3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath • leanandabradetheoutersheathwithanapprovedabrasivepaperfor150mmbeyond C thesheathremovalpoint.Marktheremovalpointoftheoutersheathasindicatedonthe relevantjointinginstructionusingaChinagraphpencil. • orcableswithsemi-conductingoutersheaths,eithergraphiteoranextrudedlayer,extra F careshouldbetakentoensurethatalltracesofconductivematerialareremoved. • seanapprovedtooltoremovethesheath.checkthetoolcuttingwheelissettothe U correctdepthtoavoiddamagingthecopperwirescreensbelow. • tartingattheremovalpointmakeacircularcutaroundthecable.Cutalongthecableto S thepositionofthesheathremovalpoint,andremovethesheath. U N C O N TR O LL ED 3.1 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 1 emovethefabricorplastictapewrapfromthescreenwireusinganapprovedknife, R takingcarenottodamagethecopperwiresbelow. • nwindthecopperwiresandlaythembackalongtheoversheathinthepositionrequired U bythejointbeingmadeandsecurewithPVCtape.Ifpreparingforaterminationalength ofredmasticsealingtapeshouldbeappliedtotheoutersheathfollowingtheappropriate instruction. 3.1.2 Removing the Bonded Polymeric Screen • heapprovedbondedscreenstrippingtoolcanbeusedtoleavevariouslengthsofblack T insulationscreenfromtheoutersheathcut.Thismeasurementvariesdependinguponthe typeofjoint: • Single-Corestraightjoints=40mm. • Single-Corebranchjoints=80mm. • Trifurcatingjoints=100mm. • Potends=80mm. • Single-Coreterminations=40mm. U N C O N TR O LL ED • Section 3 I Page 2 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 mearathincoatingofSiliconegreaseovertheconductingscreenlayer.Startingatthe S openendofthecable,setthetooltothecorrectcuttingdepthsothattheentirescreen isremovedwithonlytheminimumamountofinsulation.Itisessentialthatthecoreisas straightaspossibleforthisoperationotherwisetracesofthescreenmaybeleftbehind. • ontinueturningthetooluntilitbuttsupagainstthestopposition(dependantonthe C screenterminationpoint)andcontinuetoturnthetooluntilasmoothrightangledtaperis produced.Testthetoolfirstlyontheoverlapsectionofthecoreifrequired. • heinsulationnowrequirespolishingsmoothwithanappropriatealuminiumoxidegrit T paper(minimum150grade)untilsmoothandfreeofridges.Tofinishthisprocess,reverse thepaperand'buffup'withthesmoothside. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 3 Cleananddegreasetheinsulationwithanapprovedsolventwipetoremovealltracesof anyremainingloosematerial.Alwayswipefromtheopencoreendtowardsthescreen wirestoavoidcontaminatingtheinsulationwithcarbonfromtheremainingscreen. 3.1.3 Removing the Polymeric Insulation • UsetheapprovedAlroctoolandsetthe'stopgauge'totheconnectorinsertiondepth. • ositionthetoolattheopencoreendandadjustthebladetotherequireddepth;justdeep P enoughsothebladedoesnotdamagetheconductor. • otatethetoolalongthecoreusingthespiralcutsettinguntilthestopgaugepreventsit R frommovinganyfurther. U N C O N TR O LL ED • Section3IPage4 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 emovethetoolandtheinsulationspiral.Carefullyremovetheremainingconductorscreen R usinganapprovedknife. 3.2 Single-Core Lead Covered Cables 3.2.1 Removing the Outer Serving or Sheath • arkthepositionoftheservingorsheathterminationasindicatedontherelevantjointing M instruction. • akeacircularcutatthismarkusinganappropriateapprovedtool.Checkthatthecutis M onlythreequartersthroughthesheaththickness. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section3IPage5 owmakealengthwisecutalongthesheathtowardsthesheathcutpositiontakingcare N nottodamagetheunderlyingleadsheath. • ifttheedgeofthesheathandunwrapalongitslength,tearingoffatthecircularcutpoint. L Theuseofagastorchmayassistthisoperationifnecessary. 3.2.2 Removing the Lead Sheath • leananddegreasetheleadsheathusingtheapprovedsolventwipes.Markthelead C sheathattheremovalpointasindicatedontherelevantjointinginstructionusinga Chinagraphpencil. U N C O N TR O LL ED • Section 3 I Page 6 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 seanapprovedhackknifetomakeanindentedcircularcutaroundtheleadsheath, U takingcaretoonlycutpartwaythroughthesheath. • uttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriate C approvedhackknife.TakecarenottodamagetheCopperWoventapebelow. • pentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheath O againsttheringcut. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 7 Removing the Copper Woven Tape (CWT) • nwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan U approvedknifetoleaveasmoothfinish. 3.2.4 Removing the Insulation Screen • arkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe M relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint. • nwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainst U thetwinebinder.Removeanycarbonpaperbelowthescreentothesametermination position,followedbytwooftheinsulationpapers. U N C O N TR O LL ED 3.2.3 Section3IPage8 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Removing the Insulation Papers • nlyremovethepapersafterfittingthebarriertubingasdescribedinsection4.1.1. O Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointing instruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersand clearbarriertubetakingcarenottodamagetheconductorbelow. • Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement. • Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge. • Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe. U N C O N TR O LL ED 3.2.5 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 9 Three-Core Paper Insulated Cables 3.3.1 Removing the Outer Hessian Serving or (PE) Sheath • arkthepositionoftheservingorsheathterminationasindicatedontherelevantjointing M instruction. • Wearsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingat theremovalpointandscoreinfrontofthebinderusinganapprovedknife. • emovetheservingwiththeapprovedknifeandheatfromagastorchifrequiredorinthe R caseofapolyethylenesheathusetheapprovedtoolforthisoperation. N C O N TR O LL ED 3.3 Removing the Steel Wire Armour • laceawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe P relevantjointinginstruction. U 3.3.2 Section3IPage10 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 singanapprovedsaw,makeacircularcutaroundthearmoursatthebinderposition.Cut U throughonlyhalfthewidthofthearmourtoavoiddamagingtheleadsheathbelow. • earsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewat W atimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards. • emovethebinderandliftthearmourswithahackknifesotheyare90°tothecable. R Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolvent wipes. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 11 Removing the Inner Bitumen Layer • earsuitableglovesforthisoperation.Scorearoundtheinnerbeddinglayerswithan W approvedknifeadjacenttotheverticalarmourstakinggreatcarenottoscoreintothe underlyingleadsheath. • ttheopencableendliftthebitumenimpregnatedtextilelayerwithaknifeandunwrapit A backtotheverticalarmourposition,tearingitagainstthescorepreviouslymade.Theuse ofagastorchmayassistthisprocess. • pplymoreheattothefinallayerofbitumenontheleadsheathandarmoursandwipe A offanyremainingtracesofbitumenwithapprovedsolventwipes.Theleadsheathand armoursshouldbecleanandbrightafterthisprocess. U N C O N TR O LL ED 3.3.3 Section 3 I Page 12 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 pplytwowrapsofblackmasticsealantaroundtheleadsheathbuttingupagainstthe A raisedarmours. • akeamarkwithaChinagraphpencil130mmfromtheendoftheoutersheath.Wrapa M lengthofcoppermesharoundtheleadsheathuptothe130mmmark. