6060 Spine Road Boulder, CO 80301 USA USA Europe Worldwide 1 800 255 6964 0161 864 6800 303 444 2009 Display and Display Interface Board Upgrade for Sievers 500 Series TOC Analyzers 1. Purpose: To define the process used to remove and replace the Display and Display Interface Board in Sievers* 500 series TOC Analyzers. 2. Scope: This procedure describes how to remove a first generation display and display interface board and replace them with an upgraded display and display interface board in Sievers 500 Series TOC Analyzers (500RL and 500RLe TOC Analyzers). Note that for the upgraded display to function properly, you also must upgrade the Analyzer’s system board (upgraded system boards have an Ethernet port). 3. Safety: This procedure requires that you gain access to the inside of the Analyzer. To avoid potentially dangerous shock, be sure to power off the Analyzer as described in the procedure. Be sure to follow ESD safety precautions as instructed. 4. Materials: Display and display interface board upgrade kit One long Phillips screwdriver (#2) 1/4 in. open-end wrench Wrist ground strap (disposable unit included in kit) Bag containing four screws. NOTE: You MUST use the enclosed screws to install the replacement board. 5. Procedure: 5.1 If the Analyzer is taking measurements, press the Stop Analysis button. 5.2 (a) Insert a USB flash memory drive into the port labeled USB on the side of the Analyzer. (b) Back up the current Analyzer settings by selecting Maintenance Advanced USB I/O Save System. (a) Maintenance Advanced USB I/O Save System (b) GE Analytical Instruments, Inc. 2012J Page 1 of 9 When finished, remove the USB flash memory drive from the USB port and store it in a safe place. DIN 74775-01 Rev. C Display Board, 500 Upgr 5.3 Turn off power to the Analyzer. Also shut off the circuit breaker for the Analyzer. 5.4 Open the Analyzer’s door by rotating the top latch to the left. 5.5 Put on wrist ground strap and connect it to convenient ground point on analyzer. (example: ground stud on case or door) Inside the door, use a Phillips screwdriver to loosen and remove the five screws. 5.6 GE Analytical Instruments, Inc. 2012J Close and latch the Analyzer door, and then rotate the front panel off of the Analyzer. Page 2 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.7 Using a Phillips screwdriver, loosen and remove the four screws that secure the display bracket to the Analyzer door. 5.8 Disconnect the display board cable from the display interface board and then pull the display bracket away from the Analyzer. 5.9 Place the display bracket on a static-free surface. Using a Phillips screwdriver, disconnect the ground wire from the display. GE Analytical Instruments, Inc. 2012J Page 3 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.10 Turn the display bracket over for access the display interface board. Disconnect the three cables (labeled A, B, and C). To release cable A, rotate the latch up. Using a Phillips screwdriver, disconnect the four screws that secure the display to the bracket (labeled 1-4). Using a Phillips screwdriver, disconnect the four screws that secure the display interface board to the bracket (labeled 58). 5.11 5.12 Remove the new display interface board (left) and display (right) from the packaging. Display Type A Display Type B Verify the display type in the instrument. The kit contains either flat head screws or nonflat head screws. Use flat head screws with Display type A and non-flat heard screws with Display type B. YOU MUST USE THE SCREWS INCLUDED WITH THE KIT. CONTACT GEAI IF SCREWS DO NOT MATCH THE ILLUSTRATION. 5.13 Connect the cable to the display. Note that the display provided in the kit may be one of two configurations. See photo (a) or (b). Note that the cable already may be attached to the display for some configurations. (a) GE Analytical Instruments, Inc. 2012J Page 4 of 9 If you have the configuration shown in photo (a), note that before inserting the cable, the latch must be up. Slide the cable into the connector and then rotate the latch down to secure the cable in place. Refer to photo (c). DIN 74775-01 Rev. C Display Board, 500 Upgr (b) If you have the configuration shown in photo (b), note that before inserting the cable, the latch must be pulled out. Slide the cable into the connector and then push the latch inward to secure the cable. Refer to photo (d). (c) (d) 5.14 Secure the new display interface board to the bracket by tightening the four screws with a Phillips screwdriver. Using a 1/4 in. open-end wrench, remove the ground wire completely from the bracket. The ground wire is not used in the new configuration. 5.15 GE Analytical Instruments, Inc. 2012J Position the display against the bracket and pull the quick connect cable through the passthrough port in the bracket. Page 5 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.16 Secure the display to the bracket by tightening the four new screws supplied in the kit with a Phillips screwdriver. Do not over-tighten the screws. Make sure the cable that connects to the touch panel (J3) does not get pinched or kinked between the display and the bracket. 5.17 (a) Before attaching the cable, you must pull out the tab. (b) Connect the cable to J3 by sliding the cable into position and then pushing in on the tab. (a) (b) 5.18 (a) Note that before attaching the cable, you must raise the tab. The cable slides into place on top of the raised bar. (b) Connect the cable to J1 by sliding the cable into position and then pushing down on the tab. (a) (b) GE Analytical Instruments, Inc. 2012J Page 6 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.19 Connect the quick connector to the display interface board. 5.20 Affix the metal tape so that it makes contact with both the display and the bracket. The tape serves as the new grounding device. (Note: Picture shows a gasket, but replacement displays no longer have this feature.) 5.21 Connect the display board cable to the display interface board. 5.22 Using a Phillips screwdriver, secure the display bracket to the Analyzer by tightening the four screws. If necessary, remove the protective film from the display. GE Analytical Instruments, Inc. 2012J Page 7 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.23 If the analyzer has a clear overlay installed on the plastic front cover, then move on to step 5.23. If not, then install the overlay supplied with the display kit to the inside surface of the front cover. Make sure to align the clear section with the opening in the plastic cover and make sure the mounting surface is dry and clean. 5.24 Rotate the front panel onto the Analyzer and snap the panel into place. 5.25 Inside the door, use a Phillips screwdriver to secure the five screws. Remove wrist ground strap GE Analytical Instruments, Inc. 2012J Page 8 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr 5.26 Close the Analyzer’s door and rotate the top latch into the closed position. 5.27 Restore power to the Analyzer. Note that there may be a pause while the Analyzer acquires an IP address from the network. 5.28 Return the Analyzer to normal operation. *Trademark of General Electric Company; may be registered in one or more countries. GE Analytical Instruments, Inc. 2012J Page 9 of 9 DIN 74775-01 Rev. C Display Board, 500 Upgr
© Copyright 2026 Paperzz