Annual Paving Bid Tab A1 HMA – 2” Surface Paving – PG-64-22-9.5mm-7,000 Tons A2 HMA – Milling 7,000 SY/IN A3 HMA Crack Sealing 15,000 Lineal Feet UP1 Cost per square foot in 2” lifts for Hot Mix Asphalt patching UP2 Cost per square yard/inch for Milling of Hot Mix Asphalt UP3 Cost per lineal foot for Hot Mix Asphalt Crack Seal UP4 Cost per ton for Hot Mix Asphalt-Base-Superpave PG 64-2219.0mm UP5 Cost per ton for Hot Mix Asphalt-Surface-Superpave PG 64-229.5mm UP5 Cost per square yard for Hot Mix Asphalt – Thin Lifts and/or Wedge Course UP6 Cost per square foot for installation of Tencate Mirafi PGM-G Paving Grid Fabric Chesapeake George & Lynch, Qty. Allen Myers 7000 $ 87.00 $ 76.00 $ 77.25 10000 4.50 2.00 2.25 15000 1.45 1.00 1.56 9.50 5.00 8.75 4.50 2.00 2.92 1.45 1.25 1.56 115.00 78.00 76.25 87.00 100.00 77.25 125.00 16.00 92.25 1.30 3.50 1.50
© Copyright 2026 Paperzz