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 13 aythearmoursdownoverthemastic,ensuringthatnonearecrossed,andsecurethe L armoursoverthecoppermeshareawiththetwowormdriveclipsprovided. • pplyalayerofPVCtapetothewormdriveclipstocoveranysharpedges.Positionthe A armoursealingsleeve30mmbeyondthearmouredgeandshrinkdownstartingatthelead sheathendbeforeproceedingtowardsthecableover-sheath. U N C O N TR O LL ED • Section3IPage14 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Removing the Lead Sheath • leananddegreasetheleadsheathusingapprovedsolventwipes.UseaChinagraph C penciltomarktheleadsheath430mmfromtheoutersheathasindicatedontherelevant jointinginstruction. • earsuitableglovesforthisoperation.Useanapprovedhackknifetomakeacircular W indentedringcutaroundtheleadsheathatthepencilmark,takingcaretoonlycutpartway throughthesheath. • romtheopencableend,cuttheleadsheathlongitudinallytothecircularcutusingthe F appropriateapprovedhackknife.TakecarenottodamagetheCopperWovenTape(CWT) below. U N C O N TR O LL ED 3.3.4 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section3IPage15 pentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheath O againsttheringcut. 3.3.5 Removing the Copper Woven Tapes (CWT) • UnwindtheCWTandremovethecorefillerscarefullywiththesidecutters. • ewindtheCWTtightlyaroundthecablecoresatthecrutchpositionforadistanceof R 20mmfromtheleadsheath,thencutandtieoff.Removeanysurplustapewithinsulated sidecutters. U N C O N TR O LL ED • Section 3 I Page 16 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Removing the Insulation Screen • singanapprovedsolventwipe,removeanysurpluscablecompoundfromthescreened U coreinsulation. • arkthescreenpapersattheremovalpointindicatedintherelevantjointinginstruction. M Tieafinewirebinderaroundthescreensatthispoint. • arefullyunwrapthefirst50mmofthescreen.Securetheendofthecoreinsulationpapers C withnumberedphasetapematchingthenumeralpaper.Unwindtheremainderofthe screentotheterminationpointandremoveitbyneatlytearingagainsttheappliedbinder. N C O N TR O LL ED 3.3.6 U • R emovethenumeralpaperandonelayerofpaperbelowtothesamepointasthescreen papers,usingthesamemethodandmarkingthecoreswiththematchingnumberedphasetape. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 17 Note:Itisimportanttomarkthecoreswiththecorrectphasenumbersimmediatelyaftereach numeralpaperisremoved. ED Removing the Insulation Papers • Onlyremovethepapersafterfittingtheclearbarriertubesdescribedinsection4.1.3. • arktheclearbarriertubeoverthecorepapersatthepointofremovalasindicatedinthe M appropriatejointinginstruction. O N TR O LL 3.3.7 U N C • U singasharpknifecutaroundthecoreandthroughthepaperstakingcarenottodamagethe conductorbelow. Section3IPage18 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement. • oundingoftheconductorwithwaterpumporsimilarplierswillassistthisoperationand R willhelppreparetheconductorforinsertionintotheappropriateconnector. • Unwrapthepaperstothecutpositionandtearoffagainsttheclearbarriertubeedge. • Cleananysurpluscompoundfromthecableconductorwithanapprovedsolventwipe. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 19 Three-Core HSL Paper Insulated Cables 3.4.1 Removing the Outer Serving or Sheath • arkthepositionoftheservingorsheathterminationasindicatedontherelevantjointing M instruction. • earsuitablegloveswhileremovingtheserving.Placeawirebinderaroundtheservingat W theremovalpointandscoreinfrontofthebinderusinganapprovedknife. • Removetheservingwiththeapprovedknifeandheatfromagastorchifrequired. U N C O N TR O LL ED 3.4 Section3IPage20 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Removing the Steel Wire Armour • Placeawirebinderaroundthearmourwiresatthepointofremovalasindicatedinthe relevantjointinginstruction. • singanapproveddepthguardedorjuniorsawmakeacircularcutaroundthearmours U atthebinderposition.Cutthroughonlyhalfthewidthofthearmourtoavoiddamagingthe leadsheathsbelow. • earsuitablegloveswhileremovingthearmour.Liftandunwrapthearmourwiresafewat W atimeandbreakthemoffagainstthebinderbybendingthembackwardsandforwards. U N C O N TR O LL ED 3.4.2 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 21 ttheopencableendliftthebitumenimpregnatedlayerwithaknifeandunwrapitbackto A thearmourcutposition.Removeitatthispoint,takingcarenottodamagetheunderlying leadsheaths. • emovethebinderandliftthearmourswithanapprovedhackknifesotheyare90°tothe R cable.Cleanoffalltracesofbitumenfromthewiresusingagastorchandapprovedsolvent wipes. 