CIRCLE K GENERAL CONTRACTOR BID FORM Store No: Line & Olive Address: Shreveport, LA Date: General Contractor: Number of Days to Complete the Project: Target ___ calendar days Totals for GC for listed items: $0 Totals expected this job: $0 Includes all concrete drives and post tension slabs AFE $ Available Funds: Description Supervision & Administration Job and Storage Trailers Temporary Utilities, Water, Power, Phone, and Fax Temporary Sanitary Facilities Construction Fencing & Barricading Dumpsters, Hauling & Dump Fees Equipment Costs (Backhoe, Excavator, Crane, etc) Temporary Drives & Sidewalks Overhead & Profit Building Cleaning $0 CK Task Number 2000.10 2000.21 2000.22 2000.23 2000.24 2000.25 X Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2000.26 2000.09 2009.20 Total General Conditions / OH & P: EXCAVATION / DIRT WORK (Site & Off-Site) Description Cut / Fill Import / Export Cut and Place On-Site Dust Control Erosion Control Subgrade Stabilization Rock Excavation / Hard Dig Asphalt Paving On-Site Asphalt Paving Off-Site Total Bid Amount X CK Task Number 1100.02 1100.03 1100.04 1100.10 1100.11 1100.07 1130.03 1103.14 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Excavation/Dirt Work : LANDSCAPE Total Bid Amount X Description Decomposed Granite, Sod, or Landscaping Rock Shrubbery and Trees Irrigation Top Soil import CK Task Number 1105.03 1105.04 1105.02 1105.01 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Landscape: CONCRETE Total Bid Amount X Description Building Concrete Concrete Paving On-Site Screen Wall Footings Retaining Wall Footings Curb & Gutter Temporary / Extruded Curb Sidewalks Light Pole Bases Storm water structures On-site Decorative Concrete On-Site Miscellaneous (Ramps, Stairs, Etc.) Trash Enclosure Pad Curb & Gutter Off-Site Off-Site Sidewalks CK Task Number 2000.01 1130.04 1110.03 1110.05 1100.08 1100.09 1137.00 1100.12 1100.13 1100.14 1100.15 1100.16 1103.08 1103.17 R:\CLIENTS\Circle K\2013\Louisiana\Bid Instructions\Copy of Bid Breakdown Document Template 7-29-13 (2) Unit Type Qty Unit Cost Total Bid Amount 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8/10/20135 CIRCLE K GENERAL CONTRACTOR BID FORM Store No: Line & Olive Address: Shreveport, LA Date: General Contractor: Number of Days to Complete the Project: Target ___ calendar days Concrete Paving Off-Site 1103.15 0.00 0.00 0.00 0.00 0.00 Post tension slab included in base bid totals below: Total Concrete: MASONRY X Description Building Masonry Screen Walls Retaining Walls Stone & Architectural Enhancements Trash Enclosure Walls CK Task Number 2000.02 1110.02 1110.04 2000.03 2102.02 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Masonry: STEEL Total Bid Amount X Description Building Steel Miscellaneous Building Steel Trash Enclosure Gates and Bollards ACM fascia at Store Front furnished and installed by contractor, supporting structure (incl roofing) by GC CK Task Number 2000.06 2000.07 2102.01 Unit Type Qty Unit Cost 0.00 0.00 0.00 1116.01 0.00 0.00 0.00 0.00 0.00 Total Steel: ROOFING & STUCCO Total Bid Amount X Description Roofing Materials and Installation Metal Roofing Building Stucco / EIFS Gutters & downspouts, flashings CK Task Number 2111.01 2111.01 2000.05 2111.02 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Roofing & Stucco: CARPENTRY & DRYWALL Total Bid Amount X Description Building Framing Trusses Interior Framing Insulation Drywall Doors, Frames, Hardware, and Restroom Accessories Ceiling (Black Ceiling supplied by Circle K) FRP CK Task Number 2000.04 2000.08 2000.11 2000.12 2000.13 2101.00 2100.00 2105.00 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CK