Pencil Slat Cost Reduction Initiative Phase II Submission Team Members – QS 327 Team 2: David Harrison Vanessa Malone Shawn Myers William Myles Pamela Neill Scott Sowders John Wise Submission Date: December 7, 2005 Table of Contents PPARMP................................................................................................................3 ROLDA .................................................................................................................7 PPMTA ..................................................................................................................24 OPCP......................................................................................................................29 SOGA .....................................................................................................................32 DSDC .....................................................................................................................34 ISOQSAOOP.........................................................................................................37 KCA........................................................................................................................40 MAACE .................................................................................................................42 SOPATA ...............................................................................................................44 TAMA ....................................................................................................................46 GCA........................................................................................................................49 GBAPS ...................................................................................................................51 OCA .......................................................................................................................54 FMEA .....................................................................................................................56 QFD ........................................................................................................................59 CEAS ......................................................................................................................61 GSICPC ..................................................................................................................63 GFAPS....................................................................................................................65 MTA .......................................................................................................................67 PROJECT PORTFOLIO ASSESSMENT, RESEARCH METHODOLOGY, PLAN (PPARMP) RCA Phase: II Researcher Tool: Date: Phase II 12-1-05 1A. Assigned Forms Due, First Half Posting Cycle Compiler (s), Team Leader: Scott Sowders, Vanessa Malone 1C. Grand Form 1B. Researcher Compiled, Second Half Independent Work Posting Cycle Reviewed By All 12-7-05 Team: 2 1D. Final Compiled Work Reviewed By Scott Sowders PPARMP/ROLDA/QFD Vanessa Malone William Myles PPMTA/SOGA All 12-7-05 Vanessa Malone John Wise GBAPS/CEAS All 12-7-05 Vanessa Malone Dave Harrison Vanessa Malone Pam Neill OPCP/SHORT FORM All 12-7-05 Vanessa Malone GSICPC/MTA All 12-7-05 Vanessa Malone SOPATA/GFAPS All 12-7-05 Vanessa Malone Shawn Myers OCA/FMEA All 12-7-05 Vanessa Malone Part 2A: Project Background In any business, there are many processes that are utilized to manufacture a product or deliver a service to a customer. As companies try to compete in the global marketplace, there is a drive to create flawless processes that deliver the lowest cost. Through the use of Kaizen and lean manufacturing, companies are focusing on lowering the cost of goods and services. Quality systems such as ISO 9000 and QS 16949 allow companies to improve and standardize processes to produce a quality product. Using these tools can further opportunities for manufacturers today. Pencils have been in use as a writing utensil for many years. This is a simple tool to use for communication, and more importantly, documentation. The process to make pencils is simple and utilizes some automated and manual labor. There is some waste in the processes to make the pencil slats that make up the wooden pencil. There are many labor intensive tooling changes that add cost to the product. Some processes are manually operated and other processes may have inefficient automation with large amounts of downtime. Part 2B: Project Problem Statement The project focus is based on identifying problems with the process of manufacturing pencil slats and the cost of these problems. Once these problems are identified, improvements will be suggested and cost savings calculated. While performing this research, the team will also identify areas for improvement within the group structure that will result with improved delivery and robust results. Part 2C: Project Objectives Project objectives and are as follows: 1) 2) 3) 4) Identify problems with pencil slat production that pertain to cost. Identify options to improve processes that yield cost savings. Streamline RCA and SDA documentation posting cycles. Attain scores based on benchmark of 30. All objectives are currently in process and will be completed no later than phase 2 portfolio. Part 2D: Project Research Methodology Current methodology will involve content contained in the tool 24 toolkit. As project evolves, more content from other tools will be utilized. Project data and team communication will be performed via team chat, web board posting, telephone communication, email, or face-to-face meetings to ensure progress is consistently made. Team members previously posted all SDA and RCA forms, focusing on all aspects of project. Currently team is phasing to a system where each individual focuses on a single form and teammates post comments to the form after review. This is to eliminate redundant information and improve efficiency resulting in a robust, streamline portfolio. Part 2 Diagram 1: Project Organizational Chart For Team (illustrate how team is organized to do work) Vanessa Malone David Harrison John Wise Shawn Myers Pamela Neill Scott Sowders William Myles Part 2 Diagram 2: Facility Layout Of Process/System (illustrate the work area used to complete the project) Students enrolled in QS 327 Work center Student’s Computer Work center BGSU Blackboard Learning System Dr. John Sinn, Advisor for QS 327 Work center Dr. John Sinns Part 2 Diagram 3: Flow Chart Of Process (how product or service is produced as part of facility layout) Load Pencil Slat Into Machine Researcher Scott Sowders Shawn Myers Machine Cuts Pencil Slat to Size 3A. Project objective (s) written…… The project objective in to evaluate the process for cutting the #2 pencils wooden slat to length. The goal of the team is to find and eliminate any waste associated with the current process and to implement a new process with a cost reduction. Project objective is to identify problems with the processes of wooden pencil slats and identify improvements that are cost effective. Project will also Unload Pencil Slat Inspect Pencil Slat 3B. Findings, analyses observed as data, documentation in SDA…… This RCA table will set the guidelines for team members to follow, to ensure that team focus is maintained and that all members continue to complete work in the scheduled time frame. 3C. Conclusions, recommendations in methods, course outcomes…… To continue to develop our team relationships, continue to establish project goals, and stay focused on providing high quality work. Our team is striving for efficiency in our reporting process, better communications, higher level of team work, and total involvement of the group. 3D. ROLDA, PPMTA, PPDPOA relationships? PPMTA-evaluation ROLDA – resources This RCA will establish the team objectives. This form will establish information on the layout of this team and how we are going to get the job done. Conclusions contained in this RCA demonstrate that this team has defined goals and wants to meet the benchmark for this course (30 points for a grade). Team is also working to streamline individual responsibilities to a more efficient format. Instead of PPMTA ROLDA allow for team to evolve by identifying areas for improvement in the team members responsibilities. Vanessa Malone David Harrison Pamela Neill John Wise Currently our project objective is to meet our standards which include cutting the pencil slat as accurately as possible and reducing waste. We want to meet our customers needs and our work should meet our standards. Project objective is to accurately cut pencil slats to desired length and reduce costs by minimizing wastes Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length. Our project is to identify and cut down on the process of the slat pencil cutting. This document carefully outlines our process, layout, procedures as well as the assignment they are given and must complete by a set due date. everyone focused on everything, now the individual team members will be focused on an assigned SDA or RCA. This will result in more detailed, robust results to the project. I recommend that we continue to use this document to keep everyone informed on all aspects of the project. It’s important to have documentation to refer to in the event of a problem. The ROLDA tables help keep our information up to date. The PPMTA table is used to rate each members overall performance. Process is straightforward and allows a single operator to perform all functions of cutting the slats to length Keep process simple and efficient to assure the operator is most effective ROLDA enables us to review tools and implement what applies This tool is used to outline of the project being completed. It tells what steps are being taken to complete the project and what each team member’s role is. The team is continuing to use each tool in completing Phase II. This will be a complete portfolio or plan on how the team proposes to improve the slat cutting process to make in more efficient while saving the company money. The team is using the feedback from Tool 23 to be more efficient in completing the remaining tools and to achieve a score of 30 on the tools. Each tool is used to structure the portfolio. The project and team objectives have been defined in this RCA. ROLDA and PPMTA ROLDA, PPMTA In order to be totally efficient in completing rest of the tools, we have decided to stick to the processes we have been doing and keep it as simple as possible for the operator. Part 4 A, Tool/SDA Project Methodology, Rollout: Tool/SDA methodology is a planned completion of tools and SDA’s in course and project with each tool and phase portfolio. Relationships to FACR, and tool/phase methodologies are updated with each portfolio, coinciding with rollout of work shown in course syllabus. Final phase II portfolio presentation has 18 tools completed, minimum. SDA 1 and 2 are enhanced ongoing throughout course; SDA 3, 4 and 5 are done as shown below; and other SDA’s may be modified per team methodology (ex: up to two SDA’s used in 3, 4, 5 can be repeated and “grown” and other SDA’s may be used from a different set of tools within the total 42 ITTTM). Are any changes recommended for the rollout at this time, and if yes, what is the basis for the proposed changes? Tool SDA 1 SDA 2 SDA 3 SDA 4 SDA 5 Other (s) 19 OPCP SOGA GOTA DSDC ISOQSAOPP 20 OPCP SOGA GCA KCA MAACE 21 OPCP SOGA SOPATA TAMA GCA cont 22 OPCP SOGA GBAPS SOPATA cont OCA 23 OPCP SOGA FMEA QFD CEAS 24 OPCP SOGA MTA GFAPS GSICPC Part 4 B, Tool Portfolio Methodology Rollout. Tool portfolio completion in two week posting cycle combines tasks, who should do, William Myles This RCA outlines the team’s objective, procedures, and assignments. and when to complete in relation to all other work. Three tool portfolios are done before phase I and three after, all leading to final phase II compilation (both phases result in a “grand” accumulative portfolio, explained in the next chart). Posting cycle includes all days, and can be done ahead of time. *Astericked tasks are first done by team leader or assistant team leader on a rotating basis, and all coincide with rollout of work in syllabus. Timeline in Days/Weeks/Months (denoted by color) Task/Action/Step 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 Faculty prepares tool X discussion board area Team leadership prepares X PPARMP, assigns work* Team leadership prepares X threads in work area* SDA’s researched by all, all X X X do all SDA’s SDA’s independently posted X X X X at threads by all Non-required team chat X X X about work in motion SDA’s compiled by team X X X X X X members per PPARMP RCA’s independently posted X X X X X X at threads by all RCA’s compiled by team X X X X X X members per PPARMP Tool portfolio assembled by X X X X team leadership* Tool portfolio reviewed by X X X all on team Tool portfolio posted by X X X team leadership* Faculty assessment, post in X X new discussion board Required team chat about X X POAM, next tool Part 4 C, Phase Portfolio Methodology, Rollout.. Phase portfolio completion at mid term and final are completed with all other elements of course. Three tool portfolios are done before phase I, three after, all leading into final phase II compilation (phases result in a “grand” accumulative portfolio). *Startup at outset of course leads into first tool, and all tasks coincide with rollout of work as shown in course syllabus. Timeline in Days/Weeks/Months (denoted by color) Task/Action/Step 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 2 3 4 5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 *Team prepares startup X X portfolio, start of course Team completes first tool X X portfolio Faculty assesses portfolio per X POAM, requires chat Team completes second tool X X portfolio Faculty assesses portfolio per X POAM, requires chat Team completes third tool X X portfolio Faculty assesses portfolio per X POAM, requires chat Team enhances all tools, X X compiled as grand forms Phase portfolio reviewed by X all on team Faculty assesses phase X portfolio, POAM chat Researcher Scott Sowders 1. Project focus as noted in abstract, problem statement, objectives, methodology, diagrams, FACR’s, others: Our project focus is to identify areas of the cutting process that can be improved upon for both quality and cost reductions. Improvements will be implemented and evaluated for effectiveness. The main goals are to improve process and have the improved process be more cost effective. Ultimately allowing for a larger share of the #2 pencil market. 2. Assessment Question and reflective thoughts, Pros and Cons, for use in chats and in other ways, to improve: Question: What is the goal of the team as we head into the second phase of the course? Answer: Primary is to identify and implement an improved cutting process for the #2 pencil. Secondary is to improve efficiency in our reporting process, better communications, higher level of team work, and total involvement of the group. Shawn Myers Vanessa Malone David Harrison Pamela Neill John Wise William Myles Now that we have a process that is working we can evaluate it and look for ways to improve performance, quantity and quality. Objective is to cut pencil slats to required length and analyze how to minimize waste and unnecessary steps in the process to cut costs Our project focus is to develop a plan to reduce/eliminate waste and improve the process of the wooden slat cutting process. The project focus is to eliminate costs associated with waste in cutting wooded pencil slats that is identified above. Our objective is to reduce waste in the pencil slat production process which will reduce buying and selling costs. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: The objective of the team is to reduce waste associated with cutting a number 2 pencil slat to the proper length and to streamline the process of completing the tools. What should be done to ensure a safe working environment? Plant layout, machinery, material handling, housekeeping, fire control and pollution should be evaluated carefully and thoroughly to ensure a healthy and safe environment. What is the benefit of a flow chart? Breaking the process down on a flow chart helps to better understand some possible unnecessary steps. Why do we need to reduce cost? The market today is very competitive, especially the foreign market. To be competitive and stay in business, the company needs to cut costs and improve quality and production. Question: Why do we need to eliminate waste? Answer: Waste produces costs that drive the price of the product up and keep a company from being competitive and profitable. Eliminating non value added work eliminates waste and lowers costs. How do we reduce overall cost? We reduce cost by eliminating steps in the production process by eliminating extra steps in the process, extra paychecks, and making sure each step is done with a high amount of quality. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: The team is working very good together to complete the tools in a timely many. All team members are posting early to allow more time to complete the grand compile. Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 22 Date: 10/25/05 Researcher: Team 2 Compiler (s): David Team: 2 Harrison Information Source (Tool reviewed for this toolkit completion) In Bibliographic Form: Dr. Sinn, John " Synchronous Production: Enhanced Best Practices For Change, Lean, Variation Reduction " Industrial Technologists’ Toolkit Tool #22 Content (2005) David Harrison: This tool discusses production as either being intermittent (job-lot) or continuous (Detroit style). A key to the Japanese successfully applying synchronous production is a quality data and documentation system. This tool discusses three methods lean systems are applied. The first is kanban. Kanban is defined a s pull system. A pull system requires much more flexibility and reduced lead time and setup time. The next lean system described is takt. Waste takes on many forms, reducing efficiency, typically classified into: overproduction, delay, transport, processing, inventory, wasted motions, and defective products. Muda, Mura and Muri are all key Kaizen wastes. The most common and significant form of waste was Muda. Muda was identified as waste in: 1. Overproduction. 2. Inventory. 3. Transportation. 4. Waiting. 5. Motion. 6. Over processing. 7. Correction. Single minute exchange of dies (SMED) works any place where set up time is part of the operation. The SMED system is accomplished by analyzing internal and external components of each setup and operation. Failsafing and Poka Yoke design are enhanced problem solving tools that are discussed. The problem solving steps are: 1. Identify the problem. 2. Set parameters. 3. Analyze the problem. 4. Preliminary ideas selection. 5. Decision identification. 6. Analyze decision. 7. Prevention. 8. Future planning. The three analytical tools to use for individual, team and organizational improvement are: 1. Best practices. 2. Bench marking. 3. Auditing. Best practices and suggestion systems are used for team approaches to technical problem solving. The bench marking process is a structured and ongoing process. It is generally formalized within an organization, not simply a knee jerk reaction to a problem. The audit is a survey that raises questions about what we are doing, why we are doing it, and so on. Auditing quality is also discussed as an evaluation tool. This is done by using system audits, product audits, and process audits. These audits provide baseline, objective, data and information for potential enhancements and improvements. Researcher 1A. Main Technological Concept: David Harrison This tool discusses ways to improve production through different ways to reduce wastes and audit results. Pam Neill The main concept of tool 22 was the best practices for lean production. It explains the concepts behind Kaizen, simplicity, JIT, Poka Yoke to name a few. These are all Japanese synchronous methods. 2A. Relationship, Value Added, To Project/Technology: We can use this information to further analyze our project and find ways to further reduce wastes in our manufacturing process The main concept of our project is to figure out how to eliminate waste and increase production. All the concepts in this tool will help in completing this. This is one of the most important tools we will learn about for industry. 3A. Assessment Question, Pros And Cons, For Chat: Good tool to apply to our project for analysis. Question: What are the 5 S’s and why are they important? Answer: Sort, stabilize, shine, standardize and sustain. These are the five essential items to a positive change in a process or work environment. They are the center of the process. Shawn Myers Vanessa Malone John Wise Scott Sowders William Myles II Question: What is Just-In-Time (JIT)? The main concepts of tool 22 revolve around the fundamentals of “lean manufacturing”. This would include the theories on Just-In-Time (JIT), 5S, benchmarking, and other quality oriented functions. The relationship of this tool to our project is based on the fact that we are trying to take cost out of a process. By utilizing the fundamentals contained in this tool and applying this to the pencil slat reduction initiative, we can achieve the results that are desired. The main concept of Tool 22 getting familiarity with the different tables and their purposes in continuous improvement. Each table has a specific quality or characteristic that is documented and assessed. Being knowledgeable about these tables and their purpose is key to improvement and action. We can evaluate our process as described in this tool and be aware of inconsistencies to watch out for. The main concept of Tool 22 explains the use of Best Practices to reduce waste using Poka Yoke, JIT, failsafing, benchmarking, auditing, and TPM. Data, documentation and leadership also need to be synchronized in order to be competitive. The main technical content of the tool is Synchronous Production, Enhanced Practices for Change, Lean, and Variation Reduction Techniques. The Best Practices in this tool are ways to reduce waste in the process which will lead to lower costs and increase productivity by involving everybody in the process. The toolkit content adds value to our cutting project by introducing synchronous production techniques that can be evaluated for our process to improve materials flow and reduce WIP. It also discusses topic of Total Productive Maintenance which is a process that our team has suggested for implementation into our slat cutting process. Question: What are a few of the best practices ideas for inventory issues? The main concept of tool 22 is to identify the Best Practices for lean production. It describes the Japanese methods of Kaizen, JIT, Poka Yoke, etc. The ideas in the Best Practices will help our teams objective in many ways. All of the ideas in the Best Practices connect with our objective of reducing the production cost and minimize waste in the pencil slat production process.. What is JIT? Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: I think all the team members comprehended tool 20 well bases on their research. All abstracts touched on cutting costs and reducing wastes. Answer: Just-In-Time is a concept that basically sets up a delivery network where the right amount of product is delivered to the customer in enough time to where the customer is ready to use the delivered product. This is achieved through logistics and lean manufacturing. Why audit? Audits provide system and discipline. They provide baseline, objective, data and information for potential enhancements and improvements. Why is TPM important to a process? TPM involves all members of the plant to maintain machines to eliminate costly breakdowns before they occur. Answer: 1.Reduce set-up and change over times 2. Zero inventory , stockless production 3. Kanban Systems Answer: JIT is an acronym for Just In Time. It’s a concept where a network of delivery is set up to make sure the package is delivered to the company at the appropriate time. The appropriate delivery time in this concept is slightly before the company will need to use the product. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Team 2 with the exception of one did very will with improving the time it took to start posting. We need to keep up the multiple chats and get the whole team on the same timeline. David Harrison: A Japanese manufacturing engineer named Shigeo Shingo developed the concept that revolutionized the quality profession in Japan. It was originally called fool proofing then changed to mistake proofing and fail safing so employees weren't offended. It allowed companied to waste less energy, time and resources from doing wrong things. Poka yoke methods are simple ways to help achieve zero defects. These methods are devices that are used to either detect or prevent defects from occurring in the first place. Employee empowerment is the main method of developing a Poka Yoke. By building on many simple ideas from the company’s brightest employees, Poka Yokes can be developed and can make significant differences. An example of Poka Yokes is the malfunction of a pen. A Poka Yoke could be written to have all pieces of the pen provided to the assemble in a dish so that he could inspect the parts and ensure that all pieces were there, therefore, reducing the number of malfunctioning pens. Other things a Poka Yoke could do is make sure all requirements are done such as filling in fields within documents. This enables the process to not move forward until all of the required information is filled in. This will help eliminate mis-filed paperwork and other such problems. Poka yokes are such a simple way to prevent errors from being repeated and make processes cleaner ad more accurate. Pam Neill: Poka Yoke, or fool proofing, was developed by a Japanese manufacturing engineer by the name of Shigeo Shingo. Shingo worked for Toyota. This is the main component in the ZQC (zero quality control) system. This idea was developed to create zero defective parts. The Poka Yoke system works by using many small items to detect or prevent defects. A Poka Yoke can be created by anyone and everyone is different. Here a few examples: 1. A person picks up a pen to sign their name. They push to top to extend the ballpoint and it fails to extend. The spring is missing from the pen. A Poka Yoke could have been used in the assembling process that could have prevented this from happening. If all the parts had to be visually inspected and tested before packaging, the pen would not have failed. “The causes of defects lie in worker errors and defects are the results of neglecting those errors. It follows that mistakes will not turn into defects if worker errors are discovered and eliminated beforehand” says Shingo (Shingo 1986, pg.50). There are three different types of inspection in a Poka Yoke; judgment inspection, informative inspection and source inspection. Judgment inspection is a quality inspection. Meaning to sort out the defects. Informative inspection is using the knowledge you have gained to keep the process in control. This will help to prevent defects. Source inspection inspects the product one hundred percent. Shingo points out that this will improve the process and eliminate defects. He believes that this is the ideal method for quality control. Shingo wrote a book in 1986 arguing that the SPC process does not eliminate defects but only maintains amount of defects being created. In conclusion, in order for defects to be eliminated and processes such as ZQC and SPC to work, the employees need to make changes when defects are occurring. They need to be willing to make changes and have a positive attitude. If management shows they are willing to try and create a positive atmosphere the workers will follow suit. Shawn Myers: This article looks at Just-In-Time manufacturing nad the effects on a few businesses. One example is Gamblin Artists Oil Colors. This company Started out making 3 colors of oil paint. As the company has grown, the choices of paint grew to upwards of 87 colors. Having this many colors also increased the volume of product transferred across the plant where these were made. Overhead rail was used for this process, nut when a tube weighed 1 lb, there was a lot of tubes moving overhead. This company has hired a manufacturing consultant to look at reducing inventory. The Manufacturing Extension Partnership (MEP) is a network created by the National Institute for Standards and Technology. This program has 400 centers around the nation that assists companies with logistical and structural problems. The Oregon MEP helped Gamblin with their problems. The company would make batches of paint that would yield inventory that sat around for 3 – 6 months. By reducing the batch sizes to 1/3 the size, they reduced upwards of $200,000.00 from their inventory and the physical amount of product sitting around was cut in half. Also, decisions are made on-the-fly instead of through meetings away from the process. This cut 20 minutes of downtime out of the process when a problem arose. Teamwork and team meetings are also utilized to reduce process problems. By utilizing concepts associated with lean manufacturing and applying fundamentals with JIT, a company can achieve some impressive financial improvements. Looking at a process is an easy way to identify problems, but also looking outside the process may also yield some cost improvements. Vanessa Malone: Before you can write a competitive analysis, you need to identify your direct and indirect competitors. You can easily find listing in local on th Internet and newspapers. However, the best way to create a strong competitive analysis is to visit your competitors, check their process, get an idea of who their customers are, and see what services they offer. Talk to other customers and find out from friends and neighbors what they do or don’t like about your competitors. Talk with vendors and seek out information in business journals. You can also go online, order a product and see how long it takes to arrive, what their return policy is, and if they are easy to contact if there is a problem. Gathering a solid base of information is the first step to creating a strong competitive analysis. The next step in analyzing the information and using it to your advantage. List the strengths and weaknesses of each competitor. Then look for areas where you cannot compete and areas where you can provide something that they cannot. For example an online clothing retailer can offer a much larger selection than you can in limited space, because they do not carry a full inventory. Since your customers can try clothes on, perhaps you’ll have the latest in dressing rooms or offer a monthly fashion show where customers can see the latest clothes up close and personal. To make your competitive analysis stand out, take as many weaknesses of your competitors as possible and turn them into potential strengths for your business. Then narrow down your list to those that will give you the competitive edge. They must be realistic, cost effective, designed to meet a specific need or solve a problem, and appealing to a select segment of the market. John