3.4.3 Removing the Bitumen Layer N C O N TR O LL ED • penoutthethreeleadsheathscarefullyandremovethebitumen/paperlayerandfillers O fromallthreesheathsuptothepointwheretheunderarmourbeddingremains. U • Section 3 I Page 22 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 pplymoreheattothefinallayerofbitumenontheleadsheathsandwipeoffalltracesof A bitumenwiththeapprovedsolventwipes. • Theleadsheathsshouldbefreefrombitumenoncompletionofthistask. • uilduptheremaininginnerbeddingusingtheblackmasticfromtheThree-Coretransition B jointandtheHSLmoduletosuitthesupportring’sinnerdiameter.Fitthesupportringover thebuilduptape,positioningit60mmfromtheupliftedarmours. U N C O N TR O LL ED • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 23 rapthelengthofsuppliedblackmasticbehindthesupportring,buttingitagainstthe W armourswires.Laythearmoursdownontotheringandsecurethemwithawirebinder. 3.4.4 Removing the Lead Sheaths • nlyremovetheleadsheathsafterfirstlyfollowingthenecessarystepsdescribedin O section4.1.5.(HSLmoduleapplication). • leananddegreasetheleadsheathsusingapprovedsolventwipes.UseaChinagraph C penciltomarktheleadsheathsattheremovalpointasindicatedontherelevantjointing instruction. • seanapprovedhackknife,makeacircularindentedringcutaroundtheleadsheathat U thepencilmark,takingcaretoonlycutpartwaythroughthesheath. N C O N TR O LL ED • uttheleadsheathacrossfromtheopencableendtothecircularcut.Useanappropriate C approvedhackknife.TakecarenottodamagetheCopperWoventapebelow. U • Section3IPage24 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 ED • O pentheleadsheathupalongthelengthofthecutandcarefullyunwraptheleadsheath againsttheringcut. Removing the Copper Woven Tape (CWT) • nwindtheCWTandcarefullyremoveitbycuttingitagainsttheleadsheathedgewithan U approvedknifetoleaveasmoothfinish. 3.4.6 Removing the Insulation Screen N C O N TR O LL 3.4.5 arkthescreenpaperswithaChinagraphpencilattheremovalpointindicatedinthe M relevantjointinginstruction.Tieatwinebinderaroundthescreenatthispoint. U • UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section3IPage25 nwrapthescreencarefullytotheterminationpointandremoveitbyneatlytearingagainst U thetwinebinder.Removeanycarbonpaperbelowthescreentothesametermination position,followedbytwooftheinsulationpapers. 3.4.7 Removing the Insulation Papers • nlyremovethepapersafterfittingthebarriertubingasdescribedinsection3.1.2. O Marktheinsulationpapersatthepointofremovalasindicatedintheappropriatejointing instruction.Usinganapprovedsharpknife,cutaroundthecorethroughthepapersand clearbarriertubetakingcarenottodamagetheconductorbelow. N C O N TR O LL ED • Removetheclearbarriertubebypullingtowardstheendwithagentletwistingmovement. U • Section 3 I Page 26 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Unwrapthepapersuptothecutpositionandtearoffneatlyagainstthebarriertubeedge. • Cleananysurpluscompoundfromthecableconductorwithanapprovedwipe. 3.5 Moisture Testing on Paper Insulated Cables • Fullpersonalprotectiveequipmentshallbewornatalltimesforthistest. • entlyheattheparaffinwaxcontaineronalowheat,insertthethermometerthroughoneof G therubbergrommetsinthetopandwaituntilthewaxreachesatemperatureof125°C. U N C O N TR O LL ED • • lwayshandlethepaperstobetestedwithgloves,asmoisturefromyourhandsisenough A togiveapositivetest. • Liftoutthebasketandplacethepapertapestobetestedinit. UK POWER NETWORKS 33KV JOINTING MANUAL I 2012 Section 3 I Page 27 Thesamplesfromthefollowinglayersshallbetested: • Innerandouterbeltpapers. • Paperorstringfillers. • Innerandoutercorepapers. • Immersethebasketcompletewithpapersintheparaffinwaxbathandnotetheresults. • Ifthereisnoreactionfromthewaxoritfrothsslightly,thepapersaredryandthecableisfit tobejointed. • Ifthewaxfrothsexcessivelyandacracklingnoiseisheard,thepapersarewetandthe cableshouldnotbejointed. U N C O N TR O LL ED • • Removetheheatfromcontainerandleavetocoolbeforemoving. • hewaxcanbere-useduntilitstartstodiscolourandthereisnoneedtodisposeofitafter T eachmoisturetest. Section3IPage28 UK POWER NETWORKS 33KV JOINTING MANUAL I 2012
© Copyright 2025 Paperzz