TOWN OF WARRENTON POLICE DEPARTMENT To: Mr. J. Brannon Godfrey, Jr., Town Manager, through Chief Louis A. Battle From: Lieutenant G.W. Southard, Jr. Date: March 22, 2017 Re: SPECIAL EVENT – Memorial Day Parade and Ceremony 2017 The 2017 Memorial Day Parade and Ceremonies are scheduled for Monday, May 29, 2017 in Warrenton. The center of activities for the ceremony will be conducted outside on the grounds of the Warrenton Cemetery around the flag pole area beginning at 11:00 A.M. Parade Line-up: 9:00 A.M. Parade Start: 10:00 A.M. Public Works will be responsible for providing cones and signs for the road closures. “NO PARKING AFTER 8:30 A.M. on Monday, May, 29, 2017” will be posted on Main Street between Alexandria Pike and Clay Street, Ashby Street, and Waterloo Street between John Marshall Street and Ashby Street on Sunday, May 28, 2017. Main Street will be cleared of parked vehicles by law enforcement on the day of the event. The modified Phase I closure incorporates extended closures from Fifth Street to Falmouth Street at Lee Street, which will be the staging area for parade entries that usually go back as far as Mockingbird Lane. MODIFIED PHASE I ROAD CLOSURES WILL BE IN PLACE AT 8:30 A.M. PHASE II ROAD CLOSURES WILL BE IN PLACE AT 9:30 A.M. Modified Phase I Road Closures Lee Street Extended at Falmouth St. Falmouth Street at Lee Street East Street at Falmouth Street Mockingbird Lane at Falmouth St. Clay Street at Main Street North-South Calhoun St. and Main Street North-South Sixth St. at Main Street South Fifth Street at Lee Street North Fifth Street at Horner Street North Fourth Street and Main Street North Third Street and Main Street First Street and Main Street Culpeper Street at Lee Street Alexandria Pike at Winchester Street Main Street at Ashby Street Cones diverting traffic from right turn lane Road Closed Sign and cones Cones Cones Cones Cones Cones Road Closed Sign and cones Road Closed Sign and cones Cones Cones Cones Road Closed Sign and cones Detour Sign and cones allowing directional traffic to flow onto Winchester Street or Alexandria Pike. Road Closed Sign and Cones Phase II Road Closures (In Place at 9:30 A.M) Ashby Street at Lee Street John Marshall Street at Lee St. John Marshall Street at Waterloo Street Diagonal Street at Waterloo Street Diagonal Street at Winchester Street Pelham Street at Waterloo Street Pelham Street at Lee Street Waterloo Street at Chestnut Street Smith Street at Waterloo Street • Road Closed Sign and cones Road Closed Sign and cones Cones Cones Road Closed Sign Cones Road Closed Sign and cones Road Closed Sign and cones Cones Police Personnel: The cost of contributed manpower from the Police Department consists of seven(7) police personnel for four hours each, and is estimated at $1,035.80. The cost of contributed manpower from Public Works consists of two(2) public works personnel for four hours each, and is estimated at $155.84 for the Public Works Department. Event expenses are covered with sponsorships and private contributions, with the exception of Town resources. Officer controlled posts: Falmouth Street @ Lee Street Main Street @ Fifth Street Main Street @ Alexandria Pike Waterloo Street @ Chestnut Street Winchester Street @ Chestnut Street Lee Street @ Keith Street After the parade enters the cemetery for the ceremonies, South Chestnut Street will be closed from Waterloo Street, extending down the portion of Lee Street to Keith Street. Cones and a road Closed Sign will be placed at Waterloo and Chestnut (South bound travel lane) and on Lee Street at Keith Street. This portion of closure will remain in place until the ceremonies in the cemetery have concluded and the attendees have left. Opening the roads to traffic will be at the discretion of police personnel. The parade route will be opened to vehicular traffic by 1100 hrs.
© Copyright 2026 Paperzz