17FC0063 - Plans

REPUBLIC OF THE PHILIPPINES
SUMMARY OF QUANTITIES
ITEM
DESCRIPTION
A.
EARTHWORKS
UNIT
l.s
1.00
803(1) a
STRUCTURE EXCAVATION
cu.m
57.60
804(1) a
EMBANKMENT (FROM STRUCTURE EXCAVATION)
cu.m
44.07
804(4)
GRAVEL FILL FOR COLUMN FOOTING
cu.m
6.38
B.
OFFICE OF THE BUILDING OFFICIAL
QUANTITIES
ARCHITECTURAL
AS-PLAN
REMOVAL OF EXISTING STRUCTURE
801(1)
1
A 3
1 6
CONCRETE WORKS
STRUCTURAL CONCRETE (FOOTING)
cu.m
10.85
902(1)a1
REINFORCING STEEL (COLUMN FOOTING)
kgs
611.33
900(1)b4
STRUCTURAL CONCRETE (COLUMNS)
cu.m
6.11
902(1)a1
REINFORCING STEEL (COLUMNS)
kgs
1,272.20
3
900(1)b6
STRUCTURAL CONCRETE (BEAMS, CB AND LB)
cu.m
8.88
902(1)a1
REINFORCING STEEL (BEAMS, CB AND LB)
kgs
1,314.06
FORMS AND FALSEWORKS
903(1)
FORMS & FALSEWORKS
l.s
MASONRY WORKS
1046(1)
CHB LOAD BEARING (Including Reinforcing steel)
E.
ROOF AND ROOF FRAMING PLAN
sq.m
1
STRUCTURAL STEEL (TRUSSES)
1047(2)c
STRUCTURAL STEEL (PURLINS)
kgs
1,729.62
pcs.
48.00
kgs
189.60
sq.m.
254.60
METAL STRUCTURE ACCESSORIES (SAGRODS)
METAL STRUCTURE ACCESSORIES (CROSS BRACING)
PRE-PAINTED METAL SHEETS
2,996.76
F.
FINISHING WORKS
1027(1)
CEMENT PLASTER FINISH
sq.m.
365.90
1021(1)a
CEMENT FLOOR FINISH
sq.m.
352.00
G.
PAINTING WORKS
1032(1)a1
PAINTING WORKS (MASONRY/ CONCRETE)
H.
PLUMBING WORK
1001(9)
ROOF FRAMING PLAN
TYPICAL SIDE ELEVATION
SECTION THRU "A" AND "B"
114.16
1047(2)b
1047(1)a2
LINE AND GRADE
1.00
kgs
1047(4)
A 3
3 6
FLOOR PLAN
FOUNDATION PLAN
ROOF PLAN
STRUCTURAL
D.
1047(3)b
PERSPECTIVE
SITE DEVELOPMENT PLAN
LOCATION PLAN
SUMMARY OF QUANTITIES
2
A 3
2 6
900(1)b2
C.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
TABLE OF CONTENT
STORM DRAINAGE & DOWNSPOUT
I.
SAFETY AND HEALTH PROGRAM
B.7
OCCUPATIONAL SAFETY AND HEALTH PROGRAM
sq.m.