TO SUPPLY CK TO SUPPLY Total Carpentry & Drywall: GLASS & GLAZING Total Bid Amount X Description Storefront Glazing and Doors Interior Glazing CK Task Number 2000.15 2000.16 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 Total Glass & Glazing: TILE AND FLOORING Total Bid Amount X Description Floor Tile (Installation only including mastic and grout) Bathroom Floor Tile (Installation only) CK Task Number 2104.01 2104.02 R:\CLIENTS\Circle K\2013\Louisiana\Bid Instructions\Copy of Bid Breakdown Document Template 7-29-13 (2) Unit Type Qty Unit Cost Total Bid Amount 0.00 0.00 8/10/20135 CIRCLE K GENERAL CONTRACTOR BID FORM Store No: Line & Olive Address: Shreveport, LA Date: General Contractor: Number of Days to Complete the Project: Target ___ calendar days Bathroom Wall Tile (Installation only) Silicone Acrylic Concrete Sealer 2104.02 2104.03 Floor tile (furnished by CK) 12 x 12 crossville. Floor tile bull nose 3 inch rounded radius top (furnished by CK) 2104.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CK TO SUPPLY CK TO SUPPLY Total Tile and Flooring: PAINTING X Description Building Painting Site Painting Fuel Related Painting Parking Lot Striping Off-Site Striping Off-Site Painting & Signage CK Task Number 2000.17 1130.02 6025.02 1130.01 1103.18 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Painting: PLUMBING Total Bid Amount X Description Building Plumbing On-Site Sanitary Sewer Off-Site Sanitary Sewer Water Service to Site Natural Gas Service Piping CK Task Number 2108.00 1103.19 1103.20 1100.20 1100.22 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Plumbing: ELECTRICAL Total Bid Amount X Description Building Electric (CPI Panels & EMS supplied by Contractor) SES and Service Panels - Materials Only Parking Lot Light Installation (fixtures & poles suppled by CK) Site Electric On-Site Primary & Secondary Power Off-Site Primary Power Off-Site Street Lights Traffic Signal Installation or Relocation Work CK Task Number 2103.00 2000.19 1100.23 1100.24 1100.25 1103.22 1103.23 1103.24 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Electrical: MECHANICAL Total Bid Amount X Description HVAC Installation HVAC Units supplied by Contractor CK Task Number 2200.02 2200.01 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 Total Mechanical: MISCELLANEOUS Total Bid Amount X Description CK Task Number R:\CLIENTS\Circle K\2013\Louisiana\Bid Instructions\Copy of Bid Breakdown Document Template 7-29-13 (2) Unit Type Qty Unit Cost Total Bid Amount 8/10/20135 CIRCLE K GENERAL CONTRACTOR BID FORM Store No: Line & Olive Address: Shreveport, LA Date: General Contractor: Number of Days to Complete the Project: Target ___ calendar days Demolition On-Site Demolition Off-Site Asbestos Removal Construction Staking Concrete/Compaction Testing Millwork Installation Walk-In Cooler/Beer Cave insulated panels installation Walk-In Cooler/Beer Cave doors installation Site & Off-Site Signage (Supply & Installation) Traffic Control 1100.26 1103.25 1100.28 1100.29 1100.30 5235.00 5449.02 5000.02 5730.02 1100.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Miscellaneous: ABOVE GROUND GASOLINE Description Canopy Cost Canopy Lighting - Fixtures Only Dispenser (1 - Hose, 3 - Product) with CRINDS and valance Dispenser (1 - Hose, 4 - Product) with CRINDS and valance CRIND topper Suspended topper Hoses, Nozzles, Swivels - Regular GSM device Universal D-box Power controller Trash/Amenity units (installation only) Air/Vac unit (electrical installation only) Bollards (supply and installation) Vacuum (Likely by Vendor along with air) Dispenser Installation Calibration & Start Up