REQUESTS FOR BIDS MOWING AND LANDSCAPE MAINTENANCE OF VILLAGE PROPERTIES LEGAL NOTICE INVITATION TO BID TO PROVIDE MOWING AND LANDSCAPE MAINTENANCE OF VILLAGE PROPERTIES Sealed bids for Mowing and Landscape Maintenance of Village Properties will be received at the address listed below until Tuesday, April 7, 2015 at 10:00 a.m. Bids will be publically opened and read aloud at the above stated time and place. Proposals not physically received by the Village by 10:00 a.m. on Tuesday, April 7, 2015 will be returned, unopened to the firm. All proposals should be addressed to: Village of Oswego Re: (vendor name) Proposal for Mowing and Landscape Maintenance of Village Properties Attention: Tina Touchette Village Clerk 100 Parkers Mill Oswego IL 60543 Proposal packets are available online at http://www.oswegoil.org or at the Oswego Village Hall, 100 Parker’s Mill, Oswego, Illinois, 60543. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond from a company with an A-1 best rating, or a cashier’s check in the amount of ten percent (10%) of the bid and made payable to the client address Village of Oswego, Public Works Department, 100 Parker’s Mill, Oswego IL. 60543. No bid shall be withdrawn for a period of thirty (30) days after the bid opening date without the consent of the Village. Checks or drafts of unsuccessful bidders will be returned as soon as possible after opening and checking the bids. This contract is not subject to payment of Prevailing Wages. Each contractor is to submit their bid as indicated in the Specifications. Emailed or faxed bids will not be accepted. The Village reserves the right to reject any or all bids and to waive any informality in bidding. Award of Contract: The Village of Oswego Board of Trustees will make the final award of the proposal or contract. An Optional Meeting will take place at 10:00 a.m. on Tuesday, March 31, 2015 at the Public Works Facility, 100 Theodore Drive, Oswego IL. At this time maps will be provided and questions answered. 2 SPECIFICATIONS Mowing and Landscape Maintenance of Village Properties DEFINITIONS: The Term “Village” whenever used in the contract documents shall be construed to mean the Village of Oswego. I. Conditions: The Contractor is responsible for being familiar with all conditions, instructions, and documents governing this contract. Failure to make such preparations shall not excuse the Contractor from performance of the duties and obligations imposed under the terms of this contract. II. Insurance Requirements: The Contractor will be required to meet the Village of Oswego insurance requirements. Unless otherwise specified the Contractor shall, before commencing satisfactory to the Village of Oswego an additionally named insured in the following minimum amounts with specific coverage which includes underground, explosion, and collapse. Property Damage Bodily Injury $1,000,000 (each accident) $500,000 (each person) $1,000,000 (each accident) Workmen’s Compensation Insurance: III. All Liability imposed Workmen’s Compensation stature Employer’s Liability Insurance Contractual Liability Insurance $100,000 $500,000 Completed Operations Insurance Owned, Hired, and Non-Ownership Vehicle Bodily Injury and Property Damaged to the following Limits $500,000 Optional Meeting: An optional meeting will take place on Tuesday, March 31, 2015at 10:00 a.m. All interested vendors will meet at the Public Works Facility at 100 Theodore Drive. For further questions, contact the Public Works office at 630-554-3242. Contact with Village Employees. In order to ensure fair and objective evaluation, all questions related to this RFP, must be submitted in writing to Russ Garcia: [email protected] no later than 12:01 PM local time on Friday, April 3, 2015. Answers to all questions will be posted on the Village’s website for all to review. Contact with any other Village employee is expressly prohibited without prior consent of the persons so named herein. Vendors directly contacting Village employees will risk elimination of their proposal from further consideration. 3 IV. Equipment List: All bidders must provide a list of equipment they will use to complete the project. The Village reserves the right to determine the capability of the equipment and to reserve acceptance or terminate the Contract due to improper or deficient equipment. The Village may conduct a visit to the Contractor’s business facility to inspect all equipment that will be used to complete the project. V. Scope of Work: A. Contractor shall perform the maintenance, furnish all labor, equipment, and supplies for the mowing, string trimming, cleanup, and plant bed maintenance services for the Village properties, (see map) for the period commencing approximately May 15, 2015 and approximately April 15 in each successive year. Work shall continue through December 1 of each year, subject to conditions. 1. This work includes any and all spring, fall and winterization maintenance and care. The Contractor shall accomplish all lawn maintenance required under the contract during the hours allowed by the Village code which are 7:00 A.M. to 5:00 P.M. Monday through Friday and 8:00 A.M. to 4:00 P.M. on Saturday excluding observed holidays. Holidays shall be the legal holidays of New Year’s Day, Dr. Martin Luther King Jr. Day, Presidents’ Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day and the day after Thanksgiving Day, Christmas Eve and Christmas Day. The Public Works Department may grant, on an individual basis, permission to perform contract maintenance at other hours. All work shall be completed in a continuous manner, whereby the mowing, edging, trimming, etc., be completed before leaving the job site. B. Contractor must notify Village representative of their work schedule, to allow for inspection of maintenance work as needed. C. Prior to any mowing, remove litter from all sites. At no time shall any litter be mowed over. D. FINE CUT MOWING – All lawn areas shall be mowed every week, throughout the growing season, unless otherwise directed by a Village representative. Village Hall will be mowed on Mondays, unless otherwise directed by a Village representative. Areas to be mowed will be maintained at a height of two and half inches (2½”). Grass will be cut weekly or when it is one inch (1”) higher than the specified height. Grass next to light poles, trees, any permanent objects etc., shall be mechanically trimmed to the same height as specified above at the time of each mowing. All grass clippings and debris, shall be removed from the sidewalks, parking lots, and streets etc. at the time cutting takes place. Lawn mower blades shall be clean and kept sharp and well-adjusted to provide a clean cut. Cutting grass too closely (scalping) shall be avoided. Mowing patterns shall be changed regularly to avoid rutting. Use small mowers for difficult or tight areas where larger commercial mowing units cannot maneuver. Mowing shall be done optimally when the grass 4 is dry, however, mowing wet turf is acceptable. Bagging is not required, and grass clippings may be left on the grass providing no readily visible clumps remain on the grass surface after mowing. If clippings are excessive or diseased, they shall be removed after mowing to enhance overall turf appearance and to prevent matting, clumping and thatch buildup. In the case of fungal disease outbreaks, clippings will be collected and disposed off-site until the disease is controlled. The final appearance after mowing shall present a neat appearance. Care shall be taken with mowing equipment to avoid obstructions such as trees, shrubs, utility boxes, signage, buildings, etc., and the Contractor shall be responsible for damage caused by its operations. The Contractor shall be responsible for damage to any plant material or site features caused by the Contractor or his/her employees. The Contractor will be notified in writing of the specific nature of the damage and cost of repair. The Village will, at its option, invoice the Contractor for the payment, or reduce payment by the amount of the repairs to the Contractor. Mowing cycles shall commence on or about April 15 and continue through December 1, subject to conditions. The estimated number of occurrences is between fifteen (15) and thirty (30) per year. The contractor shall inspect sites on a weekly basis. All lawn areas shall be mowed to maintain a height of two and half inches (2½”), not to exceed three and a half inches (3½”) throughout the growing season, unless otherwise directed by a Village representative. At no time shall mowing remove more than one third (1/3) of the total leaf blade. E. MULCHING- All mulch spread is not to exceed two to three inches (2”-3”). Brown, shredded hardwood mulch will be applied during the spring. Mulch shall be applied to all perennial, shrub and tree beds. F. WEEDING- All landscaped areas will be inspected and maintained weekly and be kept weed free throughout the season. G. LANDSCAPE MAINTENANCE - Weekly visits to each area beginning the end of April through December 1, subject to conditions; a spring clean-up in March or early April and a complete mulching of all beds by May 30 in the first year of the contract (2015) and then all subsequent years mulching of all beds by May 15. 