Wise: Total Productive Maintenance (TPM) is a newly defined concept for maintaining plants and equipment with a goal of increased production while increasing worker morale and job satisfaction. Total Productive Maintenance resembles Total Quality Management such as: 1. total commitment by upper management, 2. employees are empowered to initiate corrective action, and 3. long range outlook must be accepted as this is an on-going process and may take a year or more to implement. There must also be a change in the mindset of the employees toward their job responsibilities. Maintenance is considered a part of business and no longer regarded as a non-profit activity under TPM. There is down time scheduled for maintenance as a part of the manufacturing day and it is no longer squeezed in during a break. Minimizing emergency and unscheduled maintenance is the goal of TPM. TPM was developed from TQM, which evolved in Japan under the influence of Dr. w. Edwards Deming. Plant maintenance problems were examined as part of the TQM program with some of the general concepts not fitting into the maintenance environment. Maintenance schedules were designed using preventive maintenance techniques to keep machines operational. This technique often caused the machines to be over-serviced to try to improve production. The only training maintenance personnel had was from the maintenance manual which were inadequate and there was little or no involvement from the operators. Companies committed to TQM soon realized there was a need to go further than just scheduling maintenance according to the manufacturer of the equipment and made changes to the TQM concepts to elevate maintenance to be a part of the overall quality program. There is a dispute over the origin of the term Total Productive Maintenance. Some say it was used by American manufacturers over forty years ago and others say it is from a maintenance program used in the late 1960’s by a Japanese automotive electrical parts manufacturer named Nippondenso. An officer with the Institute of Plant Maintenance in Japan, Seiichi Nakajima, is credited with defining the concepts of TPM and implementing it in hundreds of Japanese plants. The first step to implementation of a TPM system is to hire a coordinator to create an educational program to convince the entire workforce of the importance of TPM. The next step is to form action teams from people directly involved in the process to pinpoint problem areas, develop corrective actions, and initiate the corrective process. The teams start on small projects until completion then implement this system to other areas of the plant. Some of the companies that have successfully implemented TPM are Ford, Eastman Kodak, Dana Corp., Allen Bradley, and Harley Davidson. Kodak reported a $16 million dollar increase in profits from a $5 million dollar investment. Texas Instruments had an 80% increase in production figures in some areas. Most of the rest of the companies mentioned above report 50% or greater reduction in downtime, reduced spare parts inventory, and increased on-time delivery. Scott Sowders: Kanban is the information system used for JIT pull type production system. Kanban is a Japanese work meaning “card”. Kanban controls the flow of material within the MPC system. One and two card systems are commonly used. A two card Kanban system may be used to move materials through production. The first card is the transport or conveyance card and the second Kanban card is the production card. This type of system is a pull system because a work cell is authorized to produce parts only when the operator has a production card. Cards are only present when the next work cell in the production sequence pulls finished parts away. Work is paced by the flow of the Kanban system and no work cell is authorized to produce just to keep busy. The Kanban cards replace all work orders and inventory move tickets. The production cards circulate around the outside of the cells from finished goods container to the production cell and then back to the finished goods container. The conveyance cards circulate at the input side of the work cell in similar way. The system is a visual, manual in operation, and helps operate with fewer inventories than the traditional push systems. With the Kanban system the typical problems of sequencing jobs are greatly reduced. The enterprise can benefit from internal kanban systems, but new experiences are that this concept can be used with external suppliers as well. Claims in favor of the JIT Kanban System are: 1. Reduced inventory levels 2. Reduced Work-In-Process 3. Shorter manufacturing lead times 4. Increased responsiveness to customers Shorter lead times help compress scheduling and lead to less work-in-process (WIP) material. The elimination of any all non-value activities leads to spending less time and ultimately to a reduction in cost. The streamlined process works better and more efficiently because the reduction of waste. William Myles II: Tool 22 discusses several parts of the production process. It talks about production which can be continuous (the Detroit style), or intermittent (the job-lot). It also talks about the 3 main methods used by lean systems to improve the process and those methods are the muda, the kanban, and the takt. The muda is basically considered as types of waste. There are so many different types of waste and overproduction, over processing, and corrections are just a few types of waste. Next is the kanban which is described as a pull system which requires less setup time, and much more flexibility. The very last method is the takt method. Tool 22 also speaks about Total Production Maintenance (TPM). TPM is a net method used to maintain different parts of the company from the different plants down to the equipment while increasing worker morale, job satisfaction, and production. In order for TMP to be successful, there are three ideas that need to be kept and followed which are team commitment by upper management, empowered employees who initiate corrective actions, and a long range outlook must be accepted because this process may take years to implement. All of those parts were very similar to the TQM (Total Quality Management) which is where TPM comes from. Another part that tool 22 speaks about is the Poka Yoke, which was created by a Japanese engineer by the name of Shingo Shingo. The definition of Poka Yoke is fool proofing, which is the main concept in ZQC (zero quality control). It was developed to eliminate waste and have zero defective parts by using small items to detect the problems. Researcher: 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: David Harrison Kerri Simon, Poka Yoke Mistake Proofing, Retrieved on 10/22/05 from http://www.isixsigma.com/library/content/c 020128a.asp, http://www.isixsigma.com/tt/poka_yoke/ Pam Neill Shawn Myers Applegate, Jane. “Just In Time Manufacturing”. Entrepeneur.com. http://www.entrepreneur.com/mag/article/0 ,1539,289747,00.html Vanessa Malone http://www.allbusiness.com/articles/Busines sPlans/1728-1746-1776.html John Wise Roberts, Jack, Ph.D., Department of Industrial and Engineering Technology, Texas A&M University, Total Productive Maintenance (TPM), http://et.nmsu.edu/~etti/fall97/manufacturi ng/tpm2.html James A. Rehg and Henry W. Kraebber, Computer Integrated Manufacturing, Third Edition, Person Educational Inc. Chapter 9 The Revolution in Manufacturing Scott Sowders William Myles II Simon, Kerri, http://www.isixsigma.com/library/content/c 020128a.asp 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? This article describes what TQM is and how it can improve a business. This article describes Poka Yoke and how it can be used successfully. 3B. SDA’s Connected: This article explains the Poka Yoke system. Where it got its name, who invented it and why. It also gives great examples of how the system is used. This is an important tool in any process. We need to understand it to make a successful product and to satisfy our customer. This article can add value by looking at another aspect of the pencil slat process. This can be achieved by looking at the amount of inventory kept on-site and if this is necessary. OCA This article is relevant because it tells how to make an business competitive and give examples in which to do so. Sometimes people aren’t aware of how much they can do to improve business and this article tells it all. This article gives the history of TPM and how it is used to increase profits and productivity while reducing costs. This reinforces the information on TPM that is in the Tool 22 material. The source was relevant because it discussed similar topics to that of Toolkit 22, JIT Kanban Systems. It adds value by effectively demonstrating how the Japanese Kanban system works. It also demonstrates the streamlined approach to manufacturing practices. This information can be used by our group as we continue to focus on improvements for our cutting process. This article is good for our group because it goes in depth about the Poka Yoke which is relevant to our project. All All GBAPS OPCP GBAPS and OCA OPCP and SOGA GBAPS OCA Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Team members did a fine job in finding articles in relation to tool 22. Topics included Kan Ban, Poka Yoke, Total Productive Maintenance, and Just in Time manufacturing. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: All team members did very well with their articles in finding topics related to tool 22. Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: 2 Tool: 23 Date: 11/2/05 Researcher: Vanessa Compiler (s): Vanessa Team: 2 Malone Malone Information Source (Tool reviewed for this toolkit completion) In Bibliographic Form: Sinn, John W., 2002, Industrial Technologists’ Toolkit, Toolkit 23, “Failure Mode and Effects Analysis (FMEA), Quality Function Deployment (QFD), Reliability For robust Problem Solving” Tool 23 explains the purposes for FMEA, Failure Mode and Effects Analysis, and QFD, Quality function Deployment, documents. FMEA is a technique that allows workers to assess product and process systems to assure that failure in components or elements have been addressed and prevented. This involves identification, analysis and prioritization for ongoing improvement, consistent with all Kaizen and documentation approaches for lean environments. FMEA is used to analyze failures after they have occurred or to prevent their occurrence. The opportunity to identify a problem before it becomes a reality is advantageous to all concerned. The earlier FMEA systems are used the better, raising applications opportunities for new product introduction and launch. Furthermore the FMEA process and application must include an orientation of the current experiences and functions. Typical FMEA applications include : Root cause, effect- analyzing quality problems or concerns related to processing or design issues Value analysis- conducting value and/or cost analysis on a new process being considered for production Innovation- analyzing various materials or processes for redesigning product Layout Improvement- determining plant layout and materials being handled in new or existing possessing facilities Up front planning- new product or process development Understanding the customer- market analysis as related to technical aspects of product or process development, customer input Documenting process- simply document the process, creating an important record and paper trail of overall effort Part of doing improvements in lean competitiveness, as well as for basic quality decisions, is the design process. Design processes typically involve at least four major phases. These phases are (1) identifying the problem. (2) preliminary design, (3) basic drawings, and (4) specification development. Problem identification occurs in the early stages of the design process, or market research. As the problem is further focused, renderings completed, prototypes developed, and other relationships explored, various plans can be moved forward. Relating to the points above, teamwork is an essential part of industrial design and creativity for product development. Most technical problems are too complicated for a single individual to tackle. Teamwork for creativity is an art and a science requiring give and take in order to successfully be productive. On the other hand QFD typically focuses on: Product function- what must the product do? Deriving quality- how quality can be derived within product functions? Quality versus function- how quality and function are best produced? Communication- bringing enhanced communication to all Understanding competition- understand the competition and our position in the marketplace relative to competition Cost reductions- reducing costs in product where features in design may not actually address functional requirements or other needs of the customer Thus, the QFD is a way of thinking about customer needs, designing to meet those needs, and meeting them through production methods as well as design. Researcher 1A. Main Technological Concept: Vanessa Malone The main concept of Tool 23 getting familiarity with the FMEA and the QFD. Each process has a specific quality or characteristic that should be documented and assessed both to meet yours and customer needs. 2A. Relationship, Value Added, To Project/Technology: Being knowledgeable about these processes and their purpose is key to improvement. We can evaluate our process as described in this tool and be aware of inconsistencies to watch out for. 3A. Assessment Question, Pros And Cons, For Chat: Why follow the QFD process? The QFD process forces, or encourages, a consensus to be built around what we really “expect” our product to be, particularly from the quality side, but also in terms of engineering. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member): This article covers five major steps in QFD. The first step includes activities that focus on understanding the customer. The data produced is refined, and then a subset of information becomes the input to the second step. Step two involves gathering the voice of the customer and understanding the context in which the customers make statements. Contextual information clarifies the customer’s verbatim information. The purpose of this process is to establish a clear understanding of all the customer’s needs, specifically the performance requirements. These requirements can also be called demanded qualities. Each QFD analysis builds in some way upon these demanded qualities. Since the design is driven by customer information, the practitioner is more likely to design a product that meets or exceeds customer expectations. Step three translates the customer’s statements and evaluations into the design team’s language for performance measure and priorities. If necessary, the design team uses demanded qualities to identify new concepts. The design team uses performance measures to prioritize the design and development effort. Compromises may be required for the unattainable. Step four is for generating new concepts. Target costs are integrated in the generation process. The selected new concepts and associated specifications are linked to the manufacturing process and the manufacturing database. In step five, is the final analysis of product specifications to manufacturing conditions. Most importantly, QFD, does not replace an organizations existing design process. You can introduce a QFD activity at various points in the design process. The approach is flexible enough that your design team can decide when to start and stop the QFD process. Researcher Vanessa Malone 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: http://www.mv.com/ipusers/rm/qfd.htm 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? This article provides a five step process that can be used by any organization wishing to pursue the QFD process for ongoing improvement. 3B. SDA’s Connected: All Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Researcher Tool: 23 Date: 11/12/05 1A. Main Technological Concept: David Harrison Researcher: David Compiler (s): Vanessa Team: 2 Harrison Malone 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: FMEA and QFD should be applied to When should FMEA be applied? our process of cutting pencil slat to Preferably before a new process or determine if we are open to potential product is launched. failures. Tool 23 describes the purpose of FMEA and QFD. Understanding and implementing the right tools can provide quality and reduce chances of failure. David Harrison: Failure Mode and Effects Analysis is a proactive tool, technique and quality method that enables the identification and prevention of process and product errors before they occur. FMEA evolved as a process to in 1949 by the united stated military. In the early 1990’s, six sigma started to become popular as a process improvement methodology. FMEA and six sigma can help identify and eliminate concerns a company may have in a new process or product. It allows many different looks into a process or product failure and then supports the design of the new process or product so that new design will eliminate the chance of a repeat failure. If used properly, FMEA can help to improve the overall safety and quality of products and allows companies to become more proactive instead of reactive. To define a problem with a product requires documented and proved methodologies. FMEA should not be just used to define failure points, but should also be used to analyze information from a perspective point of view to we what may have led up to the failure point. Some potential targets for applying FMEA are: ¾ New processes being designed. ¾ Changing existing processes. ¾ Application of existing processes in new applications or environments. ¾ After completing a problem solving study ¾ When preliminary understanding pf the process is available. ¾ After system functions are designed, but before specific hardware is defined. ¾ After product functions are defined, but before the design is approved. FMEA can help eliminate extra time spent considering potential problems in a design concept. As each FMEA is defined, a baseline is built for future product designs. Eventually a reduction of time in process development can be derived from carrying the information from previous FMEA’s and can promote repeatability and reproducibility. Understanding how and when to implement the right process can increase quality while reducing costs and variability. 2B. Why Is This Source Relevant; How Does It 3B. SDA’s Researcher 1B. Bibliographic Source: Author; How To Add Value (Reflections By Researcher)? Connected: Access; How/Who, Published; Type Source, etc.: David Dr. Deborah L. Smith, FMEA: Preventing a ALL This article discusses the definition and uses of Harrison Failure Before any Harm is Done, Retrieved on FMEA. Relationships with new processes and 11/12/05 from products are described as well as results from http://healthcare.isixsigma.com/library/conte proper implementation of this methodology nt/c040317a.asp, Review Of Literature, Documentation Assessment (ROLDA) RCA Phase:2 Researcher Tool:23 Date:11-3-05 1A. Main Technological Concept: Researcher: Scott Compiler: Sowders 2A. Relationship, Value Added, To Project/Technology: Team:2 3A. Assessment Question, Pros And Cons, For Chat: Scott Sowders The main technical content of the tool is Failure Mode and Analysis (FMEA), Quality Function Deployment (QFD), Reliability For Robust Problem Solving. Value was added in techniques to evaluate and determine causes of variation and defects. Identification of design issues with product and/or process. Question: Why is it important to determine the Cp and Cpk of the process? Answer: It is importance because it helps to determine if process is capable of producing acceptable product and tells the processes potential to produce defective or unusable products. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member): Many organizations attempt to design quality into their processes through continuous improvement methods. When input and outputs can be measured or compared, statistical tools can be used such as controls charts. Statistical Process Control (SPC) is the application of statistical techniques to determine weather the output of a process conforms to the product or service design. Control charts are primarily used to detect defects or to signal that the process has changed or is the process of changing and the product or process will soon deviate from design. Some examples of change that may be detected are; a sudden increase in proportion of defects of a gear, increase in the average number of complaints per day at a bank, consistently low measurement in diameter of a crankshaft, and a decline in the number of scrapped parts at a milling machine. Acceptance sampling is the application of statistical techniques to determine whether a quantity if material should be accepted or rejected based on the inspection or test of a sample. No two products of services are exactly alike because the processes used to produce them contain many sources of variation, even if the processes are working as intended. Nothing can be done to eliminate variation in process output completely, however you can investigate the causes of variation and try to minimize it. There are two basic categories of variation process outputs: common causes and assignable causes. Common causes of variation are purely random, unidentifiable sources of variation that are unavoidable with the current process. An example given, an automatic machine that fill cereal boxes. The machine will not put exactly the same amount of cereal in each box. The second category of variation is assignable causes of variation, also known as special causes which is defined at any variation causing factors that can be identified and ultimately eliminated. Examples given, employees needing training or a machine needed to be repaired. For process improvements, the focus should be on the assignable causes of variation, because these are the ones and can be eliminates and directly result in better quality. 2B. Why Is This Source Relevant; How Does It 3B. SDA’s Researcher 1B. Bibliographic Source: Author; How To Add Value (Reflections By Researcher)? Connected: Access; How/Who, Published; Type Source, etc.: OPCP and Scott Department of Management BGSU, The source was relevant because of the SOGA and Sowders Introduction to Production & Operations discussion of Statistical Process Control, CEAS Process Improvements, and causes of variation Management, Pearson which relate to some of the key topics for Tool kit 23. It adds value because the SPC charting techniques were used to complete the SDA Table for Characteristic Evaluation and Auditing System (CEAS). Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Researcher Shawn Myers Tool: 23 Date: March 17, 2006 1A. Main Technological Concept: Tool 23 revolves around the idea of establishing common ground between the supplier and customer. This is accomplished through the use of FMEA and QFD. Researcher: Shawn Compiler (s): Vanessa Team: 2 Myers Malone 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Question: What role can FMEA The relationship of this tool to our play in communication between project is based on the fact that we supplier and customer? are trying to take cost out of a process. By utilizing the Answer: The FMEA system fundamentals contained in this tool allows a supplier to identify and applying this to the pencil slat characteristics and results of reduction initiative, we can achieve failures contained in a process or the results that are desired. part produced. This allows a supplier to identify a plan to control the failure rate and establish systems to reduce or prevent failures in the future. Shawn Myers FMEA (Failure Mode and Effects Analysis) allows a company or organization to take a proactive approach into identifying process and/or products errors before they happen. This is a systematic approach to eliminate errors during product development and will assist in customer satisfaction if executed properly. Some of the philosophies surrounding FMEA include: problem prevention to eliminate weknesses in a process or product, structured approach to identify problems in a process to a customer, an estimation of risk due to the failures, and a way to evaluate a control plan and prioritize actions to improve the process. An FMEA team is made up of personnel within an organization to identify problems within a process. This team will establish metrics, timelines, goals and other criteria to perform this study. The techniques used revolve around six sigma with the blessing of the organization to allow change based on the results derived from these studies. Some benefits of performing an FMEA include: utilizing the collective knowledge of the team, improve the reliability, safety, and quality of a process through logical identification of areas for concern, establish a history and documentation that can reduce cost and lead times and track risk reduction activities. The various types of FMEA include process, system and design. The only way to truly be successful with FMEA is through the use of team work and cooperation. Researcher Shawn Myers 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: Smith, Dr. Deborah L. “FMEA: Preventing a Failure Before Any Harm Is Done”. Six Sigma Healthcare. http://healthcare.isixsigma.com/library/conte nt/c040317a.asp 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: This article offers value by looking at how other industries utilize FMEA tools. FMEA OPCP Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 23 Date: 11/5/05 Researcher 1A. Main Technological Concept: John Wise The main concept of Tool 23 how the FMEA is used to identify and eliminate failures in the process that may affect the quality of the product. QFD is used to identify and satisfy the customer’s needs for the product you are producing. FMEA and QFD are more effective when used during the design step of a product and process. Researcher: John Wise Compiler (s): Vanessa Team: 2 Malone 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Why is FMEA important to a FMEA and QFD can be used to process? eliminate failures in the process that can lead to poor quality product FMEA is used to identify failures which increases waste in the process in the process, system, or design of and increases costs. the product during the early stages of the product/process development. Once these areas of failure are identified, the design can be changed to eliminate the risk of failure in the product to eliminate waste. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : John Wise Failure Mode and Effects Analysis (FMEA) is a tool that is proactive to identify and prevent process or product errors before they occur. It is a systematic way to examine a prospective process for ways a failure can possibly occur and then redesign the process to eliminate the possibility of the failure. FMEA can be applied to any process for any industry, although this article refers to the healthcare industry. FMEA is one of several reliability and design analysis tools and can also be defined as: A problem prevention tool used to identify weak areas of the process and develop plans to prevent their occurrence. A semi-quantitative, inductive bottom-up approach executed by a team A structured approach to identify the ways in which a process can fail to meet critical customer requirements A way to estimate the risk of specific causes with regard to these failures A way to evaluate the current control plan to keep failures from happening. A way to prioritize the actions needed to improve the situation Some areas that FMEA can be applied to are new processes that are being designed, current process that are changing, carry-over process that will be used in new applications, and after a problem-solving study. Preparing and updating the FMEA should be done as team made up of multi-disciplinary members from all the affected activities. The leader of the team is the responsible process owner who is also responsible for updating the FMEA. The team should consist of no more than six to ten members with a record keeper, time keeper and a champion to go along with the leader. FMEA has many benefits such as: capturing the collective knowledge of the team; improving the quality, reliability, and safety of the process; logical, structured process to identify process areas of concern; reduce development time and costs; documenting and tracking risk reduction activities; identify Critical-To-Quality characteristics. Researcher John Wise 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: Smith, Dr. Deborah L. FMEA: Preventing a Failure Before Any Harm Is Done, http://healthcare.isixsigma.com/library/conte nt/c040317a.asp 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: This article describes FMEA and how it can be used in any industry to eliminate an failures that can occur in their processes. This article also reinforces the information that is presented in Tool 23. FMEA Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 23 Date: 11/7/08 Researcher: Pamela Compiler (s): Team: 2 Neill Researcher 1A. Main Technological Concept: 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Question: What steps are taken in This tool is used to help in the Pamela The main concept of tool 23 is the brainstorming for improvements? diagnosis of failures that may be Neill explanation of FMEA and QFD. causing down time or increasing FMEA is used to diagnosis failures. Answer: identify the problem, set costs. It can also be used to help This information is used by the parameters, analyze the simplify our design. We currently engineering and/or quality groups problem, preliminary ideas are using old equipment and want to to prevent this failure from selection, decision identification, update it. What is the simplest reoccurring. QFD is used to analyze decision, prevention and solution to increasing production, simplify the design keeping costs future planning lowering cost and eliminating down and chances for failure lower. defects? Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : Pamela Neill Today companies are in high competition to win a customers business. Customers are demanding higher quality and more reliable products. This is causing companies to put more emphasis on the reliability of the product thru design. FMEA (Failure Modes and Effects Analysis) is being used more often. FMEA is used to identify potential failure modes, determine their effect on the operation of the product and identify actions to mitigate the failures (Crow). FMEA’s are especially important if a person could become injured or killed if a product fails. There are five types of FMEA’s each with a specific focus: 1) 2) 3) 4) 5) System – global system functions Design – components and subsystems Process – manufacturing and assembly processes Service – service functions Software – software functions FMEA will fill in the gap that the engineer is unable to do with adding safety factors into the design. An article in Mechanical Engineering in September 2003 read, “A large safety factor does not necessarily translate into a reliable product. Instead, it often leads to an overdesigned product with reliability problems”. When properly used, FMEA can assist an engineer in improving the quality and reliability of a product. Some benefits include: 1) 2) 3) 4) 5) Improve reliability and quality Better customer satisfaction Early detection of potential failures Documents engineering action taken to prevent and/or reduce risk in failure Decreases costs due to late changes The following are the steps in creating a FMEA: 1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11) Describe the product/process and its function Create a block diagram of product/process Complete the header on the FMEA worksheet Use a diagram to list items or functions Identify failure modes. Remember, a failure in one component may be the cause of failure in another component. Describe effects of failure modes Identify the causes of the failure modes Enter a probability factor Identify design or process Identify the likelihood of detection Review RPN (risk priority numbers) 12) 13) 14) 15) Identify recommended actions to address potential failure that have a high RPN Assign a person to the action and list a target date Document actions taken Update the FMEA as anything changes. This is the most important step. Researcher Pamela Neill 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: Crow, Kenneth. http://www.npdsolutions.com/fmea.html, 2002, Failure Modes and Effects Analysis 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: This article gave a very detailed look at FMEA and how/why it is used in industry. It discussed different areas than that of the long form. FMEA Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 23 Date: March 17, 2006 1A. Main Technological Concept: Researcher: William Compiler (s): Vanessa Team: 2 Myles II Malone Researcher 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Question: What is FMEA This tool and our project our most William Through the FMEA and QFD forms, important process in common, Myles II a common background is to be Answer: A Failure Mode and finding a quicker and less costly way formed in the customer and supplier Effects Analysis (also referred to as to improve the process. By using the of the #2 pencil slat. a FMEA or FMECA) is a bottoms ideas from this and using them in to up approach to analyzing system help our process, we will definitely design and performance. improve our project. Compiler Reflections To Help Improve Quality Of Work In Compiler Portfolio Reflections, Summary Of Technical Work, Portfolio Based On All Individual Researcher Inputs: Assessment, Based On Individual Researcher Inputs: Overall, it appears that everyone read the assigned long Tool form I feel that all have an average understanding of the FMEA for Tool 23. Each student covered the main points concerning the FMEA and QFD processes and now have a good understanding the and QFD functions. process including its purpose, results and concepts. William Myles II Failure Mode and Effects Analysis (FMEA) is a method designed to identify potential failure modes for a product or process, to assess the risk associated with those failure modes, to rank the issues in terms of importance and to identify and carry out corrective actions to address the most serious concerns. Although the purpose, terminology and other details can vary according to type (e.g. Process FMEA, Design FMEA, etc.), the basic methodology is similar for all. This document presents a brief general overview of FMEA / FMECA analysis techniques and requirements. In general, FMEA / FMECA requires the identification of the following basic information: • • • • • • • • Item(s) Function(s) Failure(s) Effect(s) of Failure Cause(s) of Failure Current Control(s) Recommended Action(s) Plus other relevant details The FMEA / FMECA analysis procedure is a tool that is used for many different purposes. It can contribute to improved designs for products and processes, resulting in higher reliability, better quality, more customer satisfaction and reduced costs. The tool can also be used to establish maintenance plans for repairable systems and/or contribute to control plans. It provides a knowledge base of failure mode and corrective action information that can be used as a resource in future troubleshooting efforts and as a training tool for new engineers. In addition, an FMEA or FMECA is often required to comply with safety and quality requirements, such as ISO 9001, QS 9000, ISO/TS 16949, Six Sigma, FDA Good Manufacturing Practices (GMPs), Process Safety Management Act (PSM). 2B. Why Is This Source Relevant; How Does It 3B. SDA’s Researcher 1B. Bibliographic Source: Author; How To Add Value (Reflections By Researcher)? Connected: Access; How/Who, Published; Type Source, etc.: William Myles II Williams, Tim This article is helpful to our process by FMEA explaining how to use the FMEA in services. http://finance.isixsigma.com/library/content OPCP /c040922a.asp Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Assessment, Based On Individual Researcher Inputs: Portfolio Based On All Individual Researcher Inputs: All agree that this can be done to improve quality, All found a considerable amount of information in regards to the performance and process. FMEA and QFD processes. They defined the process and stated important concepts and other basic information that should be obtained to conduct these analysis. Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 24 Date: 10/21/05 Researcher 1A. Main Technological Concept: John Wise The main concept of Tool 24 explains TPM and how it relates to the safety and ergonomics of the process and how it is the responsibility of everyone to implement and maintain Safety, housekeeping and ergonomics. Researcher: John Wise Compiler (s): Dave Team: 2 Harrison 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Why is TPM important to a The TPM, safety, and ergonomic process? topics in this tool are ways to reduce waste in the process related to poor TPM involves all members of the maintenance, safety, and ergonomic plant to maintain machines to issues. eliminate costly breakdowns before they occur. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : John Wise Total Productive Maintenance (TPM) is a newly defined concept for maintaining plants and equipment with a goal of increased production while increasing worker morale and job satisfaction. Total Productive Maintenance resembles Total Quality Management such as: 1. total commitment by upper management, 2. employees are empowered to initiate corrective action, and 3. long range outlook must be accepted as this is an on-going process and may take a year or more to implement. There must also be a change in the mindset of the employees toward their job responsibilities. Maintenance is considered a part of business and no longer regarded as a non-profit activity under TPM. There is down time scheduled for maintenance as a part of the manufacturing day and it is no longer squeezed in during a break. Minimizing emergency and unscheduled maintenance is the goal of TPM. TPM was developed from TQM, which evolved in Japan under the influence of Dr. w. Edwards Deming. Plant maintenance problems were examined as part of the TQM program with some of the general concepts not fitting into the maintenance environment. Maintenance schedules were designed using preventive maintenance techniques to keep machines operational. This technique often caused the machines to be over-serviced to try to improve production. The only training maintenance personnel had was from the maintenance manual which were inadequate and there was little or no involvement from the operators. Companies committed to TQM soon realized there was a need to go further than just scheduling maintenance according to the manufacturer of the equipment and made changes to the TQM concepts to elevate maintenance to be a part of the overall quality program. There is a dispute over the origin of the term Total Productive Maintenance. Some say it was used by American manufacturers over forty years ago and others say it is from a maintenance program used in the late 1960’s by a Japanese automotive electrical parts manufacturer named Nippondenso. An officer with the Institute of Plant Maintenance in Japan, Seiichi Nakajima, is credited with defining the concepts of TPM and implementing it in hundreds of Japanese plants. The first step to implementation of a TPM system is to hire a coordinator to create an educational program to convince the entire workforce of the importance of TPM. The next step is to form action teams from people directly involved in the process to pinpoint problem areas, develop corrective actions, and initiate the corrective process. The teams start on small projects until completion then implement this system to other areas of the plant. Some of the companies that have successfully implemented TPM are Ford, Eastman Kodak, Dana Corp., Allen Bradley, and Harley Davidson. Kodak reported a $16 million dollar increase in profits from a $5 million dollar investment. Texas Instruments had an 80% increase in production figures in some areas. Most of the rest of the companies mentioned above report 50% or greater reduction in downtime, reduced spare parts inventory, and increased on-time delivery. Researcher 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: John Wise Roberts, Jack, Ph.D., Department of Industrial and Engineering Technology, Texas A&M University, Total Productive Maintenance (TPM), http://et.nmsu.edu/~etti/fall97/manufacturi ng/tpm2.html This article gives the history of TPM and how it is used to increase profits and productivity while reducing costs. This reinforces the information on TPM that is in the Tool 24 material. MTA, GFAPS Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: 2 Researcher: Vanessa Compiler (s): Team: 2 Malone Information Source (Tool reviewed for this toolkit completion) In Bibliographic Form: Sinn, John W., 2002, Industrial Technologists’ Toolkit, Toolkit 24, “Total Productive Maintenance, Safety and Ergonomics: Re-engineered Lean Environment” Tool 24 presents technical functions related to maintenance and safety. Maintenance and safety involves continuous quality and productivity enhancements. Technology must be maintained and it must function in a safe manner. Mechanical equipment, production tools, transportation systems, physical facilities and all other aspects of the technological organization require proper maintenance and service functions. If maintenance or service functions are not properly performed in a disciplined manner, the organization will not function. This is a safety issue since without properly maintained equipment it increases the likelihood for mechanical failure, and possible lost time accidents. Several basic requirements should be met if maintenance and safety functions are to properly serve the technological organization. First is attitude, commitment and knowledge. Second is analysis and troubleshooting. Attitude is understanding that without properly functioning equipment, and other internal and external service, we can’t add value and produce useful outputs. Commitment is simply upholding your responsibilities and doing your part. Furthermore talents required in maintenance, safety and service functions are new skills and should be learned because they improve/change over time. Being able to recognize relationships and applying knowledge to fix problems that may not have step by step direction. Types of maintenance include preventive, predictive and remedial. Preventive maintenance involves inspections, detection and prevention of problems. Predictive is scheduled and monitored and also indicates that planning, defined as good management practices, is established. Remedial maintenance is a back-up plan in case things go wrong due to improper uses, operator error, and misunderstandings due to miscommunication. Safety, like quality and productivity, is a concern for all people. This includes management and labor. Safety requires top management support. Strong management demonstrates part of true leadership and willingness to build and maintain systems. Responsibility is key here because there is always someone’s duty to complete a part of the project. In addition to responsibility there is also ergonomic enhancements which involve the physical conditions of the environment. Plant layout, machinery, material handling, housekeeping, fire control and pollution should be evaluated carefully and thoroughly to ensure a healthy and safe environment. Based on work method principles, work areas, tasks can be analyzed for improvements, leading to cost reductions through time savings, and quality enhancements. Researcher Tool: 24 Date: 11/19/05 1A. Main Technological Concept: 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: What are guard criteria? Being knowledgeable about these Vanessa The main concepts of Tool 24 relate methods and recommendations will Malone to maintenance and safety, total Guard criteria are enclosing contribute to overall improvement. productive maintenance, and better moving parts and components, use We can evaluate our process and management practices . suitable materials, and afford procedures and as described in this maximum protection with tool combat problems and/or minimum inconvenience. prevent problems. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member): Total Productive Maintenance has two major goals which are zero breakdowns and zero defects, based on basic assumptions about the workplace related to its technological capacity. A basic assumption is that a clean, well-organized, cooperative work area is more productive than a messy disorganized area. TMP aims to maximize equipment usage through the efforts of all employees. It requires that each peivce of equipment have a maintenance plan for the entire life span of the equipment. The maintenance plan includes a maintenance prevention emphasis during the design stages, even before the equipment is built. Maintenance is carrying out tasks that serve the central purpose of ensuring that our machines are capable of doing what the users want them to do, when they want them to do it. The possible maintenance polices can be grouped as corrective, preventive, predictive and detective. Corrective maintenance is waiting until failures occur and then remedy the situation as quickly as possible. Preventive maintenance is believing that regular maintenance attention will always prevent failure. Detective maintenance applies to the types of devices that only need to work when required and do not tell us when they are in the failed state. They generally require a periodic functional check to ascertain that they are still working. Predictive maintenance is examining the equipment without looking at a calendar and assessing what attention the equipment needs. Total Productive Maintenance emphasis the importance of people, a continuous improvement attitude and the importance of the maintenance staff working together. The modern business world is a rapidly changing environment, so the last thing a company needs if it is to compete in the global market is to cause its own problems. So, the TPM is concerned with evaluating business processes to achieve improvements in cost, quality, speed etc. It can encourage positive change in organizational structure, the work-force and simply the way things are done. TMP achievements include a better understanding of the performance of their equipment, where it is worth deploying improvements and benefits, as well as improving set-ups, carrying out better maintenance tasks and trained operators. Researcher Vanessa Malone 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: http://www.maint2k.com/what-istpm.html 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? This explains the importance of maintaining and achieving good performance, quality and procedures in manufacturing. 3B. SDA’s Connected: All Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 24 Date: 11/20/05 Researcher 1A. Main Technological Concept: David Harrison The main concept of Tool 24 explains TPM and how it relates to the safety and ergonomics of the process and how it is the responsibility of everyone to implement and maintain Safety, housekeeping and ergonomics. Researcher: David Compiler (s): William Team: 2 Harrison Myles II 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Why is TPM important to a The TPM, safety, and ergonomic process? topics in this tool are ways to reduce waste in the process related to poor TPM involves all members of the maintenance, safety, and ergonomic plant to maintain machines to issues. eliminate costly breakdowns before they occur. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : David Harrison Total productive maintenance (TPM) can be described as the medical science for machines. It is a maintenance program that can increase production significantly and also improve the workers morale. Instead of maintenance being considered a task that is unproductive and a waste of money, TPM encourages downtime to be more a part of the process. In the end unscheduled and emergency downtime should be minimal. Five main reasons TPM has been introduced are: 1. Avoid wastage in a quickly changing economic environment. 2. Producing goods without reducing quality. 3. Reduce costs. 4. Produce a low batch quantity at the earliest possible time. 5. Goods send to the customers must be non defective. To properly implement TPM a company must first go through a preparatory stage. During this stage, management announces to the company what TPM is. Training is provided for key employees, and a master plan is put together for moving forward. The next stage is implementing the process. Once the system is running in the company, management begins the institutionalizing stage. The company needs to bring TPM into its core and build a framework to properly support this initiative. Companies struggling to stay competitive may need TPM to stay on the top. It can be used in industrial plants, construction, building maintenance, transportation, and other industries. Management must be completely committed to TPM to convince the employees that this tool is not just another management fad. With proper implementation, TPM will provide higher returns than what has been invested in its implementation Researcher David Harrison 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: J. Venkatesh, An Introduction to Total Productive Maintenance (TPM), Retrieved on 11/20/05 from http://www.plantmaintenance.com/articles /tpm_intro.shtml 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: This article further discusses TPM. It addresses its history, key fundamentals, and how to properly implement TPM for greater success MTA, GFAPS Review Of Literature, Documentation Assessment (ROLDA) RCA Phase:2 Researcher: Scott Compiler: Sowders Information Source (Tool reviewed for this toolkit completion) In Bibliographic Form Researcher Tool:24 Date:11-17-05 1A. Main Technological Concept: 2A. Relationship, Value Added, To Project/Technology: Team:2 3A. Assessment Question, Pros And Cons, For Chat: Scott Sowders The main technical content of the tool is Total Productive Maintenance, Safety and Ergonomics and Re-engineering Lean Environments. Value was added in techniques to evaluate and determine causes of variation and defects that can be related to poor or improper maintenance practices, as well as unfavorable conditions in the working environment. Question: Why is it important to have and continue to update preventative maintenance programs? Answer: It is importance because it eliminates the costly problems that are associated with downtime due to component failures. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member): Equipment and plant maintenance are major cost centers in the manufacturing industry. The dollars spent in this area add no direct value to the products that are being produce by the enterprise; however, if the maintenance is ignore, any successful manufacturing system would be impossible to sustain. Automation in the maintenance area can include both hardware and software systems. The hard ware includes: 1. 2. Better tools that are designed to shorten the time required to do plant and machine maintenance. Tools designed to accurately detect deteriorating components prior to failures Soft ware has two components that can improve plant and machine maintenance: 1. 2. Faster and more accurate identification of malfunctions in production hardware and manufacturing systems Better management of maintenance operations Artificial intelligence techniques in the form of expert systems allow for development of software to help personnel identify problems more quickly and easily. An expert system is a computer program containing a series of rules that mimic the logical processes of an expert in the field of maintenance. Another area of maintenance automation focuses on improving the efficiency of the management of the maintenance operation. Software in this are performs functions that include: 1. 2. 3. 4. 5. 6. Scheduling of all planned and preventative maintenance Building databases of equipment and production machine part numbers Statistically tracking machine maintenance costs Tracking the use of supplies and spare parts in inventory Supporting bar code input of machine numbers for annual capital equipment inventory checks Produce reports that help determine how maintenance operations can improve Researcher Scott Sowders 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: James A. Rehg and Henry W. Kraebber, Computer Integrated Manufacturing, Third Edition, Person Educational Inc. 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: The source was relevant because of the discussion of Maintenance Automation in Computer Integrated Manufacturing Systems. OPCP and SOGA and MTA Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Tool: 24 Date: 11/20/08 Researcher: Pamela Compiler (s): Team: 2 Neill Researcher 1A. Main Technological Concept: 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Why is safety such an important When looking at the new machinery Pamela The main concept of tool 24 is to issue? to be added to the slat cutting Neill stress the importance of preventative process, we need to evaluate the maintenance, safety and ergonomics. Besides to keep people from being safety of the workers around. The These are all essential items to keep hurt, it is a proven fact that safe preventative maintenance should workers safe and to keep a company people are productive people. also be taken into consideration. running successfully. This tool How much attention and work needs explains the main concepts of PM to be completed on this equipment? and the different types. Does the cost of maintenance exceed the value of the change? Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : Pamela Neill Ergonomics was designed to focus on the needs and capabilities of humans. I t is used to focus on the design of technological systems. Ergonomics is used in the everyday life of each person, whether in a factory or in domestic situations. It is important in work settings to improve or keep up productivity, health and even safety. Here are a few examples of how it is used: 1) 2) 3) 4) Design of computers and work stations. Ergonomics works to make the computer easier to use and to decrease errors in operation. This would be especially important in work places having control room (airport, steel mill). Design of jobs so that the employee has adequate breaks and reasonable shift patterns. Design of equipment and work areas so that the operator has better posture and reducing the repetitiveness which can cause strain. Design of work environments, this would include lighting, heating, cooling, protective equipment and even the attitudes or personalities of workers that may create a hostile environment. The main object of ergonomics is to make the employee or human comfortable and work in their natural form. People can adapt to work areas, but this can lead to stress, errors and inefficiency. The three sciences used in Ergonomics are anatomy, physiology and psychology. Ergonomists use these items in two main objectives: the most productive use of human capabilities, and the maintenance of human health and well-being (ergonomics.org). A job or item must “fit the person”. Each of the three sciences are used in the following way: 1) 2) 3) Anatomy-this improves the physical “fit” of the person and item being used. It uses the dimensions of the body (realizing everyone is a different size it takes the average) in different positions. It tries to eliminate any excessive force that may be applies on muscles, limbs and posture. Physiology-this addresses the energy requirements of the body. What are acceptable work rates and environment issues? This includes noise, vibration, lighting and temperature. Psychology-this deals with the decision making capabilities of a person. Ergonomics looks out for the human. It is a careful analysis of what effects things have on the human and how to make things friendlier and less stressful. This allows for a person to do there best and be the healthiest and productive they can be. 2B. Why Is This Source Relevant; How Does It 3B. SDA’s Researcher 1B. Bibliographic Source: Author; How To Add Value (Reflections By Researcher)? Connected: Access; How/Who, Published; Type Source, etc.: GSICPC Pamela http://www.ergonomics.org.uk/ergonomics/ Ergonomics has become a big part of safety Neill over last 10 years. It is used to keep workers at eginition.htm, 2005, The Ergonomics Society work longer and prevent them from receiving any life altering or long term problems such as with joints or muscles. It is important to help keep health costs and lost wages due to injury down in the company. Team based problems Review Of Literature, Documentation Assessment (ROLDA) RCA Phase: II Researcher William Myles II Tool: 24 Date: 11/20/05 1A. Main Technological Concept: Researcher: David Compiler (s): William Team: 2 Harrison Myles II 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: The TPM and safety topics discussed Why is TPM important? are used to eliminate waste in bad maintenance can poor up keep. It will ultimately help determine how much waste we really eliminate. The main concept of Tool 24 is about the safekeeping and maintenance of our machines and employees. It also speaks about how everyone should have a part in the maintenance and making sure it’s done right. Article Abstract Of Key Information (usually approximately 300-500 words—each tool submission requires one for each team member) : William Myles II Total Productive Maintenance is a systematic approach for continuous improvement of your maintenance activities. It is a partnership among maintenance personnel, operations management, parts inventory, and operators. This team strategy focuses on the identification of potential problems and their expedient resolution. TPM is like Six Sigma in that it utilizes key equipment metrics, including: Overall Equipment Effectiveness, Mean Time to Repair, and Mean Time between Failures. The goal of TPM is to continually improve these performance metrics. TPM aims to establish good maintenance practice through the pursuit of "the five goals of TPM" : 1. Improve equipment effectiveness: 2. Achieve autonomous maintenance: allow the people who operate equipment to take responsibility for, at least some, of the maintenance tasks. 3. Plan maintenance: have a systematic approach to all maintenance activities. 4. Train all staff in relevant maintenance skills: TPM places a heavy emphasis on appropriate and continuous training. 5. Achieve early equipment management: the aim is to move towards zero maintenance through "maintenance prevention" (MP). MP involves considering failure causes and the maintainability of equipment during its design stage, its manufacture, its installation, and its commissioning. Under TPM, operators no longer limit themselves to simply using the machine and calling the technician when a breakdown occurs. Operators can inspect, clean, lubricate, adjust, and even perform simple calibrations on their respective equipment. Management should also show interest in data concerning equipment utilization, and efficiency. In short, everyone understands that zero breakdowns, maximum productivity, and zero defects are goals to be shared by everyone under TPM. Researcher 1B. Bibliographic Source: Author; How To Access; How/Who, Published; Type Source, etc.: http://www.maint2k.com/what-is-tpm.html William Myles II 2B. Why Is This Source Relevant; How Does It Add Value (Reflections By Researcher)? 3B. SDA’s Connected: This article further explains the usage of the TPM. It explains that it used for maintenance purposes and also explains other issues dealing with the TPM. MTA GFAPS Team based problems Review of Literature, Documentation Assessment (ROLDA) RCA Phase: II Researcher Shawn Myers Tool: 24 Date: March 17, 2006 1A. Main Technological Concept: Tool 24 discusses the maintenance aspect of reducing cost in a process. Total Productive Maintenance (TPM) can offer value to a process through identifying ergonomic, health/safety, and maintenance issues that inhibit a process. Researcher: Shawn Compiler (s): Team: 2 Myers 2A. Relationship, Value Added, To 3A. Assessment Question, Pros Project/Technology: And Cons, For Chat: Question: What role can The relationship of this tool to our maintenance play in a process? project is based on the fact that we are trying to take cost out of a Answer: In manufacturing, process. By utilizing the maintenance is considered a fundamentals contained in this tool “necessary evil” due to the idea of and applying this to the pencil slat having personnel that does not reduction initiative, we can achieve add direct value to a process. the results that are desired. Through the use of TPM, predictive maintenance, and preventative maintenance, maintenance personnel can consistently perform maintenance tasks that result in reduced emergency breakdowns. Shawn Myers Vibration analysis can detect issues with machines by utilizing ultra-sound technology. This technology is complimentary to other technologies including thermography, oil analysis, and other forms of vibration analysis technologies. As a stand alone product, ultrasound is not as effective as it is when used with other technologies. Ultrasound is a high frequency sound wave that covers the audio ranges of 20 kHz to 300kHz. A noise isolating headphone is used to hear the ultrasound frequencies and the readings are demonstrated on a display panel. By focusing on a frequency of ~100 kHz that is generated by operating machinery. A good running machine would be quieter at this frequency while a rough running machine would generate noise. The data collected will be converted to a chart that can be compared to various reference readings, which would allow someone to identify the condition of the motors and/or bearings being read. A technology such as vibration analysis can allow for a quick analysis for problems. When combining this with the other technologies listed above, a company can establish a total predictive maintenance system. This would allow for a company to phase from a reactive maintenance philosophy to a predictive maintenance philosophy. Through execution of this philosophy, a company can decide when a machine needs maintenance vs. when the machine tells the company. Researcher 1B. Bibliographic Source: Author; How To 2B. Why Is This Source Relevant; How Does It 3B. SDA’s Access; How/Who, Published; Type Source, Add Value (Reflections By Researcher)? Connected: etc.: This article looks at what maintenance MTA Shawn Courtney, Stuart. “Vibration & Ultrasound technologies can do for the TPM program. OPCP Myers Technologies: A Possible Integrated Inspection Tool?” Reliabilityweb.com http://www.reliabilityweb.com/art04/vibe_u sound.htm Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Assessment, Based On Individual Researcher Inputs: Portfolio Based On All Individual Researcher Inputs: Each team member did a good job in researching the TPM concept All team members were very successful in finding articles which will ultimately help us tremendously because it deals with and articles that related to tool 24. a such an important topic. Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase:2 Tool: Phase Date:12-1-05 Researcher (s):Scott Compiler (s):William Team:2 II Sowders Myles Researcher/ 1A. Technical Project Open Agenda 1B. Presentation Improvement Actions, 1C. Ongoing Listing, How Issues Were Compiler Items, How done, Content Specific? Management/Organization, Process? Resolved, Adding Value In PPARMP. Scott Our team focus has shifted from all Team has initiated an Improvement Team members are actively involved and Sowders individuals completing each SDA and action, to have individuals focus on one meeting posting dates. This is a sign of RCA to combining best work for one or two RCA’s or SDA’s instead of all the leadership abilities of all team table per team, with each student adding doing all. This will improve the quality members and is a sign of how we have comments for team discussion. This is an of the work presented in our portfolio came together as a team. attempt provide higher quality work and and allow for streamlining of the tool to reduce repetition in postings. kit completion process. All team members know and understand their roles and are highly focused on completing the task in a timely and professional manner. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. General Communicat ion Int er nal T eam A ssessment Threaded Communications A icipation (non/req. Contributions ) Writing Quality In General Format Analysis , Reflect ion Compliance + Details In Writing Data Analysis, Accuracy General Did M ore/Less Timeliness, Delivery Than Asked Cooperation And Attitude Leadership, Prof. Demeanor Grand Total Per Individual WORK/RATING (1-10): 1 = low /bad; 10 = high/good; 0 = no contribution M EM BER Pan Neill 10 10 10 10 10 9 10 9 10 10 10 John Wise 10 10 10 10 10 9 10 9 10 10 10 10 9.83333 10 9.83333 Dave Harrison 10 10 10 10 10 9 10 9 10 10 10 10 9.83333 Shaw n Myers 10 10 10 10 10 9 10 9 10 10 10 10 9.83333 Vanessa Malone 10 10 10 10 10 9 10 9 10 10 10 10 9.83333 9 9 9 9 9 8 9 9 9 8 8 7 8.58333 William Myles TOTAL TEAM AVERAGE 9.625 Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase: 2 Researche r/ Compiler Vanessa Malone Tool: Date: 12/1/05 Researcher (s): Vanessa Compiler (s): Malone 1A. Technical Project Open Agenda 1B. Presentation Improvement Items, How done, Content Specific? Actions, Management/Organization, Process? Team 2 has done a great job this Team leadership has improved. semester. We are now wrapping up Dates are set and all are completing Team: 2 1C. Ongoing Listing, How Issues Were Resolved, Adding Value In PPARMP. All are participating and involved with the work it takes to complete tasks on time. Phase II. our project into Phase II. All assignments have be given and everyone are to have their compiles by Sunday and I will post the Grand Compile for the team to look at on Monday. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. Int er nal T eam A ssessment General Communicat ion Threaded Communications Chat Participation (non/req.) SDA/RCA Contributions Writing Quality In General Analysis , Format Reflect ion Compliance In Writing + Det ails Data Analysis, Accuracy Did General M ore/Less Timeliness, Than Asked Delivery Cooperation And Attitude Leadership, Prof. Demeanor Grand Total Per Individual WORK/RATING (1-10): 1 = low /bad; 10 = high/good; 0 = no contribution M EM BER Harrison 9 9 10 10 10 9 10 9 10 10 10 10 9.66667 Neill 9 7 10 8 10 9 10 9 10 10 10 10 9.33333 Myers 9 9 10 10 10 9 10 9 10 10 9 Myles 8 8 8 8 9 9 10 8 8 8 10 7 8.41667 Sow der 9 9 10 10 10 9 10 9 10 10 10 9 9.58333 Wise 9 9 10 10 10 9 10 9 10 10 10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 9 9.5 9 9.58333 #REF! TOTAL TEAM AVERAGE 9.34722 E xternal T eam A ssessment G eneral C o m m unic a t io n C hat P art ic ip a t io n ( n o n / r e q .) T hread ed C o m m unic at io n s SD A /R C A C o n t r ib u t io n s W r it in g Q u a l i t y In G eneral A n a ly s is , R e f le c t io n In W r i t i n g F o rm at C o m p lia n c e + D e t a ils D ata A na ly s is , A ccuracy D id M o re/Less T han A s k ed G eneral T im e lin e s s , D e liv e r y 9 9 .4 3 C o o p erat io n A n d A t t it u d e L ea d e r s h ip , Pro f. D em eano r G rand T o tal P er In d i v i d u a l W O R K / R A T IN G ( 1 - 1 0 ) : 1 = lo w / b a d ; 1 0 = h ig h / g o o d ; 0 = n o c o n t r ib u t io n T ea m N a m e Team 1 7 .1 4 7 .5 7 7 .8 6 9 9 .7 1 9 10 8 .7 1 Team 2 9 .5 7 8 .1 4 8 .7 6 0 8 3 # D IV / 0 ! T O T A L T E A M A V E R A G E # D IV / 0 ! 2B. Compare and benchmark work of all teams, numerically below, how all is managed and organized relative to Gantt charts above, to what must be accomplished in PPARMP, and overall outcomes desired in course. Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase: II Researcher/ Compiler David Harrison Tool: PHII Date: 12/4/05 Researcher (s): David Compiler (s): William Team: 2 Harrison Myles 1A. Technical Project Open Agenda 1B. Presentation Improvement Actions, 1C. Ongoing Listing, How Issues Were Items, How done, Content Specific? Management/Organization, Process? Resolved, Adding Value In PPARMP. Team two has chosen to streamline our Streamlining our process has allowed Because of the team process we are all efforts. This has allowed our team to our team to work more as a team rather more focused on how the tables are work more as a team and also improved than as individuals working together and how they relate to our communication with each other. I each other. really like the way our team is coming together minus one. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. I nt er nal T eam A ssessment General Communicat ion Chat Part icipat ion (non/ req.) Threaded Communicat ions SDA/ RCA Cont ribut ions Writ ing Qualit y In General Analysis , Ref lect ion In Writ ing Format Compliance + Det ails Dat a Analysis, Accuracy General Did M ore/ Less Timeliness, Delivery Than Asked Cooperat ion And At t it ude Leadership, Prof . Demeanor Grand Tot al Per Individual WORK/RATING (1-10): 1 = low /bad; 10 = high/good; 0 = no contribution M EM BER Wise 10 10 10 10 10 10 10 9 10 10 10 Malone 9 10 8 9 9 9 10 9 10 9 10 10 9.91667 Myers 10 10 10 10 10 10 10 10 10 10 10 Myles 6 7 6 7 7 6 8 8 6 8 7 6 6.83333 Neill 10 10 10 10 10 10 10 9 10 10 10 10 9.91667 Sow ders 10 10 10 10 10 9 10 9 10 10 10 9 9.17 9.50 9.00 9.33 9.33 9.00 9.67 9.00 9.33 9.50 9.50 8.83 8 9.16667 10 10 9.75 TOTAL TEAM AVERAGE 9.26389 Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase: 2 Researcher (s): Vanessa Compiler (s): Team: 2 Malone 1C. Ongoing Listing, How Issues 1A. Technical Project Open Agenda 1B. Presentation Improvement Researche Were Resolved, Adding Value In Items, How done, Content Specific? Actions, r/ PPARMP. Management/Organization, Compiler Process? Team leadership has improved over Everyone has been and will continue William Team 2 has done well this semester. to participate in the tools and Phase the entire semester, and even at its Myles II Besides a few concerns in the middle II. lowest, the team came together to of the semester, everything has come get everything done. together very well and overall, team 2 has done a very good job. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. Int ernal T eam A ssessment Tool: General Communication Date: 12/1/05 Threaded Communications Chat Participation (non/req.) SDA/RCA Contributions Writing Quality In General Format Analysis , Reflection Compliance + Details In Writing Data Analysis, Accuracy General Did M ore/Less Timeliness, Than Asked Delivery Cooperation And Attitude Leadership, Prof. Demeanor Grand Total Per Individual WORK/RATING (1-10): 1 = low /bad; 10 = high/good; 0 = no contribution M EM BER Harrison 9 9 10 10 10 9 10 9 10 10 10 10 9.66667 Neill 9 7 10 8 10 9 10 9 10 10 10 10 9.33333 Myers 9 9 10 10 10 9 10 9 10 10 9 Malone 9 9 9 9 9 9 10 10 9 10 10 9 9.33333 Sow der 9 9 10 10 10 9 10 9 10 10 10 9 9.58333 Wise 9 9 10 10 10 9 10 9 10 10 10 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 9 9.5 9 9.58333 #REF! TOTAL TEAM AVERAGE 2B. Compare and benchmark work of all teams, numerically below, how all is managed and organized relative to Gantt charts above, to what 9.5 E xternal T eam A ssessment G eneral C o m m unic a t io n T hread ed C o m m unic at io n s SD A /R C A C o n t r ib u t io n s C hat P art ic ip a t io n ( n o n / r e q .) A n a ly s is , R e f le c t io n In W r i t i n g W r it in g Q u a l i t y In G eneral F o rm at C o m p lia n c e + D e t a ils D ata A na ly s is , A ccuracy D id M o re/Less T han A s k ed G eneral T im e lin e s s , D e liv e r y 9 9 .4 3 L ea d e r s h ip , Pro f. D em eano r C o o p erat io n A n d A t t it u d e G rand T o tal P er In d i v i d u a l W O R K / R A T IN G ( 1 - 1 0 ) : 1 = lo w / b a d ; 1 0 = h ig h / g o o d ; 0 = n o c o n t r ib u t io n T ea m N a m e Team 1 7 .1 4 7 .5 7 7 .8 6 9 9 .7 1 9 10 8 .7 1 9 .5 7 8 .1 4 8 .7 6 0 8 3 Team 2 # D IV / 0 ! T O T A L T E A M A V E R A G E # D IV / 0 ! must be accomplished in PPARMP, and overall outcomes desired in course. Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase:2 Researcher/ Compiler Shawn Myers Tool:19 - 24 Date:March 17, Researcher (s):Shawn Compiler (s): 2006 Myers 1A. Technical Project Open Agenda 1B. Presentation Improvement Actions, Items, How done, Content Specific? Management/Organization, Process? Team is completing phase 2 and Team members are presenting a wrapping up all loose ends to deliver a professional project, but need to focus complete, robust project portfolio for on revising and updating SDAs management review. throughout the process to enhance value and achieve benchmark score. Team:2 1C. Ongoing Listing, How Issues Were Resolved, Adding Value In PPARMP. All members are firing on all cylinders, now we need to bring it together. . General Communication Int ernal Team Assessment Threaded Communications icipation A (non/req. Contribu) tions Writing Quality In General Analysis , Format Data Reflection Compliance Analysis, In Writing + Details Accuracy Did General More/Less Timeliness, Than Asked Delivery Cooperation And Attitude Leadership, Prof. Demeanor Grand Total Per Individual WORK/RATING (1-10): 1 = low/bad; 10 = high/good; 0 = no contribution MEMBER Pan Neill 9 10 10 10 9 9 10 9 9 9 10 John Wise 9 10 10 10 9 9 10 9 9 9 10 9 9.41667 Dave Harrison 9 10 10 10 9 9 10 9 9 9 10 Scott Sowders 10 10 10 10 9 9 10 9 10 9 10 9 9.58333 Vanessa Malone 9 10 9 10 9 9 10 9 9 9 10 8 9.25 WilliamMyles 9 10 9 9 9 9 9 9 9 9 9 8 9 9 9.41667 10 9.5 TOTAL TEAMAVERAGE 9.36111 Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase: II Researcher/ Compiler Pamela Neill Tool: Phase Date: 12/3/05 Researcher (s): Pamela Compiler (s): II Neill 1A. Technical Project Open Agenda 1B. Presentation Improvement Actions, Items, How done, Content Specific? Management/Organization, Process? This is our final agenda. Our team did a great job this semester. We have come a long way since tool 19. We should be proud of the work we posted. Great job team! Team: 2 1C. Ongoing Listing, How Issues Were Resolved, Adding Value In PPARMP. The only thing left to do is post the final compilation. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. Int ernal T eam A ssessment G eneral C o m m unic a t io n T hread ed C o m m unic at io n s C hat P art ic ip a t io n ( n o n / r e q .) SD A /R C A C o n t r ib u t io n s W r it in g Q u a l i t y In G eneral A n a ly s is , R e f le c t io n In W r i t i n g F o rm at C o m p lia n c e + D e t a ils D ata A na ly s is , A ccuracy D id M o re/Less T han A s k ed G eneral T im e lin e s s , D e liv e r y C o o p erat io n A n d A t t it u d e L ea d e r s h ip , Pro f. D em eano r G rand T o tal P er In d i v i d u a l W O R K / R A T IN G ( 1 - 1 0 ) : 1 = lo w / b a d ; 1 0 = h ig h / g o o d ; 0 = n o c o n t r ib u t io n M EM BER H a r r is o n 10 10 10 10 10 10 10 10 10 10 10 10 10 M a lo n e 10 10 10 10 10 10 10 10 10 10 10 10 10 M y ers 10 10 10 10 10 10 10 10 10 10 10 10 10 M y le s 9 9 9 10 10 10 10 10 9 9 10 9 9 .5 Sow der 10 10 10 10 10 10 10 10 10 10 10 10 10 W is e 10 10 10 10 10 10 10 10 10 10 10 10 10 9 .8 3 9 .8 3 9 .8 3 1 0 .0 0 1 0 .0 0 1 0 .0 0 1 0 .0 0 1 0 .0 0 9 .8 3 9 .8 3 1 0 .0 0 9 .8 3 T O T A L T EA M A V E R A G E 9 .9 1 6 6 7 Portfolio Presentation Management Team Assessment (PPMTA) RCA Phase: II Tool: Phase Date: 12/2/05 Researcher (s): John Wise Compiler: William Team: 2 II Myles Researcher/ 1A. Technical Project Open Agenda 1B. Presentation Improvement Actions, 1C. Ongoing Listing, How Issues Were Compiler Items, How done, Content Specific? Management/Organization, Process? Resolved, Adding Value In PPARMP. John Wise The team has streamlined the tool The team is working together and is The team has grasped the new concept completion process with each team efficiently completing the tools. Each for completing the tools. All team member submitting one or two team member is assigned a document members have stepped up to handle the documents and an article abstract for for each tool and each team member responsibilities for the documents ROLDA. will complete an article abstract for assigned to them. ROLDA. Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Portfolio Assessment, Based On Individual Researcher Inputs: Based On All Individual Researcher Inputs: We have completed all assignments and I’m preparing the final Everyone has completed individual assignments on time and as portfolio. requested. 2A. Analyze/review portfolio management contributions and reflect all in numerical ratings below for persons on your team. Int er nal T eam A ssessment General Communicat ion Threaded Communications Chat Participation (non/req.) SDA/RCA Contributions Writing Quality In General Analysis , Format Reflection Compliance In Writing + Details Data Analysis, Accuracy Did General M ore/Less Timeliness, Than Asked Delivery Cooperation And At titude Leadership, Prof. Demeanor Grand Total Per Individual WORK/RATING (1-10): 1 = low /bad; 10 = high/good; 0 = no contribution M EM BER Harrison 10 10 10 10 10 9 10 10 10 10 10 Malone 9 10 9 10 10 9 10 10 10 10 10 9 9.66667 Myers 10 10 10 10 10 9 10 10 10 10 10 10 9.91667 Myles Neill Sow ders 5 5 4 7 8 6 8 8 5 7 5 10 10 10 10 10 9 10 10 10 10 10 10 10 10 10 10 9 10 10 10 10 10 9.00 9.17 8.83 9.50 9.67 8.50 9.67 9.67 9.17 9.50 9.17 10 9.91667 1 5.75 10 9.91667 10 9.91667 8.33 TOTAL TEAM AVERAGE 9.18056 Continuous Documentation Tools (19-24) SDA-Ongoing Process Control Plan (OPCP) Compiler (s): David Harrison Part Name: Wooden Slat Researcher (s): All Team: 2 Phase: II Process Location: Trim Saw Tool: Ph II Date: 12/1/05 OPCP Form 1 Of 1 Supplier: Great Lake’s Pencils Revision: 2 Other Pertinent General Information: Raw material is delivered to and placed in the bins by material handlers. Process Description. Provide a written description of process in text format and a process flow chart depicting the same: The operator walks to container and retrieves wooden slat, it is taken to trim saw where it is precisely placed in a jig. The operator clamps wood in place and places hands on palm buttons (palm buttons protect the operator from being hurt, the machine will not run until both buttons are pushed at same time) and saw cuts wooden slat to precisely 7”. The operator removes wooden slat from trim saw and uses calipers to measure the length of the slat. If the slat is within specifications, it is then placed into a container for good parts. Then the process starts over. Employee Pulls Slat From Pallet Employee Places Slat In Trim Saw Employee Pushes Palm Buttons Employee Removes Cut Slat Employee Inspects Slat L h Tools For Manufacture/Production. Describe equipment required to produce the product, consistent with the flow chart above: (1) operator, (1) raw material container, (1) trim saw, (1) caliper, (1) good container, (1) rejected container Process Parameters. Describe unique elements involved in processing the product which require additional explanation: The slat must be free of any nicks, deformities, break out on the ends, and ends must be square to the body. The saw blade must remain sharp and cutting wheel speed must be high enough to prevent chipping. Product Characteristics. Describe all characteristics of the product, primarily as attributes or variables which are critical: 7” long, grade A wood, square cut ends, smooth cut ends. The grain of the wood is long and straight. This grain reduces friction during sharpening making the sharpening task quick and easy. Class. Describe any codes or other unique identifiers per the specific industry or organization to help further distinguish the product: The material of the wood is carefully chosen incense cedar. Product/Process Specification. Provide specific measurable definitions for each product characteristic identified above: Length to7” +/-.030”, Ends cut square to body +/- 2 deg. Evaluation Method. Describe how specifications of characteristics are evaluated, what the measurement systems are: Measurement system is a go/no go gage used by the operator. The slat is set on the gage. If it is too long it will not go into the gage. If it is too short, it will drop through the gage. The quality department will sample hourly with calipers and record for SPC. The square cut ends are checked with a go/no go gauge. Operator will visually inspect each part for deformities. Sample Size, Frequency of Inspection. Describe the sample, how it is derived, including devices used to inspect in a step by step manner: The operator will insert each piece into the go/no go gage. Quality Control will obtain a 5 piece sample per hour and check length with calipers and end squareness with angle gage and record on SPC charts. The sample will then be returned to the finished parts tote. Analysis Methods. Describe the methods and systems used to analyze the sampled data, such as statistical, experimental, and so on: The data from the hourly quality control checks will be entered into an SPC. The SPC program will create histogram and X bar and R charts for review by the quality control department. Reaction Program. Describe steps to be taken when product or process is found to be functioning inappropriately: The quality and maintenance departments are to be notified when more than 2 consecutive parts do not pass the go/no go gage or the process is showing out of control in the SPC program. The maintenance and quality techs will investigate the cause the non-conformity. Quality will check the first 5 pieces after the problem has been found and corrected before the process is restarted. Researcher John Wise Pam Neill David Harrison Scott Sowders 1. Project objective (s) written…… The project objective is to cut the pencil slat to the correct length and to eliminate waste from the process. Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. As a team, our job is to research the process, develop ideas and present them to upper management for review. Objective is to minimize wastes in our process cut pencil slats to required length. Once wastes are identified, we are to analyze the opportunity to improve the process. Objective is to develop and maintain an Ongoing Process Control Plan for the cutting department’s process of cutting #2 pencils to length. 2. Findings, analyses observed as data, documentation in SDA…… The OPCP defines the process and parameters that control the process. Internal and external customers can look at the OPCP to determine what our process is and how we control it. This can also be used to develop new processes for a new product. The OPCP is a detailed description of how the process works. It describes everything from the process, sample size and specification. It is a vital tool in making sure the process remains stable and cost effective. This can be used for training and should be available to employees and customers at all times. The project is to identify waste in cost associated with pencil slat production. Then 4. PPARMP, ROLDA, PPMTA relationships? This table should be used for training of all employees using the trim saw and inspecting after this operation. These are all important steps in the process of cutting the wooden slat to length. There should be a 3 ring binder kept near the operator station readily available as a reference to employees. PPARMP is a tool used by the team to document our progress of our project. Operators must continually monitor charts from SPC software for out of control measurements. Any “bad” out of control charts need to be further reviewed by quality assurance for methods to make all product “in control”. Manufacturing processes should support these efforts. QA department should determine a way to inspect more or all pencils to gather more information for statistical analysis. By reducing defects, a higher quality and quantity of pencil slats can be produced. Product defects are directly assignable to process conditions such as: Department should implement a Preventative Maintenance schedule to: 1. 2. Poor quality cuts/ speed of cutting and wheel wear OAL discrepancies/ improper loading Process conditions can be improved upon as well as the process itself. Shawn Myers 3. Conclusions, recommendations in methods, course outcomes…… The team has decided on the process to be used for the project and to streamline the process of completing each of the tools. The OPCP reflects the input from all team members for controlling the process. OPCP identifies details associated with the process. Information contained on this form will allow researchers to gain knowledge in how the 1. 2. 3. Sharpen or replace cutting wheels before wear can become a factor. Inspect cutting device motor for condition that may affect RPM’s Check fixture and calibrate fixture gauge point. Findings include the identification of process and how performed. Process is manually performed on machinery with minimal . PPARMP will need to change as the process is developed and changes are made. PPMTA is used by team members to rate the rest of the team. PPMTA lets each team member know how the other members feel they are doing or how much they are contributing to the project. ROLDA is used to help us learn the tools and see how each tool is used in industry. PPARPM’s processes can be further reviewed for implementation PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. ROLDA PPARMP opportunities for improvement will be identified. process is run. The objective here Information obtained and analyzed in this form will allow is to outline the recommendations for entire process, improvement. qualifications, and methods in detail. Steps are explained so that we all know the exact process and even find flaws or make recommendations in some areas as we see fit. OPCP states the processes William The project associated with the production Myles objective is to lay process and also gives room for out a way to limit improvement. the processes and eliminate waste, also to reduce production cost. Steps are to show exact process and recommendations . Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: The OPCP is an important document to record and control the process. The OPCP needs to change as the process changes. It is a good tool to use for future processes. The OPCP reflects the process of cutting the wooden slat for # 2 lead pencils to the correct length and was created from the input from the entire team. automation assist with load/unload cycles. Also visual inspection performed by operator. Automation may be an option to improve productivity. These are areas for improvement. The OPCP document is very important in the stages of product description, manufacture, process, etc. We can make changes to our process control plan. Vanessa Malone To find a way to test multiple or all pencils in order to find and gather information needed to help improve the process. The PPARMP outlines our goals and future progression. The PPMTA determine who is putting forth their best work as with who is researching for the ROLDA tables. ROLDA PPARMP PPMTA Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: The entire team is working together to complete the tools with the streamlined process. The new process to complete the tools is working well and needs to continue for the team to be successful. Continuous Documentation Tools (19-24) SDA-Standard Operation General Analysis (SOGA) Compiler (s): Researcher (s): William Myles II Team 2 Operation Description: Pencil slat length cutting Team: 2 Phase: II Tool: 2 Date: 11/06/05 Location: Cutting Department Operator(s) John Doe Team Members: David Harrison, Vanessa Malone, William Myles, Pam Neill, Scott Sowders, Shawn Myers, John Wise Part/Service: Wooden slat for #2 pencil Other Pertinent Information: 1 shift per day operation/operator pay scale =$10.00 hr General Operation Information # Of Pieces 1600 per shift Shift:1 Potential Waste Reductions/Analysis Create Symbol Step Operation Procedures Description Load pencil into cutting device, seat against gauge 1 Time 5 sec Other/Remarks -Currently a manual operation -Add automatic loading device Cut Pencil to Length, operator press start 2 3 sec. Unload Pencil from cutting device 3 5 sec. Visual inspection for square cut and length of 7” +/- 1/32” 4 5 sec. -Need operator to press start -Use cameras/lasers to recognize part present, automatic cut operation -Eliminates need for operator -Currently a manual operation -Add automatic unload -Potential for human error -Add camera/laser inspection, more precise, reliable and quick Process/Functions To Be Improved – How? 1. Add automatic loaders and unloaders for wooden slat. Eliminates need for employee 2. Automatic cutting process, part to be recognized with camera/laser. Eliminates need for employee Other: 3. Inspection by camera/laser. Eliminates human error, employee and time. General Summary Of Findings: Pencils are manufactured well but costs need to be minimized by reducing cycle time and employee costs Relationships To Cost, TAKT, SPC Or Other Data—With Charts/Forms Attached/Imbedded/Provided: Histogram attached Total Cycle Time: 18 seconds Potential Waste: 10% Pencil Slat Length 70 60 50 40 30 20 10 0 6.95 6.97 6.99 7.01 7.03 7.05 Length (In.) Researcher Pam Neill 1. Project objective (s) written…… Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. 2. Findings, analyses observed as data, documentation in SDA…… This process has potential of becoming more efficient. By eliminating the human error, the parts may be loaded more accurately, inspected more thoroughly and unloaded more quickly. By changing these items, the company will save money and eliminate much waste. The waste includes time, money and product. 3. Conclusions, recommendations in methods, course outcomes…… The items discussed for potential change would cause minimal down time and the cost will be minimal compared to the time and waste savings. I recommend we take immediate action to pursue this change in process. There is no risk involved and the competition is getting tight. Our competitors are using state of the art equipment and are able to make their products cheaper. We need to be able to decrease costs 4. PPARMP, ROLDA, PPMTA relationships? PPARMP ROLDA John Wise Project objective is to eliminate costs associated with waste in the cutting of the wooden slat for a pencil. Automating the equipment could reduce waste by 10% by shortening the cycle time associated with loading, unloading, and inspection. Shawn Myers Project objectives is to eliminate costs that are not essential to the product. Then we will discuss opportunities for improvement. Vanessa Malone Project objective is to identify the process and critique it. We can make changes to the process or keep it the same depending on the severity of the problem. To develop and analyze the process flow chart for cutting#2 pencils to length, with a goal of process improvement at a cost reduction. Opportunities for cycle time reduction are in the load and unload operations. Another opportunity could be to eliminate visual inspection and replace with an electronic gage or go-no go gage inline with the unload process in exit chute (if available). We could increase production if we can get a machine that will load and cut more than on slate at a time. This will drastically increase production rates. Scott Sowders To insure that a square cut in achieved, the operator must load the pencil into the cutting device properly. Seating pencil to the positive stop is very critical. Blade wear in vital to the quality of the cut. to compete. The cost to automate the process can be overcome by the potential savings of the elimination of a person and scrap associated with the manual process. Recommendation is to automate the entire process. Automating the inspection process will cut out the entire visual operation by integrating this into the unload cycle. Other opportunities are available in the unload, load cycles with automation integration. PPARMP and ROLDA PPARMP ROLDA A machine that will double production will be beneficial to our process and decrease manual labor. The PPARMP outlines our goals and future progression. The PPMTA determine who is putting forth their best work as with who is researching for the ROLDA tables. Build a better fixture, one that assures that the pencil can only be loaded in a manner that ensures proper end gauging, while decreasing the load and unload times PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. PPARPM should be consulted to review issue with team members and leader. Automatic loading should be By reducing the cycle times for Project objective the first and easiest each step in the process, we is to review steps improvement to see a quick have a great opportunity to of process for increase our production rates by return on investment process considering improvements improvement by recommended. analyzing each step in the process. ROLDA The first steps that should be William Our objective is to Not only by reducing PPMTA changed are to use more production time but also Myles II analyze and PPARMP machines in the process which making sure each cut is a high determine steps quality cut, we should definitely will help improve quality in in the pencil slat every aspect. reduce production time and process which increase production rate to can help improve improve efficiency of the slat. production time, cost and eliminate wasted steps and parts. Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Assessment, Based On Individual Researcher Inputs: Portfolio Based On All Individual Researcher Inputs: David Harrison The team agrees that we can eliminate waste and increase production by improving the loading, unloading and inspection of the wooden slat. Our team objective is to improve the wooden slat cutting process. Each team member understands this table and agrees on the improvements. Individuals need to make sure they post their work in a timely manner. We are a team and depend on one another for information and timeliness. Our communication has become strong over the last few weeks. Most people are participating regularly. We need to work on the information being posted in tools be accurate and alike. Tool 19 SDA-Documentation System Design, Communication (DSDC) General Use/Application: SDA focuses technical content and deliverables on project objectives, all associated with technological assessment for improvement. All researchers on team complete the information below and submit to the compiler for finalizing in portfolio. When completed, all researchers should be listed as contributing, detailing technical assessment issues, as reflections by all related to the SDA. Compilers also develop reflections synthesized over time, based on inputs contributed by each, and their own review and reflections of the team’s work. This also involves use of SDA-FACR (below) to determine findings, analysis, conclusions and recommendations (FACR) ultimately merged into grand form format by compilers for inclusion in the final portfolio when compiled by team leadership. Persons not contributing substantially at SDA’s, and FACR responses should have lower scores shown in PPMTA at final grand portfolio. Compiler (s): Scott Sowders Team: QS327 – Team 2 Phase: I Tool: 19 Date: 9/2/05 Researcher 1. John Wise Communication Method, Internal And External Customers: 1. The internal communications for the team involve the discussion board, chat sessions, and e-mail. The external communications are with the instructor Dr. Sinn. Toolkit/Blackboard Design Element, How Does It Work? 1. The Blackboard works well for doing the postings and the chats. It has been difficult for this first tool to understand what is needed on the forms in the tool kit. Hopefully the more we do the easier they will become. 1. Blackboard in our simulated board room, technical post area, and general link to other team members. How To Improve Professional Relationships, Communication? 1. Communication should get better as the team gets better organized and has a project to focus on. Scott Sowders 1. Most communication conducted through e-mails, blackboard, and required chat sessions. David Harrison 1. Internal communication to team members takes place on BGSU Blackboard and via chat sessions. External communication to Dr. Sinn is completed through posts on Blackboard’s instructor forum and via email. 1. Blackboard is a forum where a topic/assignment is posted. Each team member is responsible to post and/or participate in a discussion 1. Students can improve communication by posting their required information in a timely manner. Shawn Myers 1. Communication will be performed through the use of e-mail and chat rooms. Other forms of communication may include use of the Blackboard system, telephone, and/or face-to-face meetings. 1. Professional relationships will evolve and improve through the use of chats and email communication. Vanessa Malone We have been posting are tables on the Discussion Board in Blackboard. We are beginning to have weekly chats where all members will discuss issues, problems, recommendations, etc. 1. Blackboard allows for a central interaction point that allows the use of e-mail, chat rooms, and forum posts for communication. This allows for more efficient interaction of team members. All team members complete the toolkits/tables individually and then post their tables on the Discussion Board. After all tables are posted they are compiled and reviewed. Last, the compiled tables are later compiled again by the team leader into one Microsoft word document containing all work, which is then posted for the instructor to evaluate. 1. The way to improve relationships and communications is to gain the respect from other team members, by showing respect and co-operation to all, and putting forth the required effort to complete the course objectives. Recommendations I feel would improve our relationship and communication skills are to post on time, earlier if possible, ask questions, participate in chat sessions and put forth your best effort in all work for the course. Pam Neill Communication between team members (internal customers) will occur with the used of chat sessions, emails, and telephone and possible some personal contact. Communication with Dr. Sinn (external customer) will be with chat sessions and emails. William Myles Our communication method will be through the internet, e-mails, blackboard, chats. The toolkit for a first time user is very confusing. In QS326 I was almost completed with the course when I realized what the class was actually supposed to be about and how to use the tools. The toolkit is overwhelming and sometimes confusing. Blackboard works very well for communication and the posting of documents. It also gives you a chance to look at team members work if you don’t understand a particular table. Blackboard is our online class room. It is where papers are turned in and announcements are made. Communication can only be improved if no one is participating. How our team is working right now is working quite well. The professional relationship comes with age and time. I believe this team has some age on it and has a very professional manner. We are working very well as a team. The easiest way to help improve professional relationships and communication is through giving and getting respect, making sure everyone gets there work done in a timely manner, and getting to actually know each other. Identify How The Systems’ Design You Are Advocating Can Assist IN Tying Together PPDPOA, TPMSS, FACR, TRIRPA And Other Elements Of Team Problem Solving And Improvement: These documents are building blocks to improving the process for this project. Explain ISO/QS Characteristics And Other Necessary Entities To Be Possessed By Documentation And Communication Systems, Categorically, Particularly Focused On Service Functions: ISO/QS requires documentation to be in place to control the process and quality of the product. It is necessary for every member of the team to understand the quality policy and the process as it pertains to their work area, from management to the worker on the line. Using The Template At The End Of The Applications Complete A Cause And Effect Diagram Indicating Issues And Opportunities For Systemic Documentation Relationships/Improvements, Particularly Focused On Service Functions: To be able to post the grand compiles on time, team members need to post their individual documents in a timely manner. Chat sessions also need to be attended to keep in touch with the team and add input to the project. Diagram on Page 2 Identify And Explain Why Your Organization Is Well Suited To The Documentation And Communication System Being Developed, Particularly Focused On Service Functions: My company is a supplier in the automotive industry, so I am familiar with some of the ISO/QS documentation requirements, although I do not deal directly with them. Some of this knowledge can used to help develop the documents used for this project. Researcher 1. Project objective 2. Findings, analyses observed as 3. Conclusions, recommendations 4. PPARMP, ROLDA, (s) written…… data, documentation in SDA…… in methods, course outcomes…… PPMTA relationships? John Wise A project has not Communication is the key to any Everyone needs to participate in the ROLDA can be used by been selected at this team being successful. The first chat sessions and try to get their team members to gain a time. chat session took a while to get postings in on time. better understanding of a organized and the team still needs topic that another team to used to working with each other. member has chosen. Scott Sowders Initial project not Group communication has been Continue to develop our team PPARMP- leadership. yet determined, good to this point; focus needs to communications and professional ROLDA – resources now our focus is on change from learning relationships. PPMTA- assessment learning the documentation to determining a interlinings of the project topic. course. PPARPM helps identify Without excellent Blackboard provides the David To understand internal customer that communication, objectives will necessary tools to properly Harrison how proper will require consistent be difficult to achieve communicate with our internal communication is communication. and external customers necessary both internally and externally. PPARMP – Establishes Improve communications by Communication needs to be Shawn Communication project background and using chat room and message embraced and improved to Myers among team objectives. board options available. fulfill course objectives. This members to will also allow all team establish project ISOQSAOPP – Identifies members to become engaged in objectives and project priorities what may be a difficult course. create a forum to including communication post and retrieve issues. materials to fulfill project objectives. PPMTA – Evaluates individuals and teams to identify opportunities for improvement. Vanessa The objective of Communication is essential in I recommend that team members This SDA states the Malone this SDA is to teamwork, especially in an online should not limit their resources to importance of encourage team course. Our words and opinions only the long form documents. documentation. Some data Pam Neill William Myles members to make use of email, Blackboard, Discussion Board and chat sessions to discuss, develop, and/or improve relationships and communications. must be clear and documented when necessary. Searching the web is another way to obtain information. We have not currently determined a project to develop over this course. The objective of this table is for Dr. Sinn to receive feed back on how well we are communicating and how are the tools being given to us working. Our initial project is not yet decided. Communication is the most important part of this class. It can not be stressed enough. Whether through chats, emails or phone, we need to be in constant communication just as a team would be in the real world working on a project. Keep the communication ties strong. Make sure you attend chat sessions and participate. We need to work as a team to produce strong project results. Communication has been good so far, although a project needs to soon be determined. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Overall, I feel the Technical work performed by the members who submitted work was very good. The broad range of response reflects the diversity of our group. Once our group decides on a project topic, this diversity will bring many different ideas to the table and allow for group success will be documented in either the PPARMP, ROLDA or PPMTA documents. Again, all must contribute to the work load. Points are distributed as a means to inform all team members who is putting forth the necessary amount of work to make this portfolio successful. PPMTA is all about effort and communication. How much effort are you putting into the class? This will show in your scores on this table if you are not participating. We need to continue to PPARMP/ ROLDA / communicate with each other in a PPMTA professional manner. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: I feel that once we are set on a project, tables will be more effectively answered and therefore, our quality of responses should improve. E-Mail Independent Postings Not correct None sent Not on time Not being read Do not understand Grand Compile Not Family time Busy during Other classes Working hours Not Participating Time Chat Sessions General Cause and Effect Analysis Diagram Tool 19 SDA-ISO/QS Audit, Objective Prioritization Plan (ISOQSAOPP) Compiler (s): John Wise Researcher: Shawn Myers Team: 2 Phase: 1 Tool: 19 Date: March 17, 2006 Location: Current Operation: Tool 19 Completion Thread on BGSU Performing functions pertaining to Blackboard Learning System. tool 19 including RCAs, SDAs, discussion groups and message board postings. General Description Of Operations/Production Functions/Systems Being Assessed As An Internal Audit: Operations that have been Organization Under Discussion: Great Lake’s Pencils proposed for the project will revolve around production and consistency. This should be finalized no later than tool 20. ISO/QS Element (TS 16949 2002—Other Standard) The TS 16949 2002 standards in: Process definition Process improvement Process measurement Process control Administrative Organization Area/Function Technical Description Blackboard learning system. Actual Audit Findings/ Preliminary Information Findings will be documented and organized in the various tool RCAs and SDAs utilized during this project. Planning Statement Or Issue, Particularly As Associated With The Service Environment: As a team, to efficiently decide on a project and to accurately achieve results in a timely manner. Objectives Prioritized, 5 Being Highest: 5. Determine project for team. Actions Required, Recommendations For Change Identifying a project and fulfilling all requirements for the course to deliver a complete and robust Phase II assignment. Criticality Level: HML Where H = 5; M = 3; L = 1 Fac = Facility issues; Cost = Cost issues Time = Time issues Pers = Personnel issues Criticality HML Fac Cost Time Pers 1 4 5 5 4. Complete the 6 toolkits in a 16 week window. 1 4 5 5 3. Improve communication amongst team members. 1 3 5 4 2. Continuously update and develop the team portfolio. 1 3 5 4 1. Documentation that is standardized and consistent. 1 3 3 3 Problem Background: For students taking a course such as this, the material and concept can be confusing and overwhelming. Task/Deliverable/Objective: To complete the 6 tools and 2 phases in the 16 week window that is required. Resources? (Budget/Other Concerns)? The resources are available, but the biggest opportunity is the more experienced students and time. Who Will Do? Team 327 – Team 2 How Measured? Dedication of the team and the results of the Portfolio Outcome Assessment Matrix (POAM). Gantt Chart Showing Time/Task/Deliverable (Goal/Step/Objective) Relationships (Indicate Weeks/Days/Months: X = Weeks ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Task/Deliverable 1. Startup X X 2. Toolkit 19 X X 3. Toolkit 20 X X 4. Toolkit 21 X X X 5. Phase I X X X 6. Toolkit 22 X X X 7. Toolkit 23 X X X 8. Toolkit 24 X X X 9. Phase II X X X X 4. PPARMP, ROLDA, 3. Conclusions, 2. Findings, analyses observed Researcher 1. Project PPMTA relationships? recommendations in methods, as data, documentation in objective (s) course outcomes…… SDA…… written…… PPARPM defines who Any SOP can be reviewed with This document will help an David To break the and how will be working this document on a yearly basis individual “visualize” the Harrison objective down on the objective. or more often as required to problem area by prioritizing the into more determine what improvements issues into subcategories. manageable subcould be made for the categories and department and organization prioritize them facility issues, cost issues, time issues, and personnel issues. Pam Neill The objective of This is a beneficial tool to have a An audit should be performed What direction is the John Wise Shawn Myers Vanessa Malone Scott this table is to document findings that are wrong in an organization or process and how to solve or recommendations on how to help change. The problems are prioritized with 5 being the highest. Each item is looked at in how it affects the company in regards to the facility, cost, personal or time. This document is used to audit the process to ISO/QS standards and to record any corrective actions that need to be taken. The corrective actions are prioritized and rated as to how critical they are to the process. Complete 6 tools (tools 19 - 24) and 2 phase assignments that are based on the 6 tools. Team also to demonstrate continuous improvement through experience and growth on this project. This audit is essentially a survey which raises questions about what we are doing, why we are doing it, etc. It is an evaluation or assessment process used to determine the degree of adherence to criteria or standards. Team project yet person complete from outside the particular process being audited. An outside person will see things that a person working there everyday overlook. An audit could help save the company money or even save a person’s life if the finding is serious enough. on a regular basis but should be done randomly. The audit needs to see the everyday operations without being aware of what is happening. People may act differently, do things differently or change things if they know they are being audited. You want to know what is happening when know one is looking. project to take should be stated in the PPARMP. This direction will be directly correlated to every tool presented. This document is a good follow up tool after the audit has been completed. The corrective actions and recommendations for improvement are recorded to use as a checklist to improve the process. This document would be useful if used later in the course after the project has been selected and the process and OPCP has been established. Internal audits are useful to a company to make sure documentation is kept up to date. PPARMP is a document that would be audited for ISO/QS certification Charts demonstrate the time frame to accomplish assignments in. This SDA also utilizes a list of top 5 objectives to identify opportunities based on what issues are holding up these objectives. Team is currently engaged with loads of potential. This will be proven by the phase II assignment. Also communication needs to be improved. PPARMP establishes overall direction and objectives to accomplish. Also identifies project and establishes background. The audit is focused on assessing documentation assembled to demonstrate the effectiveness of the quality management system. Furthermore, the audit can help prevent customer complaints by discovering and working on matters before they turn into problems. Audits provide baseline, objective, data and information for potential enhancements and improvements as well as dissatisfaction in data if that’s the case. It will show our progress whether it is good or bad. Data will be logged into the PPARMP, ROLDA and PPMTA documents. Later this document will be used to evaluate the data collected in those documents. Document intended to be used In order to use effectively, an PPARMP- leadership. by a quality representative for to be determined. process evaluation. Suggested This will be used changes for improvement will in the future to be made by auditors and analyze our reviewed by management for process with implementation. intend on identifying troubling and improvable areas. This document is used to help William This document is individuals see the corrected Myles II used to audit the actions or actions that need to ISO/QS process be corrected. and determine whether any corrections are needed. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: The team has an understanding of what this document is to be used for. The team has completed the first task of selecting a project and successfully completed 3 of the 6 tools on time. The bottom 3 tasks have been improving each week as the team develops. Sowders actual process must in place to audit. Group should have project identified in short order for future analysis. ROLDA – resources PPMTA- assessment This document will be more useful after we determine a project and the OPCP has been started. PPARPM will explain who is doing a particular job and how that job should be done. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Deadlines for individual postings need to be met to properly compile the documents. Issues for anyone not being able to post on time need to be communicated to the entire team. Comments in the POAM for each tool need to be implemented in the following tools. Tool 20 SDA-Kaizen Cost Analysis (KCA) General Use/Application: SDA focuses technical content and deliverables on project objectives, all associated with technological assessment for improvement. All researchers on team complete the information below and submit to the compiler for finalizing in portfolio. When completed, all researchers should be listed as contributing, detailing technical assessment issues, as reflections by all related to the SDA. Compilers also develop reflections synthesized over time, based on inputs contributed by each, and their own review and reflections of the team’s work. This also involves use of SDA-FACR (below) to determine findings, analysis, conclusions and recommendations (FACR) ultimately merged into grand form format by compilers for inclusion in the final portfolio when compiled by team leadership. Persons not contributing substantially at SDA’s, and FACR responses should have lower scores shown in PPMTA at final grand portfolio. Compiler (s):Scott Sowders Researcher (s):Scott Team:2 Phase:1 Tool:20 Date:9-16-05 Sowders Product/Process Under Discussion (include attachments such as Man Machine Analysis, SPC Data, Current Operation/location: Cutting #2 Pencil Time Studies, Other):Cutting process / Cutting department Setup Time:5 minutes Non-Value Added Time:15s General Description Of New Targeted System/Method Being Proposed: Changeover Time: dedicated Other Suspected Wastes: excess Build new fixturing to increase production and reduce scrap. line materials cut off Defect Rate %:5% Thru put Time:18s Analysis Item Current Cost Targeted New Results (Time, Cost, Output, Estimate Method Method Other Improvements) Daily Requirements 1600/day .08/pcs .05/pcs=$80.00/ .03 reduced cost per cut, reduce =$128.00/day day scrape 20% Shifts Per Day 1 Available Minutes/Day (Shifts/Day X Hrs/Shift X 60 Min/Hr) - (Breaks + Cleanup + Changeovers, Etc.) Operating Rate % (Avail Min/Day – Scheduled Downtime) / (Avail Min/Day) Scrap Rate %: (1Shift/Day X 8 Hrs/Shift X 60 Min/Hr) - (20 min Breaks + 15 Cleanup=480mi ns-35mins =445 mins/day (445 –35)/ 445=.92x100 =92.1% 5% Tact Required (Min/Piece) (Avail Min/Day (.3) (445 X 92) / [1600 X 1 35mins=116pcs lost production =$11.67 potential revenue (1Shift/Day X 8 Hrs/Shift X 60 Min/Hr) - (20 min Breaks + 0) =480mins20mins =460 mins/day 20mins=66pcs lost production =$6.67 potential revenue 7.9% of potential (460 –20)/ 460=.956x100 =95.7% 16pcs/day X $.10 =$1.60 (.25) (460 X 96) / [1600 X 3.6% increased up time 80pcs/day X $.10 =$8.00/day Scrape reduced by 20% X Op Rate) / [Daily Req. X (1 + Scrap Rate)] (1 + 5%]=122.82/16 80 =.07 n/a Slowest Pace Time (Min/Pc) n/a Output/Hr (Pcs/Hr) (60 Min/Hr) / (Slowest Pace Time) 200 240 # Of Ops 1 1 Output/Op/Hr (Pcs/Op/Hr) (Output/Hr) / (# Of Op) 200 240 Line Balance (Op1 + Op2 + …. Op n) / (# Of Op X Slowest Op) n/a (1 + 4%]=110.40/16 64 =.06 n/a n/a n/a n/a n/a Productivity % (New Output/Op/Hr – Old Output/Op/Hr X 100) / (Old Output/Op/Hr) Researcher (240-200)x100/200 =20% 1. Project objective (s) written…… To compare current process cost analysis with the new alternative process costs. Determine how much the new process can save the cutting department. 2. Findings, analyses observed as data, documentation in SDA…… Proposed fixture upgrades and quality instrumentation will benefit the cutting department in several different ways. 1.) 3.6% increased up time 2.) 20% reduction in scrap 3.) 20% increase in productivity 3. Conclusions, recommendations in methods, course outcomes…… Recommendation is to purchase the new cutting fixture and go/no-go gauge for the cutting line. Continue to analyze the operation with a focus on automation for further cost savings Pam Neill To eliminate waste and money in the cutting of the wooden slat for the #2 pencil. By improving this process alone, productivity can be increased. This increase in productivity can be completed in the same amount of time. John Wise The objective is to identify and reduce the costs associated with cutting the #2 wood pencil slat to length Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. To review process of cutting pencil slates to length Reducing scrap and increasing the production rate will increase revenue by $63.00 / day for the company without increasing the production time Recommending the automatic loading and unloading of the slat and inspection by laser to improve not only the scrap rate but also the output rate of slats in the same amount of time. This will save the company money and will allow employee commitment to other parts of the facility. Adding automatic load and unload/measuring equipment will improve production. Scott Sowders Shawn Myers David Harrison 4. PPARMP, ROLDA, PPMTA relationships? PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. Each SDA is required for each tool. These are used for all tools to provide leadership, understanding, and ratings. Opportunities need to be identified to improve #2 cedar slat production. This production is hampered by the shaping operation, which is a bottleneck for the entire production process. Implementation of the shaper retrofit will allow for a significant capacity improvement. MAACE We found that small savings throughout the process can build to significant savings. Implement changes that reduce cycle times to increase available production hours. Process flows can help determine if the process is efficient and if costs can be After observing the variance in Project objective the numbers it is obvious we here is to identify need to improve quality how many production of Brazilian pine detective slates pencil slates. If cutters are are produced sharpened everyday on the 3rd with manufacturing #2 shift I feel that the quality of the pencil slats. After cuts will improve drastically. reviewing the results we can then work toward changing the process or maintenance of machines to reduce the number of defective pencil slates produced. William Our project is to go Using the different numbers we Myles through the pencil found that small savings will be slat production made which will eventually turn process of a #2 into larger savings. pencil and figure out ways to refine the process by using shorter steps and reducing the production cost. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Overall, I feel the Technical work performed by the members who submitted work was very good. The broad range of response reflects the diversity of our group. Once our group decided on a project topic, the creative thinking process went into full speed ahead. I feel at this point we are well on our way to a successful project. Vanessa Malone We should all come to an agreement about how often the cutters should be sharpened to reduce the number of defective cuts. We should review which cutters should be used and how often in order for us to reach the maximum profit. reduced The PPARMP outlines our goals and future progression. The PPMTA determine who is putting forth their best work as with who is researching for the ROLDA tables. PPMTA ROLDA PPARMP Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: All submitting members show a good understanding of the KCA table, each member brought a different view to the project and it shows the technical awareness that the group as a whole shares. As we move forward we can strive to improve our reporting. With each tool confidence is gained, allowing for a more complete report. Tool 20 SDA-Methods Analysis And Cost Estimates (MAACE) Compiler (s): John Researcher (s): John Wise Wise Operation/Process: cutting the #2 pencil slat. Team: 2 Product/Component Under Discussion: wooden slat/trim saw/inspection/loading/unloading Phase: I Weight Issues: Storage and Contract: Preparation: Aesthetics/Market Appeal: Availability: Date: 9/15/05 Location: trim saw Persons Interviewed: process engineers/operators Current Processing/Other Pertinent Information Reviewed/Analyzed: Using out of date trim and inspection products. Maintenance Costs: Transport and Handling: Service Requirements: Processing Capability: Tool: 20 General Focus Of Study: to reduce the time of production process and also improve on the quality and cut the buying cost. Cost Estimates And Methods, Comparison Current Method Proposed Method Potential Savings Potential Cost 1 per year 2x per year $0.00 $500.00 yr By hand/tow motor Conveyor load/unload $18,000.00 $10,000 initial cost As needed As needed $0.00 $0.00 37 per hour 50 per hour $35,000.00 yr new lasers for inspection $5,000 initial Training $800.00 initial n/a n/a n/a n/a Crates on pallets Remove w/conveyor Replacement crates $0.00 $2500.00 system n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Others As Defined: Running Downtime $800.00 Column Totals: $55,500.00 $17,100.00 Summary Interpretations Observations: By updating this machinery and process, we have a potential of saving up to $60,000 per year. The initial cost is much less than the savings. There would only be 2 down days and we could run on a Saturday to make up for the loss time. This should be a priority due to the savings and increase in production. Issues/Functions To Be Improved? How To Improve? Who Will Do? 1.Loading and unloading of material Add conveyors to bring material in and take out Subcontractor When Completed? 4/1/06 2.Inspection of length of slat Lasers Subcontractor 5/1/06 3. Training 8 hrs training Process engineer 4/2/06 Other Observations? Modifications to existing machinery may be necessary This will need to be complete after the conveyors are installed Training must be thorough and must be emphasized how important it is. Identify And Attach Other Pertinent Inspection Information, Or Related Data: n/a Researcher Shawn Myers John Wise Pam Neill Vanessa Malone David Harrison 1. Project objective (s) written…… Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. The objective is to identify and reduce the costs associated with cutting a #2 wood pencil slat to length. To eliminate waste and money in the cutting of the wooden slat for the #2 pencil. After reviewing the results we can then work toward changing the process or maintenance of machines to reduce the number of defective pencil slates produced. We decided to replace old PLC devices with new up-to-date ones and we decided to replace old cutters with thick, sharper ones. Review process of cutting pencil slats to length to find improvements and 2. Findings, analyses observed as data, documentation in SDA…… Findings in this SDA involve the Shaping operation for the #2 pencil cedar slat line. The findings demonstrate that the equipment is inefficient and maintenance needs to be improved. Also packaging improvements may be needed. 3. Conclusions, recommendations in methods, course outcomes…… The findings identify opportunities for improvement by retrofitting the machinery, improve maintenance programs and utilize reusable packaging. 