Tilapia __X__ Pangasius ___ Initial (Inicial)__Surveillance (Vigilancia)

Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
ASC Audit Report
Version (Versión) 5 APR (ABRIL)
(Reporte de Auditoría)
Tilapia __X__ Pangasius ___
Initial (Inicial)__Surveillance (Vigilancia) __X__ Recertification(Recertificación)
____
Name client (Nombre del
cliente)
Client number (número del
Cliente)
Name contact person
(Nombre de persona de
contacto)
Address client (Dirección del
cliente)
Telephone, fax, e-mail
(Teléfono, Fax, correo
electrónico)
Certificate code (Código de
certificado)
Date of issue of certificate
(Fecha de emisión del
certificado)
Date and length of audit
(Fecha y duración de la
auditoría)
Name of auditor(s) Nombre
del auditor (res)
Inspected unit (s) Unidades
inspeccionadas
Number and % of members
evaluated
(in case of group
certification) / Número y %
de los miembros evaluados
(en caso de certificación
grupal)
Issued by / Elaborado por
Address / Dirección
Telephone / Teléfono
Fax
Email / Correo electrónico
Website / Portal de internet
Certifier / Certificador
Date / Fecha
C.I. Piscicola Botero S.A./C.I. Piscícola Botero S.A.
842703
Yuli Hernandez
26th Street No. 5W-14 Apartment 217, Neiva, Huila (CALLE 26 No. 5W-14 APTO
217, Neiva, Huila)
(+57) 3143935915; N/A; [email protected]
CUP-C842703-ASC-01-2015
December (Diciembre) 13, 2013
February 24-25, 2016; Two (2) days Farm; One (1) day Chain of
Custody MSC CoC /Febrero 24-25, 2016; Dos (2) días en Finca;
Un (1) día Cadena de Custodia MSC CoC
Jose Renato Recalde /José Renato Recalde
C.I. Piscicola Botero S.A. (PRD 065679)/C.I. Piscícola Botero S.A.
N/A
Control Union Peru SAC / Control Unión Perú SAC
762 Rivera Navarrete Ave., floor 15, San Isidro, Lima Peru /Av.
Rivera Navarrete 762, piso 15, San Isidro, Lima Perú
+ 5117190400
+ 5117190410
[email protected]
www.cuperu.com www.controlunion.com
Midori Kawazo
21-04-2016
Signature / Firma
ASCCRPT.F01(05)
Page (Página) 1 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
1. METHODOLOGY /METODOLOGÍA
Control Union Peru (CUP), a member of the Control Union World Group is an international inspection and certification
body and is accredited by ASI on behalf of the Aquaculture Stewardship Council (ASC) to carry out inspection and
certification according to the ASC farm certification standards.
Control Unión Mundial es un organismo de inspección y certificación y es acreditada por ASI en nombre del Consejo De
Administración de la Acuacultura (ASC) para llevar a cabo inspección y certificación de acuerdo a los estándares de
certificación para fincas ASC.
Audits and certification is carried out in conformity with the procedures as laid down in the Procedure Manual and the
program manual for the auditor and certifier. During the audit the qualified CU auditors use standardized audit forms
to record their findings.
Las auditorías y certificación se lleva a efecto en conformidad con los procedimientos establecidos en el Manual de
Procedimientos y el Manual de Programa para el auditor y certificador. Durante la auditoría los auditores calificados de
CU utilizan formatos de auditorías estandarizados para registrar sus hallazgos.
Based on the information provided by the auditor and by the client, the certifier reviews and evaluates all information
provided and certifies the products when all conditions of the regulations are fulfilled. The result of the evaluation is
documented in Chapter 7. Audit work by the auditor and certification by the certifier are clearly separated activities.
Basado en la información provista por el auditor y por el cliente, el certificador revisa y evalúa toda la información
provista y certifica los productos cuando todas las condiciones de las regulaciones son cumplidas. El resultado de la
evaluación es documentada en el Capítulo 7. El trabajo de auditoría por el auditor y la certificación por el certificador
son actividades claramente separadas.
2. REPORT / REPORTE
This certification report is made in accordance with the ASC Certification and Accreditation requirements, Version 1.0,
Annex C.
Este reporte de certificación es realizado de acuerdo con los requerimientos de certificación y acreditación
ASC versión 1.0, anexo C
2.1 Background of the assessed company and description of the management system/Historia de la
compañía evaluada y la descripción del sistema de administración:
Production method, number and area of units, etc
The Betania dam was built in 1981 is located in the southwestern department of Huila, is filled and maintained by the
waters of the river Magdalena and Yaguara, the dam has an approximate area of 7,400 hectares in the mirror of
water, with temperatures between 21 a 30 degrees Celsius. The local fish species found are Bocachico, Dorada,
Picuda, Sardinata, Capable, and Tilapia Nicuro.
