/2015 SIKI IM STUDIO /PERFORMA 15 SIKI IM Select Works Arnhem Mode Biennale with Archi-Tectonics SIKI IM x Leong Leong Siki Im was born in Cologne, Germany. He moved to the UK and studied at the Oxford School of Architecture. After working as an architect in various cities around the world, he started his career in fashion in New York and was Senior Designer for both Karl Lagerfeld and Helmut Lang. In September 2009 in New York City, Siki Im introduced his first solo collection which won him the prestigious Ecco Domani award for Best Men’s Wear in 2010. In 2011, Siki Im was awarded with the Samsung Design & Fashion Fund and 2015, Im received the Vilcek Prize and Woolmark Award. To expand SIKI IM, Siki Im introduced in 2014 the extension line DEN IM, which encompasses essential utilitarian clothing. Currently, he is also PERFORMA 15 Design Team: Siki Im, Nicole Mater, & Kamilla Intersection Why must authorities stand with their back to a wall?- Stephen Joseph on theatre configuration Inspired by Elizabethan theatre configurations, Lounge spaces are made of light, soft furniture, Performa 15 creates an multi-directional allowing users to rearrange their space to theatre that encourages interaction between create additional viewing spaces or more the audience and performer. A dynamic private lounge seating. The exterior of the store sectional slice through the narrow space front, covered in the same anonymous rubber creates several types of settings. By partially material as the stands, frames a dramatic view suspending the viewing platforms, allowing of the underside of the structure, beckoning them to rest at the stage in the centre, the passers by to enter. areas beneath the seats can be utilized as lounge, kiosk, and food preparation space. The stairs and stage are covered in soft, textured rubber mat, sharply contrasting the underside of the stands, which are left raw and structural. PERFORMA 15 Dynamic Section Kiosk Viewing and performance Lounge Kitchenette At 12’ 0” A.F.F. At 4’ 0” A.F.F. Additional Furniture and Lighting hung Suspended Tables Secured Aircraft Cable Suspension System OSB and Dimensional Lumber Steps Oriented Strand Board Sheathing with Lumber Framing for Base Steel tube structure Assembly Suspended Florescent Tube Light @ 12’ 0” A.F.F. Suspended Florescent Tube Light at 8’ 0” A.F.F. Projector Location Suspended Florescent Tube Light at 10’ 0” A.F.F. Suspended Florescent Tube Light at 12’ 0” A.F.F. Illumination Storefront Elevation Regulations Compliance Checklist – A flexible space considering diverse commissions and happenings. – Distribution point for materials and information about the biennial. – Press point. – Film screening area. (not a black box) – Lecture and Seminar space. – Book and Artworks store / Library. – Communal work table. (discussions, panels) – Ticket selling kiosk. – Main performance area with rehearsal space. Seating for 80 people. – Lounging area(s). – Area for food and drinks. – Kitchenette. Production Schedule OFF-SITE Finalize ALL Documentation for Structure • Cut List for all elements (joist, ribs, panels, etc) • Consult with Structural Engineer • Label every member for assembly and reassembly • Finalize Model-Color Code Materials • Material Take-Offs • Comprehensive Shopping list (fasteners, screws, lights, etc.) Finalize all Design/Details decision: • Hanging rods, seating, hanging tables • Free-standing furniture • Lighting • Kitchenette • Storage • Facade Preparation (Oct 7-14): • Buy all materials 2x4 lumber, materials, etc. • Cut all joists, wood, rubber sheeting etc • Welt all metal structure • Build stage-platforms • Build furniture • Build façade structure 10/28 Thurs 9am: • CNC end ribs pick-up from TB • Assemble Ramp South End and Middle Section • Build Display Niches and Liners 10/29 Friday 9am: Mock-ups • • • • Assemble Entire ramp Cut Masonite sheathing Resolve Edge Details at Openings Layout lighting and wiring plan 10/30 Saturday • De-Assemble and organize parts 10/31 Sunday • Build Display Niches and Liners Production Schedule (continued) ON-SITE: Oct 15: • Delivery to site • Assemble Structure • Prepare ceiling Oct 16-21: • Assemble Structure • Install structural screws, turnbuckles, and cables into ceiling Oct 22: • Assemble stage-platform • Apply wood on structure • Install lighting Oct 23: • Assemble seating to west ramp • Apply rubber sheeting Oct 24: • Assemble seating to east ramp • Apply rubber sheeting Oct 25: • Hang west ramp to ceiling • Attach stage-platform Oct 26: • Hang east ramp to ceiling • Attach stage-platform Oct 27: • Layout all Display Niches • Prep all lighting fixtures • Exterior Furniture • Prep for rubber installation Oct 28: • Rubber Installation Oct 29: • Clean Up and prepare for soft open Budget SIKI IM STUDIO //// // 611 BROADWAY Nº840 NEW YORK NY 10012 E: [email protected] T: +1 646 454 0000 WWW.SIKIIM.COM
© Copyright 2025 Paperzz