Monthly Report October 16, 2014 Pine-Strawberry Water Improvement District Agenda Section VII - CH2M HILL Monthly Report A. Repair Order Status B. Well and Tank Report C. Vehicle Report D. Well Test Report CH2M HILL MONTHLY REPORT – 10.16.2014 2 Pine-Strawberry Water Improvement District Repair Order Status – [Customer Service Orders] September, 2014 Item Qty. Investigate Leak 3 Leak in Meter Box Qty. Hrs. 1.50 Replace Meter 2 1.50 4 5.00 Water Pressure 1 0.50 Leak in Main 5 8.50 Water Quality 1 0.75 Meter Re-read 15 7.00 Miscellaneous 4 2.50 Meter Install 2 2.00 Lock Meter 17 7.50 Read Meter/Moving In Remove Meter/Non-pmt. Hrs. 38 18.33 1 0.50 Item CH2M HILL MONTHLY REPORT – 10.16.2014 Total 93 56.00 3 Pine-Strawberry Water Improvement District Repair Order Status – [Maintenance Work Orders] September, 2014 Item Qty. Preventative Maintenance Work Orders Hrs. 152 159 Corrective Maintenance Work Orders 0 0 Safety Work Orders 0 0 Line Locates 20 20 Line Breaks 16 96.5 188 275.5 Total CH2M HILL MONTHLY REPORT – 10.16.2014 4 Pine-Strawberry Water Improvement District Well and Tank Report - Production – September 2014 (see printed handout for well summaries) August Source Gallons % of Total PSWID Wells 4,740,596 52% WSA Wells 4,416,890 48% Total 9,157,486 Notes: 1. Sent 937,000 gallons from Pine to Strawberry 2. Delivered 79,100 gallons to Solitude Trails development CH2M HILL MONTHLY REPORT – 10.16.2014 5 Pine-Strawberry Water Improvement District September Vehicle Report ID Description # Miles/ Hours 1 2010 Polaris Ranger 2 2005 Chevy 1500 3 Qty., Gals. $, Fuel $, Maint. 48 24.72 $88.19 0 1,658 116.16 $421.23 $548.89 2005 Dodge Dakota 888 69.38 $251.15 0 4 2002 Ford F350 115 21.31 $75.00 0 5 2002 Ford F350 0 0 0 0 6 2006 Ford F150 1,977 182.05 $649.05 $634.81 7 2006 Case 580 22 50.01 $185.82 0 Total $1,670.44 $1,183.37 Maintenance Notes: Chevy 1500 – Wheel bearing, lube and oil. Ford F150 – Fuel filter, spark plugs & wires, lube, oil. CH2M HILL MONTHLY REPORT – 10.16.2014 6 Pine-Strawberry Water Improvement District Well Test Report (and distribution system) Water Quality Testing (completed) Routine Monthly Total Coliform (TC) Sampling All samples “absent” for the presence of TC and E.coli Water Quality Testing (due in October) Routine Monthly Total Coliform Sampling Disinfection By-products (PR1 & WOG) VOC’s at Tank Farm (Toluene) Radionuclides at McNight WSA (Adj. Gross Alpha) CH2M HILL MONTHLY REPORT – 10.16.2014 7
© Copyright 2026 Paperzz