The farm has been in operation since 1987, raises Tilapia
(Oreochromis niloticus) and operates over 2.8 hectares. The nearest town is Hobo-Huila.
La represa de Betania fue construída en 1981 y está localizada al Sur-oeste del Departamento del Huila, es
llenada y mantenida por las aguas del Río Magdalena y Yaguará, la represa tiene un área aproximada de
7,400 hectáreas de espejo de agua, con temperaturas entre 21 a 30 grados Celsius. Las especies de peces
locales encontradas son Bocachico, Dorada, Picuda, Sardinata, Capable, y la Tilapia Nicuro. La finca ha
estado en operación desde 1987, cría Tilapia (Oreochromis niloticus) y opera en 2.8 hectáreas. La ciudad
más cercana es Hobo-Huila.
Fingerlings are purchased from Piscicola Penjamo and self-supply by hatchery installment on earthen ponds, on the
other hand, Master Freight International S.A.S. and Airseatrans S.A. are the companies taking the processed product
from Bogota to Miami, US. Piscicola Penjamo takes fingerlings up to the production facilities located at Betania dam
near Neiva in Department of Huila. Fingerlings are placed into 160 square meters cages where they are left to gain a
weight up to 20 grams over a period of 2 months; next, fish are transferred to a 400 square meter cage where they
reach a weight of 1,000 grams over a 7 months period. The total yearly production at C.I. Piscicola Botero is 2.6 Tons.
Los alevinos son comprados de la Piscícola Pénjamo y auto-abastecidos por una instalación con piscinas
de tierra, por otro lado, Master Freight International S.A.S. y Airseatrans S.A. son las compañías que
llevan el producto procesado desde Bogotá a Miami, US. Piscícola Pénjamo lleva los alevinos hasta las
instalaciones productivas localizadas en la represa de Betania cerca de Neiva en el Departamento del
Huila. Los alevinos son colocados en jaulones flotantes de 160 metros cuadrados donde son mantenidos
hasta ganar un peso mayor a 20 gramos por un período mayor a 2 meses; lo siguiente, los peces son
transferidos a un jaulón de 400 metros cuadrados donde alcanzan un peso de 1,000 gramos por un
período mayor a 7 meses. La producción anual en la C.I. Piscícola Botero es de 2.6 toneladas.
C.I. Piscicola Botero has a ferry and a harvesting truck which can handle up to 3.500 kilos per trip. Live fish is then
delivered to the processing plant where fillets are carved, packed and loaded into a refrigerated truck to maintain the
required temperature so the product can endure the 7 hours trip to the International airport in Bogota where the
product is dispatched by plane.
C.I. Piscícola Botero cuenta con un ferry y un camión para cosecha los cuales transportan más de 3,500
kilos por viaje. Peces vivos son, por lo tanto, repartidos a la sala de proceso donde los filetes son
ASCCRPT.F01(05)
Page (Página) 2 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
procesados, empacados y cargados en un camión refrigerado para mantener la temperatura requerida de
tal forma que el producto pueda perdurar las 7 horas de viaje desde el Aeropuerto Internacional en Bogotá
donde el producto es llevado por avión.
The farm has 30 workers which stay on the farm during their shifts. Transport to/from the farm, as well as meals,
fresh drinking water, bathroom facilities, sleeping quarters are provided by the farm. Wastes are collected on the farm
and brought back to the mainland for proper disposal on a regular basis. Transport for this is managed by the farm.
La finca tiene 30 trabajadores los cuales permanecen en la finca durante sus horarios de trabajo. El
transporte a/desde la finca, así como también la comida, agua fresca, instalaciones sanitarias, cuartos
para dormir son provistos por la finca. Los desperdicios son recolectados en la finca y traídos de retorno a
tierra para un adecuado depósito de forma regular. El transporte para esto es manejado por la finca.
The farm also held BAP certificate.
La finca también ostenta el certificado BAP.
Production capacity of the farm: 4.5T
La capacidad de producción de la finca: 4.5T
2.2 Summary/Sumario
The scope of this audit is: Tilapia (Oreochromis niloticus) , single site.
The applicable standards are: ASC Tilapia standard v 1.0, ASC tilapia audit guide 1.0 and the ASC certification and
accreditation requirements v 1.0.
El alcance de esta auditoría es: Tilapia, único sitio.
Los estándares aplicables son: Estándar de tilapia ASC v 1.0, Guía de auditoría ASC tilapia 1.0 y
Requerimientos de certificación y acreditación ASC v 1.0.
PRINCIPLE 1: OBEY THE LAW AND COMPLY WITH ALL NATIONAL AND LOCAL REGULATIONS PRINCIPIO 1:
OBEDECER LA LEY Y CUMPLIR CON TODAS LAS REGULACIONES NACIONALES Y LOCALES
All regulations related to aquaculture operations were fulfilled as: Payment to CAM and AUNAP water use and property
documents. The company is up to date with taxes obligations and property obligations. The internal labor, health and
safety regulations working according to local laws. All legal compliance was updated for 2016.