1. Landscape beds shall be kept free of weeds for the duration of this contract. Any weeds found within the bed shall be removed. Poison ivy shall be sprayed and removed. 2. All plants in the landscape beds shall be pruned in accordance with ANSIZ133.1 standards. Pruning shall be completed in the spring, fall, and late fall for winterization. Prune all other shrubs after dormancy to rejuvenate old canes and stems. Approximately one quarter (¼) of the stems shall be trimmed to two to three inches (2”-3”) above the ground. Remove the largest and oldest stems first. 3. Remove dead plant material. Notify the Village of Oswego of the date, type of plant, and location of removal within five (5) working days of removal. 4. Remove all trash from bed. 5 5. Rake leaves from all landscaped areas weekly and remove leaves from the site beginning the last week in September. Estimate five (5) occurrences per year. 6. Using an edger, edge all lawn areas, plant beds, tree rings, and where lawn abuts hard surfaces such as concrete, pavers, and cobble edges and gravel paths. Lawn edging cannot be done with a string trimmer. Estimate four (4) occurrences per year. 7. Monitor plants for disease and pest activity. Report any problems to the Village. 8. Deadhead perennial flowers to promote more flowering. Pinch back perennial flowers to promote more dense flowering. Cut back perennials to promote new growth from the base of the plants. Deadhead roses to promote new blossoms. H. RIGHT-OF-WAY ROUGH CUTTING - all ROW areas shall be mowed once a month with the first cut beginning in May prior to the Memorial Day Weekend and ending with the last cut by the end of October. Areas to be mowed will be maintained at a height of six inches (6”) throughout the growing season, unless otherwise directed by a Village representative. Grass next to light poles, trees, any permanent objects etc., shall be mechanically trimmed to the same height as specified above at the time of each mowing. All debris and litter shall be removed prior to cutting. I. FORECLOSURE MOWING – Contractor will be required to mow foreclosed properties on an as needed basis. This will be paid at the Hourly Rate as specified on the bid sheet. A Village representative will contact the Contractor with specific addresses. The Contractor will have five (5) business days after notification to complete work. The grass is to be brought to height of one half (1/2) of the existing height not to exceed eight inches (8”). For example: if grass is eight inches (8”) high at time of notification, the grass shall be cut to four inches (4”). J. EQUIPMENT – All equipment and vehicles used by the Contractor shall be maintained and in good working mechanical condition. K. SAFETY REQUIREMENTS 1. Contractor will be responsible for high visibility vests for employees when working within 25 feet (25’) of roadways. Safety cones shall be used around equipment and roadway. 2. The contractor shall take all due precautions to avoid damaging the sprinkler heads, quick couplers and drip irrigation hoses. Any damage to the infrastructure by the contractor during the terms of this contract shall be repaired at the sole expense of the contractor within ten (10) days of the damage. 3. Work in the right-of-way shall be conducted in accordance with the Illinois Manual of Uniform Traffic Control Devices and the Illinois Department of Transportation Standard Drawings: 6 a. 216-701901-04 Traffic Control Devices b. 216-701006-05 Off Road Operations, 2L, 2W EOP FROM PAVEMENT EDGE 15’ (4.5 m) TO 24" (600 mm) L. CLEAN-UP OPERATIONS 1. Blow debris and clean off walkways, steps, and other hardscapes. 2. Haul and dispose of all materials in accordance with State and local ordinances. M. MONTHLY REPORTS - During the growing season, submit monthly written reports outlining services performed, problems encountered, and any plant health concerns. The Contractor will be required to submit the monthly report by the 15th of the month, with the request for payment. Invoices summited without completed monthly reports will be rejected. The contractor shall provide the Owner with one contact person to whom all concerns can be addressed. N. METHOD OF MEASUREMENT - This work will be measured for payment by cycle completed per location for the type of work specified. O. BASIS OF PAYMENT 1. Mowing will be paid for at the contract unit price per cycle per location for the type completed. Only the initial mowing will be paid for during any given cycle. Any subsequent mowing required to obtain a height of not more than three and a half inches (3½”), (88.9 mm) or to disperse mowed material will be considered as included in the cost of the initial mowing. 2. Landscape maintenance will be paid for at the contract unit price per cycle per location. 3. The cost of inspections will not be paid for separately but shall be included in the cost of other items. 4. If, in the opinion of the Village of Oswego Public Works Department, the contractor has not or is not satisfactorily performing the work covered by this specification, and within forty eight (48) hours of receipt of a written demand from the Village of Oswego, for performance, has not cured a n y defect in performance specifically itemized in such demand, the Village of Oswego may, at its option: a. Withhold payment. b. Consider all or any part of this contract breached and terminate the contractor, or c. May hire another contractor to cure any defects in performance or complete all work covered by this specification for the remaining term of this contract. d. Any demand for performance shall be specifically delivered to contractor by personal delivery or certified or registered mail. The Village will make periodic inspections and follow up as needed with the contractor to discuss any issues etc. 7 VI. Billing/invoicing: All billing and invoicing will be done on a monthly basis with detailed itemized billing for each work item performed for each location. Billing will include the date, the work item performed, the cost per work item and the total cost. VII. Rejection of Bids: A. The Village reserves the right to cancel invitations for bids or requests for proposals without penalty when it is in the best interest of the Village. Notice of cancellation shall be sent to all individuals or entities solicited. B. The Village reserves the right to reject any or all bids, to waive any minor informality or irregularity in any bid, to negotiate changes and/or modifications with the lowest responsible bidder and to make award to the response deemed to be the most advantageous to the Village. Bidders shall be required to comply with all applicable federal, state and local laws, including those relating to employment of labor without discrimination on the basis of age, race, color handicap, sex, national origin or religious creed. C. Any bid not conforming with the specifications or requirements set forth by the Village in the bid request may be rejected. D. Bids may also be rejected if they are made by a bidder that is deemed un-responsible due to a lack of qualifications, capacity, skill, character, experience, reliability, financial stability or quality of services, supplies, materials, equipment or labor. VIII. Award of Bid: A. Formal bid submission shall be tabulated and a recommendation shall be prepared by the Department Head making a purchase subject to the formal bid requirements and sent to the Finance Director for review. If an award is to be made to other than the lowest bidder or if the purchase was not included in the fiscal year budget, justification must be made in writing. B. The items of work not specifically mentioned in the Schedule which are necessary and required to complete the work intended shall be done incidental to and as part of the items of work for which a unit price is given. No additional payment will be made for such incidental work. The Contractor shall be responsible for identifying all costs to complete the project on time and in order to create a functional and operational system in accordance with the Plans and Specifications. C. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price. D. The Finance Director shall send a recommendation and tabulation of all formal bids received for purchases meeting the requirements to the Village President and the Board of Trustees for consideration of awarding a formal contract. E. All awards made in accordance with this Code are final determinations. 8 F. Renewal Option: The contract shall be for a one year period, but may be extended on an annual basis at the option of the Village of Oswego in its sole and absolute discretion, for up to two additional years, on the terms in the bid document submitted in response to the request for proposal. IX. Change Orders: A. After a contract is awarded pursuant to the competitive bid procedures specified herein, additional purchases or modifications may be made under the contract, or the terms of the contract may be extended, without rebidding the materials, supplies, services or equipment involved, provided that the change order: 1. Is not of such a size or nature as to undermine the integrity of the original bidding process; and 2. Is germane to the original contract; and 3. Does not exceed twenty percent (20%) of the contractor amount; and 4. Is approved by the Board of Trustees. However, the Village Administrator, or his/her designee can approve change orders for amounts that are not greater than fifteen thousand dollars ($15,000.00). The Village Board shall be informed of any such Village Administrator approved change order at the next Village Board meeting. B. Change orders for contracts for public improvements shall be as provided by state law. X. Construction Contracts: A. The bidder must comply with all applicable laws prerequisite to doing business in the state. B. The bidder must have a valid Federal Employer Tax Identification Number or Tax Identification Number (for individuals). C. The bidder must provide a Statement of Compliance with provisions of the State and Federal Equal Opportunity Employer requirements. D. The bidder must provide evidence of any professional or trade license required by law or local ordinance for any trade or specialty area in which the Contractor is seeking a contract award. Additionally, the Contractor must disclose any suspension or revocation of such license held by the company, or of any director, officer or manager of the company. Any material changes to the Contractor’s status, at any time, must be reported in writing to the Village within 14 days of its occurrence. Failure to comply with this requirement is grounds for the Contractor to be deemed non-responsible. E. The bidder must provide the name and addresses of all known Subcontractors, the general type of work to be performed by these Subcontractors and the expected amount of money that each will receive under the contract. If at any time during the term of the contract a Contractor adds or changes any Subcontractors, he or she shall promptly notify, in writing, the Village Finance Director or their designee of the names and addresses of each new or replaced Subcontractor and the general type of work to be performed. F. The bidder must provide an affidavit indicating all incomplete work under Contractor and all pending Contractors, along with a schedule of the expected completion of each such contract. 9 XI. Additional Items A. CONTRACT REQUIREMENTS The successful bidder will be required to enter into a contract with the Village of Oswego consistent with the terms of this Request for Proposal which should contain the following terms: 1. Wage Rate Requirements a. The type of work under this contract is not subject to prevailing wages per the Illinois Department of Labor’s Prevailing Wage Landscaping FAQ (http://www.illinois.gov/idol/FAQs/Pages/Landscaping.aspx accessed March 4, 2015). B. INDEMNIFICATION To the fullest extent permitted by law, Contractor shall indemnify, defend, save and hold the Village, its trustees, officers, employees, agents, attorneys and lenders (collectively the “Indemnitees”) harmless from and against all loss and expense (including, but not limited to, reasonable attorney’s fees and other costs and expenses) by reason of the liability imposed by law upon the Indemnitees, or any of them, for damages because of bodily injury, occupational sickness or disease, including death, resulting therefrom, sustained by any employees of Contractor or subcontractors, while performing the work or while at the site where work under the Contract is being conducted or elsewhere, while engaged in the performance of Work under the Contractor, or sustained by any person or persons other than employees of Contractor, however such injuries may be caused, whether attributable to a breach of statutory duty or administrative regulation or otherwise, and such injuries for which liability is imputed to the Indemnitees, or any of them, or claims for property damage because of injury to or destruction of tangible property, directly or indirectly arising or alleged to arise out of the performance of or the failure to perform the work or the failure to protect the work or the site, or the condition of the work, the site, adjoining land or driveways, or streets or alleys used in connection with the performance of the work. Without limiting the generality of the foregoing, the defense and indemnity set forth in this section includes, subject only to the limitations contained in this section, all liabilities, damages, losses, claims, demands and actions on account of bodily injury, death or property loss to an Indemnitee or to any other person or entities, whether based upon, or claimed to be based upon, statutory, contractual, tort or other liability of any Indemnitee. In addition, such defense and indemnity shall include all liabilities, damages, losses, claims, demands and actions for defamation, false arrest, malicious prosecution or any other infringement or similar rights. The provisions of the indemnity provided for herein shall not be construed to indemnify any Indemnitee for its own negligence. If any, to the extent not permitted by law or to eliminate or reduce any other indemnification, right or remedy which the Village is otherwise entitled to assert. If any claim indemnified hereunder has not been settled or discharged when the work is completed, final payment of the Contract Sum shall not be due, unless and until Contractor provides a bond or other security equal to one hundred and fifty percent (150%) of the amount of such claim in a form and substance satisfactory to the Village. In any and all claims against any Indemnitee or any of its agents or employees by any employee of Contractor, anyone directly or indirectly employed by him or anyone for whose acts he may be liable, the indemnification obligation under this Section shall not be limited in any way by 10 any limitation on the amount or type of damages, compensation or benefits payable by or for Contractor under Worker’s Compensation acts or other employees benefit acts. C. SEXUAL HARRASSMENT During the entire term of the contract, Contractor shall have in full force and effect a written Sexual Harassment Policy, which complies with the Illinois Human Rights Act (775- ILCS 5/1-101 et.seq.) including at least the following: 1) a statement on the illegality of sexual harassment; 2) the definition of sexual harassment under Illinois Law; 3) a description of sexual harassment, utilizing examples; 4) an internal complaint process, including penalties; 5) the legal recourse, investigative and complaint process available through the Illinois Department of Human Rights (“Department”) and the Illinois Human Rights Commission (“Commission”); 6) directions on how to contact the Department and the Commission; and 7) protection against retaliation as provided by Section 6-101 of the Act. D. DRUG FREE WORKPLACE In compliance with State of Illinois Compiled Statutes, Chapter 30-580, The Contractor certifies and agrees that it will provide a drug free workplace by: 1. Publishing a Statement: a. Notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance, including cannabis, is prohibited in the Contractor’s workplace. b. Specifying the actions that will be taken against employees for violations of such prohibition. 