APS Construction Update November 2014 Adobe Acres Elementary School Address: 1724 Camino Del Valle SW Year School First Opened: 1964 Project Scope: One renovated and one new building (with a total of 21,963 sq. ft.), that include: A. B. C. New Building with 7 Kindergarten class rooms, 1 Art/Music multipurpose room/space square feet New Artificial Turf Playground and Fenced Kindergarten Tot-lot Renovated/expanded Kitchen/Cafeteria with bathrooms and Storage Date of Completion: Feb 2014 Budget: $5 million Architect: RMKM Contractor: T.A Cole & Sons 2 Chaparral Elementary School Address: 6325 Milne RD NW Project Scope: New Classroom wing, Kitchen Cafeteria, & Site/Field and traffic improvements • 21 Classroom wing addition • • • • • • • • Site/traffic improvements • • • • 7 Kindergarten classrooms 1 kindergarten level D Classroom 1 Special education classroom 5 Intensive support Classrooms 1 Occupational / Physical therapy 5 regular education classrooms 1 fine arts classroom. New Play field New Playground New Parent & Bus pick up drop off plus roadway construction Kitchen Cafeteria Addition/renovation • • existing cafeteria and kitchen was enlarged additional storage was added Budget: $15.9 Million Project Status: Construction 95% complete; Kitchen Cafeteria, field, and infrastructure currently in use Estimated Date of Completion: December 2014 Architect: Cherry / See/ Reames General Contractor: Shumate Contractors Inc. 3 New PreK-8th Grade School in SW of Albuquerque Address: 4050 118th Street SW 87121 Square Footage: 245,437 Project Description: New K-8 school serving 1,350 students. Budget: $48.6 million Project Status: 60% construction complete Estimated Date of Completion: July 2015 Architect: Jon Anderson Architects General Contractor: Bradbury Stamm 4 West Mesa High School Address: 6701 Fortuna Road NW Year School First Opened: 1967 Project Scope: Classroom Building “M” • • Replacement. 2 phases for a total of 28 new classrooms. Phase 1 - a three story classroom building with 17 classrooms. Phase 2 - a two story classroom building with 11 classrooms, situated just north of the three story building. Project Status: Construction Documents being developed Estimated Date of Completion (both phases): January 2017 Total Project Cost: $ 18.8 million Architects: Mahlman Studio General Contractor: TBD 5 Rio Grande High School Address: 2300 Arenal Rd SW Year School First Opened: 1959 Project: 9th and 10th grade academies new classroom block; new permanent bus lane; new courtyards and patio, addition of site lighting for security; completion of fire lane loop; new tennis courts; addition of artificial turn for football and baseball fields; landscaping and fencing upgrades Project Status: Design complete Groundbreaking: Spring 2015 Est. Date of Completion: Summer 2016 Budget: $25 million Architect: Van H. Gilbert Architects General Contractor: TBD 6 Ventana Ranch Elementary School Address: 6801 Ventana Village Rd NW Year School First Opened: 2004 Project Description: Artificial turf field, landscaping and site work. A great asset to the school and the surrounding community. Est. Budget: $580,720 Project Status: Completing design Groundbreaking: December 2014 Estimated Date of Completion: May 2015 General Contractor: TBD 7 Marie Hughes Elementary School Address: 5701 Mojave NW Year School First Opened: 1981 Project Scope: School replacement Phase I: Demolition Play Areas and New Construction of 2 story Classroom Block Phase 2: Demolish existing old classroom blocks, Portable removal, loop road/bus Drop-Off/Parking construction and New Field/Playground construction Status: Under design Ground breaking: Summer 2015 Est. Date of Completion: July 2016 Budget: $21.9 million Architect: G. Don Dudley General Contractor: TBD 8 Highland High School Rebuild Address: 4700 Coal Avenue SE 87108 Year School First Opened: 1949 Project: Highland HS new Classroom Block and PAC construction and Gym upgrade Project Status: Under Design Est. Groundbreaking: Phase I Summer 2016 Est. Date of Completion: Phase I December 2017 Budget: $14,790,014 Architect: SMPC General Contractor: TBD 9 Albuquerque High School Commons Address: 800 Odelia Road NE 87102 Year School First Opened: 1916 Project: Commons/Cafeteria/Classroom Renovation and Addition/ Music Classrooms Project Status: 95% Construction Documents Est. Groundbreaking: Summer 2016 Est. Date of Completion: Dec. 2017 Budget: $14,155,777 Architect: Jon Anderson General Contractor: TBD 10 Sandia HS Science Classroom Block/Library Address: 7801 Candelaria NE, Albuq, NM 87110 Year School First Opened: 1958 Project: Two new buildings (with a total of 75,350 sq. ft.), that include: A. New Science and Math Academy (57,592 square feet, three stories) B. New Library - 17,758 square feet, two storiesthe new Library Building includes computer labs, small group study rooms, and a graphic arts production studio. C. New Softball