Fluctuations in steam temperature reduced to less than ± 2 K in Dingzhou, China SPPA-P3000 Temperature Optimizer reduces temperature fluctuations and permits an increase in setpoints, thus increasing efficiency. The Plant The two 600 MW coal-fired units of Hebei Guohua in Dingzhou, China were completed in 2004. The drum-type boilers and turbines are licensed GE products of the Shangai Electric Group and the process control system is SPPA-T2000. The Task Due to large fluctuations in steam temperature, the temperature setpoints regularly had to be reduced manually to levels significantly below the design value so as to avoid violation of permitted limits. This was especially the case during load ramps. The result was a significant reduction in efficiency. The task was to reduce the fluctuations in steam temperature in all load situations to such an extent that a reduction in efficiency due to reduced steam temperatures could be avoided. All rights reserved. Subject to change without prior notice Printed on chlorine-free paper. The trademarks and brand names used in this document are the property of Siemens AG or their associated companies or the individual holder. The information in this document contains general descriptions of the technical options available, which are not necessarily implemented in all Individual cases. The required features should therefore be specified in each individual case at the time of closing the contract. 550 100 Greater efficiency due to higher average steam temperature Fully automatic operation of temperature controls without manual intervention 550 100 540 70 540 70 40 530 Time / min 530 0 20 HP steam temp. A 40 60 80 HP steam temp. B 100 120 140 HP steam temp. setpoint 160 Load Situation prior to implementation of SPPA-P3000: Slow load ramps, major temperature fluctuations, temporary setpoint decreases Process Optimization References Power Generation The Result Load / % P311TO_FR_Dingzhou_e_V1-0 Shang Wei PM of project (CIO) Hebei Guohua Dingzhou Power Generation Co. Ltd. Temperature/°C Siemens AG Power Generation Instrumentation & Controls Siemensallee 84 D-76187 Karlsruhe [email protected] www.siemens.com/sppa-p3000 Our Solution SPPA-P3000 Temperature Optimizer detects critical heat input perturbations at an extremely early stage and automatically initiates prompt countermeasures. The basis for the solution includes online models of non-linear superheater time behavior and model-based monitoring structures. Even age-related changes in valve characteristics are automatically detected and compensated. In this way temperature deviations can be restricted to the extraordinarily low level of ± 2K "We have solved the problem of temperature fluctuations completely through the use of SPPA-P3000 Temperature Optimizer." Load / % Siemens AG Power Generation Freyeslebenstraße 1 D-91058 Erlangen during load ramps with gradients of 4%/min. Even in exceptional situations, ± 5K is not exceeded. Temperature/°C Published by and Copyright © 2008 Increased efficiency for Dingzhou power plant in China thanks to SPPA-P3000 Temperature Optimizer Instrumentation & Controls Time / min 0 20 HP steam temp. A 40 60 80 HP steam temp. B 100 120 140 HP steam temp. setpoint 40 160 Load Situation subsequent to implementation of SPPA-P3000: Fast load ramps, minor temperature fluctuations, no setpoint decreases
© Copyright 2026 Paperzz