2. Notifying the employee that, as a condition of employment on such Contract, the employee will: a. Abide by the terms of the statement; and b. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction. 3. Establishing a drug free awareness program to inform employees about: a. b. c. d. The dangers of drug abuse in the workplace; The Contractor’s policy for maintaining a drug free workplace; Available counseling, rehabilitation, or assistance programs; and Penalties imposed for drug violations. 4. Providing a copy of the Statement required by subsection (a) to each employee engaged in the performance of the Contract and to post the Statement in a prominent place in the workplace. 5. Notifying the contracting agency within ten (10) days after receiving notice of any violations as listed above. 6. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program, by any employee who is so convicted, as required by Section 5 of the Drug Free Workplace Act. 11 7 Assisting employees in selecting a course of action in the event drug counseling, treatment, and rehabilitation are required and indicating that a trained referral team is in place. 8 Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. 9 The Contractor will be required to sign a Drug Free Workplace Certification. E. SUBSTANCE ABUSE PREVENTION ON PUBLIC WORKS PROJECTS Before an employer commences work on a public works project as defined in 820 ILCS 130/2, the employer shall have in place a written program which meets or exceeds the program requirements in the Substance Abuse Prevention on Public Works Projects Act, to be filed with the public body engaged in the construction of the public works and made available to the general public, for the prevention of substance abuse among its employees. The testing must be performed by a laboratory that is certified for Federal Workplace Drug Testing Programs by the Substance Abuse and Mental Health Service Administration of the U.S. Department of Health and Human Services. At a minimum, the program shall include all of the following: 1. A minimum requirement of a nine (9) panel urine drug test plus a test for alcohol. Testing an employee's blood may only be used for post-accident testing, however, blood testing is not mandatory for the employer where a urine test is sufficient. 2. A prohibition against the actions or conditions specified in 820 ILCS 265/10. 3. A requirement that employees performing the work on a public works project submit to pre-hire, random, reasonable suspicion, and post-accident drug and alcohol testing. Testing of an employee before commencing work on a public works project is not required if the employee has been participating in a random testing program during the ninety (90) days preceding the date on which the employee commenced work on the public works project. 4. A procedure for notifying an employee who violates 820 ILCS 265/10, who tests positive for the presence of a drug in his or her system, or who refuses to submit to drug or alcohol testing as required under the program that the employee may not perform work on a public works project until the employee meets the conditions specified in subdivisions (2)(A) and (2)(B) of 820 ILCS 265/20. F. NON-COLLUSION The Contractor is barred from bidding for this contract as a result of a violation of either Section 33E-3 or Section 33E-4 of Chapter 38 of the Illinois Revised Statutes concerning bid rigging, rotating, kickbacks, bribery and interference with public contracts. The Contractor will be required to sign the Non-Collusion Certification. G. INELIGIBLE CONTRACTORS OR VENDORS The Contractor shall certify their review of the village debarment list found at www.oswegoil.org and to further comply with all provisions of Title 1-16-16 of the Village Code. Each proposal, bid or quotation must also include a listing of all intended subcontractors. 12 Bids received from any listed contractor in response to an invitation for bids shall be entered on the abstract of bids and rejected. Proposals, quotations, or offers received from any listed contractor shall not be evaluated for award or included in the competitive range, nor shall discussions be conducted with a listed offer or during a period of ineligibility. If the period of ineligibility expires or is terminated prior to award, the village may, but is not required to, consider such proposals, quotations, or offers. H. COMPLIANCE WITH LAWS AND REGULATIONS In connection with the performance of the work, the Contractor shall comply with all statutes, laws, regulations, and orders of federal, state, county, or municipal authorities which shall impose any obligation or duty upon the Contractor. IN WITNESS WHEREOF the parties hereto have executed or caused to be executed by their duly authorized agents, this contract in DUPLICATE, each of which shall be deemed original, on the day and year first written. ______________________________________________________________________________ Steve Jones, Village of Oswego Administrator Date Attest_________________________________ Title___________________________________ ______________________________________________________________________________ (Printed Name of Contractor) ______________________________________________________________________________ Address Date ______________________________________________________________________________ City State Zip Code ______________________________________________________________________________ Signature of Authorized Representative ______________________________________________________________________________ Title Date 13 DRUG FREE WORKPLACE CERTIFICATION In compliance with State of Illinois Compiled Statutes, Chapter 30-580, The Contractor certifies and agrees that it will provide a drug free workplace by: Publishing a Statement: A. Notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance, including cannabis, is prohibited in the Contractor’s workplace. B. Specifying the actions that will be taken against employees for violations of such prohibition. C. Notifying the employee that, as a condition of employment on such Contract, the employee will: 1. Abide by the terms of the statement; and 2. Notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five (5) days after such conviction. D. Establishing a Drug Free Awareness Program to inform employees about: 1. The dangers of drug abuse in the workplace; 2. The Contractor’s policy for maintaining a drug free workplace; 3. Available counseling, rehabilitation, or assistance programs; and 4. Penalties imposed for drug violations. E. Providing a copy of the Statement required by subsection (a) to each employee engaged in the performance of the Contract and to post the Statement in a prominent place in the workplace. F. Notifying the contracting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction. G. Imposing a sanction on, or requiring the satisfactory participation in a Drug Abuse Assistance or Rehabilitation Program, by any employee who is so convicted, as required by Section 5 of the Drug Free Workplace Act. H. Assisting employees in selecting a course of action in the event drug counseling, treatment, and rehabilitation are required and indicating that a trained referral team is in place. I. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. The undersigned affirms, under penalties of perjury, that he/she is authorized to execute this certification on behalf of the designated organization. ____________________________________________________________________________ (Printed name of Contractor) ____________________________________________________________________________ Address ____________________________________________________________________________ City State Zip Code ____________________________________________________________________________ Signature of Authorized Representative ____________________________________________________________________________ Title Date 14 NON-COLLUSION CERTIFICATE The Undersigned Bidder is not barred from bidding for this Contract as a result of a violation of either Section 33E-3 or Section 33E-4 of Chapter 38 of the Illinois Revised Statutes concerning bid rigging, rotating, kickbacks, bribery and interference with public contracts. ___________________________________________________________________________ (Printed Name of Contractor) ___________________________________________________________________________ Address ___________________________________________________________________________ City State Zip Code ___________________________________________________________________________ Signature of Authorized Representative ___________________________________________________________________________ Title Date 15 ELIGIBLE CONTRACTOR AND SUBCONTRACTOR CERTIFICATE The Undersigned Bidder is not barred from bidding for this Contract as a result of a violation of either Section 33E-3 or Section 1-19-16 of The Village Code regarding ineligible contractors. ___________________________________________________________________________ (Printed Name of Contractor) ___________________________________________________________________________ Address ___________________________________________________________________________ City State Zip Code ___________________________________________________________________________ Signature of Authorized Representative ___________________________________________________________________________ Title Date 16 STATE AND FEDERAL EQUAL OPPORTUNITY EMPLOYER CERTIFICATE The Undersigned Bidder agrees to comply with all State and Federal Equal Opportunity Employer laws. ___________________________________________________________________________ (Printed Name of Contractor) ___________________________________________________________________________ Address ___________________________________________________________________________ City State Zip Code ___________________________________________________________________________ Signature of Authorized Representative ___________________________________________________________________________ Title Date 17 REFERENCES VILLAGE OF OSWEGO General Information, list below current business references for whom you have performed work similar to that required by this proposal. Facility: _______________________________________________________ Address: ________________________________________________________ City, State, Zip Code:__________________________________________ Telephone Number: _______________________________________________ Contact Person: _________________________________________________ Dates of Service: _______________________________________________ Facility: _______________________________________________________ Address: ________________________________________________________ City, State, Zip Code: __________________________________________ Telephone Number: _______________________________________________ Contact Person: _________________________________________________ Dates of Service: _______________________________________________ Facility: _______________________________________________________ Address: ________________________________________________________ City, State, Zip Code: __________________________________________ Telephone Number: _______________________________________________ Contact Person: _________________________________________________ Dates of Service: _______________________________________________ If additional sheets are needed, please make copies. 18 SUBCONTRACTORS VILLAGE OF OSWEGO Provide the name, contact information, and value of work for each and every subcontractor which will be employed on this project. Subcontractor No. 1: _______________________________________________ Address: ________________________________________________________ City, State, Zip Code:______________________________________________ Telephone Number: _______________________________________________ Value of Work Subcontracted: _______________________________________ Nature of Work Subcontracted: _______________________________________ Subcontractor No. 2: _______________________________________________ Address: ________________________________________________________ City, State, Zip Code:______________________________________________ Telephone Number: _______________________________________________ Value of Work Subcontracted: _______________________________________ Nature of Work Subcontracted: _______________________________________ Subcontractor No. 3: _______________________________________________ Address: ________________________________________________________ City, State, Zip Code:______________________________________________ Telephone Number: _______________________________________________ Value of Work Subcontracted: _______________________________________ Nature of Work Subcontracted: _______________________________________ If additional sheets are needed, please make copies. 19 EQUIPMENT LIST VILLAGE OF OSWEGO Provide the name, contact information, and value of work for each and every subcontractor which will be employed on this project. Name Make Model Year If additional sheets are needed, please make copies. 20 Use (Fine Cut/Rough Cut/Etc.) BID SHEET Fine Cut Mowing Location 2015 2016 2017 SITES Park-N-Ride, Entire Site Village Hall - Entire Site Public Works Facility – Entire Site Park at South end of Harrison St Public Parking lot @ Harrison St South of W Washington St Promenade Outlot North of E Van Buren & E Washington St Utility Sites - TOTAL Booster Station #2 Well # 3 Well # 4 Well # 6 Well # 7 Well # 8 Well # 9 - No landscape beds Well # 10 Well # 11 $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle RIGHTS-OF-WAY Station Drive, Both Sides, Entire Limits Tuscany Trail Bike Path from Well 11 property east toward Orchard. (Both sides of the bike path) North St, at Intersection of North Adams and South Adams 1 Fine Cut Mowing Location Adams St, East Side from Jackson to Waubonsee Creek Monroe St Alley between Wilson & E Benton St South side of Douglas St near intersection of Main St, 380’ easement W Tyler St, South Side, from Adams to Main Penn Ct, South Side Washington Street, North Side, from Harrison to Adams Mill Road, North Side, Fox Chase S. to Village Limits Mill Rd, South Side, from Fox Chase S. to Village Limits Mill Rd Bike Path, from Rte 31 to Orchard Rd (from the curb to the path) Woolley Road, NS, from Plainfield Rd to Colchester Dr - TOTAL Woolley Road, North side, from Plainfield Road to Stonehill Lane Woolley Road, North Side, from Stonehill Lane Colchester Drive Hackney Lane Right-of-way, East of Morgan Valley Collins Road, North Side, from Grove Road to Buckskin Islands on Boulder Hill Pass - TOTAL Island on BHP across from Chesterfield Dr Island on BHP btw Orchard Ave & Church Parking lot Island on BHP btw US Rte 34 and Orchard Ave Island on BHP, south of Lombardy Ln BHP, East Side, US Rte 34 to Chesterfield BHP, East Side, Chesterfield to School Property 2015 2016 2017 $_______ $_______ per cycle per cycle $_______ $_______ per cycle per cycle $_______ $_______ per cycle per cycle $_______ $_______ $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle per cycle per cycle $_______ $_______ $_______ $_______ $_______ $_______ per cycle per cycle per cycle per cycle per cycle per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle 2 Fine Cut Mowing Location US Rte 34, North Side, Walgreens to PD Bridge TOTAL US Rte 34, North Side, Walgreens to Pfund Ct US Rte 34, North Side, BPH to Chesterfield US Rte 34, North Side, from Bridge to 100' North US Rte 34, North Side, from Bridge to BHP US Rte 34, North Side, from Chesterfield to PD US Rte 34, North Side, from PD to Bridge US Rte 34, North Side, from Pfund to Bridge Douglas Road, East Side, from Wiesbrook to Barnaby - TOTAL Douglas Road, East Side, from Long Beach to Saugatuck Douglas Road, East Side, from Wiesbrook to Long Beach Douglas Road, East Side, from Easement to Barnaby Douglas Road, East Side, at Farmington Lakes Dr (ComEd easement) Douglas Road, East Side, from Saugatuck to Barnaby Douglas Road, West Side, from Ferwood to Barnaby TOTAL Douglas Road, West Side, from Long Beach to Saugatuck Douglas Road, West Side, from Fernwood to Long Beach Douglas Road, West Side, from Easement to Barnaby Douglas Road, West Side, US 34 to Old Post Rd 2015 2016 2017 $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle 3 Fine Cut Mowing Location 2015 2016 2017 Douglas Rd (East side from Bluegrass Pkwy to service entrance near Sears Douglas Rd (West side from Bluegrass Pkwy to Dunn Funeral Home property US Route 30 Islands from Douglas Rd to US Rte 34 South side Right-of-way from Douglas Rd to Rte 34 North side Right-of-way from Douglas Rd to Rte 34 US Rte 34, North Side from N.S. of 2677 US Rte 34 to Heritage Drive Heritage entrance island at US Rte 34 TOTALS: $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle 4 Landscape Maintenance Location Park-N-Ride, Entire Site Village Hall - Entire Site Park at South end of Harrison St Public Parking lot @ Harrison St South of W Washington St Promenade Utility Sites - TOTAL Booster Station #2 Well # 3 Well # 4 Well # 6 Well # 7 Well # 8 Well # 10 Well # 11 TOTALS: 2015 2016 2017 $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $_______ $_______ $_______ per cycle per cycle per cycle $____________ per cycle 5 $____________ per cycle $____________ per cycle Right-of-Way Rough Cut Location 2015 Tuscany Trl (North side of road) Tuscany Trl (South side of road) Mill Rd (South side of road) Mill Rd (North side of road) Route 31 (West side of road) Minkler Rd (East side of road) Minkler Rd (West side of road) Cole Ave Lot Stephens Rd (South side of road) Stephens Rd (North side of road) Collins Rd (South side of road) Collins Rd (North side of road) Woolley Rd (North side of road) Woolley Rd (South side of road) Durham Ln (South side of road) Wolf’s Crossing (South side of road) Wolf’s Crossing (North side of road) Fifth St (West side of road) Fifth St (East side of road) Roth Rd (East side of road) Roth Rd (West side of road) Harvey Rd (East side of road) Harvey Rd (West side of road) Route 34 (East side of road) Route 34 (West side of road) TOTALS: $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $____________ 6 2016 per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $____________ 2017 per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $_______ $____________ per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month per month FORECLOSURE HOURLY RATE $_________________________ PRINTED NAME _____________________________________ SIGNED ______________________________________ TITLE ________________________________________ COMPANY ___________________________________ DATE ___________________ 7 CONTRACTOR BID AGREEMENT TO: Village of Oswego 100 Parker’s Mill Oswego, IL. 60543 The undersigned bidder, in compliance with your advertisement for bids for work as specified, and related documents prepared by or at the direction of the Village of Oswego, Owner, and being familiar with all conditions surrounding the work, including availability of labor and material, does hereby propose to furnish materials, labor, equipment and services and pay for same and shall perform all work required for the completion of the Project, in accordance with the Contract documents and at the price provided. The undersigned bidder understands that prevailing wages must be paid in connection with the work, and agrees to maintain and provide to the Village upon its request, required documentation to support compliance with the Illinois Prevailing Wage Act, in accordance with the law. Bidder certifies this bid to be for the project described in the Instruction to Bidders document and to be in accordance with plans, specifications and Contract documents, including the invitation for bids. In no event shall any delays or extensions of time be construed as cause or justification for payment of extra compensation to the Contractor. Any claims for an increase of the Contract time shall be made in writing to the Village within seven (7) days of the cause. Signed: ____________________________________________ Print Name: ____________________________________________ Title: ____________________________________________ Company Name: ___________________________________________ Date: ____________________ x:\publicworks\rfp\2015 mowing and landscape maintenance rfp.docx na Fine Cut Mowing Location 2015 m ID ed 55 US Route 30 Ri ve r Un 32 Route 31 7 8 14 US Route 34 13 R ou te 7 Do u Ma dis on 31 Route 9A - Orchard Station Dr 5 6 Chic 9 46 12 11 ago 15 1 50 21 37 41 42 38 US R te ou 49 34 30 10 20 33 te 4 29 26 30 44 43 28 27 25 22 24 47 23 45 ou 3 Mill Rd R R 1 48 S 34 S 2 54 U te 35 34 Route 25 53 36 gl a s Rd a 57 ou U 9 en al -G 31 56 51 40 39 16 17 Woolley Rd 22 -P la fie in ld 52 19 18 16 - Grov e 22 -P l ai nf i el d Date Printed: 3/16/2015 ² 2 Miles The requested map will be created for study purposes only.Please refer to the official recorded plats or deeds for the actual legal descriptions and property dimensions. No liability is assumed for the accuracy of the data delineated herein, either expressed or implied by the Village of Oswego or its employees. This work is protected by the United States Copyright Act of 1976 (17 U.S.C. Sec101 et seq). You are not permitted to use and/or reproduce any part of a copyrighted work of the Village of Oswego in violation of Federal Copyright Law. Doing so may result in prosecution under such law. If you wish to use property in which the Village of Oswego owns a copyright, you must obtain written permission through the Community Development Department in the Village of Oswego, located at 100 Parkers Mill, Oswego, Illinois 60543. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 Location Park-N-Ride, Entire Site Station Drive, Both sides, Entire Limits Mill Rd, N Side,from IL Rte 31 to Orchard Rd Mill Rd, S Side, Fox Chase S. to Village Limits Village Hall - Entire Site Washington St, North Side, from Harrison to Adams Park at South end of Harrison St Public Parkinglot @ Harrison St & W Washington St Promenade North St, at Intersection of N Adams, along Adams Outlot North of E Van Buren & E Washington St Monroe St Alley betw een Wilson & E Benton St Intersection, IL Rte 71 & Douglas St, NE Quadrant W Tyler St, South Side, From Adams to Main Penn Ct, South Side Woolley Rd, N. Side, from Plainfield to Stonehill Woolley Rd, N. Side, from Stonehill & Colchester Hackney Ln Right-of-Way, E. of Morgan Valley Collins Rd, North Side, From Grove Rd & Buckskin Island on BHP across from Chesterfield Dr Island on BHP btw Orchard Ave & Church Parkinglot Island on BHP btw US Rte 34 and Orchad Ave Island on BHP, south of Lombardy Ln US Rte 34, N. Side, Walgreens to Pfund Ct US Rte 34, N. Side, from Pfund to Bridge US Rte 34, N. Side, from Bridge to 100' North US Rte 34, N. Side, from Bridge to BHP US Rte 34, N .Side, BPH to Chesterfield US Rte 34, N. Side, from Chesterfield to PD US Rte 34, N. Side, from PD to Bridge Douglas Rd, East Side, from Longbeach to Saugatuck Douglas Rd, East Side, from Weisbrook to Longbeach Douglas Rd, East Side, around Easment to Heritage Douglas Rd, East Side, from Saugatuck to Barnaby Douglas Rd, West Side, from Longbeach to Saugatuck Douglas Rd, West Side, from Fernw ood to Longbeach Douglas Rd, West Side, from Easment to Barnaby