Field-provides a new natural sod field with greatly improved dugouts, practice cages, concessions, and storage facilities. Project Status: Completed May 2014 Budget: $ 21,106,354 Architect: Mahlman Studio General Contractor: HB Construction 11 La Cueva HS ISP/GYM Address: 7801 Wilshire NE 87122 Year School First Opened: 1986 Project Scope: The project consists of 3 distinct parts: Part I : Addition of an ISP facility to serve special education programs Part II : Addition of a weight room Part III : Renovation of the existing weight room Project Status: Design approval Est. Date of Groundbreaking: Summer 2016 Est. Date of Completion: Fall 2017 Budget: $10,149,891 Architect: RMKM General Contractor: TBD 12 Dolores Gonzales ES Classroom Block Address: 900 Atlantic St SW Year School First Opened: 1975 Project Scope: New 21 Classroom Block to include and Art/Music and 4 Kindergarten Classrooms Cafeteria expansion Restroom remodel New Playground Project Status: Under construction Est. Date of Completion: December 2014 Total Budget: $7.9 million Architect: Westwork Architects General Contractor: Shumate Constructors Inc. 13 The Career Enrichment Center (CEC) and Early College Academy (ECA) Address: 807 Mountain Road NE Albuquerque, NM 87102 Project Square Footage: 20,230 Project Scope: 2 Science Labs 2 Prep areas EMT lab 1 prep area 2 language Classrooms 2 Multi Purpose Classrooms Food Prep Teaching Space Multi Purpose PE/Functions space Electrical Transformer Flatwork/sidewalks/ADA Recycling/Garbage Receptacle area Project Status: Under construction Est. Completion Date: Spring 2016 Total Budget: $5.5million Architect: Lee Gamelsky Architects General Contractor: TBD 14 Food Services Central Kitchen and Storage Address: 800 Louisiana Blvd. NE Square Footage: 100,000 Project: Renovation of a 100,000 square foot facility into a food processing facility/commercial kitchen/warehouse for APS Food services Project Status: Under Construction Est. Date of Completion: December 2014 Budget: $14.2 million Architect: Studio SW Architects Contractor: Gerald A. Martin, LTD 15 eCademy/New Futures Cafeteria/Commons Address: 5300 Cutler Ave NE Year School First Opened: 1915 (old AHS Site) Project Scope: Cafeteria/Commons eCademy & New-futures Site development Infrastructure Date of Completion: March 2014 Budget: $3.8 million Architect: Gregory Hicks General Contractor: Anchor Built 16 Valley HS Rebuild Address: 1505 Candelaria NW 87107 Year School First Opened: 1954 Project Scope: The master plan requires building " S " be razed and to construct a new classroom addition consisting of a new Crime, Law, & Protection Classroom building. Project Status: 95% construction documents complete Est. Groundbreaking: Phase I Summer 2016 Est. Date of Completion: Phase I Fall 2017 Budget: $7,194,644 Architect: Huitt Zollars General Contractor: TBD 17 Manzano HS Rebuild Address: 12200 Lomas Blvd. NE 87112 Year School First Opened: 1961 Project Scope: Preliminary Scope is Physical Education wing Additions and Renovations. Project Status: 50% Construction Documents Est. Groundbreaking: Phase I Summer 2015 Est. Date of Completion: Phase I Fall 2016 Budget: $14,844,920 Architect: Studio SW General Contractor: TBD 18 Mountain View ES Rebuild Address: 5317 Second St. SW 87105 Year School First Opened: 1952 Project Scope: Demolition and replacement of all buildings on the campus except for mini-gym and Kindergarten classroom building. New facilities will include 25 classrooms, library, health office, parent center, cafeteria/kitchen, administration area, and related support spaces. Project Status: 50% Construction Documents Est. Groundbreaking: Summer 2015 Est. Date of Completion: Dec. 2016 Budget: $21,173,547 Architect: Gregory Hicks General Contractor: TBD 19 RFK Charter Multipurpose/PE/Gym Address: 4300 Blake Rd SW Year School First Opened: 2001 Project Scope: Multi Purpose Facility Multi media center Physical educational Gymnasium/Community space combo Full Auto Body Shop Project Status: Under construction Est. Date of Completion: Jan 2015 Budget: $5.4 million Architect: DWL Architects General Contractor: Anchor Built 20 Montezuma Turf Address: 3100 Indian School NE 87106 Year School First Opened: 1953 Project Scope: Montezuma Elementary School Community Turf Field consists of approximately 24,000 square feet of an artificial turf field bordered by a concrete walking path, low water use landscaping and trees. The following components were installed: Artificial turf field; Concrete walking path; Low water use landscaping and trees; Pre-engineered steel shade structure; Concrete plaza Infrastructure including electrical, parking and landscape; Picnic table; Seating; Trash receptacles and Fencing Project Status: Complete Date of Completion: August 2014 Budget: $ 360,000 General Contractor: Westwind Landscape 21 MacArthur Elementary School Address: 1100 MacArthur Rd NW Year School First Opened: 