Todas las regulaciones relacionadas con las operaciones de acuicultura fueron cumplidas como: Pago al
uso del agua CAM y AUNAP y documentos de propiedad. La empresa se encuentra al corriente de las
obligaciones y deberes impuestos a la propiedad. El Reglamento interno de trabajo, de salud y seguridad
laboral operan según las leyes locales. Todo el cumplimiento legal esta actualizado a 2016.
PRINCIPLE 2: MANAGE THE FARM SITE TO CONSERVE NATURAL HABITAT AND LOCAL BIODIVERSITY
PRINCIPIO 2: MANEJAR LA FINCA PARA CONSERVAR EL HABITAT NATURAL Y BIODIVERSIDAD LOCAL
DDDO average and during audit were below 65%
El promedio y valor de auditoria de DDDO fueron menores a 65%
All water quality values were inside the data set from January to December 2015,
Todos los valores dentro del rango de valores del juego de datos desde Enero a Diciembre del 2015
No evidence of wetlands conversion before or after 1999.
No se evidenció conversión de humedales antes o después de 1999.
PRINCIPLE 3: CONSERVE WATER RESOURCES
PRINCIPIO 3: CONSERVAR RECURSOS ACUÁTICOS.
All information for calculations about phosphorus and nitrogen from feed and fertilizers was available as feed producer
declarations, invoices and consumption records. The phosphorus levels were under maximum values of the standard.
Toda la información para los cálculos acerca del fósforo y nitrógeno de alimentos y fertilizantes estaba
disponible tales como declaraciones de fabricante de balanceados, facturas y registros de consumo. Los
niveles de fósforo están por debajo de los máximos del estándar.
PRINCIPLE 4: CONSERVE SPECIES DIVERSITY AND WILD POPULATIONS
PRINCIPIO 4: CONSERVAR LA DIVERSIDAD DE LAS ESPECIES Y LAS POBLACIONES SILVESTRES
The farm takes the necessary measures to avoid escapes of cultured fish to the receiving water bodies as proper
maintained nets at cages, transportation that don´t allow escapes and sampling of the efficiency of double nets.
Maximum depth of Betania Dam on the sample was 36 mts and the cage depth is 4 meters deep. No evidence of use
of GMOs or lethal predator control.
La finca toma las medidas necesarias para evitar escape de los peces cultivados a las aguas receptoras
tales como redes en los jaulones, transporte que no permite escape de peces y muestreo de la eficiencia
de doble mallas. La profundidad máxima del embalse de Betania en el área de muestreo fue de 36 mts y la
profundidad del jaulón es de 4 m. No evidencia de uso de GMOs o control LETAL de depredadores.
ASCCRPT.F01(05)
Page (Página) 3 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
Principle 5: USE RESOURCES RESPONSIBLY
Principio 5: USE LOS RECURSOS RESPONSABLEMENTE
C.I. Piscicola Botero S.A. feed suppliers are Contegral and Solla. Through declaration letters, they explained that the
source for fishmeal and fish oil is from sustainable sources for the feed used in grow-out and first stages. All
information was available and in compliance.
Los proveedores de alimento balanceado de C.I. Piscicola Botero S.A. son Contegral y Solla. Mediante
cartas de declaración, ellos explicaron que la fuente de harina y aceite de pescado es de fuentes
sustentables para el engorde y la precría. Toda la información estaba completa y en cumplimiento.
PRINCIPLE 6: MANAGE FISH HEALTH AND WELFARE IN AN ENVIRONMENTALLY RESPONSIBLE MANNER
PRINCIPIO 6: MANEJO DE LA SALUD Y BIENESTAR DE LOS PECES DE UNA MANERA RESPONSABLE CON EL
MEDIO AMBIENTE.
There was no evidence of using allowed substances (in origin and destiny countries); however there is a Veterinarian
Health Plan managed by a qualified professional. No treatments have been performed by the veterinarian so far, no
evidence of medicine related to a recorded pathology event. No Antibiotics are used on the farm.
No se evidenció el uso de sustancias permitidas (en países de origen y destino); sin embargo hay un plan
de salud veterinario manejado por un profesional calificado. Ningún tratamiento ha sido realizado por el
veterinario hasta ahora, no hubo evidencia de medicina relacionada con un evento patológico registrado.
Ningún antibiótico es utilizado en la finca.
The mortalities collection and final disposal don´t present risk of spread of pathogens internally or to natural water
bodies. The recovery value is over 65%
La recolección y desecho final de mortalidades no presenta riesgos de propagación de patógenos
internamente o hacia los cuerpos de agua natural. El valor de recobro está por encima del 65%
PRINCIPLE 7: BE SOCIALLY RESPONSIBLE
PRINCIPIO 7: SER SOCIALMENTE RESPONSABLE
This principle was not evaluated on this audit. Este principio no fue evaluado en esta auditoría.