Douglas Rd, West Side, US Rte 34 to Old Post Rd Douglas Rd, West Side from Lagoon to Funeral Home Douglas Rd, East Side, from Bluegrass to Sears Lot Us Rte 34, North Side, from 2677 to Heritage Dr Heritage enterance island at US Rte 34 BHP, East Side, from US Rte 34 to Chesterfield BHP, East Side, from Chesterfield to School Bndy Booster Station #2 Well # 3 Well # 4 Well # 6 Well # 7 Well # 8 Well # 9 - No Landscape Beds Well # 10 Well # 11 Tuscany Trl, South Side, Bike Path to Well Prop. US Rte 30, From Douglas Rd to Rte 34, North Side US Rte 30, From Douglas Rd to Rte 34, South Side US Rte 30, Islands from Douglas Rd to Route 34 SQFT 67080.673527 21666.431873 205806.178767 4724.527446 88519.838122 19132.071057 41964.014608 47540.407012 33748.429608 17804.33118 3830.2452 23213.911905 8855.300729 6957.331606 4297.016946 29267.921348 22020.607708 13248.559923 35089.387572 2101.682675 5705.499764 1968.975614 1827.628936 30897.427666 36663.163625 1443.21116 39043.819662 20086.767477 21054.466876 5208.785289 26917.539031 20012.251934 37372.887063 17322.115527 21291.019204 20306.82481 3083.573506 46346.928248 11382.481368 38371.9597 20969.767675 1462.753049 13935.035011 3720.261904 19667.130048 20128.444161 18854.247098 15266.262061 65804.429352 42968.97201 29519.006691 89254.824825 66222.251034 12066.326826 238547.138118 241693.06855 16401.044872 AC 1.539967 0.497395 4.724679 0.108461 2.032144 0.439214 0.963365 1.091382 0.77476 0.408733 0.087931 0.53292 0.203291 0.159719 0.098646 0.671902 0.505526 0.304146 0.805545 0.048248 0.130981 0.045202 0.041957 0.70931 0.841674 0.033132 0.896326 0.461131 0.483346 0.119578 0.617944 0.45942 0.857967 0.397663 0.488777 0.466182 0.070789 1.063983 0.261307 0.880903 0.481402 0.03358 0.319906 0.085406 0.451497 0.462087 0.432836 0.350467 1.510668 0.986436 0.677666 2.049017 1.52026 0.277006 5.476311 5.548532 0.376518 Lyndhurst Ln Kudu Dr Di Farnsworth Ave Roaring Creek Dr t Fredercksburg Ln Wi Wing a Dr te W Waterbury Cir C inga t e Pl Ba er Va le n urg ksb n L Vic lfs W Wo Rd g in s s Cro d Wolf R Harvey Rd Roth Rd (West Side of Road) 0.69 Rance Rd Pionee r Ct Pal omino 1.86 2.54 0.07 0.18 0.38 0.38 2.79 2.39 4.86 2.67 4.12 5.03 0.95 0.69 0.43 3.77 4.37 1.06 1.34 0.27 0.31 9.58 8.63 2.58 2.38 Acre Stewart Rd 80813.666451 110827.0537 3148.937679 7674.093364 Appaloosa 16758.342223 Rd 16364.553876 121402.708362 104101.667568 211973.349086 47878.455641 179269.092868 218971.817578 41560.486079 29985.256624 18548.719618 164331.375652 190558.579723 46099.466196 58177.618334 11970.689562 13299.492729 417630.773067 375753.237846 112535.554752 103691.183492 Palomino Ln Roth Rd Square Foot Gilmore Rd Dr Royce Dr Leisur e Ln wk Douglas Rd Cottoneaster Cotton e as te r Ct Ave Ironwood Ave Juniper St Collins Rd Cole Ave Lot Collins Rd (South Side of Road) Douglas Rd (East Side of Road) Durham Ln (South Side of Road) Fifth St (East Side of Road) Fifth St (West Side of Raod) Harvey Rd (East Side of Road) Harvey Rd (West Side of Road) Mill Rd (North Side of Road) Mill Rd (South Side of Road) Minkler Rd (East Side of Road) Minkler Rd (West Side of Road) Roth Rd (East Side of Road( Roth Rd (West Side of Road) Route 31 (West Side of Road) Route 34 (East Side of Road) Route 34 (West Side of Road) Stephens Rd (North Side of Road) Stephens Rd (South Side of Road) Tuscany Trl (North Side of Road) Tuscany Trl (South Side of Road) Wolf Rd (North Side of Road) Wolf Red H Rd (South Side of Road) awk Ct Woolley Rd (North Side of Road) a dH Woolley Rd (South Side of Road) Re Amy Dr Ln Pr est on t Collins Rd (South Side of Road) 2.54 W 127th St W Timb er W oo Ct d Plainfield ood T imber Cir Rid gew o od Ln Simons Rd Schlapp Rd Rese rve Old Rd Stephens Rd (South Side of Road) 1.34 Lambert Dr Dr t i ne W a y D ev oe s Sun hi Lor een Ct kla uc nd Dr Lu nd qu ist Dr Ro urk e Dr Hawley Dr voe De Be Ct N S Bennett Ct O gde B l vd n F a lls Ogden Falls Blvd Sparkle Ct Roth Rd (East Side of Wolf Rd Road( 0.95 (South Side of Road) 8.63 D e v oe D r O gd e n F all s C ir idgevi Br Loradale Rd Boha Ebony Dr Fleet Dr Baden Ave Keene Ave Barton Dr Wilmore Dr Cardinal Ave Frankfor t Ave O gd en B lvd Fa lls Blvd r int D ll Po Kenda k Trl y Dr Salem B ll r h Berks ir e Ct Homev S Heritage Dr Ha Ct So u thb Blv u ry d Dr p Dougla s Rd B dis on Ad ld Mustang Dr Un n am ed Fifth St s tone g h am Br Rd las Seto n Ln t f ie Co lcheste rD r Si m s Ct bur y s t Ct V r Marty Ln ue st e m Ct e xS Fo Ct e Ar lin g Ct ton on C Ct inde rfo Thorn rd C bury Della Ln Sh k Stonehill Rd Dor e He d Hedgerow Ln Blue Heron Dr Goldenr od Dr Secretariat Ln St on t Tr Ct ee Ben v on Ke n Cre ek ia L Glor ir C ter f or d Ca therine Ct Cante O ng H o rd Pl Rd tfield Dou g Metina Mond Dr W em bley Rd Charolotte E M erchants Dr ts to n W Merchan Dr Fallcreek Cir nd le Pe Winrock Rd Ingle shir Ct e y Fra nce s ca Ct Dr ngh a am Ja y St Lake vie Dr w Isle view Dr Pines Wh ite Ln Dr Danbur y bard W a Hu b Sierra Rd Judith Circle Dr E Br o Ct ck lder Hill P Bou as s gw ick tti Sherwo o d Dr Plank Dr Forest Ave e si d Ln Pr airieview Ingleshire Rd W Yeadon Dr rd fo t Par Oaklawn Ave rthampt No St o n e hill Rd t Mo nro eS hla St n As M a in S Mo St Ma nro d is eS on t St S Ba rcla y Cu Ct lv Fieldcrest er R Dr d Ave As hla wn NM dm St as Ha rris on St S Ad am sS t Dr adison N Ada Il Rt SA Ml De hi ll h us ke r 16 Rd dg Carpenter Ave t S ou therl We aver S Hunt Club Ct Ave St ms St e 31 C Stil Lak La k Ct e C Dr Minkler Rd La ug ht on Catherine Ct Clay Ct stle We i gh Ct Ln i ng Dr S h as e B Ct M ad i Ct son u rc Unnamed Cebold Dr Burc he Dr Ash ley Way Wh Lynx Ln nd W e C t st E Old Minkler Rd Bu Roulock Rd Rd dge oo G re dr i en b riar R d K no llwoo d Dr Al d R on d H ill Il Rte 25 Il Rte 31 Au gust a R d Dr Beaver Ct Reaga n Dr r N Cherry D r S Cherr y D S West Dr Gr Ct eenv iew Whitewat er L n Green vie Ln G w re Dr man N West Dr Clark Ave Century Ch Dr i pmunk Fanad Ct D o r Truman Dr u Ar b Walnu t Creek Ln ma n Dr Spruce St Willo wwood Dr or Ln White Oak Dr Station Dr Mar y t Cen tuS ry Dr Cha rle s Ct Bison Rd D o n eg a l Ct O Orchard Rd Station Dr o od Dr Hea ther w W a C Dr Justice Dr de Trl an Taft D r R Ct elia nc e c O Tr Br a l S dy t Ev Sh Tus ca ny W Rickard Dr E Rick ard Dr Ta llg r a Ln ss Windsor Dr Co n C S Sp Mayfield r y Ln i e ld h ill Lakewood Creek Dr Ga p e vine Tr l t Tim ber Ct Ct Gr Hobbs Ct H o b Ln b Ch apin Way Aurora The requested map will be created for study purposes only.Please refer to the official recorded plats or deeds for the actual legal descriptions and property dimensions. No liability is assumed for the accuracy of the data delineated herein, either expressed or implied by the Village of Oswego or its employees. This work is protected by the United States Copyright Act of 1976 (17 U.S.C. Sec101 et seq). You are not permitted to use and/or reproduce any part of a copyrighted work of the Village of Oswego in violation of Federal Copyright Law. Doing so may result in prosecution under such law. If you wish to use property in which the Village of Oswego owns a copyright, you must obtain written permission through the Community Development Department in the Village of Oswego, located at 100 Parkers Mill, Oswego, Illinois 60543. Scotch Rd rry d S C h e Blv Blos s o m k Dr 22 ³ ± ³ Rd Oa k C re e er ov A nd Dr d ill Liszka Ln Hemlock Ln iel inf xH Ct v er t t t t ll a n B lvd Dr m t rS t h um ur t McL e t on B St 30 ¢ ¬ ¡ e Dr vo De Ct e B Dr Townsend Dr r Foster D Pl Shenandoah Dr Dr nnett Pa r k Chesapeake Ln n e urk Ro Chapin Way McGrath Dr Risen Star Ln shing L Antietam Ct Harvey Rd (West Side of Road) 2.39 Ln Woolley Rd Sequoia Ct Sundo wn r C Dr Treasure Dr Harvey Rd (East Side of Road) 2.79 oakum Blvd Gastville St Foster Dr b ine W ood C t e e k Cir Cu ve n A 30 rla Ha Rte US d ows Ct j santon ea Pa triot Ct C an y o n t C ree k C t e ll tch Mi Cryst a l C Ct Yoakum Blvd Y r Fifth St (East Side of Road) 0.38 Pointe Trl Elmwoo r M ea ge D d Ave ne Falls Blvd Ma nwa y Co Ln r Summ erlin D t Blue Rid Council Ave ³ ± ³ Stephens Rd Bl Pr ea kn es sD r Dr Wilson Indian Hill L n Ogden Bl oo m Ct fie ld a Pl r Valley D Buckskin Dr Chest nu t Dr Ogd en Falls