4. PPARMP, ROLDA, PPMTA relationships? SOGA Support cost associated with the recommended changes will still result in an overall saving to the company The recommendation is to install the auto load and unload/inspection equipment. These are used for all tools to provide leadership, understanding, and ratings. Findings show that there is sufficient evidence that there is a large enough cost savings to implement new equipment and eliminate processes. Productivity will increase with the addition of loading and unloading conveyors The SDA allowed us to actually change old procedures as well as update machine tools. I feel the results from this new equipment will decrease defective slates, therefore reducing waste. Recommendations include the addition of loading and unloading conveyors, laser inspection of length and significant training in operation and maintenance. All 3 SDA’s are required for each tool The findings identify opportunities for improvement. The PPARMP outlines our goals and future progression. The PPMTA determine who is putting forth their best work as with who is researching for the ROLDA tables. The findings indicate it would be very profitable to invest in this loading and scanning technology for the pencil slat cutting operation Initiate the purchase of the proposed equipment for installation in Q1 2006 PPARPM should be consulted to review issue with team members and leader. Scott Sowders savings Objective is to analyze and estimate our current process methods and costs and compare with the new proposed methods. Compare potential savings with potential costs. Analyses observed demonstrated that the cutting department’s current methods can be improved by the proposed new fixturing and quality instrument. 1. 2. 3. 4. Recommendation is to purchase the new cutting fixture and go/no-go gauge for the cutting line. Continue to analyze the operation with a focus cost reductions. higher production greater uptime machine availability increased quality of cuts William Myles Our project is to Newer products and more review the steps in technology will produce more producing #2 pencil quality cuts which will shorten the slats and find ways production time which is what our to shorten the project is about therefore, that production process would be a good way to improve and reduce the process. production and buying cost. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: The team has a good understanding of the project that was chosen and the application of the MAACE document to the project. The team feels that automatic loading, unloading, and inspection in this process will cut costs and improve productivity. The team is communicating and working together to make this project a success. One conclusion is to include the automatic load and unload inspection devices. PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. PPARMP gives a brief overview of our goals, while PPMTA gives an overview of who is doing well and who is doing not so well. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Most of the team posted their individuals early which helped complete the compiles early. The team captain sent reminder e-mails about deadlines and extra chats kept the team in contact to answer any questions anyone had. These should continue to keep the team on track. Tool 21 SDA-SOP And Takt Analysis (SOPATA) Compiler (s): William Myles II Researcher (s):Team 2 Team: 2 Operation/Process: Pencil Slat cutting Reason For Analysis: Reduce costs associated with cutting process Other Pertinent Information: General Operation Information Proc Symb Step Operation Description 1 Load pencil slat into cutting device, seat against gauge 2 Cut pencil slat to length, operator press start Totals Phase: 2 Tool: 21 Date: Oct. 3 2005 Location: Huron, OH Individuals Interviewed: Machine Operator # Of Pieces:40 Part: Pencil Slat Distance Man. Proc. Capacity Potential Waste Work Work Time Reductions Ft. In Hr Min WIP Cyc T Other . . . .08 10% min .05 min 10% .13 min General Interpretation Of Findings Based On Ongoing Improvement In Product: An Example Provided Requires Addressing Operations 5 And 4 To Get A Better Balance. Also Note That This Analysis Does Not Account For Handling Time, Storage, WIP And Related Issues. Identify Time In Seconds, Minutes 1 Or Hours. 0 Color The Values In To Provide A Bar Graph 9 8 7 6 5 4 Seconds X 3 Minutes 2 Hours 2 3 4 Unload Slats Inspect Slats 1 Load Slats Operation Identify each operation in order of occurrence, listed in the spaces to the right. Cut Slats 1 5 6 7 8 9 10 11 12 13 14 TAKT Time = 5+3+5+5 = 18 sec. Total Operations Time = 18 Seconds Total n Operations = 4 Operations To Be Combined, Eliminated Or Improved—How? 1. Operation 1 is manual and should be analyzed for automation. 2. Operation 2 can use cameras/lasers to recognize part present, automate cut operation Current TAKT Time = 18 Seconds 3. Operation 3 is manual and should be analyzed for automation. TAKT Target Time = 16.2 Seconds 4. Operation 4 could add camera/laser inspection, more precise, reliable and quick Attach Flow Charts, Facility Layouts, Man Machine Analyses. 5. TAKT Time Is Calculated Where OpT Represents The Time For Each Operation Summed And Divided By The Number Of Operations (n) In The example Given TAKT Is Found By Adding 7 + 8 + 6 + 5 + 9 + 7 + 6, All Minutes. Process/Functions To Be Improved Or Eliminated? How? By Who? When? 1. Operation 1 Automate Loading Team 2 Qtr 1 ‘06 2. Operation 2 Implement cameras and automate Team 2 Qtr 2 ‘06 cutting 3. Operation 3 Automate Loading Team 2 Qtr 1 ‘06 4. Operation 4 Implement camera inspection system Qtr 3 ‘06 Actual TAKT Time (Grand Average Of All Process Times): 18 Seconds Targeted TAKT Time (Identify The Best Case Time Projected, Or Goal, For This Grand Average Of All Times): 16.2 Seconds Potential WIP Waste (Identify Any Specific Work In Process Waste Opportunities For Reduction—Not Covered Elsewhere): Others Possible Savings (With Explanation): Total Estimated Savings (With Explanation): Estimated 10% improvement through implementation of recommended improvements Recommendations From Study (Provide A Detailed Listing For Future Follow Through In Various Ways—Including Shown Below): Functions To Be Improved? 1. Researcher David Harrison How To Improve? 1. Project objective (s) written…… Purpose of this SDA is to indicate processes in need of improvements and identifies who, when, and how the process can be improved Who Will Do? 2. Findings, analyses observed as data, documentation in SDA…… This document relates to SOGA in identifying cycle times and opportunities for improvement. When Completed? 3. Conclusions, recommendations in methods, course outcomes…… By analyzing suggested improvements, we can benefit by achieving a 10% gain in production Other Observations? 4. PPARMP, ROLDA, PPMTA relationships? PPARMP should be consulted to review issue with team members and leader. Pamela Neill John Wise Scott Sowders William Myles II Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. As a team, our job is to research the process, develop ideas and present them to upper management for review. The objective is to identify and eliminate waste associated with the cutting to length of wooden slats for #2 lead pencils. The objective of this SDA is to evaluate the cutting process and eliminate any and all sources of waste, increase production, and improve process. The objective of this SDA is to determine, evaluate and eliminate the wooden pencil slat production process. These particular jobs are being done to reduce production cost. Vanessa Malone The objective of this SDA to improve by eliminating waste, all waste. This tool works in coordination with SOGA. It identifies the same process times, operations and improvements. The only difference is the visual of the colored bar chart. It would be in the best interest of the company to follow through with the recommended improvements. There would be a savings of around 10% for this process alone. PPARMP, ROLDA and PPMTA are used to help the team to continue and improve and used for guidance. This document studies the process as related to time and is related to SOGA. The study shows a possible savings of 10% in the amount of time necessary to cut the slat. Recommendation is to proceed with the improvement suggestions to reduce the cycle time of this process. PPARMP and PPMTA is used to identify leadership and team tasks and for rating of team members. This document is very similar to the SOGA it used for cycle time evaluations and analysis of improvement opportunities. Focus on reducing load and unloading times. Bringing these times down closer to the cutting time will increase productivity. PPARMP- Leadership, initiates team focus. ROLDA – Resources show how tools are used. PPMTA- assessment of team participation. This tool resembles the SOGA a lot. They both deal with time management and cycles. They also focus on operations and improvement of the process. This SDA is also identifies process times which is basically another way to format the similar information in the SOGA table. Here is another angle to look at to continuously improve. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Based on the postings of everyone in our team, we have all agreed on one project objective which is to identify and eliminate waste in the wooden pencil slat cutting process. Because waste will be taken out, that will also reduce production cost which in turn will reduce buying cost. The best decision to make would be to just use the recommended improvements. It would benefit us the most instead of using other methods of improvement. The PPARMP, ROLDA, AND PPMTA are used to identify the team leader, and talk through any problems within the team. We should carefully look over these documents to determine if the process needs revising in any way to increase production and eliminate problems. All are important to illustrate whose doing what, what needs to be done and ensuring all are researching. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: As long as our team keeps making the improvements that we have been making then everything will go well. We need to carefully continue to look over the documents and make sure they are all done correctly. Tool 21 SDA-Time And Method Analysis (TAMA) Compiler (s): William Myles Process Dist Symbol In Ft. Researcher (s): Vanessa Team: 2 Time In Minutes X 5 Observations Ave. Time .07 . .07 .08 .09 .08 .08 1 .05 .05 .05 .05 .05 .05 1 . 02 .02 .02 .02 .02 .02 1 .03 .03 .03 .03 .03 Phase: 1 Tool: 21 Process/Method Description Remarks/ Observations Cost Est.? Pencil slat manually loaded into cutter by machine operator Slats are inserted to corner backstop to assure they are kept square $6/hr Slates are cut to length using two push buttons to assure operator is safely out of the way. Slates slide down the shut and into a bin for inspection Pencil slates slide down into a bin Unloading takes place here $6/hr Screen will flash green if length is acceptable and red if its unacceptable $6/hr 3 .17 .17 .18 .19 Foreign Elements (Breaks, Interruptions) 1. Interruptions occurring if a machine malfunctions .18 Be sure to take accurate measurements for better quality $24/hr $6/hr .03 Slats are inspected for proper length on the measuring table. Measured length is automatically loaded into the SPC program by pushing a button Totals/ Summ. Date: 9/29/05 .18 Time ? ? These steps are taken to produce a 7” long pencil slat that is lacquered and ready to be sold. Associated With Which Method? How To Improve? Depending on the severity of the problem it could take longer to fix. We can schedule times when maintenance can regularly check a machine to make sure its working properly to reduce the possibility major problems with operation 2. General Process/Functions To Be Improved Or Eliminated? 1. Shaping process is the bottleneck – need to find improved cutters with more production capability 2. Possibly try to combine 2 processes? How? We should research to find other cutters that will produce a better cut Basically we’d have to try a few different setup to see if we can reduce processing time Possible Savings? We could save time “touching-up” the edges We could save time simply by making this process shorter and as a result produce more pencil slats. Actual TAKT Time (Grand Average Of All Process Times): .18 seconds Targeted TAKT Time (Identify The Best Case Time Projected, Or Goal, For This Grand Average Of All Times): 16.2 Potential WIP Waste (Identify Any Specific Work In Process Waste Opportunities For Reduction—Not Covered Elsewhere): Loading of wood – use automatic loads Others Possible Savings (With Explanation): shortening the production process by combining two steps into one; we will as a result produce more pencil slates in the same amount of time Total Estimated Savings (With Explanation): We will save because we will have profited more- increase in production Recommendations From Study (Provide A Detailed Listing For Future Follow Through In Various Ways—Including Shown Below): Inspection – use lasers or cameras, largest waste reduction Loading of wood – use automatic loads Improve fixturing for faster load and unload, and for more consistent lengths/ new fixtures Load and cut multiple pencils at a time/ new fixtures and larger cutting wheel Issues/Functions To Be Improved? 1. Inspection 2. Loading Researcher Vanessa Malone Scott Sowders Shawn Myers Pamela Neill How To Improve? Use lasers or cameras instead of workers Automatic Who Will Do? When Completed? Digital camera, a sensor A machine As soon as materials are cut As one slat is being cut the next slat is loading into the cutter 3. Conclusions, recommendations in methods, course outcomes…… This will help us perform to the highest of our ability in quality and quantity. 1. Project objective (s) written…… The objective of this form is to review the steps taken to cut a pencil slat and evaluate the effectiveness, timeliness and quality. The objective is to document and evaluate the cutting process for the #2 pencil with the goal of cost reduction through elimination of any and all waste. 2. Findings, analyses observed as data, documentation in SDA…… Based on the information provided we can determine if the process needs tweaking for improvement or maybe even change steps in the process where we see fit. Once documented, the process can be monitored and studied for things like: 1. eliminations of motion 2. non-value added operations 3. line balancing 4. human error Analysis of this document will assist the team in making decisions that will help in achieving our goals of process improvements and cost reductions. Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. As a team, our job is to research the process, develop The information contained on this SDA looks at each step of a process and identify waste associated with the “human” element in the process. Conclusions identify improvements with use of automation and in process gages to fulfill quality requirements and reduce operation time. There appears to be too much time taken to cut (1) wooden slat. The complete process takes over 2 minutes. By documenting this process we can evaluate where to eliminate time, motion and employees. The process takes to long and is not cost efficient. Each step needs to be analyzed to determine what can be done to cut cost and time. Can we add automatic loaders and unloaders, add automatic inspection cameras or automate the whole process? These are options we need to look at in Other Observations? N/A This will ensure that our process is continuous with no interruptions. 4. PPARMP, ROLDA, PPMTA relationships? The PPARMP outlines our goals and future progression. The PPMTA determine who is putting forth their best work as with who is researching for the ROLDA tables. PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. PPARMP ROLDA Each tool is continuous thru out the project. They are used to document the history of the project, evaluate our work and see how the tools are used in the real world. determining the best process for ideas and present a lean manufacturing them to upper environment. management for review. PPARPM’s processes can This document should be used The addition of a manual David Objective is to be further reviewed for to establish a team to analyze loading system would have a Harrison minimize wastes implementation cost savings by adding a large impact on the cutting in our process cut automatic loading system and process. Also need to evaluate pencil slats to the setup process to determine if revue what’s involved in setting required length. up the cutter. there are any wastes currently Once wastes are built into the process. identified, we are to analyze the opportunity to improve the process. PPARMP is used to Each step needs to be looked at John Wise The objective is to The process time to cut the slat develop team tasks and more closely to determine if is 18 seconds. Time can be identify and leadership and to automating the process will saved by automating the eliminate waste determine direction for save time and money. process for loading, unloading, associated with the team. and inspection. the cutting to length of wooden slats for #2 lead pencils. PPMTA Each step needs to be evaluated The loading and unloading William Our team ROLDA and possible re evaluated in process will be cut short if we Myles II objective is to were to add a loading system. It order to save time and money in PPARMP reduce waste in the production process. will eliminate some of the time the production of which will usually be 18 pencil slats and seconds also reduce the cost to buy the pencil by reducing production cost. Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Assessment, Based On Individual Researcher Inputs: Portfolio Based On All Individual Researcher Inputs: We all have reviewed the process, which is very simple and We all feel that we can reduce the overall time. We may productive. Currently we are concerned with reducing waste and combine two steps. We’ll discuss this at the next chat. improving the process time for production per pencil. Tool 21 SDA- (GCA) Compiler (s): David Researcher (s): Harrison Team 2 Operation/Part: #2 pencil production line Team: Phase: QS 327 – Team 2 1 Process Location: Huron, Ohio Tool: 21 Date: 9/29/05 General Use/Application: 1. Study examples and general information below, after reviewing content and discussions in long and short forms. 2. Identify all necessary costs associated with product as part/unit costs. 3. Calculate the Break Even Point (BEP) and Profit or Loss (P or L) based upon team’s project. 4. Calculate Payback (PB) In Percent based upon team project figures. Part/ Materials/ Operation Or Specifications/ SubTotal Dir. Ind. Other Unit Costs Components Function Related Information Unit Unit Cost Cost Costs Cost Cost $ .32 $ .13 $ .17 20000 units per day $ .04 $ .42 $ .03 $ .01 $ .01 250 scheduled work days 5 day/week standard operati Column Grand Totals Total Part Costs $ .51 Cost Descriptions: (Profit) +(Cost Of Production, Sales Cost) Break Even Point (BEP): where income equals expense. Payback (PB) In Percent BEP = FC/(SIU – VCU) CI/ITC = PB Fixed Costs (FC): Taxes, Interest, Utilities. Cash Inflow (CI), Labor savings +Scrap, reject savings (others) Variable Costs Per Unit (VCU): Material And Labor (also called direc Initial Total Cost (ITC) Cost of system (shipping, setup, training, etc.) Sales Income Per Unit (SIU), revenue generated. Sub Unit Cost, Various Parts Or Costs. Indirect Costs, Support Services Such As Sales, Engineering, Quality Total Unit Cost, Multiple Sub Units Can Be Summed As A System. Example profit or loss (P or L) based upon: Example Break Even Point (BEP) based upon: BEP = FC/(SIU – VCU) P or L = I – (FC + VC). FC = $100.00 I = $200.00 VCU = $.50 Per Unit FC = $100.00 SIU = $1.00 Per Unit VC = $100.00 BEP = 100.00/ (1.00 - .50) P or L = 200.00 – (100.00 + 100.00) = 100/(50) = 200 Or $200.00 = 200.00 – (200.00) = 0 Calculate profit or loss (P or L) based upon team’s project. Calculate BEP based upon team’s project. P or L = I – (FC + VC) BEP = FC/(SIU – VCU) I = .51 * 20000 = $10200.00 FC = $800.00 FC = $800.00 VCU = $ .10 per unit VC = $.10 * 20000 = $2000.00 SIU = $ .72 per unit P or L = $10200.00 – (800.00 + 2000.00) = $7400.00 BEP = $800.00/(.72-.10)= $1290.32 Technical Description Of Proposed Improvement: This typically will include general information about where the improvement is located in production, how it works, and anticipated general enhancements to be noted. Specific cash inflow generated by upgrade is listed also, such as: • Quality defects will be reduced by 20% = $1/unit inflow • Production rate will be increased by 10% = $.10/unit inflow • Safety improvement reduces lost time accidents by 50% = $.20/unit inflow • Work stoppage reductions will enhance throughput by 50% = $.50/unit inflow • WIP reductions at workplace will be enhanced = $.40/unit inflow Total cash inflow = $2.20/unit Calculate Payback (PB) for project: Example Payback (PB) Calculation: CI/ITC = PB CI/ITC = PB CI = 252,000 CI = $700.00 ITC = 780.000 ITC = $1050.00 PB =252,000/780,000= 32% annually PB = $700.00/$1050.00= 61% (annually) 4. PPARMP, ROLDA, 3. Conclusions, 2. Findings, analyses observed Researcher 1. Project PPMTA relationships? recommendations in methods, as data, documentation in objective (s) course outcomes…… SDA…… written…… PPARMP Identify opportunities to Highly profitable product line. Shawn Project objective OPCP improve processes further. InOpportunities for improvement Myers is to identify ROLDA line automated gauging and through equipment upgrades processes more automation in the load and other options. Automated involved with and unload process would be manufacturing #2 gauging inline would also help. beneficial. pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Management should launch a Process flows can help David The objective is to The savings determined have a team immediately to begin determine if the process is payback of 32% which will Harrison find wastes and working on this project efficient and if costs can be allow the company to grow in realize what reduced terms of production and quality. value can be achieved by eliminating them Scores are determined by a Because there is always room Findings here can be Vanessa The project persons contribution to for improvement we should determined from the data Malone objective here is SDA’s and FACR identify opportunities to provided. Our payback is a to show prices responses. improve processes further. little over 50% so I can infer that expenses and our product line is performing income. well. Pam Neill Project objective The cost analysis is minimal. The costs are minimal for All 3 tools are used to help is to identify and The payback for this proposed implementing this project. The the team become more fluent with our project and company needs to immediately eliminate waste in project is 32% annually. The become more familiar with create a budget, assign a team break even point is at a low cost the wooden slat the tools we are using. and create a time line for of $1290.32. The waste will be cutting process eliminated by up to 20% with an making these changes. It will which in turn cost the company little money increase in production by up to reduces cost. As but have great results. 10%. This is a minimal cost a team, our job is project with achieving and cost to research the effective results. process, develop ideas and present them to upper management for review. PPARMP- Leadership, Payback analysis shows The manual cutting process has Scott To identify initiates team focus. investments in improved several areas that could use Sowders process for fixturing and quality improvements. Improvements cutting #2 pencil ROLDA – Resources show will reduce scrap levels and also instruments upgrades will net to length and to how tools are used. nearly 32% annual payback. increase production rates. apply cost analysis PPMTA- assessment of principals to the team participation. process to determine BEP, profit or loss, and Payback. The PPARMP provides Improvements to the process The investment needed to John Wise To cut the #2 direction on completing the will increase the production increase production and reduce pencil slat to tools. ROLDA is definition scrap will have a 32% annual length and reduce rates and reduce scrap. of tools. PPMTA is payback. costs by using evaluation of team BEP, P&L, and PB members. analysis All 3 tools will help us get a Cost to make the slats will be at By improving all the processes William Our team project better understanding of what the lowest prices which will in the slat production will Myles is to keep quality cause an annual payback of reduce production cost and cuts. Also to is going on and be more 32%. make the production of the slats reduce efficient in what is needed to more efficient. production cost be done. and the actual cost of the pencil. Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Assessment, Based On Individual Researcher Inputs: Portfolio Based On All Individual Researcher Inputs: This form needs better clarification for values used in All GCA’s completed had very similar costs for the pencil slats calculations. Calculation requirements were unclear which led to ranging from $0.36 to $0.51. Amount of savings varied quite a bit the majority of the variation between individual posts. based on production volumes. I selected a higher volume production value to achieve a higher resolution to clearly see results of even minute improvements. Tool 22 SDA-General Benchmarking/Auditing Process, Systems (GBAPS) Compiler (s): Researcher (s): Team: Phase: Tool: Date: Team 2 Shawn Myers Team 2 2 22 March 17, 2006 Describe The Process, Product, Issue Or Problem Requiring Benchmarking/Auditing: Wooden slat pencil production at trim saw machine. What Are The Comparative Groups Or Organizations To Be Benchmarked/Audited? Comparative groups to be benchmarked includes similar process at competitors or other facilities within our organization. Describe The General Data Collection And Analysis Methods: Data collection will include the utilization of OPCP, PASPC, SOGA, and other audit oriented documentation. Describe General Differences Noted Between Our Group And The Group Being Benchmarked/Audited: Our group consists of employees that have vast amounts of experience and knowledge to improve process. The other groups to be benchmarked are companies that are newer with newer employees and processes that have not reached full maturity in execution. Describe The Overall Plan To Be Followed In The Benchmark/Audit, Including Pre And Post Steps, Timeframes And Follow Through: Specific Issue/Concern? Timeframe What Is The Measurable? Who Will Do And How? 1. Material Handling – automated vs. manual 2. Equipment capability 6 months Time study of operator Engineering / Team 2 3 months Cycle times Engineering First Time Quality Quality Control Gage Repeatability Team 2 3. Process Improvement 4 months Identify opportunities to Engineering combine processes, free up Team 2 machinery Describe Basic Steps, Procedures And Protocol To be Followed In The Daily Conduct Of The Benchmarking Audit: Contact Methods Clearances/Security General Arrangements Methods Of Communication 1.Team 2 Members Meet with Engineering personnel on a daily basis. Face-to-face meetings, presentations, e-mail. Data To Be Reviewed? Allowed access to material and resources associated with this process only. Further clearances will be decided on an as-necessary basis. How To Review Data? Existing Equipment? Existing Space? Operator Training? Other? 1.Trim Saw 12’ x 22’ footprint Yes Machinery is old Documentation To Be Reviewed? Data gathered and recommendations. How To Review Documentation? 1. Opportunities that are Executive level presentation. Powerpoint and hard-copy identified as a result of this audit. documentation delivered in portfolio format. Identify What Existing Resources Will Be Used In The Improvement, Based On The Benchmarking Process: Identify What New Resources Will Be Required For Improvement, Based On The Benchmarking/Auditing Process: New Equipment? New Space? New SOP’s, Training? Other? Yes Yes, 6’ x 6’ footprint needed for robots and/or pneumatic automation. After Completion Of The Benchmarking/Auditing Process, Identify All Findings Requiring Corrective Actions, And In What Ways: 1.Automation Findings? Corrective Actions? Who Will Address? When To Be Completed? 1.SOP needs to be updated Update based on OPCP and Engineering ASAP other findings. 