2.3 Decision/Decisión
C.I. Piscicola Botero S.A. is recommended to maintain the current ASC certification for Tilapia farming version 1.0.,
principle seven (7) ´Be socially responsible´ was not assessed on the present surveillance audit. None nonconformities were detected on the present surveillance audit on principles 1-6 of the ASC Tilapia Standard.
C.I. Piscícola Botero S.A. es recomendada para mantener la actual certificación ASC para cultivo de Tilapia
versión 1.0., el principio siete (7) ´Ser socialmente responsable´ no fue evaluado en la presente auditoría
de vigilancia. Ninguna No conformidad fue detectada en la presente auditoria de vigilancia en los
principios 1-6 del estándar ASC para tilapia.
Date of last inspection/Fecha de la última inspección; 3-4 February, 2015 and the certificate was updated on May 20,
2015 and the expiration date; from date of issuance until December 12, 2016
La fecha de la última inspección; 3-4 Febrero, 2015 y el certificado fue actualizado el 20 de Mayo, 2015 y
la fecha de expiración del certificado; desde la fecha de emisión hasta Diciembre 12, 2016.
2.4 Audit background/Antecedentes de la auditoría
Author(s)/Autor (es): Jose Renato Recalde (RR)
Audit dates/Fechas de auditorías: February (Febrero) 24th (24) and (y) 25th (25), 2016
Report finished at/Reporte concluyó el: 28-02-16
Report reviewed at (Reporte se revisó el): 03-04-16
Date of the certification decision/Fecha de la decisión de certificación: 13-12-13
Date of continuing certification decision: 21/04/2016
Persons involved in the audit/Personas envueltas en la auditoría:
Yuli Hernandez: C.I. Piscicola Botero S.A. Chief Executive Officer/Gerente General C.I. Piscícola Botero S.A.
Diana M. Pasos: Tilapia Hatchery Coordinator/Coordinadora de Alevinera
John Edison Castillo: Production Supervisor/Supervisor de la Producción
William Serrato: Harvest coordinator/Coordinador de Pesca
Jhon Alexander Perdomo: Production Manager/Jefe de Producción
Activities audited/Actividades auditadas:
This surveillance audit did not include the social principle seven (7). The production activities audited were: / Esta
auditoría de vigilancia no incluyó la evaluación del principio social siete (7). Las actividades auditadas
fueron:
Feeding / Alimentación
Veterinary treatments / Tratamientos veterinarios
ASCCRPT.F01(05)
Page (Página) 4 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
-
Version (Versión) 5 APR (ABRIL)
Receiving waters reference points water sampling and DO lecture / Muestreo de agua de puntos de referencia
de cuerpo de agua receptor y lecturas de OD.
Harvest / Cosecha (non-compulsory on this surveillance audit) (no obligatorio en esta auditoria de vigilancia)
Minimum distance between the bottom of the cage and the bottom of the receiving waters where the cage is
placed / Mínima distancia entre el fondo del jaulón y el fondo del cuerpo de agua receptor donde el jaulón es
colocado
Predator control / Control de Predadores
Chemicals storage / Almacenamiento de químicos
Stakeholder participation/Participación de las personas directamente influenciadas por la producción:
Neither participation nor comments to this audit / No hubieron ni comentarios ni participación de las personas
directamente influenciadas por la producción para esta auditoría.
Previous Audits (if applicable)/Auditorías previas (si aplica): 3-4 February, 2015 / 3-4 Febrero, 2015
Summary of previous ASC certification audit(s) and conclusion(s), with recommendations or conditions. Sumario de
previas auditorías de certificación y conclusiones, con recomendaciones o condiciones.
Standard item/Item Del standard
Grading/Categoría
2.3.1 DDDO sampling procedures
The sampling times for the DDDO sampling
has not been 1hr prior to sunrise and 2h prior
to sunset. Instead, the samples have been
taken approximately 12h apart and usually
at/just after sunrise and at/just after sunset.
Major/mayor
2.3.1 El procedimiento de muestreo para
DDDO. Las veces para el muestreo de
DDDO no ha sido una hora antes de la
salida del sol y 2 horas antes del ocaso.
En su lugar, las muestras han sido
tomadas aproximadamente 12 horas en
espacio y usualmente en/o justo
después de la salida del sol y en/o justo
después del ocaso.
Additionally, the sampling for DDDO has not
been performed at RWFA (it was performed
at 3 points within the farm, separate from
RWFA).
Adicionalmente, el muestreo para el
DDDO no ha sido realizado en el punto
RWFA (fue realizado en los 3 puntos
dentro de la finca, separado del RWFA).
Additionally, the sampling was done at 1m
depth instead of 0.3m depth.
Adicionalmente, el muestreo fue hecho a
1 metro de profundidad en vez de 0.3 m
de profundidad.