Blvd Woolley Rd Woolley Rd (South Side (North Side of Road) 2.38 of Road) 2.58 Ab ingd on Dr ste r Morgan Hackney Ln Furlong St Hu tchison St Barringto n D r l ls S o uthbu ry Blvd ir C Andover Dr ea els Ch t C S pencer Ln r De erfield D n Fa Ogded Blv l Co r D ch e Amherst field Dr D eer Leesburg St Nam e Dr Colchester Dr Dor e Amherst Ct Claridge Dr Yoakum Blv d Y Blvd Burkhart Dr Durham Ln (South Side of Road) 0.18 on e n wood Vista D Ashcroft Ct Yoakum Yoakum Blvd Yoakum Blvd Blvd Pimlico St Yoak um Yoakum v d Blvd oakum Bl Raint r e e t fre Dr Linden Dr Gr e Pl Ar boretum Way Millersbur g St Keierleber Rd m Po t Ams Ct inca Ln Yoakum Blvd rose Ln Prim Pkwy as s Wolf Rd (North Side of Road) 9.58 l fie y a W n M a Ct tn D u rh am Ln m field Cir W Bloo re s t Ave Dylan Dr dy Ma n Ln k y Pu to n y Ave Christian Ct Grand tion ma cla Pro Dr estic Ln burn Au Dr ation Cit Dr e gr Blu uthbury So B lvd Ct i lling t on Br Ct Cr D iew Dr r nce Da n L ed am Ct W ale gd rin t C o Alex Ct Cir E Fifth St (West Side of Belmon t Ave ic Dr Raod) 0.38 Charis mat Wolf Rd Dreas Dr Stephens Rd (North Side of Road) 1.06 Cir n Un T ry bu u ry Cirew k sb Ct Douglas Rd (East Side of Road) 0.07 Jessam ine Dr C n Ca ry SouthbBurlvd Sout hb u k B lvd wbrookC ee r f Su C ado Sp et pl ge sD ire Bluegr ass Pkwy A ffirmed Ave Faye tte Dr ew Dr Blue Ridge Ct t ke wy Mar k r P D Versailles ire sh mp Ct Route 34 (East Side of Road) 3.77 Dr e ur o Ln St ent oll fth nav Ap Fi Bo Sp Paris Ave nhill Du n L nd d me na Un Gray s ay Gr Ct r sD ay r G t Poin al l nd K e Dr ed re 4 oin t m na um ak Yo Blvd Dr rd e H il nd ld e r Ci r B ou P a ss D ul Bo P wthorne Dr m Ct Bradford Ct und Que e n Dr ab Un ua Sq s o n Dr US e3 ll P nda r D rn Ke Bro r D S Ma th ou Pl y m C t Ba nd Kir kla ¢ ¬ ¡ ngate C £ ¤ ¡ e C re nd n o L am Grantham Ln 30 34 B ellevue Cir nnon Cir Georgetown Dr o hr W i n t ry u hb Bower Ln So u t vd y l r B u M b ans uth lvd So B d s f ield Litch fiel t d Fa Wa y i r fie ld ay Woodland W gerow Grov e Rd t v Miles Dr d me na n U Bellevue C sca d e Ca Wilto n Ct Ashcroft Ln Vista Dr Blue Heron Dr Ro 1 ge Rt 30 ellevue Cir Cir W Bellevue y inc Qu r D s k ge Sq Pfun d C St Mclaren D r Schofield D r p ringbro o S rita He i llm l W o m il ne S to L n hts Knig e Ct g Brid r ea t Cro f Ba u e y h le As t C Ke i Po C o ra Son Dr Angela Cir h n Jo sep exa l C t A Ct Ri d g Circle Ct h r Rd Manch e ste N Avon Ct Springda le Rd Pad d ock St She fie ld Rd Ame s bury Rd Stratfo rd Rd lo eb Rd Pu Cr C d nR Windcres t Dr 34 W a Robert Rd St t Dr rst b Dr Cob Ct Buc k Ct Ha Ct Sonora Dr nha m Rd ck Pl ay yW Dr ne ha m p to ic gw Se d Ct ig ele Ln n g to n Dr Route 34 (West Side of Road) 4.37 St gbrook Trl prin N m o kside F ar ingto n Lakes Dr Dr Cor Barnaby ne Ci Ric mD r h ond Richmond r D Ct ovi Dr rno n Ve r D Fi fth Ct Barnaby Dr and Dr We ave Ct r A Rte Kirkla Ct Ct Ct r ntilly D Ge r Dr Hu n te Hunter Ct Wh it Ch a t E B righton Way ield Garf S et iff ir Su dbu ry C lf t on Do White Pines Ct Dr Ken s ington Dr Fifth St ompto n Ct S US n nt d a ll Dr bl e Ch eshire Ct £ ¤ ¡ Re Allin Ct d ding C gto n t Poplar Ct Arboretum Way ey Wiesbrook Dr rbury in r tf nt Eas Dr Fr d ft Cro Ct cford ti un e nse ubo a W ce 's olton o Theodore Dr st Danbury Ct Morga nV al l Ha S ee ley S Rd l Te Camb r i d Dr d Bi ckfor A ve n tr y Rd try Co u n r St n to ng rio Ct n Sudbury Cir utl e hi as Ln Cla Cole Ave m lu Ca om Blo s s Rose b Ln te et ew v ie w ion at rn t a C C Danbury Dr Carn at ion Dr ssom aux Blo Ct Ch ate t C ilm W Pine h Ln u Dr P Wa rfo d as er H s ill Stonehill Rd e Av Parkv i Sara to g a Ct l Chu r c h il Ln eshire Lands ChPr Tewks hir Ct e C es wick t t ! ( ! Lak e L n t 34 Briar cl Ln d an C Ch u Terrace Ln rc Li Heathg ate R d Braebu rn Beauw d i sR Dr ra s g l l d Ta ch R bea g n Lo cky L u Ct An thony rk Ct Ma Ct on r Victoria L n Ha £ ¤ ¡ La kevie w Ct r Prairievie w D gate Cir on rsimm L n Ln d Rd t Locust Ave Hickory St ate Dr No r thg H ig h l hill Ln c r u h rby by Der Pa r k Ct Ln Ch on S Pl EW North S klin Fra n t kory St S Po lk Hic de r Aft on D De Pomeroy Rd Old Post Rd M eade R d 71 bert y Ct St d Penn o Rd Ct Chicag Ct Faro r Towns Xing 30 £ ¤ ¡ Julep Ave on ffers E Je St E Ja ck s sh land Bell A Ct St d E Benton St Wi lso n p le e Ma n Av St Judso as ugl trid St 34 £ ¤ ¡ ie l Rd n Lomba r dy L nt Gra St 34 £ ¤ ¡ Croydon Ct H unt Cl u Je ffe S t r so n m woo ef No narcik Bed Ct Nort h St W t El Brand on Cir Ct e Dr Cath e r in L o ng C Evergreen Ct a te eG on t S r D son Ja c k Pl nS 25 ! ( ! Pa rk gto Sherw i ck s Cole Ave Lot 1.86 Creek Dr ² ec Etts inger Rd Carlisle Ct B ing Cr e e k Rd Sen t Riv e r Ru n Blv d ie w erv Riv Ct r Fulle Ave Ln ll Bu e Rd e 71 Il Rt 2nd St Boulder es Hill cent t d o o Bir chw Ct Crestwood Rd Saugatuck Rd Rd S ed Rd Orchard Ave ! ( ! W Bu Va n r W W en St Ben Tyl St B E Va ton er ur e n nS St t Iris Ct Pe Glendale Ave Dr Coyote Ct C W Wash in Osage C t Lattice Dr Hu n t Club Dr Oak go Pickf ord Rd on Dr 31 water C e Parker P aradise P kwy el ren Her n nL o Su nd 71 Date Printed: 3/16/2015 Run er Riv lvd P B arkland Sundow n Ln n wn L ! ( ! untry Rd Co x Fo Ct Regal Oak Ct i ew Ct ie w erv Riv Minkler Rd (West Side of Road) 5.03 Morga C Ln ate r Route 31 (West Side of Road) 0.43 Fox Chas e Ct adge rLn Ct Bad g er Do Ln Coun Dr a ter L n Stonew Minkler Rd (East Side of Road) 4.12 W ind ra n ers e t Rd rW Oakwood Highview Cen t Ct ury Lenn ox Ct Deerpath Dr t W Washin gt o n S enview Ln ury D Cent Ce ntury Dr itetail X R iv ervie w Ct Rd o Lo Rd e dg Ri S w do un r d F ie ld p oint R Eastwa y Dr r Ct L y an m p Fo t C r se D Bobc at r iv er w o o d v e rwood Ri r D Riverw Ct r Cente r D o od d oo R Rooseve lt Dr 34 wD nt Vie Ple a sa N Pr esid e ntial Pr e side n Blv tial Eise nhod wer Dr Blvd Tr £ ¤ ¡ t Forest C w Br istol Ct ff Lync li Dr W £ ¤ ¡ s ncliff Dr Ly E 34 US Rt e 34 Beaver Xing Clearw P rospect Lenn ox Dr Fox Ch a Millstr e am L n Grace St Arbor Ct Oak Hill Dr t s st o n Ci r Bu rr C t e arl Ch St Unnamed No Hoover Dr Tr u rway Pl Edythe Dt Dr bus Ho Bentson St Ar r owwood Hic kory Ln il C ay an W n Cr ca e ri Am u ir S q ir C Tr a Unnam ed Obrien Way nd e Unnamed Rive r Ln Gra Ba yberry Dr Ma nhatt Cir Man hatt an Cir Fawn Dr Kiwi Ct Ct o ls w El Ct wen Me a vis Da nb lle Ho Ct r th 9A Unnam ed Lewis St um Mill Rd (North Side of Mill Rd Road) 4.86 Mill Rd Ash Grove Ln (South Side Willowwood D r of Road) 2.67 Burr Oak Dr " ± ³ dowwood Ln Lewis St rth Dr Ellswo k ac M udslinger Dr w illo wood D r N In i s Ct ho ail Dr ckt Pineridge Dr S Seeley St Holly Ln D Pin Tr e e Dr ridg e Pin e N e Ct Club Hou se L n Berrywood Ln Lehman Xing Matlock Dr Yorkville Whit e Ln lv e rin e r wl Bu n Dr Wo ill nh ve C Ha Hudson Dr Cir cle D Laurie L n Dolores St an t Otter Way oodch uck W Trl C ougar Ln t rre Fe ing X ns Pr est o Anna Maria Ln Ju st Ct ice Rd St Kris ce G ti er L n eo ne m r g St m e Co Biso n Ct Shore Dr S lia Magno Ct Sh ore Ct Ri Light Rd ck Ct Kevin Ln Cro ok Dr er r d Tuscany Trl (South Side of Road) 0.31 Bur gundy Ct Dr er D Marlin Dr Anchor Rd Dolphin Ct Sh ell Ct H a Boat Ln r b or D r Co l C Shoe g d nR Tuscany Trl n sto Pre Dr oeger a S Be re m Cre ve Tuscany Trl (North Side of Road) 0.27 rd Rd ilfo Gu d sR u r o C od om 5 Gains wen Ct Ct O wen Ct R eld Gr a te 2 Il R Gra p evine T rl n ins Ct Du oo d D Ingles hire Rd Sh er mea d Rd Pembro oke Rd Marnel Rd Spr i ng Garden Cir Dr cle Wyndh am Dr Dr Ha m eD rc l Hillc Ci rest S carsd a le Ct Rd M arina Dr a erid Sh Ct Ct Gre enf i aw kh B l a c Blvd k aD rW rlo Me t Ct n an r ook h u m i llb Ke tc E M C ir t Ct Ke ay Rocky W Rd Concord Dr Bau m Trl er ilv ings r t C Briarcliff Rd Ct r a C u r tm t C 9 ³ ± ³ a len Ga ston e Rd rd co o n Dr Le Ci r nox yf rd co C t Al d Ct o n B Ma Ct d or nc o C Dr E ll Pass r Hi lde ou Rox b u ia mb Colu Ln Ln a Gen e v ry bu Han L n idge r Cl a Ln air ox tcl Len Dr Montgomery Providence Rd M on Ln Ct Al do n Fern w d Surrey R Dr W liff odc Wo Rd man re Be d R ck r Klo Ci m Rd a Amst erd rd a ch Or 25 ! ( ! N an m ge Ha n L Ct 31 ! ( ! Rd a len Ga Ald o Rd n Rough Cut Mowing Areas W Countryside Ln W Ap Red ple Rd
© Copyright 2026 Paperzz