506.02
l.s
1.00
month
2.50
S 3
4 6
GENERAL CONSTRUCTION NOTES
LAND USE AND ZONING
2
S 3
5 6
3
S 3
6 6
DETAIL OF RC BEAM
COLUMN FOOTING DETAILS
STEEL TRUSS DETAILS
STEEL STRUT DETAILS
SPOT DETAILS
TYPICAL TRUSS ANCHORAGE
ARCHITECTURAL
STANDARD
MULTI-PURPOSE MODEL
PERSPECTIVE
(REFER TO DETAILED PLANS)
N
STRUCTURAL
N
W
11.00
W
6.00
TO LABO
5.00
S
E
STAGE
PERIMETER FENCE
S
SANITARY
THIS SITE
PERIMETER FENCE
San Isidro
CAPALONGA
San Roque
Catioan
Camagsaan
Mactang
Dahican
Ubang
16.00
ROAD RIGHT OF WAY
E
ELECTRICAL
Mataque
Calabaca
Itok
Catabaguangan
GATE
Binawangan
Mabini
Alayao
Del Pilar
San Jose
Dolores
Lucbanan
TO CAPALONGA TOWN
PROPER
San Antonio
Villa Belen
MECHANICAL
Magsaysay
Villa Aurora
San Lorenzo
SITE DEVELOPMENT PLAN
LOCATION MAP
SCALE
SCALE
NTS
NTS
CADD BY :
PROJECT TITLE / LOCATION :
SHEET CONTENT :
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
PASIG, DAET, CAMARINES NORTE
REGION V
COMPLETION OF
MULTI-PURPOSE BUILDING
( 11.00m x 22.00m )
·
·
·
·
PERSPECTIVE
SITE DEVELOPMENT PLAN
LOCATION MAP
SUMMARY OF QUANTITIES
SIEGFREY M. PANTE, uap
RECOMMENDING APPROVAL :
APPROVED :
SET NO. :
SHEET NO. :
ARCHITECT I
PREPARED/ DESIGNED BY :
PDS
DONNA JEAN T. LACSON, uap
ARCHITECT/ SPECIAL AGENT I
CHECKED BY :
ELMER CEZAR A. ZALETA, uap
BRGY. CATABAGUANGAN, CAPALONGA, CAMARINES NORTE
SUBMITTED BY :
ARCHITECT II
AGNES B. VILLALUZ
VICTORIO F. CORPORAL
ROMEO D. DOLOIRAS
ENGINEER III
CHIEF, PLANNING & DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
DISTRICT ENGINEER
1
1
A 3
1 6
0.40mm. THK STD. RIDGE ROLL
0.40mm. THK. HI-RIB 1030
PRE-PAINTED ROOFING PANEL
0.40mm. THK STD. RIDGE ROLL
0.40mm. THK. HI-RIB 1030
PRE-PAINTED ROOFING PANEL
B
A
2
1
11.00
5.00
6.00
RCB-1
RCB-2
2.50
APEX OF ROOF TRUSS
2.50
APEX OF ROOF TRUSS
TOP OF RC-BEAM
TOP OF RC-BEAM
7.50
PAINTED FINISH
5.00
5.00
7.50
STEEL TRUSS
(SEE DETAIL)
PAINTED FINISH
BASKETBALL COURT
PROPOSED COVERED COURT
( PHASE - I )
FIN. GRADE LINE
( PHASE II )
FIN. GRADE LINE
FRONT ELEVATION
TYPICAL SIDE ELEVATION
SCALE
SCALE
1:100mts
2
1
5.00
A
5.00
STAGE
F
5.33
5.33
EXISTING PERIMETER FENCE
SLOPE
E
PROPOSED COVERED COURT
( PHASE II )
CEMENT FLOOR FINISH
C
C
( PHASE I )
SLOPE
5.33
ENTRANCE/
GATE
D
5.33
D
A
EXISTING COVERED COURT
16.00
5.33
PERIMETER FENCE
PERIMETER FENCE
E
16.00
5.33
0.50
1.00
6.00
0.40mm. THK. HI-RIB 1030
PRE-PAINTED ROOFING PANEL
EXISTING PERIMETER FENCE
B
3
0.40mm. THK STD. RIDGE ROLL
STAGE
F
2
22.00
0.50
1.00
6.00
1:100mts
1
3
22.00
B
2
B
ROOF EAVES LINE
EXISTING PERIMETER FENCE
A
EXISTING PERIMETER FENCE
ROOF PLAN
FLOOR PLAN
SCALE
SCALE
1:100mts
1:100mts
CADD BY :
PROJECT TITLE / LOCATION :
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE DISTRICT ENGINEER
PASIG, DAET, CAMARINES NORTE
REGION V
COMPLETION OF
MULTI-PURPOSE BUILDING
( 11.00m x 22.00m )
SHEET CONTENT :
·
·
·
·
FLOOR PLAN
FOUNDATION PLAN
FRONT ELEVATION
TYPICAL SIDE ELEVATION
SIEGFREY M. PANTE, uap
RECOMMENDING APPROVAL :
APPROVED :
SET NO. :
SHEET NO. :
ARCHITECT I
PREPARED/ DESIGNED BY :
PDS
DONNA JEAN T. LACSON, uap
ARCHITECT/ SPECIAL AGENT I
CHECKED BY :
ELMER CEZAR A. ZALETA, uap
BRGY. CATABAGUANGAN, CAPALONGA, CAMARINES NORTE
SUBMITTED BY :
ARCHITECT II
AGNES B. VILLALUZ
VICTORIO F. CORPORAL
ROMEO D. DOLOIRAS
ENGINEER III
CHIEF, PLANNING & DESIGN SECTION
ASSISTANT DISTRICT ENGINEER
DISTRICT ENGINEER
1
2
A 3
2 6