REPUBLIC OF THE PHILIPPINES SUMMARY OF QUANTITIES ITEM DESCRIPTION A. EARTHWORKS UNIT l.s 1.00 803(1) a STRUCTURE EXCAVATION cu.m 57.60 804(1) a EMBANKMENT (FROM STRUCTURE EXCAVATION) cu.m 44.07 804(4) GRAVEL FILL FOR COLUMN FOOTING cu.m 6.38 B. OFFICE OF THE BUILDING OFFICIAL QUANTITIES ARCHITECTURAL AS-PLAN REMOVAL OF EXISTING STRUCTURE 801(1) 1 A 3 1 6 CONCRETE WORKS STRUCTURAL CONCRETE (FOOTING) cu.m 10.85 902(1)a1 REINFORCING STEEL (COLUMN FOOTING) kgs 611.33 900(1)b4 STRUCTURAL CONCRETE (COLUMNS) cu.m 6.11 902(1)a1 REINFORCING STEEL (COLUMNS) kgs 1,272.20 3 900(1)b6 STRUCTURAL CONCRETE (BEAMS, CB AND LB) cu.m 8.88 902(1)a1 REINFORCING STEEL (BEAMS, CB AND LB) kgs 1,314.06 FORMS AND FALSEWORKS 903(1) FORMS & FALSEWORKS l.s MASONRY WORKS 1046(1) CHB LOAD BEARING (Including Reinforcing steel) E. ROOF AND ROOF FRAMING PLAN sq.m 1 STRUCTURAL STEEL (TRUSSES) 1047(2)c STRUCTURAL STEEL (PURLINS) kgs 1,729.62 pcs. 48.00 kgs 189.60 sq.m. 254.60 METAL STRUCTURE ACCESSORIES (SAGRODS) METAL STRUCTURE ACCESSORIES (CROSS BRACING) PRE-PAINTED METAL SHEETS 2,996.76 F. FINISHING WORKS 1027(1) CEMENT PLASTER FINISH sq.m. 365.90 1021(1)a CEMENT FLOOR FINISH sq.m. 352.00 G. PAINTING WORKS 1032(1)a1 PAINTING WORKS (MASONRY/ CONCRETE) H. PLUMBING WORK 1001(9) ROOF FRAMING PLAN TYPICAL SIDE ELEVATION SECTION THRU "A" AND "B" 114.16 1047(2)b 1047(1)a2 LINE AND GRADE 1.00 kgs 1047(4) A 3 3 6 FLOOR PLAN FOUNDATION PLAN ROOF PLAN STRUCTURAL D. 1047(3)b PERSPECTIVE SITE DEVELOPMENT PLAN LOCATION PLAN SUMMARY OF QUANTITIES 2 A 3 2 6 900(1)b2 C. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TABLE OF CONTENT STORM DRAINAGE & DOWNSPOUT I. SAFETY AND HEALTH PROGRAM B.7 OCCUPATIONAL SAFETY AND HEALTH PROGRAM sq.m. 506.02 l.s 1.00 month 2.50 S 3 4 6 GENERAL CONSTRUCTION NOTES LAND USE AND ZONING 2 S 3 5 6 3 S 3 6 6 DETAIL OF RC BEAM COLUMN FOOTING DETAILS STEEL TRUSS DETAILS STEEL STRUT DETAILS SPOT DETAILS TYPICAL TRUSS ANCHORAGE ARCHITECTURAL STANDARD MULTI-PURPOSE MODEL PERSPECTIVE (REFER TO DETAILED PLANS) N STRUCTURAL N W 11.00 W 6.00 TO LABO 5.00 S E STAGE PERIMETER FENCE S SANITARY THIS SITE PERIMETER FENCE San Isidro CAPALONGA San Roque Catioan Camagsaan Mactang Dahican Ubang 16.00 ROAD RIGHT OF WAY E ELECTRICAL Mataque Calabaca Itok Catabaguangan GATE Binawangan Mabini Alayao Del Pilar San Jose Dolores Lucbanan TO CAPALONGA TOWN PROPER San Antonio Villa Belen MECHANICAL Magsaysay Villa Aurora San Lorenzo SITE DEVELOPMENT PLAN LOCATION MAP SCALE SCALE NTS NTS CADD BY : PROJECT