Locked Bag 1001, West Pennant Hills NSW 2125 Project Information Line: 1800 997 057 (free call) Email: [email protected] Fact sheet April 2016 www.northconnex.com.au Junction Road compound NorthConnex is a nine kilometre tunnel that will link the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills, removing around 5,000 trucks off Pennant Hills Road daily. The tunnel motorway includes interchanges to the north and south to accommodate connections at either end of the project. When complete in 2019, it will link Sydney’s north to the orbital network and enable travel from Newcastle (M1) to Melbourne without a single set of traffic lights. NorthConnex will also boost the state and national economies by providing more reliable journeys and shorter travel times for the movement of freight. The Junction Road compound was approved as part of the Environment Impact Statement (EIS) for the NorthConnex project. The compound is a temporary facility to support the widening of the M1 Pacific Motorway and will be used to provide site amenities for construction site personnel and also used for the storage of material and equipment. It is expected the compound would be in place for approximately three years and will be removed when construction is complete. After work is complete, the area will be revegetated and rehabilitated in accordance with the project deed. The compound will provide parking for up to 50 light vehicles with staff accessing the compound via Coonanbarra Road and Carrington Road, Wahroonga. Access by heavy vehicles would be required during site establishment and demobilisation; however, heavy vehicle movements are anticipated to be relatively low during construction activities. Fact sheet: Junction Road compound I April 2016 Site compound information Table 1: Site compound information Activity Detail Access to Site Via Coonanbarra Road Vegetation removal 5,200m2 of vegetation, this includes mostly weeds and exotics with small pockets of non-Endangered Ecological Community vegetation (non EEC vegetation) Cockle Creek management Sections of Cockle Creek will need to be pipped and covered to create a safe work and laydown area Site establishment timeframe Up to six months including: tree removal, Cockle Creek work, amenity installation and M1 Motorway access Demobilisation and rehabilitation All amenities removed and creek rectified to its original state and area revegetated and rehabilitated in accordance with the project deed Map of temporary construction compound Figure 1: Graphic layout of Junction Road compound Construction timeline 2015 2016 2017 2018 2019 Site establishment M1 works Figure 3: Summary of key activities and their duration Demobilisation, rehabilitation and landscaping Fact sheet: Junction Road compound I April 2016 KEY Safe Crossing Area Traffic Controller Station Figure 2: Site pedestrian/vehicle movement plan Environmental Management Environmental controls have been put in place to minimise the potential impacts on the local community and environment from construction activity. These controls, summarised below, are outlined in the Construction and Environmental Management Plan (CEMP) and its sub-plans, available on the NorthConnex website. Fact sheet: Junction Road compound I April 2016 Table 2: Outline of control measures being implemented at Junction Road Compound Potential impact Control measures Noise • Construction work on the surface will be limited to standard construction hours of Monday to Friday 7am6pm, Saturdays 8am-1pm , except when approval is granted for working outside these hours . • Any works outside of standard hours will be notified separately to the community • Vehicles will be fitted with non-tonal reversing beepers • Equipment and vehicle engines will be turned off when not in use • Noise generating equipment such as; generators will be located as far away from project site neighbours as possible. • Water carts, sprays, sprinklers and dust curtains will be used to suppress dust when needed Air quality (dust and emissions) • Equipment and vehicle engines will be well maintained and turned off when not in use to minimise emissions • Controls such as wheel washes and shaker grids will be used to minimise dust or mud tracking • Weather conditions will be monitored and construction activities adjusted as necessary to minimise dust generation. Traffic, pedestrian and road safety • Safe pedestrian access around worksites will be maintained and signposted • Traffic control personnel will be stationed at the site entrance at all work operating hours assisting pedestrians across the entrance • Traffic controllers will direct traffic into the site when heavy vehicle movements are taking place. • All hazardous substances will be stored in accordance with the suppliers instructions Storage of hazardous substances • Bund and spill management kits with ability to contain a minimum of 110 per cent of the volume of the largest stored container • Storage areas located away from natural or built drainage lines to minimise the likelihood of pollutants entering any adjacent watercourses in the unlikely event of a spill or leak escaping the bunded area. More questions? NorthConnex Website The NorthConnex project team is committed to working closely with you to inform you of upcoming work over the course of the project and to minimise impact from our construction activities. Visit www.northconnex.com.au to stay in touch with the latest project information including construction progress and activities in your area. http://www.northconnex.com.au/ junction_road_compound.php For further information on NorthConnex please don’t hesitate to contact members of the project team. Phone: 1800 997 057 (24 hours a day) Email: [email protected] Visit the interactive map on the website to view the depth and route of the main alignment tunnels: http://giswebapps. aecomonline.net/northconnex/map_view.html Mail: Locked Bag 1001, West Pennant Hills NSW 2125 Visit: NorthConnex Community Information Centre, 118 Yarrara Road, Pennant Hills, open weekdays from 9am to 5pm. If you require the services of an interpreter, please contact the Translating and Interpreting Service (TIS International) on 131 450 and ask them to call the NorthConnex Project Team on 1800 997 057 - the interpreter will then assist you with the translation. TIS International business hours are 9am to 5pm Monday to Friday. For more information: 1800 997 057 (free call) [email protected] www.northconnex.com.au RMS XX.XXX
© Copyright 2025 Paperzz