1948 Project Scope: 12,373 Square foot addition/renovation • Kindergarten Classrooms & Play Lot • Cafeteria Addition / Kitchen Upgrades • Improve Site Lighting for Security • Install Security Fencing • Site Improvements Budget: $4,309,277 Project Status: Under construction Est. Date of Completion: Spring 2015 Architect: Wright & Hammer General Contractor: Anchorbilt 22 McKinley Middle School Address: 4500 Comanche NE Year School First Opened: 1956 Project Scope: Classroom block Addition Drainage/Infrastructure Project Status: Under construction Est. Date of Completion: Aug 2015 Budget: $ 6,196,182 Architect: NCA Contractor: Shumate Constructors 23 Eldorado High School Address: 11300 Montgomery Blvd NE Year School First Opened: 1970-71 Project Scope: Renovation of: Math Humanities Fine Arts Project Status: Under Construction Est. Date of Completion: July 2015 Total Budget: $4.4 million Architect: Van H. Gilbert Architects General Contractor: ESA Construction Inc. 24 Del Norte High School Address: 5323 Montgomery Blvd NE Year school First Opened: 1964-65 Project Scope: a) Phase 4 Industrial Fine Arts Building complete b) Phase 5 Cafeteria demolition and roof Project Status: Cafeteria under Construction Est. Date of Completion: (phase 5) Fall 2015 Budget: $11.5 million Architect: Dekker/ Perich/Sabatini General Contractor: T.A Cole & Sons 25 Reginald Chavez ES Address: 2700 Mountain Road NW 87104 Year School First Opened: 1955 Project Scope: 25,454 square foot addition New 10 classroom block and library, including new kindergarten classrooms Project Status: Under Bid for Construction Est. Date of Completion: Spring 2016 Budget: $7.4 million Architect: Cherry/See/Reames General Contractor: TBD 26 Collet Park Elementary School Address: 2100 Morris NE Year School First Opened: 1961 Project Scope: 19,249 square foot addition/renovation Kindergarten Classroom block Administration expansion Project Status: Under Construction Est. Date of Completion: Feb 2016 Budget: $6.2 million Architect: Vigil & Associates General Contractor: T.A Cole & Sons 27 Comanche Elementary School Address: 3505 Pennsylvania NE 87110 Project Square Footage: 13,976 square feet Project Scope: Kindergarten Addition 5 Kindergarten Classrooms Administration Renovation Fine Arts Addition 1 Music/Fine Arts classroom Relocation & Upgrade of existing utilities New Fire suppression sprinkler system Increased site work Total Project Budget: $6.9 Million Est. Date of Completion: Summer 2015 Architect: PA Architects General Contractor: T.A. Cole 28 Projects in Design now for Construction 2015 1. Aztec Complex-Special Education and Autism Center Preliminary Scope: Major Interior Renovation and Site Work Total Project Budget – $ 7,600,000.00 2. Ernie Pyle MS Preliminary Scope: Classroom Addition; Renovation of the 300 wing into an Art Complex; Misc HVAC work throughout the school Total Project Budget: $9,260,004.00 3. Marie Hughes ES Preliminary Scope: Cafeteria/Kitchen/Classroom Addition and some site work. Total Project Budget: $8,475,010.00 4. Mountain View ES Preliminary Scope: Replace Older Buildings Total Project Budget: $21,173,547 29 Projects in Design now for Construction 2015 11. Jefferson MS Preliminary Scope: Music Classroom Addition and Renovation Total Project Budget: $2,218,695.00 12. Madison MS Preliminary Scope: Gymnasium/locker room Renovation Total Project Budget: $1,521,445.00 13. Manzano High School Preliminary Scope: Physical Education wing Additions and Renovations. Total Project Budget: $9,699,645.00 14. Jackson Middle School Specialized Lab Addition & Old Wing Replacement and Renovation Total Project Budget: $12,335,939 30 Projects in Design now for Construction 2015 5. Reginald Chavez ES Preliminary Scope: Kinder Addition and Replacement of Classroom Buildings Total Project Budget – $7,415,261.00 6. Rio Grande High School Preliminary Scope: Restructuring of the campus and the construction of 9th and 10th grade academies. Total Project Budget: $25,255,234.00 7. Valley High School Preliminary Scope: Raze Building “S” and Construct new classroom in its place. Total Project Budget: $6,620,487.00 8. West Mesa High School Preliminary Scope: Replace Classroom Wing “M” Total Project Budget: $ 18,782,829.00 9. Atrisco ES Preliminary Scope: Re-roofing and Classroom Replacement Total Project Budget: $9,854,543.00 31 Projects in Design now for Construction 2016 10. Early Childhood Facility Prototype Preliminary Scope: To design and construct an early childhood facility that will combine pre-k education and day care services. To be replicated on up to ten sites over the next 4 years. This is the first one. Total Project Budget – $4,563,750 11. Montgomery Complex Training and Meeting Facility: Preliminary Scope: District training facility for teachers, staff with appropriate IT labs and meeting spaces for up to 500. Total Project Budget – $ 10,088,572 32
© Copyright 2026 Paperzz