2. Automation would be Cost analysis to be utilized for Engineering 9 months beneficial. implementation. Finance Explain How Operators, Supervisors, Quality, Engineering And Other Personnel Were Involved In The Process, Pre And Post: Operators performed functions of operation. Engineering and Quality perform support functions to operation. Supervisor facilitates all of these functions in an organized, structured manner. Describe General Differences Noted Between Our Group And The Group Being Benchmarked/Audited: Our group utilized experience and knowledge to get results. Also had better training opportunities vs. other groups. Describe New Goals, Or Changes To Be Made, Based On What Was Studied, Potential Implications For Strategic Planning: Changes to be made will revolve around using automation to free up the operator for other responsibilities. This will also allow for quicker cycle times. Describe Groups To Be Communicated With, And Communication Methods To Be Used, Internal And External: Plant personnel. Describe New Broad Based Objectives Recommended At The Group/Team Level And Beyond, Based On Benchmarking/Auditing: Need to improve productivity by introducing technology to the process. Describe, In Detail, The Process Benchmarked, Differences Between The Way We Do It And The Process Benchmarked, Based on The Study: Process benchmarked involved the cutting of pencil slats to size. This utilized a trim saw that was hand loaded and unloaded. This process was similiar to the benchmarked process, where the benchmarked process uses more advanced machinery. The benchmarked process also lacks experienced personnel to operate process. Describe Changes/Improvements Recommended In Our Benchmarking/Auditing System Or Process, Based On This Study: No improvements identified at this time. Researcher 1. Project 2. Findings, analyses observed 3. Conclusions, 4. PPARMP, ROLDA, objective (s) as data, documentation in recommendations in methods, PPMTA relationships? written…… SDA…… course outcomes…… Automation is the best OPCP Process is competitive due to Shawn Project objective opportunity to improve experienced personnel Myers is to identify productivity. operating machinery. There are processes opportunities to improve involved with manufacturing #2 productivity and free up pencil slats. Once operators for other tasks. this is identified, improvements to the processes to reduce cost and improve quality will be implemented. OPCP By automating the process, we Waste can be eliminated by Pamela Neill Project objective can eliminate a worker, improve installing more hi tech is to identify and quality and increase quantity. eliminate waste in machinery. It will be more The market is becoming more advanced and allow for cleaner, the wooden slat competitive and new companies faster and more accurate cuts. cutting process This will help to eliminate waste are able to make more pencils in which in turn less time and cheaper. New and down time due to reduces cost. equipment will put us one step deteriorating machinery. We closer to keeping up with the may also be able to decreases ever growing competitive cost by eliminating an market. employee. OPCP Automating the process will John Wise The objective is to The process is similar to other eliminate one operator that can plants that were studied. The identify and be used in another part of the productivity was better with eliminate waste plant. our process due to more associated with experienced personnel. The the cutting to manual operation adds waste to length of wooden the process that can be slats for #2 lead eliminated. pencils. PPARMP- leadership It appears that we could Our process utilizes the Scott The project activity allows for team introduce some automation into experience and talent of our Sowders objective is define members to stay focused our process. By automating the team members. This gives us a the process for and know process we can improve competitive advantage over the cutting the #2 responsibilities. productivity levels and benchmarking operation, which pencil wooden ROLDA – resources, potentially redistribute some is still in early stages of slat to length. show knowledge gained resources to other area of development, however, there Once identified from topic research and manufacturing. are still areas that we can focus on allow for engagement improve on to better streamline elimination of PPMTA- assessment, the operation and eliminate waste with the team members evaluate waste. goal of cost performance. reduction and quality OPCP-Continue to improvements. improve process We have recommendations to OPCP Our process is quite simple and Vanessa The objective of improve by automating a few can be easily understood. The Malone this table is to steps. responsibilities of each team identify the member have been established process and then and practiced. evaluate. Based on evaluations make changes where you see fit. All necessary to improve. William Our project Our process is very easy and Automating the process will OPCP Myles II objective is to understandable. Each team help eliminate so time which David Harrison reduce the production cost and waste of producing the #2 pencil slat. After the production costs go down then profits will go up and buying cost will go down. Objective is to minimize wastes in our process cut pencil slats to required length. Once wastes are identified, we are to analyze the opportunity to improve the process. member has done has experienced the process and has agreed to it. will help reduce production cost. By further analyzing our process and streamlining it, we can produce more parts more economically. This will primarily be done through automating the material handling and inspection steps within or process. Automating steps in this process will provide our biggest opportunity for improving the process and eliminating waste. Collect From All, Compile Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: SDA is filled out completely and represents benchmarking format for group on subsequent tools. This will ensure accurate and structured analysis so that group will deliver a complete and robust final phase portfolio. OPCP Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Team needs to review SDAs that were submitted in previous tools and add more information that will add value to our project. Tool 22 SDA-Operation Capacity Analysis (OCA) Compiler (s): Vanessa Malone Researcher (s):Vanessa Malone Operation: #2 pencil production line Team: 2 Phase: 2 Tool: 22 Process: Cut, Load, Unload, Inspect Date: December 1, 2005 Location: Huron, OH Other Pertinent Information (attach charts, tables, information as needed): General Operation Information Proces s Symbo l Operation Description Production Functions People Req. Mech . Proc. Manua l Work WIP Lev. Dist. Units Prod. Inv. Lev. Ft. I n Capacity Time Hr. Mi Potential Waste Reductions/Other Pencil slat manually loaded into cutter by machine operator 1 No Yes Avg. Cut Pencil to Length, operator press start 1 Cutte r No Avg. Unload Pencil from cutting device 1 Yes 1600 piece s/shi ft Avg . 1600 piece s/shi ft Avg . Avg. Vanessa Malone Shawn Myers Yes 3 TAKT Time: 16 seconds Total Cycle Time: 18 seconds Potential WIP Waste: 10% Others: Researcher 7 .001 .08 Slats are inserted to corner backstop to assure they are kept square .58 7 .001 .08 -Need operator to press start -Use cameras/lasers to recognize part present, automatic cut operation .58 7 .001 .08 -Currently a manual operation -Add automatic unload No 1600 piece s/shi ft Visual inspection for square cut and length of 7” +/1/32” .58 1. Project objective (s) written…… The objective of this table it to outline the process. Each process specialized and dedicated, is contingent on the others. Before a process can proceed, the previous process must be completed, in sequential order. This requires operations at each process to have predictable and pre-determined levels of production with minimal defects and wasted product. Project objective is to identify problems with the pencil slat production and Avg. Avg . .58 7 .001 .08 -Potential for human error -Add camera/laser inspection, more precise, reliable and quick No 1600 Avg piece . s/shi ft Process/Functions To Be Improved – How? 1. Add automatic loaders and unloaders for wooden slat. Eliminates need for employee 2. Automatic cutting process, part to be recognized with camera/laser. Eliminates need for employee 3. Inspection by camera/laser. Eliminates human error, employee and time. 2. Findings, analyses observed 3. Conclusions, 4. PPARMP, ROLDA, as data, documentation in recommendations in methods, PPMTA relationships? SDA…… course outcomes…… All are necessary Change is expected in best Waste reduction and simplicity documentation of work practices. This is planned for are pertinent. The simpler the done by each team and built in by design in approach the will generally be member in our goal to virtually all that is being done, the most acceptable, based on make this project based on improved conditions documented and justifiable data successful. in production. Change is and information. essential to almost any organization wishing to remain competitive. Automation seems to be the common theme when deciding what will reduce cost and maybe free up manpower. Automation needs to be explored and implemented. OPCP GBAPS Pamela Neill John Wise Scott Sowders identify improvements to lower cost. Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. As a team, our job is to research the process, develop ideas and present them to upper management for review. The objective is to identify and eliminate waste associated with the cutting to length of wooden slats for #2 lead pencils. The project objective is define the process for cutting the #2 pencil wooden slat to length. Once identified focus on elimination of waste with the goal of cost reduction and quality improvements. Automating the equipment will reduce the cost of the product by eliminating an employee, reducing waste and increasing production. This process needs to be further evaluated and recommended to management for automation. All three items are used each week in further developing our project and team skills. Adding automation to the process will eliminate a person and reduce scrap and cycle time to eliminate waste. More analysis of the process and automation added to reduce waste. PPARMP and PPMTA is used to identify leadership and team tasks and for rating of team members. It appears that we could introduce some automation into our process. By automating the process we can improve productivity levels and potentially redistribute some resources to other area of manufacturing. There are opportunities available for improvements through the implementation of automation. I recommend starting the implementation process, however, we should continue to evaluate the process and explore other avenues along with automation. PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. OPCP-Continue to improve process GBAPS- benchmarking PPARPM’s processes can be further reviewed for implementation By further analyzing our Objective is to process and streamlining it, we minimize wastes can produce more parts more in our process cut economically. This will pencil slats to primarily be done through required length. automating the material Once wastes are handling and inspection steps identified, we are within or process. to analyze the opportunity to improve the process. Adding automated equipment William Our project seems to be the best way to Myles II objective is to reduce waste and time. find and eliminate waste that goes along with the #2 pencil slat production process. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: All agree that our objective is to continue working towards eliminating waste as well as utilizing the best process to produce #2 pencils of good quality. David Harrison Automating steps in this process will provide our biggest opportunity for improving the process and eliminating waste. This process needs to be further tested and analyzed. PPMTA ROLDA PPARMP Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: All also feel that this process can be improved through automation. Automation can reduce waste and increase production rates. Tool 23 SDA-Failure Mode And Effects Analysis (FMEA) Compiler (s): Shawn Myers Researcher (s): Shawn Myers Team: QS 327 Team 2 Phase: 2 Tool: 23 Date: March 17, 2006 FMEA Form 1 Of 1 Part Name/Service: Process/Service Location: Pencil Slat Cutting and Shaping Department – Huron, Ohio Supplier: Product, Process or Design FMEA, and Why? Revision: Northern Lumber Company Process 1 Other Pertinent General Information, Particularly Oriented To Other Supportive Documentation And Data Attached: NA Process Description. Provide a general written text description of the process, and detailed flow chart of same: The operator walks to container and retrieves wooden slat, it is taken to trim saw where it is precisely placed in a jig. The operator clamps wood in place and places hands on palm buttons (palm buttons protect the operator from being hurt, the machine will not run until both buttons are pushed at same time) and saw cuts wooden slat to precisely 7”. The operator removes wooden slat from trim saw and uses calipers to measure the length of the slat. If the slat is within specifications, it is then placed into a container for good parts. Then the process starts over. Employee Pulls Slat From Pallet Employee Places Slat In Trim Saw Employee Pushes Palm Buttons Employee Removes Cut Slat Employee Inspects Slat L h Product Description. Provide a general written text description of the product, and detailed step by step functioning of same: 7” long, grade A wood, square cut ends, smooth cut ends. The grain of the wood is long and straight. This grain reduces friction during sharpening making the sharpening task quick and easy. Potential Failure Mode. Describe the general failure which has occurred or may occur, giving appropriate details to help all improve on same: Company exposed to failure in this process due to the age of the machinery and the quality of raw materials being received. Characteristic Key Characteristics. Describe key characteristics in product or process to be addressed to decrease likelihood of Ranking 1-10: failure (rank order according to level of criticality, 1 being low and 10 being high): 1 Uphold supplier quality and responsibility. 2 Maintain equipment on schedule. 3 Train new employees as they are brought online. 4 Upgrade quality systems to customer and ISO specifications. 5 Inventory of replacement parts for machinery. 6 Health and Safety. Severity Potential Effects of Failure. Describe the general failure effects, particularly focused on implications for damage to Rating 1-10: 7 surrounding environment (provide a rating of severity where 1 is low and 10 is high): Lack of product for delivery to customer. Employee accident or injury. Equipment downtime due to lack of replacement parts or maintenance. Other equipment idling due to lack of stock from previous processes. Quality risk to customer. Occurrence Potential Causes of Failure. Describe general failure cause, particularly focused on process or product design which Failure 1-10: 3 are implicated, with sufficient details to enable improvement. Also provide a occurrence of failure rating ( 1 = low and 10 = high): Machine not producing quality parts. Machine not operable due to maintenance issues. Current Detection Control. Describe systems or methods of detecting failure which can lead to control of failure, including methods for same. Also provide a rating from 1-10 to indicate likelihood of occurrence ( where 1 = high and 10 = low): Preventive maintenance initiative, health/safety and training on operation of equipments, utilize kanban system for stocking replacement parts, kitting for major repairs to equipments, and utilize supplier scorecard to communicate to supplier. Risk Priority Number (RPN). Provide a RPN based on multiplying severity X occurrence X detection. RPN Calculated: 42 Responsible Area: When: Engineering Q2 2006 Recommended Action. Describe appropriate actions to be taken in process or product to alleviate failure, including area to take action and when (if multiple actions are needed, add rows): Current actions will involve implementing systems as stated under current detection control. Researcher 1. Project 2. Findings, analyses observed 3. Conclusions, objective (s) as data, documentation in recommendations in methods, written…… SDA…… course outcomes…… Problems with the production of Findings analyze some failures Shawn Project objective pencil slats identified and for this process. There are Myers is to identify analyzed for potential failures. systematic and structural issues processes This form identifies the results with the process. These involved with of potential failures and offers manufacturing #2 problems leave the company options to control these failures. pencil slats. Once vulnerable for supply chain breakdowns. this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Need to evaluate and Evaluation shows some Scott The project implement a preventative potential for the occurrences of Sowders objective is to maintenance program to ensure define the process failures. These failures could that the existing equipment is occur from improper for cutting the #2 functioning to capacity. maintenance of the cutting pencil wooden Continue to explore system device or the clamping fixture. slat to length. improvements to reduce Once identified potential for failures and focus on eliminate sources of waste. elimination of waste with the goal of cost reduction and quality improvements. John Wise Pamela Neill William Myles II Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. Our project objective is to find and eliminate waste in the #2 pencil slat Some failures can occur in this process that can affect quality and delivery to the customer. Steps need to be taken in the process to reduce the number of chances for failure and to increase the level of detection to keep failures from getting to the customer. Findings show that there are issues that are potential failures in this process. These failures may cause loss of production, poor quality products and/or slow delivery to customer. Engineering/management needs to evaluate potential failures and take corrective action to ensure production is not interrupted and/or poor quality parts are being produced. Evaluations need to be done in order to eliminate those steps causing excess waste and this form gives ways to do that. It shows potential reasons for the Some failure could occur in our process causing a loss of quality, more time to finish the process, and many more problems. All of these issues are waste that are Detection Control 1-10: 2 4. PPARMP, ROLDA, PPMTA relationships? PASPC PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. OPCP-Continue to improve process ROLDA is knowledge from other sources, PPARMP is leadership and assignments, PPMTA is rating to help team improve All three items are continuous tools used in the improvement process. PPARMP, ROLDA, and PPMTA are all used in the improvement processes. David Harrison Vanessa Malone production process to reduce production and buying cost. Our project is to accurately cut pencil slats to desired length and reduce costs by minimizing wastes Our focus is to eliminate waste by keeping our process up-todate and continuously finding ways to reduce cost in all areas of production. initially trying to get rid of. waste and ways to eliminate it. Failures within our system could negatively impact our ability to produce quality pencil slats in the appropriate time. Potential failure points should be analyzed and understood to eliminate or prepare four such failures. ROLDA enables us to review tools and implement what applies We will use this form to analyze failures after they have occurred in order to prevent the occurrence of more in the future. This form is helpful in enhancing our design for continuous improvement. Based on these causes and effects being identified, changes be made by the group. All are important in assessing our project to its fullest extinct. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Team members understand the purpose of this form in trying to be proactive to the projects needs. This form enhances our research by providing an opportunity to identify potential causes for failure and plan for it accordingly. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Team needs to maintain focus and momentum to complete the remaining tool and phase 2 portfolio. Tool 23 SDA-Quality Function Deployment (QFD) Compiler (s): David Researchers (s): All Team: 2 Harrison Supplier: Great Lakes Pencils Customer: The Pencil Factory Customer Requirements Stated And Prioritized By Customer. 1 Is A Low Priority And 9 Is High. (1, 5, 9) Slats cut to proper length 9 9 9 9 9 9 7 Supplier Comments About Customer Requirements Should Be Placed Here. Grand Totals: Sum All Values In Horizontal Rows. 9 34 9 28 5 7 5 Supplier Priority Rating For Each Customer Requirement. Use Priority Rating Of 1, 5 Or 9. 1 Is Low Priority And 9 Is High. Vision system investments in place to improve quality 9 9 5 7 Date: 11/7/05 Product Or Process: Pencil slat cutting 5 9 9 Tool: 23 5 9 9 Slat cut is square to slat length 5 QA randomly inspects slats For deviations Provide A Priority Rating By Supplier Of Technical Capabilities, 1, 5 Or 9. Automatic loading ensure Slats are positioned for a Square cut Implementing vision syste To ensure cuts cut to Appropriate length Supplier Technical Capabilities. Describe How Customer Demands Are Met. Phase: II 5 5 Automatic loading Investment in place to Ensure quality cut Slat cut is smooth 1 9 9 5 1 Customer Should Provide Priority Ratings Of Each Technical Capability Statement Provided By Supplier As A 1, 5 Or 9. Researcher David Harrison Pamela Neill Shawn Myers John Wise Scott Sowders 1. Project objective (s) written…… Accurately cut pencil slats to desired length and reduce costs by minimizing wastes Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length The project objective is to define the process for cutting the #2 pencil wooden 1 9 5 39 25 QA sampling seems sufficient Customer Should Provide Comments About Supplier Technical Capabilities. 39 3 1 Addition of loadin System has helped cuts Addition of vision Should increase Cut accuracy Grand Totals: Sum All Values In Boxes. Higher Numbers Indicate Top Priorities. 9 5 5 5 18 QA team provides inspecti and operators are trained For proper cutting. At Matrix Intersections Where Customer Demands And Supplier Capabilities Cross, Supplier Places Priority Rating In Upper Right Of Box. Customer Priority Rating Goes In Lower Left Of Box. Averaged Two Numbers Goes In Center Of Box As Sum For Grand Totals. Values Used Are 1, 2 Or 3. 2. Findings, analyses observed as data, documentation in SDA…… Our process focus is appropriate based on customer feedback of product requirements 3. Conclusions, recommendations in methods, course outcomes…… Continue to monitor results of adding an automated loading and vision system 4. PPARMP, ROLDA, PPMTA relationships? The most important priority to the customer is the slat cut length with the lowest priority being a smooth cut. Our team is currently focusing on the cut length and how to improve it. Continue to focus on improving the cut length of the wooden slat. This is the most important to the customer. Team needs to continue focusing on this issue to satisfy customers needs. Continued improvement of project. The customer and the supplier use this form to attain common understanding of the requirements for the product produced. Based on the information, the smoothness of the cut is an issue between the 2 parties. There needs to be formal meetings to identify the requirements for the pencil finish. This will ensure that all parties agree and focus on the same issues. PPARFMP PASPC GCA The most important characteristic from this operation is to cut the slat to the correct length. Need to continue cutting the slat to the correct length during the current process and after any improvements have been made to the process. All used to improve and rate the team in the process of completing the tools. Based upon QFD activity, the most important quality characteristic of the cutting process is final length requirement. Square cuts and In order to maintain our level of quality, with regards to cut length, we should focus attention on ensuring that current system is properly PPARMP- leadership activity allows for team members to stay focused and know responsibilities. All William Myles II slat to length. Once identified focus on elimination of waste with the goal of cost reduction and quality improvements. Our project objective is to identify any waste in the production of the #2 pencil slat and find ways to eliminate that waste. smoothness of cuts are less critical to the customer. maintained. Also, we need to continue to explore system improvements that will decrease numbers of lost slats due to improper lengths and eliminate sources of waste. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. Based on the feedback from the customers and suppliers of the #2 pencil slat, this process is efficient enough. We need to continue to focus on ways to improve the process in order to satisfy the customer and save money for the company. They’re all used to improve the process. We continue to build quality and satisfy our customers by Our focus here is accurately cutting pencil slates. to think about customer needs, designing to meet those needs, and meet them through production methods as well as design. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Team continues to provide input for cost reductions to achieve a smoother process to ensure customer satisfaction Vanessa Malone We must follow the design stages for quality, which include prototype development and the study of performance standards and requirements, and overall cost projections related to achieving quality. All are needed for continuous improvement. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: The entire team needs to continue to meet the deadlines established for the postings of the documents. The team has come together more as a unit and our work flows much better.. Tool 23 SDA-Characteristic Evaluation And Audit System (CEAS) Compiler (s):Scott Sowders Researcher (s):Scott Sowders Team:2 Phase: II Tool:23 Date:12/2/05 General Product/Part Description: Wooden Pencil Slat Inspection Description: Check Overall Length (OAL) of Sample Operation: Wooden Slat Cutting Gage/Device: Digital Calipers No. 1 Date/ Operator Run Size/ Sample 20/4 Characteristic: OAL Cp Cpk X-bar R SPC UCL SPC LCL R&R % Charts Used: SBC X-Bar Chart Corrective Actions/Observations/Other 11-1-05 / 2.0 1.53 7.007 .011 7.017 6.996 98% Process in control no corrective action Fred needed. 2 11-3-05 / 20/4 1.66 1.33 7.006 .010 7.017 6.995 98% Process in control no corrective action Wilma needed. What Does SPC Charting; Cp And Cpk Indicate Regarding Potential Changes In Characteristics? Cp is the tolerance width divided by 6 standard deviations (process variability). Cpk is an index that measures potential for the cutting operation to generate defective outputs relative to the upper and lower length tolerances. What Does The Most Recent Audit Of Systems Indicate Regarding Characteristics Changes? OAL characteristic of the cutting process in statistical control and fall within upper and lower dimensional tolerances. What Engineering/Design Changes Are Being Considered And What Will Be The Potential Impacts On Characteristics? Automatic loading and unloading of the cutting device. What Relationships And Implications Can Be Noted based On Operator, Date, Size Of Run, And other Issues Such As Maintenance: The process outputs were relatively unchanged from operator to operator. Preventative Maintenance program is having a positive effect on the cutting operation. What Relationships And Implications Can Be Noted based On UCL and LCL, Tolerancing, and Gage R & R %: UCL and LCL are well within the upper and lower dimensional tolerances. Gage R & R is adequate for the operation. Identify And Attach Other Pertinent Inspection Information, Or Related Data: Measured Lengths (OAL) of Sample 1= 7.003-7.008-7.014-7.004 Measured Lengths (OAL) of Sample 2= 7.004-7.000-7.005-7.014 2. Findings, analyses observed Researcher 1. Project as data, documentation in objective (s) SDA…… written…… The data from the 2 sample Scott The project groups show that our #2 pencil Sowders objective in to slat cutting process is evaluate the statistically in control and is process for capable of meeting our product cutting the #2 specifications. pencils wooden slat to length. The goal of the team is to find and eliminate any waste associated with the current process and to implement a new process with a cost reduction. Data groups sampled from Fred David Our project is to and Wilma are both statistically Harrison accurately cut in control per the process pencil slats to specifications. desired length and reduce costs by minimizing wastes The current process statistics Pam Neill Project objective from samples taken from (2) is to identify and eliminate waste in runs show the process is in control. the wooden slat cutting process which in turn reduces cost. The process of cutting the pencil John Wise Project objective slat to the correct length is in is to identify and control based on the samples eliminate costs taken from 2 different operators. associated with waste for cutting a wooden pencil slat to the correct length Findings on this SDA Shawn Project objective demonstrate that the process is Myers is to identify currently in control. This could processes change due to internal or involved with manufacturing #2 external issues. pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Based on our current Vanessa Our focus here is documentation we are Malone to evaluate our incompliance with our current process standards. and look for any 3. Conclusions, recommendations in methods, course outcomes…… Recommend to continue the preventative maintenance program to ensure cutting mechanism is kept in good working condition. In attempt to continue to cut cost, I recommend exploring automating the loading and unloading of the cutting device. 4. PPARMP, ROLDA, PPMTA relationships? Continue with existing practices. Process should not be modified except to allow for improvements in cycle time ROLDA enables us to review tools and implement what applies The current process is in control and should be left alone. In agreement with team to add load and unload equipment to increase production. ROLDA, PPARMP and PPMTA are continuous tools used by the team to improve the quality of our portfolio. Recommendation is to continue to use the current machine and process to cut the slats. Add load and unload equipment to reduce cycle time without affecting the quality of the product. ROLDA is knowledge from other sources, PPARMP is leadership and assignments, PPMTA is rating to help team improve. Based from the quality standpoint, this process is capable of producing a quality part. Volume may be the issue with this process. PASPC FMEA We should continue are current process, but still look at ways to improve in areas. All are necessary to build our portfolio and asses team and individual work. PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. discrepancies, then make changes where see fit. According to the samples taken, William Our project is the process is currently in Myles focused on control. This SDA could change improving the #2 in the future due to different pencil slat issues. production. In order to do that we must find and eliminate waste in the production process. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Team continues to strive forward with each tool and reporting quality also increases. Overall, I feel the Technical work performed by the members was very good. The broad range of response reflects the diversity of our group. As we complete each tool kit, it brings the team focus more closely together. Our recommendation is to continue with the process that has been going on. It’s very capable of producing quality parts and should be left the way it is so far. ROLDA, PPMTA, and PPARMP are all tools used to help the team improve in quality. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: As we move forward we can continue to strive to improve our reporting by streamlining. With each tool confidence is gained, allowing for a more complete report. I encourage that team members continue to work together and that everyone stay focused. Tool 24 SDA-General Safety Inspection Checklist /Pareto Chart (GSICPC) Researcher (s): Vanessa Malone Team: 2 Freq enc Of Occ Operation: Employee places slat in the trim saw Reason For Inspection: Trim saw produces a jagged cut Individuals Interviewed: Myers, Myles, Neill,Wise, Sowders Other Pertinent Information: Checklist Item OK Not Not Safe App. Good Housekeeping/Cleanliness X Piling and Storage/Tagging Systems X Aisles, Walkways, and Exists X Tools And Supplies X Ladders And Stairs X Machinery And Equipment X Floors, Platforms, and Railings X Electrical Fixtures/Equipment X Dust, Ventilation, and Explosives X Overhead Valves, Pipes, Markings X Protective Clothing/Equipment X Washroom, Lockers, Shower, Deluge X Unsafe Practices/Horseplay/SOPs X First Aid Facilities X Vehicles, Hand and Power Trucks X Fire Fighting Equipment X Guards And Safety Devices X Lighting, Work Tables/Areas X General Maintenance X Safety Training, Communication X Company/OSHA Standards – Comply X Cranes, Hoists, Conveyors X Scrap And Rubbish X Other Items, Circumstances X Other Pertinent Information (Attached And Explained): N/A Phase: 2 Tool: 24 Date: 11/19/05 Location: Trim Saw; Great Lake’s Pencils Inspection By: Vanessa Malone Reviewed By: David Harrison Approval Date: 11/30/05 Actual Site Explanations/Action/Other Cutter on trim saw may be dull or broken Fixtures should be inspected for damage Evaluate preventive maintenance used Problems. Will be monitored by plant manager 20 42 18 38 %O Tot O Compiler (s): Vanessa Malone General Shape Of Chart Is Constant, But Frequency 16 34 14 30 12 26 10 21 8 17 6 X X 4 Pareto Is Often Done Early In Analyses, based On Histograms. It Is Used To Show Areas Needing Attention Versus Those We Can Postpone--A Good Decision Tool. 13 X 9 2 5 X 1 % Of Occurrences Is For Each Attribute Relative To Total Of All Occurrences. CLEAN FRST AID SCRAP Rank Findings From Highest To Lowest And Left To Right Researcher 1. Project objective (s) written…… VANESSA The objective of MALONE this document is to check operations, procedures and processes to ensure that they are safe as well as correct them if they currently are dangerous or pose as a hazard. John Wise Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length Shawn Myers Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Pamela Neill Project objective is to identify and eliminate waste in the wooden slat cutting EQUIP X MATNCE 0 Shade Columns To Show Differences Among Findings And % Values Shift To Present Relationships In Facts. Chart Can Be Expanded To Show Unlimited Numbers Of Attributes 2. Findings, analyses observed as data, documentation in SDA…… I did find that the cutter is broken. As a result we have a small number of pencil slates with jagged cuts, which we can’t sell. Thus, we have produced unnecessary waste. 