Biomass Cogeneration Facility Savannah River Site Aiken, SC August 2015 Future City Project Savannah River Site Project Overview Clean●Green● Sustainable●Steam • • • • • Project Background & Drivers Project Scope Project Benefits Program Status Construction & Start of Operation • Summary of Operation Project Background • The existing D-Area Powerhouse was built in 1953 and provides steam to nuclear and industrial activities in F-, H-, and S-Areas. It is a co-generation facility and provides approximately one half (20 MW) of the Site’s electrical demand. 3 Project Benefits • Greenhouse Gas (GHG) emissions reduced by 100,000 tons a year significantly decreasing the carbon footprint of the SR Site • Overall annual air emissions rates will decrease – Particulate Matter – NOx – SOx > 400 tons a year, > 2,500 tons a year > 3,500 tons a year • The amount of river water currently drawn from the Savannah River will decrease by over 2.8B gal per year • Sustainable design methods are being used and energy efficient technologies incorporated 4 September 14, 2009 to January 2012 5 Integrated Project Team • IPT formed in September 2009 • Included CO, FPM, representatives of FRs, Permits, SRNS, technical representatives as required • Held meetings every week for the two-year construction period • Provided input to the IMRT which has met every quarter 6 Truck Off Loading Pad • First footer poured in June 2010 • Three off-loading pads • Dump time is 6-10 minutes • The hopper holds two loads (80T wood chips) • 50 trucks per day is about 1 truck load every 15 minutes 7 Stacker Reclaimer • First footer poured in May 2010 • Receives chips from the transfer tower • Holds about 800 truck of wood chips (32K Tons) • About a 30 day supply at 1KT per day 8 Steam Line Interconnection • Major Effort & Coordination with Ameresco, DOE, & SRNS • Coordinate interconnection during planned site steam outage • Successfully completed April 12, 2011 9 13.8 kV Line Tie In • Worked with SCEG, MOX, DOE SR • 18 months of effort • Ameresco to provide 30% of the SRS power and 100% steam from renewable fuel by February 2012 10 Burma Road Construction (from 3K Feet) 11 Steps of Commissioning & Startup • • • • 12 Steps of Commissioning & Startup Ameresco System Commissioning of 30 systems Ameresco Equipment Performance Testing DOE–SR Team Readiness Assessment Summary of First 3 Years of Operation • After the first three years of operation – the main facility has provided 5.2 billion pounds of steam – 1.3 billion pounds of steam exported to SRS – 299,400 megawatts of green energy generated to the site electrical grid ($23.9M) • This program is a great example of private industry and the federal government forming a partnership and working together for success 13 The Challenge for the “Future City Project” • To design and construct a biomass cogeneration facility to meet the requirements for providing 100 % of the heating requirements and 40% of the electrical requirements using “green energy.” (review other options for providing the energy natural gas for example) • Develop and implement a safety program; Establish your IPT • To work with banking institutions to obtain a construction loan for the plant (this is not a federally funded project) 14 The Challenge for the “Future City Project” • Establish a contract with the local utility to allow you to “interconnect” with their 115Kv line to provide power to the city • Establish contracts with the wood industry to supply “off spec” wood • Negotiate an air permit with the SC Department of Health and Environmental Control (DHEC) to burn a % of other fuel (like tire derived fuel) • Look at other additions to electrical security like a 25 MW solar array 15 Thank you for your time! Nicole Bulgarino Vice President Ken Chacey Ameresco Site Program Manager Doug Bush Operations and Maintenance Manager Clinton (Sandy) Sandmel Safety Manager
© Copyright 2025 Paperzz