Rehabilitation and Signalization of Irmak – Karabük – Zonguldak Railway Line Project Cross Section Sleeper Type Rail Joints Rail Cant Previous Situation 25-120 km/h 243 m 5.556 m ‰22 130 mm 62 cm 22,5 tons/axle 1.435 mm S49 B58 LWR 01:40 Rail Fastener K Type Rigid Ballast Lime Stone, 30/60 mm Description Average Speed Min. Radius of Curve Max. Radius of Curve Maximum Gradient Max. Superelevation in Curve Sleeper Spacing Maximum Axle Load Track Gauge Project Scope Scope of the Contract 25-120 km/h 243 m 5.556 m ‰22 130 mm 62 cm 22,5 tons/axle 1.435 mm S49 B58 CWR 01:40 Changing Sleepers HM Skl-14 Type Elastic / Old Parts K Type Rigid Basalt, 30/60 mm Ballast Screen and Cleaning in some section All Ballast Change in some section Alignment Information Lenght of Main Line Lenght of Sidings Minimum Radius of Curve Miximum Radius of Curve Curves with Radius Between 300 and 500 m Curves with Radius Less than 300 m Lowest Altitude Highest Altitude Turnouts Culvert Tunnels Total Lenght of Tunnels Length of the Longest Tunnel Bridges Total Lenght of Bridges Lenght of the Longest Bridges Maximum Gradient Lenght of Gradients above ‰15 Lenght of Gradients under ‰15 Level Crossings 415 km 62,3 km 243 m 5.556 m 50 km 58 km 14 m (Zonguldak) 1281 m (Güllüce) 200 nos (S49-1:9-R300) 1.426 nos 53 nos 16.924 m 3.507 m (Tunnel No:3) 118 nos 3.582 m 120 m (3 nos) ‰22 92 km 323 km 250 nos Sleeper Factory Panel Site Panel Site 7 Km Turnouts (200 nos) 20 nos 6 Km 20 nos Ballast Addition (after cleaning) (199 km) Ballast Addition (missing) (400 km) Project Work Scheme 1 Km 2 Km 2 Km 1 Km 12 Km 1 Km 25 Km 15 Km 415+000 Zonguldak 3 Km 404+941 Çatala zı 390+327 Filyos 353+480 Gökçebey ilyenice 339+783 Kayadibi 327+326 Y 319+344 Balıkısık 290+875 Ülkü 304+636 Bolku Rmin:243 L:121 Km 293+687 Karabük 275+483 Cildikısık 244+514 Ortaköy 254+259 Eskipazar a 232+272 smetp 16 Km 266+305 Hanköy Rmin:246 L:59 Km Rmin:394 L:4 Km 217+736 Kurtçimeni 205+849 Çerke 188+409 Atkaracalar 169+678 Kur unlu Rmin:245 L:17 Km 160+616 Sumucak 148+735 Göllüce 1 Km Rmin:251 L:55 Km 380+100 Saltukova 7 Km Rmin:244 L:18 Km 369+361 Çaycuma 1 Km Track Renewal - Sidings (63 km) 131+065 Ildızım 102+256 Çankırı 081+008 Germece Track Renewal – Main Line (104 km) Rmin:245 L:25 Km 117+531 Gümü döven Rmin:296 L:15 Km Rmin:260 L:48 Km 060+192 Tüney 050+965 Dümbelek 038+358 Alibey 019+212 Kalecik 000+000 Irmak Rmin:244 L:38 Km Rmin:296 L:16 Km 17 Km 11 Km 2 Km 12 Km 3 Km 18 Km 4 Km 26 nos 8 nos 34 nos 22 nos 55 nos 15 nos m m s 415+000 Zonguldak Rehabilitation and Signalization of Irmak – Karabük – Zonguldak Railway Line TRACK REHABILITATION IS COMPLETED WITHOUT INTERRUPTING THE TRAIN OPERATION Track Usage 72 hrs. Yapıray 48 hrs. TCDD Irmak – Karabük – Zonguldak Railway Line The Line Irmak – Karabük – Zonguldak (IKZ) belongs to the 2nd Region, which is located in Ankara, the capital of Turkey. The main line of IKZ has a length of about 415 kilometers and starts at the junction station of Irmak branching off from railway line Ankara – Kayseri. The IKZ railway line is one of the important railway corridors of Turkey between Black Sea and Anatolia. Headquarters T: +90 216 521 30 00 F: +90 216 505 54 21 / 22 Rayton Afyon Factory Adres: Zafer Mah. Ahmet Özyurt Cad. T: +90 272 271 50 18 F: +90 272 271 5246 [email protected] [email protected] [email protected] www.yapiray.com
© Copyright 2026 Paperzz