Steam Turbine Chillers are a Great Choice for CHP Summer Thermal Load 1 Brian Smith Johnson Controls, Inc. Company Confidential The Two Challengers Absorption Chillers Packaged Steam Turbine Driven Centrifugal Chillers 2 Company Confidential The Match • Round 1- First Cost • Round 2- Efficiency • Round 3- Installation • Round 4- Footprint & Weight • Round 5- Flexibility • Round 6- Serviceability 3 Company Confidential Round 1 – Cost In what Hollywood movie did this famous boxer have a cameo appearance? 4 Company Confidential Round 1 – Cost In what Hollywood movie did this famous boxer have a cameo appearance? ANSWER: Hangover Part 2 5 Company Confidential Round 1 - First Cost First Cost Absorption Packaged Steam Turbine Driven Centrifugal Absorption has an edge over steam turbines at 1500-tons 6 Company Confidential Round 1 - First Cost First Cost Absorption Packaged Steam Turbine Driven Centrifugal Steam turbine chillers have the advantage in larger sizes 7 Company Confidential The Match Absorption • • • • • • 8 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential - Steam Turbine - Round 2- Efficiency 6.7 lb. / ton-hr. 5.9 lb. / ton-hr. Absorption Packaged Steam Turbine Driven Centrifugal 1500 TR Chiller Steam Turbine uses 14 % less energy 9 Company Confidential The Match Absorption • • • • • • 10 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential 0 Steam Turbine 1 Round 3 - Installation 1500 TR Packaged Steam Driven Turbine Centrifugal Chiller Absorption Chiller 2800 TR Ships in 2 pieces and bolts together on site Ships in multiple pieces Multiple units in multiple pieces And requires field welding assembly 11 Company Confidential The Match Absorption • • • • • • 12 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential 0 0 Steam Turbine 1 1 Round 4- Footprint and Weight 30 ft 10ft PackagedAbsorption 1,500 TR Steam Turbine(3,500 kW) 12 ft 1,500 TR (3,500 kW) 19ft Steam turbine chiller is half (53%) of the absorption chiller 13 Company Confidential Round 4- Footprint and Weight Steam Turbine Installed Weight 84,000 lb (38,180 kg) Installed Weight: 115,000 lb Absorption (52100 kg) 1,500 TR (3,500 kW) Steam turbine chiller is 30,000 pounds lighter 15 Company Confidential The Match Absorption • • • • • • 16 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential 0 0 0 Steam Turbine 1 1 1 Round 5 - Flexibility Chilled Water Down To: Tower Water Down To: Tower Water Up To: 17 Company Confidential Steam Turbine Absorption 36 °F 38 °F 2 °C 3 °C <55 °F >68 °F <13 °C >20 °C 100 °F 100 °F 38 °C 38 °C Round 5 - Flexibility Steam Pressure Comparison – 1500 TR Chiller 60 to 300 psig Packaged Steam Turbine Driven Centrifugal 60 to 150 psig Absorption 0 30 60 90 120 150 psig 180 210 240 270 Steam Turbine Driven Centrifugal Benefits from Superheat Steam 18 Company Confidential 300 Round 5 - Flexibility Variable Primary Flow System Capability Automatic Isolation Valve Primary Pumps Chiller 1 Chiller 2 Chiller 3 Typical load with 2 way valve Bypass Valve Flow Meter Steam Turbine- flexibility to handle rapidly fluctuating loads and operation Absorption- Sensitive to rapid changes Steam Turbine Can Save Considerable Energy with VPF 19 Company Confidential Round 5 - Flexibility 20-30 minutes to start from a cold start While, Steam Turbine can warm-up without circulating warm chilled water first However, Absorption requires flow through 20 Company Confidential The Match Absorption • • • • • • 21 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential 0 0 0 0 Steam Turbine 1 1 1 1 Round 6 – Serviceability TRUE or FALSE Sylvester Stallone was not only the star of Rocky, but also the writer. ANSWER: TRUE 22 Company Confidential Round 6 – Serviceability • Conventional Technology • Leak Checking • Corrosion Issues 23 Company Confidential The Match Absorption • • • • • • 24 Round 1- First Cost Round 2- Efficiency Round 3- Installation Round 4- Footprint & Weight Round 5- Flexibility Round 6- Serviceability Company Confidential 0 0 0 0 0 Steam Turbine 1 1 1 1 1 Steam Turbine Scores a Technical Knock-Out 25 Company Confidential University of Missouri at Columbia – Columbia, MO 26 Company Confidential Louisiana State University – Baton Rouge, LA 27 Company Confidential University of Connecticut – Storrs-Mansfield, CT 28 Company Confidential Summary “The fight is won or lost far away from witnesses - behind the lines, in the gym, and out there on the road, long before I dance under those lights.” - Muhammad Ali 29 Company Confidential
© Copyright 2026 Paperzz