Generator Power Factor Requirements Control Area Point of

Generator Power Factor Requirements
Control Area
HE
CIN
SIGE
LGEE
IPL
NIPS
METC/CONS
ITC/DECO
ALTW
CWLD
AMRN
IP
CILC
CWLP
SIPC
ATCLLC/WPS/WEC/MGE/UPPI/ALTE
XEL-NSP
MP
GRE
OTP
MDU
Wolverine
MEC
EES - LA/ TX /MS
EES - ARK
AECC
CLECO
SMEPA
City of Alexandria /CLECO
LAFA
Point of Interconnection* At Generator Terminal Bus
lag 0.95 lead 0.95
lag 0.95 lead 0.9
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95 <20MW
lag 0.9 lead 0.95 >20MW
lag 0.9 lead 0.93
lag 0.9 lead 0.93
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.9 lead 0.95**
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.892 lead 0.93
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
***
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
lag 0.95 lead 0.95
Effective Date
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/17/2010
3/8/2006
5/6/2010
5/6/2010
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/8/2006
9/21/2011
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/8/2006
3/8/2006
9/1/2009
5/19/2015
5/19/2015
5/26/2015
5/27/2015
6/2/2015
5/13/2015
5/26/2015
* Point of Interconnection to the transmission system
**The reactive power requirements set forth for ATCLLC apply to all generating facilities interconnected to ATCLLC’s transmission facilities, with the exception of:
1.)
2.)
3.)
The Kewaunee and Point Beach nuclear reactor power plants, the reactive power requirements for which are governed by existing FERC‐approved Interconnection Agreements,
Wind‐powered generating facilities, the reactive power requirements for which are governed by the provisions of Order No. 661‐A of the FERC, and
Generating facilities that were in existence at the time of ATCLLC’s inception (1/1/2001), continue to maintain their pre‐existing output level, and were interconnected to either:
a). ATCLLC’s transmission facilities, the reactive power requirements for which are governed by existing FERC‐approved Interconnection Agreements
and MISO’s First Revised Rate Schedule No. 4 Operating Protocols for Existing Generators, or
b). the facilities of an LDC interconnected to ATCLLC’s transmission facilities as the power factor requirements were established at the time of
interconnection to the LDC facilities and remain unchanged.
***AECC generation facilities interconnected under the "Power Coordination Interchange and Transmission Service Agreement" between Entergy and AECC dated June 27, 1977, restated October 1, 2001 and
precursor agreements continue to maintain the power factor requirements established at the time of interconnection. AECC facilities interconnected under separate Interconnection agreements are:
1.)
Oswald Generating Facility, lag 0.95 Lead 0.95
2.)
Magnet Cove Generating facility, lag 0.95 lead 0.97.
Lag = Generator operating at an over‐excited mode (ie‐ injecting MVAR)
Lead = Generator operating at an under‐excited mode (ie‐ absorbing MVAR)