NC
Status/Estado
de la NC
Closed/cerrada
Falling
(Falla)
N/A
Corrective
action/Acción
correctiva
Root Cause: Various
to count;
misunderstanding on
the previous audit and
ignorance on the real
calculation.
Causa Raiz: Son
varias: mal
entendimiento en la
auditoria pasada y
desconocimiento
del calculo real.
Corrective Action: Procedure RPR60 has
been modified and
RPR06 Manual for the
DDDO calculation. –
Procedure has been
modified as follows: it
has been measured
according to the
standard once a
month, on RWFA, 5
AM and 4 PM, at 0.3
m deep
Acciones
correctivas:- Se
modificará el
procedimiento
RPR60 y el manual
RPR06 para el
cálculo del DDDO. El procedimiento
sera asi: Se medira
de acuerdo al
estandar una vez al
mes, en el RWFA, a
las 5 a.m y 4 p.m,
con una
profundidad de 0,3
metros.
Timeframe: First
sampling was
accomplished on
February 28, 2015
Tiempo de
ejecución: La
primera toma fue
ASCCRPT.F01(05)
Page (Página) 5 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
2.4.1c, 2.5.1g Percent error between auditor
and farm values
It was not possible to calculate the percent
error from the farm's calculations because
the farm had not calculated an average for
their data points.
Major/mayor
Version (Versión) 5 APR (ABRIL)
Closed/cerrado
N/A
2.4.1c, 2.5.1g Porcentaje de error entre
los valores del auditor y de la finca.
No fue posible calcular el porcentaje de
error con los cálculos de la finca porque
la finca no ha calculado un promedio
para sus puntos de muestreo.
realizada el 28 de
febrero, 2015.
Root Cause: For
ignorance and
standard
misunderstanding,
farm did not know
average calculation
was necessary.
Causa Raiz: Por
desconocimiento y
mal entendimiento
de la norma, la finca
no sabía que debia
sacar promedios.
Corrective Action:
Information was
passed to the
computer of all
parameters taken as
daily as monthly in
2014. From now on
data have been
supported on
computer.
Acción correctiva:
Se pasó la
información de
mediciones al
computador de
todos los
parámetros que se
tomaron tanto
diariamente como
mensualmente en
2014. De ahora en
adelante se siguen
llevando en el
computador.
Timeframe: 2014
information to obtain
average values, this
information was ready
by March 23 and it
was sent through
email.
2.5.1 (previous year) (año anterior)
Water quality monitoring matrix and methods
Data is available confirming that the required
parameters are measured, however
La matrix de monitoreo de agua y los
métodos para el muestreo se
encontraban disponibles confirmando
que los parámetros requeridos eran
medidos, sin embargo,
- chlorophyll A is still only measured every 3
months by the external lab.
ASCCRPT.F01(05)
Major/mayor
Closed/cerrado
N/A
Tiempo de
ejecución: La
información del
2014 para dar
promedios se tuvo
lista el 23 de marzo
y fue enviado por
correo electrónico.
Root Cause: First,
chlorophyll a was
measured each
trimester due to lack
of proper equipment
to measure and the
external lab was very
expensive. Salinity
was not measured due
to the presumption,
salinity is equalled to
0 on continental
waters
Causa Raiz: Primero
Page (Página) 6 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
-Clorofila A es todavía medida cada 3
meses por un laboratorio externo.
- Salinity has not been measured at all.
-Salinidad no ha sido medido del todo.
- DO has not been recorded also as
%saturation.
-OD no ha sido registrado tampoco como
% saturación.
- turbidity, ammonia, phophates are not
sampled from a 1m column of water
(chlorophyll a sampling was not witnessed)
-Turbidez, amoniaco, fosfatos no son
muestreados a una columna de agua de
1 m (el muestreo de clorofila a no fue
presenciado)
- GPS is not used to verify the sampling
locations each time the sampling is
performed. The only method used is visual
alignment with 1-2 points in the surrounding
land.
-GPS no es utilizado para verificar las
localidades de muestreo cada vez que el
muestreo es realizado. El único método
utilizado es alineación visual con 1-2
puntos en los alrededores.
All other parameters are measured at the
correct frequency.
Todos los demás parámetros son
medidos a la frecuencia correcta.
Additionally, monthly data are not analyzed
so it is difficult to extrapolate the normal
value range.
Adicionalmente, el muestreo mensual no
es analizado de tal forma que es difícil
extrapolar los valores en el rango
normal.
Version (Versión) 5 APR (ABRIL)
la clorofila a se
media
trimestralmente por
que no se contaba
con el equipo para
medirlo y el
laboratorio externo
era muy costoso. La
salinidad no se
media porque se
deducía que era 0
en aguas
continentales.