Tank, Line, and Stage I Testing allowance (final testing) Demolition of Old Canopy Island lane markers (1 through 12) Concrete - Gas Canopy Footings Concrete - Canopy Slab Gas Electric ALL Fuel Related Graphics (RVIe) - Installation (Assume JMP) Estimate for CK supplied precision testing and documents X CK Task Number 6200.01 6215.00 6500.01 6500.02 6500.03 6500.04 6500.05 6500.06 6500.08 6500.09 6500.10 5820.00 6015.00 6025.01 6015.00 6005.00 6500.11 6100.07 EXP 6220.00 1145.00 6200.02 6200.03 6200.04 6100.01 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY CK TO SUPPLY Total Above Ground Gasoline: BELOW GROUND GASOLINE Description Tank Hole Excavation Tank Hole Excavation - Wet hole Gas Tank Installation Observation Monitoring Wells Clean Backfill sand (as applicable) Gas & Vapor Piping Materials Gas Piping (Supply & Installation) Vapor Recovery Piping (Supply & Installation) 20,000 Double Wall compartment Jacketed Tanks 10,000 Double Wall Jacketed Tanks Tank Freight Tank Monitoring System (Install only) Submerged pumps Dispenser Containment Misc equip - flex connectors, ball valves, entry boots, etc Estimate for CK supplied precision testing and documents Environmental Issues Remove Existing Tanks Total Bid Amount X CK Task Number 6600.01 6600.02 6605.00 6600.06 6100.03 6100.03 6100.04 6600.03 6600.04 6600.05 6125.00 6115.00 6100.05 6100.06 1100.32 1100.06 EXP R:\CLIENTS\Circle K\2013\Louisiana\Bid Instructions\Copy of Bid Breakdown Document Template 7-29-13 (2) Unit Type CK TO SUPPLY CK TO SUPPLY Qty Unit Cost Total Bid Amount 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8/10/20135 CIRCLE K GENERAL CONTRACTOR BID FORM Store No: Line & Olive Address: Shreveport, LA Date: General Contractor: Number of Days to Complete the Project: Target ___ calendar days Concrete - Tank Slab UST Electric #1 ALL Tank Accessories - Installation #2 Sheet Piling #3 Dewatering (Alternate) #4 Dewatering Treatment (Contaminated Water) #5 Soil Haul and disposal (non-impacted) 1139.00 6100.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Below Ground Gasoline: STORE EQUIPMENT & CIRCLE K SUPPLIED ITEMS Description Cabinets Installation Walk-In Cooler & Reach-In Door Installation (incl shelving) Manager's Office Desk (supply & installation) Coffee Equipment Installation Roller Grill Equipment Install Fountain & Ice Machine Equipment Installation (incl BIB Equip) Frozen Beverage Equipment Installation Dairy Case Installation Sign and Graphics Installation Throughout Gondola assembly Intercom, & Speakers Installation Door chime system installation Fire Extinguishers (5 lb) Install X CK Task Number 5325.00 5440.02 4000.00 5020.00 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 5002.02 5040.02 5120.01 5730.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Allowance for tax and freight in cost estimate at % 0.15 % Total Store Equipment & Circle K Supplied Items: SIGNAGE Total Bid Amount 0 0.00 0.00 X Description Signage Mech & Elect Installation (signs highlited above) LED Aimer Installation by GC CK Task Number 6710.03 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 Total Signage: DEVELOPMENT COSTS Total Bid Amount X Description Building/Canopy/UST/Site permit fees Impact and Other Government Fees Electrical & Utility connect Fees Escrow Agreements UST closure contractor by CK CK Task Number 0000.01 0000.02 0000.03 0000.07 Unit Type Qty Unit Cost 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Development Costs: Totals by CK R:\CLIENTS\Circle K\2013\Louisiana\Bid Instructions\Copy of Bid Breakdown Document Template 7-29-13 (2) Total Bid Amount 0.00 8/10/20135
© Copyright 2026 Paperzz