3. Conclusions, recommendations in methods, course outcomes…… I recommend that we practice better preventive maintenance. We could have prevented this breakage if we routinely had maintenance check the equipment. 4. PPARMP, ROLDA, PPMTA relationships? All are necessary to continue to progress successful as a team. Safety on the machine and process is good, but some areas for maintaining the machine have been noted as needing attention. The PM program needs to be adjusted to eliminate the waste associated with poor maintenance which can lead to bad parts and lost production. PPARMP is for team leadership and assignments, ROLDA is documentation, PPMTA is team rating. Safety inspections will allow for the company to take a proactive approach to the safety of the operator. By offering a safe work environment, a company can reduce cost involved with work accident downtime, litigation, and lack of training. General maintenance is identified as an area for improvement. Maintenance manager should direct this vs. plant manager. Also PM program needs to be identified and executed. Inspection of tooling for wear and replacement tooling ordered. PPARMP MTA The overall process is safe and effective. There could be improvement in the maintenance and equipment. The equipment probably stems down from the lack Maintenance has been found to be an area of concern. This needs immediate attention. Lack of maintenance can cost a company money, down time or even injuries. Each item continues to help in the progression of a successful final portfolio. process which in turn reduces cost. of maintenance being performed. Maintenance may need to be retrained or have daily/weekly meetings on what is not being completed. A possible team may need to be formed to help this area. Process has several potential safety issues. We need to implement additional processes to check the following: 1. Tools and supplies 2. Machinery 3. Electrical Fixtures 4. Maintenance Objective is to minimize wastes in our process cut pencil slats to required length. Once wastes are identified, we are to analyze the opportunity to improve the process.. The safety of the machine is good William Our project although improvements can be Myles II objective is to made in maintenance and eliminate as equipment. The pencil cutter has a much waste as small problem which needs to be possible in the fixed. Some pencils had jagged production of the cuts which are considered waste so #2 wooden pencil to improve, we must eliminate that slat. If done problem. right, we can reduce production time and also production and buying costs. Scott Sowders The overall process is safe and The project effective for cutting slats to length. objective in to There are still areas for evaluate the improvement associated with our process for maintenance practices. Should cutting the #2 continue to focus on Preventative pencils wooden Maintenance Program slat to length. The goal of the team is to find and eliminate any waste associated with the current process and to implement a new process with a cost reduction. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Everyone agrees that our primary goal is to reduce waste as much as possible. We know that by tackling this goal we can increase production as well as reduce unnecessary costs. Also precision in cutting the pencil slates is another one of our focuses. Customer expect good quality from us. David Harrison First step would be to discuss this situation with the maintenance department and create a plan of attack. Once all areas with safety issues are addressed, maintenance routines require review and changes to inspect problem areas to reduce future safety issues. PPARPM’s processes can be further reviewed for implementation Maintenance has been an area where we need to improve. We must discuss how the maintenance needs to be, what we need to do to get to that level, and take those actions to actually change the maintenance as needed. PPARMP MTA Continue to develop and maintain proper maintenance schedules. Areas of focus should be: PPARMP- team leadership/group assignments ROLDA- additional content research PPMTA-team performance evaluation 1.Cutting wheel condition 2.Electrical components 3. Slat holding fixture Concentration in these areas will eliminate machine down time and improve slat quality, thus reducing waste and process costs. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Most agree that maintenance needs to improve. Maintenance schedules should be set for the cutting tools. Electrical components as well as holding fixtures. We need to practice better maintaining of our equipment so that we can reduce downtime, reduce waste and improve quality. Tool 24 SDA-General Failsafing/Auditing Process, Systems (GFABS) Compiler (s): Pamela Neill Researcher (s): William Team: 2 Phase: II Tool: 24 Date: 11/19/05 Myles II General Background Information On Process, Product, Issue Or Problem Requiring Failsafing/Auditing: The cutting of wooden pencil slats is currently being completed by a single operator. The operator loads the slat into the machine, cuts the slat, removes the slat and does a manual inspection. Issues consist of slow loading and unloading, unloading incorrectly and human error during inspection of cut slat. Describe The Overall Plan To Be Followed In The Audit, Including Pre And Post Audit Steps, Timeframes And Follow Through: Currently analyzing the installation and use of automatic loading and unloading machines and the use of lasers or cameras for inspection. After installation, the team would re-analyze the process daily to confirm this process is more precise and time saving. Then once this has been proven, the process will be placed on a 6 month audit. Should be completed in a 6 month time frame. Specific Issue/Concern? Timeframe What Is The Measurable? Who Will Do? 1. Lack of employee compromising 6 months and acceptance. Describe Basic Steps, Procedures And Protocol To be Followed In The Daily Conduct Of The Audit: Have a person visually watch the process and document any disorder or problems seen, take hourly samples of (10) slats to verify auto inspection is properly working. Person should document all findings and report daily to project engineer, explaining any problems or positive performances or issues. Person should also take a final count on how many slats are processed each day to verify production figures are going up and chart. Contact Methods Clearances/Security General Arrangements Methods Of Communication 1. Project engineer if any problems n/a n/a (2) way radio or personal persist. Identify Who Will Be Interviewed In The Audit, Purpose Of The Interview: The project engineer, maintanence personal and employees working on this line. Interviewee? Interviewer? Specific Focus/Questions? Time And Place? 1. Project Engineer Auditor Is the upgraded process saving Conference room money? 2 weeks after process is in full Is the upgraded process working mode. producing more product? Is the upgraded process eliminating defects? 2. Maintanence Personel Auditor Have there been any shutdowns Conference room due to new process? 3 weeks after process is in full What has been the length of working mode. time? Are there multiple shutdowns for the same reason? 3. Employees on line Auditor How is the new process working? Randomly after process is in full Do you have any complaints? working mode. What Errors Are Needed To Be Failsafed? Specific Issue/Concern? Timeframe What Is The Measurable? Who Will Do? 1. Loading of slat improperly 1 per 8 hr shift Incorrect loading of slat 2. Unloading of slat improperly 1 per 8 hr shift Incorrect unloading of slat 1. Rejected part is actually good or accepted part is a reject 1 per 8 hr shift Length of pencil slat Maintenance will verify when alarm sounds for incorrect load Maintenance will verify when alarm sounds for incorrect unload Quality control should catch during routine inspection of (10) slats per hour Describe Visibility In The Work Area: Clean, no clutter, well lit Clutter/Lost Product Issues Potential Safety Issues Housekeeping Issues General Organization 1. none None None Identify Specific Data And Documentation To Be Reviewed, And In What Ways: Clean/organized/open Data To Be Reviewed? How To Review Documentation? How To Review Data? Documentation To Be Reviewed? 1. Reject charts To be reviewed with auditor and Excel charts created by quality project engineer control 2. Time savings/increase production To be reviewed with auditor and Excel charts created by quality project engineer control Identify What Existing Resources Will Be Used In The Improvement, Based On The Failsafing/Audit Process: Visually in auditor review Existing Equipment? 1. Cutter Existing Space? No extra space needed Operator Training? Train maintenance and operators to reset machine 2. Calipers No extra space needed Train maintenance and electricians Identify What New Resources Will Be Required In The Improvement, Based On The Failsafing/Audit Process: Other? New Equipment? 1. Loading machine New Space? 12”x36” Other? New SOP’s, Training? Train maintenance and electricians Visually in auditor review 2. Unloading machine 12”x36” Train maintenance and 2. Unloading machine electricians 3. Lasers/cameras No extra space needed Train maintenance and electricians After Completion Of The Failsafing/Audit Process, Identify All Findings Requiring Corrective Actions, And In What Ways: Findings? Corrective Actions? Who Will Address? When To Be Completed? 1. No findings needing corrective action Explain How The Five Why’s Were Applied In The Process: They were used to determine if the new proposed equipment will benefit the process. Explain How Upstream And Downstream Operations May Be Impacted By The Proposed Changes, Improvements: The existing machinery may need to have production rates increased to keep up with the new more modern machineries production. After Completion Of The Failsafing/Audit, Identify All Findings Requiring Corrective Actions, And In What Ways: Findings? Corrective Actions? Who Will Address? When To Be Completed? 1. No findings needing corrective action. Explain How Operators, Supervisors, Quality, Engineering And Other Personnel Were Involved In The Process: They were involved in the reviewing of charts, operations and problems involved with the addition of the new process. Explain How This Audit Can Be Improved: Do the audit on a more regular basis. Researcher Pamela Neill John Wise David Harrison Vanessa Malone Shawn Myers 1. Project objective (s) written…… Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length Objective is to minimize wastes in our process cut pencil slats to required length. Once wastes are identified, we are to analyze the opportunity to improve the process. Project objective here is to evaluate our process by examining all steps, machines and tools. We are looking for inconsistencies as well as any other problems in our setup and routine. Project objective is to identify processes involved with manufacturing #2 pencil slats. 2. Findings, analyses observed as data, documentation in SDA…… The Auditor will monitor the new process to assure that it is in the best interest of the company. He/She will also interview and discuss the process with engineers, maintenance and hourly employees for input. This will become part of a regular routine to ensure the process is maintained and achieving its highest quality. This document is used to determine areas where failsafing is needed and whether it is effective enough in the process. Auditing should encompass all individuals involved in the process before, during, and after the process has been designed and implemented. 3. Conclusions, recommendations in methods, course outcomes…… Repeat the audit process once every six months to ensure the process is working and being maintained properly. If this process is successful and saves the company money, it may be considered for other areas of the plant. 4. PPARMP, ROLDA, PPMTA relationships? Each item is used during each tool to improve the teams progress as we reach our final Phase II portfolio. The audit should be performed before the process is changed and after the new process has been implemented. Follow up audits should be performed every 6 months. PPARMP is for team leadership and assignments, ROLDA is documentation, PPMTA is team rating Failsafing this process will help us improve our process. This will be done by auditors working with our plant engineer, maintenance, quality department and line workers. Our timeframe for this process is 6 months. Auditors need to maintain the recommended time frames to meet with the plant engineer and maintenance personnel. PPARPM’s processes can be further reviewed for implementation Based on results the auditor will make changes where see fit. Also in a few months the new procedure will be evaluated to ensure that it is an effective change. Auditors have made good recommendations. We have to wait and see if our results match our expected outcomes. All are necessary to show the team’s progression as we continue to complete the toolkits. Fail safe opportunities will improve the processes and protect the customer. This form will offer information that may not be obvious on other forms. This form needs to be read by management and implemented to get results. PPARPM Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented Scott Sowders PPARMP- leadership After implementation of Assigned auditors will work The project activity allows for team improvements, a new audit hand in hand with process objective is to members to stay focused should be performed every 6 define the process engineers, operators, and and know months to decide whether supervisors to improve process for cutting the #2 responsibilities. process in acceptable or if through the technique of pencil wooden ROLDA – resources, further improvements are failsafing. By removing slat to length. show knowledge gained necessary. potential failure causing Once identified from topic research and characteristics of the cutting focus on allow for engagement process, quality, production, elimination of PPMTA- assessment, and on time delivery to the waste with the team members evaluate customer will increase. goal of cost performance. reduction and quality improvements. William PPARMP The recommendations made by By making our processes fail Our project Myles II the auditors seem to be good safe, we run the risk of less objective is to but we must wait to see if they injury or waste. The Auditor find and will hold up to their eliminate waste in will make changes wherever changes are needed and to make expectations. the production of the # 2 pencil slat. sure the process is safe, inspections will be held in the After we near future. eliminate the waste, production and buying costs will go down resulting in more profit. Compiler Portfolio Reflections, Summary Of Technical Work, Compiler Reflections To Help Improve Quality Of Work In Portfolio Assessment, Based On Individual Researcher Inputs: Based On All Individual Researcher Inputs: It is determined that fail safing the process is essential. This tool gives The quality of work has improved drastically since the first tool. We more opportunity for finding problems that may not be so obvious in other need to continue this quality going into the final Phase II portfolio. No tools. It is agreed that after the auditor completes his audit, management improvements recommended. should evaluate the comments and take action. Tool 24 SDA-Maintenance Tracking Analysis (MTA) General Use/Application: SDA focuses technical content and deliverables on project objectives, all associated with technological assessment for improvement. All researchers on team complete the information below and submit to the compiler for finalizing in portfolio. When completed, all researchers should be listed as contributing, detailing technical assessment issues, as reflections by all related to the SDA. Compilers also develop reflections synthesized over time, based on inputs contributed by each, and their own review and reflections of the team’s work. This also involves use of SDA-FACR (below) to determine findings, analysis, conclusions and recommendations (FACR) ultimately merged into grand form format by compilers for inclusion in the final portfolio when compiled by team leadership. Persons not contributing substantially at SDA’s, and FACR responses should have lower scores shown in PPMTA at final grand portfolio. Compiler (s): Researcher (s): Team: Phase: Tool: Date: Shawn Myers Shawn Myers QS 327 – Team 2 2 24 November 19, 2005 Operation: Location: Pencil Slat Size – Trim Saw Great Lakes Pencils Adjustments Inspections Parts Installed Others Track General Work With A Brief Work Explanation Here And An X With Time 1 2 3 Time 1 2 3 Time 1 2 3 Time 1 2 3 Time Date Identified Categorically To The Right Req. Req. Req. Req. Oct. 12 Cylinder Change - EM X Oct. 21 Setup Adjustment – New Stop Block X X X Installed Oct 22 Hydraulic Filter - PM X X Nov. 12 Cutting Tooling Change - PM X X Identify Planned Preventive Maintenance Functions According To Frequency Of When It Is To Be Done (D = Daily; W = weekly; M = monthly; Q = quarterly; B = biannual; A = annual), Along With A Brief Description Of The Planned Functions. # Work, Maintenance Function Planned To Be Performed Freq Project Cost Time Standard SOP Prepared? How To Access? M 240.00 4 HRS. Generated / Supervisor Person To Do? Adjustments 1 Cutting Tooling Change 1 Parts/Materials Installed Change Belts and Filters 1 MR M 175.00 1 HR. Generated / Supervisor MR Belts and Hydraulic System M NA 1 HR. MR 2 Inspect Proximity Switches and Fuses M 45.00 1 HR 3 Thermography – Control Panel A 45.00 1 HR Generated / Supervisor Generated / Supervisor Generated / Supervisor 1 Other Install new Panelmate / PLC / Micrologix. 9234.00 10 HRS Inspections Generated / Supervisor EL EL EL Remedial Maintenance Functions, Unplanned But Required To Keep The Operation Running. Date Oct. 12 Researcher Shawn Myers John Wise Pamela Neill David Harrison Description Of Work Performed Cylinder Change - EM 1. Project objective (s) written…… Project objective is to identify processes involved with manufacturing #2 pencil slats. Once this is identified, improvements to the processes to reduce cost and improve quality will be implemented. Project objective is to identify and eliminate costs associated with waste for cutting a wooden pencil slat to the correct length Project objective is to identify and eliminate waste in the wooden slat cutting process which in turn reduces cost. Objective is to minimize wastes in our process cut pencil slats to required length. Once wastes are identified, we are Parts Required Hydraulic Cylinder 2. Findings, analyses observed as data, documentation in SDA…… Maintenance tracking can be beneficial to identify downtime in the process. As demonstrated on this month’s form, there was some downtime for PMs and one service call for emergency maintenance. Time? Costs Who? Other 1.25 134.6 MR Order another Hrs. 6 3. Conclusions, recommendations 4. PPARMP, ROLDA, in methods, course outcomes…… PPMTA relationships? Continue performing PM functions PPARMP on a monthly basis. This was a slow month for service calls and demonstrates consistent uptime. New Panelmate / Micrologix to take advantage of some programming opportunities to improve cycle time. Maintenance tracking can be used to identify items to be put on a PM schedule and areas that need to be looked at closer if something is reoccurring. Most of the items this month were for normal PM with one emergency call. PM program needs to be continued on a normal schedule. Maintenance calls to the machine were minimal for the month. PPARMP is for team leadership and assignments, ROLDA is documentation, PPMTA is team rating Preventative maintenance is essential to a successful company. This schedule will keep track of what needs to be completed, how often and who is to complete. It will also help to decide which items can be completed during a down time. Each item has a cost and time associated with it. If there is going to be a 2 hour down time during the day, we know that we can not plan to do a tool change which takes 4 hours. This is a successful scheduling tool. Maintenance work performed is crucial to track for several reasons. It allows better preventive maintenance routines, it allows production to better plan their runs, and it allows management to properly budget for parts and downtime. This should be a part of every company’s PM program. It will help to organize the workers, let them know how long it should take and how much it will cost the company. It is similar to a project management tool in that you can see who can complete what tasks and if they are over used. Each tool is essential to completing a successful and organized final portfolio. Due to previous maintenance inspections, our company is better prepared for problems before they happen. We still struggle at times with management wanting to minimize preventative maintenance time to increase production. This document helps illustrate why this PPARPM’s processes can be further reviewed for implementation to analyze the opportunity to improve the process. Vanessa Our project Our equipment should be tested on Malone objective here is to a regular basis to ensure that all reduce waste in components are working as production process. expected. If we practice preventive As a result cost maintenance we should be able to should decrease if prevent large scale disasters. we have a stable and effective process. Scott Sowders Maintenance Tracking Analysis, The project is used to track all maintenance objective is to define the process performed over given time, whether it is scheduled or for cutting the #2 emergency services. It can be pencil wooden used to identify reoccurring slat to length. issues that should become part Once identified of the Preventative Maintenance focus on routine. It can also help identify elimination of spare parts that need to be kept waste with the on hand. goal of cost reduction and quality improvements. William In order for us to reach our goal Our project Myles II of eliminating waste we must objective is to use some caution and identify and maintenance is a large part of eliminate waste that. In order to make sure we in the production eliminate waste we must first of the #2 pencil keep the machines in good slat. If this is done successfully, order. production and buying cost will also go down. Compiler Portfolio Reflections, Summary Of Technical Work, Assessment, Based On Individual Researcher Inputs: Currently team members understand the importance of the MTA form for cutting costs associated to this process. Through identifying problems related to indirect labor and/or maintenance, the company can better understand what can be done to predict maintenance vs. react to emergencies. time is important. We are going to continue to carry out preventive maintenance checks on a regular basis. All are necessary to continue to improve individual as well as a team. Continue with current PM schedule, but be on the look out for new or reoccurring problems. If reoccurring problems arise make adjustment to the PM schedule to head off these type problems. PPARMP- leadership activity allows for team members to stay focused and know responsibilities. ROLDA – resources, show knowledge gained from topic research and allow for engagement PPMTA- assessment, team members evaluate performance. We have decided to continue with our regular maintenance checks and possibly add more if needed. Each tool is very useful in successfully completing this project. Compiler Reflections To Help Improve Quality Of Work In Portfolio Based On All Individual Researcher Inputs: Team is rounding third and heading to home base. We hit one of our goals which was to achieve benchmark status (30 points). PORTFOLIO OUTCOME ASSESSMENT MATRIX (POAM) POAM places course student learning outcomes in all parts of project portfolios for team work shown in course rollout. POAM is used by instructor, attached to six tools and two phased presentations, for teams to communicate feedback in doing outcomes. Outcome 1, Communications: Good communication practices are reflected in all work, ultimately as team portfolio. Outcome, aims general assessment, reflect researcher/compiler/team management in work supplied, completed. score a) Portfolio system shows good management, writing quality, well organized to communicate project, course outcomes 4.00 b) Supplier, customer documentation in discussion board, chats, adds short and long term value to project and portfolio 4.00 c) Power point “short form” presentation evolves (3-5 slides) to summarize, explain, compliment “long form” portfolio 4.00 d) Forms, chats, threads show good team management, responsibilities balanced, doing early posts, compiling, rotating 4.00 Improvement feedback, including persons not fully supporting, total points earned (8/16 possible) as a team in final post: Team continued to be on target, looking good, right up until the conclusions were presented at phase II. Power point was significantly improved based on feedback to compliment long form “mechanics and functions”, how the work is being done. Team continued to grow “grand forms”, providing a nice synthesis process to demonstrate maturity and solid management, at phase II. Focus in PPARMP, primarily on technical project—pencil slat improvement—was pretty well corrected and overall nicely done. Outcome 2, Review of literature: Literature, information reviewed and abstracted supports, grows ideas, knowledge. Outcome, aims general assessment, reflect researcher/compiler/team management in work supplied, completed. score a) Critique course content as abstracted information, topically, adds value via portfolio development 4.00 b) Critique external sources of information, relevant to course content, abstracts add value to portfolio, list of references 4.00 Improvement feedback, including persons not fully supporting, total points earned (4/8 possible) as a team in final post: ROLDA continued right on the money—very nice—excellent grand form synthesis to show knowledge grown and applied in project. Outcome 3, Content applications: Organize, apply, document knowledge via course content as solutions to project. Outcome, aims general assessment, reflect researcher/compiler/team management in work supplied, completed. score a) Researchers grow individual knowledge as applications provided in discussion board for first half of posting cycle 4.00 b) Each researcher compiles all others’ individual postings as grand form “best practices” for at least one application 4.00 c) Assessing various systems as tools appropriate to the broader global environment, addressing, solving project issues 4.00 Improvement feedback, including persons not fully supporting, total points earned (6/12 possible) as a team in final post: Team continued doing a nice technical analysis, demonstrating a significant portfolio of how to do lean/six sigma projects. Technical level of research methodology, documenting how tools were used to assess and add value was precisely on the money. Documentation of forms and format to make systems work as “best practices” at phase II—as recommendations for improvement—both in team processes as well as technical processes based on FACR at objectives—were right on target and nicely done. Excellent simulation and model applications of systems for improvement—good foundation to grow with and on. Outcome 4, Research methodology: A structured, intentional research plan is designed and implemented. Outcome, aims general assessment, reflect researcher/compiler/team management in work supplied, completed. score a) Findings, analysis, conclusions and recommendations are logically derived in project, reflected in portfolio 4.00 b) Objectives in research are developed and managed to objectively explain and address all work of team 4.00 Improvement feedback, including persons not fully supporting, total points earned (4/8 possible) as a team in final post: Team continued evolving project plan as a useful way to direct overall technical work—right up until the end—at phase II. Reflection, engagement and application of technical content, particularly around focus of FACR’s, continued building an excellent base at phase II--still further focused and expanded around tools and how they were applied—used to assess the project/problem—and to show improvement. Nice work, particularly as you brought appropriate closure!! Outcome 5, Project management: Resources well managed to make effective decisions, improve professional practices. Outcome, aims general assessment, reflect researcher/compiler/team management in work supplied, completed. score a) Researchers assess internal and external services performed, judging, rating quality in team members’ work provided 4.00 b) Problem solving and decision-making show added value in resource management and improvement 4.00 c) Culture of team provides development of good professional practices, growth in knowledge from project, beyond 4.00 d) Ethical and “values oriented” issues engage “political correctness and diversity”, as questions raised, addressed 4.00 Improvement feedback, including persons not fully supporting, total points earned (8/16 possible) as a team in final post: Team continued moving forward to conduct and demonstrate work as professionals, in positive directions, nicely done, using internal and external feedback in constructive and positive ways to enhance work and team organization. Very nice documentation to demonstrate and portfolio the team’s work. Other general feedback/information for team: Very nice work continued right up through phase II……..Very impressive, leadership and empowerment, a team well communicating, nicely managed and showing a mature sense of who you were and what had to be done. Very nice, a pleasure to review and assess. JWS Team Assessed: QS 327 T2 Assessor: JWS Work Assessed: PII Date: 12-13-05 Team Points: 60.00
© Copyright 2026 Paperzz