Corrective Action:
- GPS coordinates
were calculated once
more and the exact
place was marked
with buoys in order
not to make mistakes
on the measurements
Acción correctiva:
- Se calcularon
nuevamente las
coordenadas con el
GPS y se marcó el
sitio exacto con
bollas para que no
haya posibilidad de
error en las tomas.
- Chlorophyll a is
measured monthly
with the support of an
external lab.
- La clorofila a se
mide mensual con
la ayuda de un
laboratorio externo.
- An equipment to
measure salinity was
purchased.
-Se compró un
equipo para medir
la salinidad.
- An additional column
was added on the
measurements file to
calculate percentage
of saturation.
- Se adicionó una
columna en el
archivo de
mediciones para
calcular el
porcentaje de
saturación.
- Measurement format
called ´physicalchemical parameters
sampling´was
modified to calculate
monthly values in
order to be able to
compare with the
standard parameters.
ASCCRPT.F01(05)
Page (Página) 7 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
-El formato de
medición llamado
"Toma de
Parámetros Físico
Químicos" se
modificará para
calcular los valores
mensuales para
poderlos comparar
con los parametros
de la norma.
Timeframe:
All information was
set by March 30,
2015.
2.6.1 (previous year) (año previo) Wetlands
prior to 1999
The only map available was for post-1999,
the map for pre-1999 was not available.
Major/mayor
Closed/cerrado
N/A
Humedales previo a 1999. El único mapa
disponible era posterior a 1999, el mapa
previo no se encontraba disponible
Tiempo de
ejecución: Toda la
información quedó
lista el 30 de Marzo.
Root Cause: a map
from Google was
printed out to see
surrounding areas to
the dam and in such
way to be able to
verify no wetlands
were around.
Causa Raiz: Se
imprimio un mapa
en google para ver
las areas aledañas a
la represa y así
verificar que no
habian humedales.
Corrective Action:
Huila map was found
with all the available
wetlands and it was
identified Betania dam
on the map to verify
the nearest wetland
around.
Acción correctiva:
Se buscó el mapa
del Huila con todos
sus humedales y se
identificó la
Represa de Betania
en el mapa para
verificar los
humedales más
cercanos.
Timeframe: 30 de
marzo.
3.1.1e, 3.1.2d, 3.1.3e, 3.1.4d
N&P inputs and output calculations
N&P input calculations were not completed
prior to the audit. It is recommended that
the client use the calculations template
provided by previous certifier.
Cálculos y resultados de los valores de
N&P. Los cálculos de N&P no fueron
completados previo a la auditoría. Se
ASCCRPT.F01(05)
Minor/menor
Closed/cerrado
N/A
Tiempo de
ejecución: March
30, 2015
Root Cause:
Calculations were
performed according
to recommendations
from previous audits.
Causa Raiz:
Se estaba
calculando como la
auditoria anterior
habia definido.
Page (Página) 8 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
recomendó que el cliente use el formato
de cálculos provistos por el previo
certificador.
Corrective Action:
Information was
entered to ASC
template as it has
been doing and the
information was
entered to the
template the
consolidated
information to make
monthly calculations
of nitrogen and
phosphorus.
Acción correctiva:
Se ingresó toda la
información a la
plantilla de ASC
como se venía
haciendo y se
ingresó a la plantilla
la información
consolidada para
hacer los cálculos
mensuales de
nitrógeno y fósforo.
Timeframe:
It was started
calculations since
February 28, 2015
Tiempo de
ejecución
Se inició el cálculo
el 28 de febrero,
2015.
5.1.1d FFER values
FFERm is not compliant:
FFERm= 2.01, FFERo=0.599
Valores FFER, FFERm no cumplían:
FFERm= 2.01; FFERo=0.599
Minor/menor
Closed/cerrada
N/A
Root Cause:
Conversions are very
variable due to
various aspects
difficult to control.
Causa Raiz: Las
conversiones son
muy variables por
varios aspectos
deficiles de
controlar.
Corrective Action: All information
regarding to
calculations was again
verified corresponding
to 2014 values for
FFER, in order to
discard any mistake.
Acción correctiva:
Se volvió a verificar
toda la información
del cálculo del 2014
para FFER, para
descartar un error.
Timeframe:
Implemented March
30, 2015.
Tiempo de
ejecución:
ASCCRPT.F01(05)
Page (Página) 9 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
5.1.2c CITES information
CITES information was not available for
either feed supplier
Minor/menor
Version (Versión) 5 APR (ABRIL)
Closed/cerrado
N/A
Implementado
Marzo 30, 2015
Root Cause:
This information was
searched for in other
website
www.iucnredlist.org
Información CITES. La información
CITES no se encontraba disponible para
cualquier proveedor de concentrado.
Causa Raiz:
Esta información se
había buscado en
otra página
www.iucnredlist.org
Corrective Action:
According to the
information from feed
suppliers, the
information was found
in CITES to crossed
check species are not
in extinction.
Acción correctiva:
De acuerdo con la
información de los
certificados de los
proveedores de
alimento se buscó
en CITES para
corroborar que la
especie no esté en
vía de extinción.
