575775) >
Review Changes (RFQ 575775,3 RFQ 575775,4)
View RFQ 575775,3
View RFQ 575775,4
Header
Label
Amendment
Description
RFQ 575775,3
RFQ 575775,4
Add proposal format requirement Add response to online discussion questions; extend proposal due date; add
for evaluation criteria
revised cost breakdown; provide clarification in scope concerning alternate 1.
Requirements
Action Requirement
Updated Scope and Functional Requirements
The construc on work planned for this project includes the demoli on of defined exis ng site features and
pavement and subsequent construc on and installa on of landscape and gardens, water features, plaza and
hardscape, historic wall reconstruc on, paths, parking, roads, u li es, site furnishings and all other plan
components as defined in the plans and specifica ons; as well as all permits and temporary facili es as
needed.
Section
Scope Detail
and Functional
Requirements
Target
Value
.
The project is composed of separate zones within the park with the following main components:
1. Cockrill Spring Zone. This is a 6.5‐acre area fron ng on West End Avenue. Work includes the
reconstruc on of the historic perimeter wall, dayligh ng of exis ng Cockrill Spring and crea ng a
surface pool and water feature, Cockrill spring plaza, permanent sea ng for Musicians Corner
integrated into the landscape, construc on of mul ple pedestrian paths and bridges, gardens, trees
and landscaping, u li es, site furnishings, irriga on, stormwater systems, and other enhancements.
2. Parthenon Parking Zone. The Parthenon Parking Zone is defined in the plans and project manual as
alternate 1 and should not be included in the guaranteed maximum price. The proposed cost for
alternate 1 should be entered into the appropriate sec on of the revised cost breakdown
spreadsheet. This is a 6.8‐acre area immediately north and east of the Parthenon. Works includes
the development of new pedestrian paths, parking, an entry plaza space, events lawn, gardens, trees,
landscaping, u li es, site furnishings, irriga on, stormwater systems, and other enhancements. If
Metro elects to issue a no ce to proceed for the Parthenon Parking Zone
add/alternate, we an cipate that such no ce will be issued in September of 2014.
Added
The attached Construction Documents and Project Manual contain technical specifications which
Scope Detail
establish minimum qualifications for the general contractor and sub-contractors. Please be sure that and Functional
all construction team members meet the minimum qualifications stated in the technical
Requirements
specifications.
.
Metro reserves the right to issue multiple purchase orders for various phases of work contingent
upon available funding.
The entire project, including any accepted alternates, should be completed by Summer 2015.
Notes and Attachments
RFQ 575775,3
6/4/2014 1:22 PM
Review Changes (RFQ 575775,3 RFQ 575775,4)
2 of 4
Title
Type Description
Subcontractor File
Form
File
Substitution
Request Form
File
2014
Sustainable
Sites Initiative
(SSI) Checklist
Project Manual File
Construction
Plans
Cost
Breakdown
File
File
Pre-proposal File
Sign-In Sheet
Pre-Proposal File
Powerpoint
Complete the
spreadsheet and
submit Excel file
back with
response. Name
file "Subcontractor
Form"
Must be
completed and
submitted by the
Prime Contractor
by the deadline
shown in the
solicitation.
Please completed
and submit back
as part of
Methodology and
Approach
https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_...
Category Last Updated By
Last
Updated
Usage
To
Supplier
[email protected] 30-May-2014 One-Time
To
Supplier
[email protected] 30-May-2014 One-Time
To
Supplier
[email protected] 30-May-2014 One-Time
To
Supplier
To
Supplier
Completed and
To
submit back with Supplier
quote. File should
be in excel format
and named "Cost
Breakdown"
Amendment #1
To
Supplier
Amendment # 1 To
Supplier
[email protected] 30-May-2014 One-Time
Publish
to
Update Delete Catalog
[email protected] 30-May-2014 One-Time
[email protected] 30-May-2014 One-Time
[email protected] 30-May-2014 One-Time
[email protected] 30-May-2014 One-Time
RFQ 575775,4
Title
Type Description
Subcontractor File
Form
Substitution
File
Request Form
Complete the
spreadsheet and
submit Excel file
back with
response. Name
file "Subcontractor
Form"
Must be completed
and submitted by
the Prime
Category Last Updated By
Last
Updated
Usage
To
Supplier
[email protected] 04-Jun-2014 One-Time
To
Supplier
[email protected] 04-Jun-2014 One-Time
Publish
to
Update Delete Catalog
6/4/2014 1:22 PM
Review Changes (RFQ 575775,3 RFQ 575775,4)
3 of 4
File
2014
Sustainable
Sites Initiative
(SSI) Checklist
Project Manual File
Construction
Plans
Cost
Breakdown
File
Pre-proposal
Sign-In Sheet
Pre-Proposal
Powerpoint
Online
Discussion
Questions and
Responses
Revised Cost
Breakdown
Spreadsheet
File
File
File
File
File
https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_...
Contractor by the
deadline shown in
the solicitation.
Please completed To
and submit back
Supplier
as part of
Methodology and
Approach
To
Supplier
To
Supplier
DO NOT USE. See To
revised Cost
Supplier
Breakdown
Spreadsheet
Amendment #1
To
Supplier
Amendment # 1
To
Supplier
Amendment # 4
To
Supplier
Amendment # 4; To
Completed and
Supplier
submit back with
quote. File should
be in excel format
and named
"Revised Cost
Breakdown"
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
[email protected] 04-Jun-2014 One-Time
Lines
No changes exist.
Controls
Schedule
Label
RFQ 575775,3
RFQ 575775,4
Preview Date
Open Date
Close Date
30-May-2014 09:12:26
05-Jun-2014 14:00:00
04-Jun-2014 12:51:44
12-Jun-2014 10:00:00
Contract Terms
No changes exist.
View RFQ 575775,3
View RFQ 575775,4
Home Logout Preferences Help
Privacy Statement
Copyright (c) 2006, Oracle. All rights reserved.
6/4/2014 1:22 PM
Review Changes (RFQ 575775,3 RFQ 575775,4)
4 of 4
https://isupplier.nashville.gov/OA_HTML/OA.jsp?OAFunc=PONINQ_...
6/4/2014 1:22 PM