TITLE / LOCATION : SHEET CONTENT : REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER PASIG, DAET, CAMARINES NORTE REGION V COMPLETION OF MULTI-PURPOSE BUILDING ( 11.00m x 22.00m ) · · · · PERSPECTIVE SITE DEVELOPMENT PLAN LOCATION MAP SUMMARY OF QUANTITIES SIEGFREY M. PANTE, uap RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. : ARCHITECT I PREPARED/ DESIGNED BY : PDS DONNA JEAN T. LACSON, uap ARCHITECT/ SPECIAL AGENT I CHECKED BY : ELMER CEZAR A. ZALETA, uap BRGY. CATABAGUANGAN, CAPALONGA, CAMARINES NORTE SUBMITTED BY : ARCHITECT II AGNES B. VILLALUZ VICTORIO F. CORPORAL ROMEO D. DOLOIRAS ENGINEER III CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 1 A 3 1 6 0.40mm. THK STD. RIDGE ROLL 0.40mm. THK. HI-RIB 1030 PRE-PAINTED ROOFING PANEL 0.40mm. THK STD. RIDGE ROLL 0.40mm. THK. HI-RIB 1030 PRE-PAINTED ROOFING PANEL B A 2 1 11.00 5.00 6.00 RCB-1 RCB-2 2.50 APEX OF ROOF TRUSS 2.50 APEX OF ROOF TRUSS TOP OF RC-BEAM TOP OF RC-BEAM 7.50 PAINTED FINISH 5.00 5.00 7.50 STEEL TRUSS (SEE DETAIL) PAINTED FINISH BASKETBALL COURT PROPOSED COVERED COURT ( PHASE - I ) FIN. GRADE LINE ( PHASE II ) FIN. GRADE LINE FRONT ELEVATION TYPICAL SIDE ELEVATION SCALE SCALE 1:100mts 2 1 5.00 A 5.00 STAGE F 5.33 5.33 EXISTING PERIMETER FENCE SLOPE E PROPOSED COVERED COURT ( PHASE II ) CEMENT FLOOR FINISH C C ( PHASE I ) SLOPE 5.33 ENTRANCE/ GATE D 5.33 D A EXISTING COVERED COURT 16.00 5.33 PERIMETER FENCE PERIMETER FENCE E 16.00 5.33 0.50 1.00 6.00 0.40mm. THK. HI-RIB 1030 PRE-PAINTED ROOFING PANEL EXISTING PERIMETER FENCE B 3 0.40mm. THK STD. RIDGE ROLL STAGE F 2 22.00 0.50 1.00 6.00 1:100mts 1 3 22.00 B 2 B ROOF EAVES LINE EXISTING PERIMETER FENCE A EXISTING PERIMETER FENCE ROOF PLAN FLOOR PLAN SCALE SCALE 1:100mts 1:100mts CADD BY : PROJECT TITLE / LOCATION : REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE DISTRICT ENGINEER PASIG, DAET, CAMARINES NORTE REGION V COMPLETION OF MULTI-PURPOSE BUILDING ( 11.00m x 22.00m ) SHEET CONTENT : · · · · FLOOR PLAN FOUNDATION PLAN FRONT ELEVATION TYPICAL SIDE ELEVATION SIEGFREY M. PANTE, uap RECOMMENDING APPROVAL : APPROVED : SET NO. : SHEET NO. : ARCHITECT I PREPARED/ DESIGNED BY : PDS DONNA JEAN T. LACSON, uap ARCHITECT/ SPECIAL AGENT I CHECKED BY : ELMER CEZAR A. ZALETA, uap BRGY. CATABAGUANGAN, CAPALONGA, CAMARINES NORTE SUBMITTED BY : ARCHITECT II AGNES B. VILLALUZ VICTORIO F. CORPORAL ROMEO D. DOLOIRAS ENGINEER III CHIEF, PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 A 3 2 6
© Copyright 2026 Paperzz