Timeframe: 30 abril,
2015
5.1.3 Sustainability policy
Sustainability policy, letter of intent and
communication was not available.
Minor/menor
Closed/cerrada
N/A
Política de sostenibilidad. La política de
sostenibilidad, la carta de intención y la
comunicación no se encontraba
disponible.
Tiempo de
ejecución: April 30,
2015
Root Cause: Due to
ignorance to feed
suppliers, letters were
not sent to feed
suppliers
Causa Raiz:
Por
desconocimiento no
se envió la carta a
los proveedores.
Corrective Action:
Letters were sent to
feed suppliers in order
to have an evidence.
Acción correctiva:
Cartas fueron
enviadas a los
proveedores de
alimento para que
quede soportado.
Timeframe: March 30,
2015
5.1.4ª Fish Source Scores
Fish source scores were available for
Contegral but not for Solla.
ASCCRPT.F01(05)
Minor/menor
Closed/cerrada
N/A
Tiempo de
ejecución: 30
Marzo, 2015
Root Cause: For
SOLLA was very
difficult to deliver the
Page (Página) 10 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
whole certification.
Puntajes de Fuente de pescado. Los puntajes
de Fuente de pescado se encontraban
disponibles para Contegral pero no para
SOLLA.
Causa Raiz: Para
solla fue muy difícil
entregar la
certificación
completa.
Corrective Action: It
was requested to
SOLLA to finish the
certification related to
FISh source scores.
Acción correctiva:
Se le pidió a SOLLA
que complemente la
certificación
solicitada en el
puntaje de fuente
de pescado.
Timeframe: April 30,
2015
5.1.4b&c Verification of Fish source scores
The fish source scores for Contegral could not
be verified for all species listed because the
information about the species and location
was not precise. The scores for Solla could
not be verified because they were not
supplied.
Minor/menor
Closed/cerrada
N/A
Tiempo de
ejecución: 30 abril,
2015
Root Cause: Due to
CONTEGRAL ignorance
about the information
to be delivered on the
certification.
Causa Raiz:
Por desconocimento
de Contegral en que
informacion debia
entregar en la
certificacion.
Verificación de puntajes de fuentes de
pescado. El puntaje de Fuente de
pescado para CONTEGRAL no pudo ser
verificado para todas las especies
enlistadas porque la información acerca
de las especies y la localidad no eran
precisas. Los puntajes para SOLLA no
pudieron ser verificadas porque no
fueron entregadas.
Corrective Action: It
was asked to
CONTEGRAL to
complete the
certification
particularly about Fish
Source scores.
Acción correctiva:
Se le pidió a
Contegral que
complemente la
certificación
solicitada en el Fish
Source Scores.
Timeframe:April 30,
2015
Tiempo de
ejecución: 30 abril,
2015.
5.3.1
Energy Budget Worksheet
The Energy Budget worksheet was available,
however it only included the energy based
on invoices from the electrical company (no
other types of energy were included).
El presupuesto para el uso de energía. El
ASCCRPT.F01(05)
Major/mayor
Closed/cerrada
N/A
Root Cause: There
was lack of
knowledge; farm had
to calculate quantities
of fuel used by the
operations.
Causa Raiz: No se
Page (Página) 11 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
presupuesto del uso de energía se
encontraba disponible, sin embargo solo
incluía la energía basada en las facturas
de la compañía de electricidad (no otros
tipos de energía fueron incluídas)
conocía que
también se debía
calcular la cantidad
de combustible
usado en la granja.
Additionally, there were several months
where the electrical company sent invoices
indicating 0 use because they had
overcharged the previous month. Thus it is
difficult to verify the completeness of the
data.
Corrective Action:
From now on; fuel
calculations have been
performed on the
template ´Energy in
joules´
Adicionalmente, hubieron varios meses
donde la compañía Eléctrica envió
facturas indicando 0 utilización porque
tuvieron una sobre carga el mes previo.
Así fue difícil verificar lo completo de la
información.
Acción correctiva:
De ahora en
adelante se ha
calculado el
consumo de
combustible en el
formato " Energía
en Julios"
Timeframe:Starting
from February 5, 2015
to today.
Tiempo de
ejecución: Desde el
5 de feb en
adelante.
6.1.1 Percent Recovery
The average percent recovery was 62%,
which is just below the requirement.
Porcentaje de recuperación. El
porcentaje de recuperación fue del 62%,
lo cual se encuentra justo abajo del
requerimiento.
Minor/menor
Closed/cerrada
N/A
Root Cause: On the
farm, there was a
problema on the
stocking because
fingerlings used to be
received and these
were not counted
physically.
Causa Raiz: En la
granja teniamos un
problema en las
siembras por que se
recibian los alevinos
y no se contaban
fisicamente.
Corrective Action:
Starting from
November 2014 any
fingerlings lot arriving
the farm are counted
in order for the
recovery calculation to
be more realistic.
Acción correctiva: A
partir de noviembre
del 2014 cada lote
de alevinos que
llega a la granja se
cuentan y así es
más verídico el
cálculo de la
recuperación.
Timeframe: March 30,
2015
Tiempo de
ejecución
30 de marzo.
ASCCRPT.F01(05)
Page (Página) 12 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
Other activities/Otras actividades:
Audit plan was submitted one (1) week prior to the audit to the client, no comments were received on the plan and the
organization of the audit was accomplished according to arrangements agreed with the client. Additionally, during the
audit, the auditor witnessed a harvesting process (non-compulsory for this surveillance audit); this process do not
imply escapes risk, tank truck container is both sealed and not opened until this one reaches processing factory.
El plan de auditoria fue entregado una (1) semana previa a la auditoría al cliente, no hubieron comentarios del plan y
la organización de la auditoría fue cumplida conforme a los arreglos acordados con el cliente. Adicionalmente, durante
la auditoría, el auditor presenció un proceso de cosecha (no obligatorio para esta auditoría de vigilancia); este proceso
no implica riesgos de escapes, el camión tanque es sellado y no abierto hasta que llegue a la planta de proceso.
2.5 Scope/Alcance
ASC standard version/Versión ASC estándar: ASC Tilapia standard v 1.0, ASC Tilapia audit guide v
1.0./Estándar ASC tilapia v 1.0, Guía de auditoría de la ASC tilapia V 1.0.
Species/Especies: Oreochromis niloticus and hybrids/Oreochromis niloticus e híbridos.
Singles site certification/certificacion en sitio unico
Scope of audit/Alcance de la Auditoría: Units and locations included in the audit with geographical
coordinates/Unidades y locaciones incluídas en la auditoría con las coordenadas geográficas
Production Unit
name/Nombre de la
Unidad Productiva
Production Unit number
(assigned by
CUSI)/Número de la
Unidad de Producción
(Asignado por CUSI)
C.I Piscicola Botero
S.A.
PRD 065679
Address and
geographical
positions/Dirección y
posiciones
geográficas
Ensenada Piedras
Gordas, Represa
Betania, Municipio de
Hobo, Vereda Vilaco
847806E-78298N;
847774E-782766N;
847832E-782954N;
847733E-782819N;
847923E-782968N;
847747E-782887N;
847964E - 782916N;
847721E -782920N
Receiving
water/Cuerpo de agua
receptor
Betania Dam/Represa
de Betania
Receiving water/Cuerpo de agua receptor: The receiving water body is fresh water from the Betania Dam that
has 36 m depth. C.I. Piscicola Botero S.A. discharges directly to Betania Dam.
Los cuerpos de agua receptores es agua dulce de la represa de Betania que tiene 36 m de profundidad. C.I.
Piscícola Botero S.A. descarga directamente a la represa de Betania.
The selections of the RWRP, RWFO and RWFA are simple: upstream, farm discharge and downstream.
La selección de los puntos RWRP, RWFO y RWFA es simple: aguas arriba, descarga de la finca y aguas
abajo.
2.6 Description of the start of the Chain of Custody/Descripción del inicio de la cadena de custodía.
Tilapia products from C.I. Piscicola Botero SA are eligible to carry the ASC ecolabel; however the processing plant is
not currently using it and it is able to enter into further certified chains of custody.
Los productos de tilapia de C.I. Piscícola Botero S.A. son elegibles de llevar la eco-etiqueta; sin embargo la
sala de proceso no está actualmente utilizándolo y puede entrar en las siguientes cadenas de custodia
certificadas.
Considerations for the decision/Consideraciones para la decisión:
Tracking, tracing and segregation systems within the aquaculture operation / Sistemas de rastreo,
trazabilidad y segregación dentro de la explotación acuícola:
Only certified product will be produced at C.I. Piscicola Botero S.A. and no inputs of non-certified products
from external sources at farm level, the dispatch documents show C.I. Piscicola Botero S.A. as origin.
Solo productos certificados serán producidos en C.I. Piscícola Botero S.A. y no se tienen ingresos
de productos no certificados de Fuentes externas a nivel de finca, los documentos de despacho
muestran a C.I. Piscícola Botero S.A. como origen.
-
Use of transshipment / Uso de trasbordo
Transshipment not practiced, fish is loaded into oxygenated tanks and doors sealed until the arrival to
processing plant.
No se practica trasbordo, los peces son cargados en tanques oxigenados y las puertas selladas
hasta su arribo a la planta de proceso.
ASCCRPT.F01(05)
Page (Página) 13 of (de) 14
Report (Reporte) number (número): 842703-ASCRPT-2016-01-RR
2014
Version (Versión) 5 APR (ABRIL)
-
Eligible operators and point(s) of landing / Operadores elegibles y puntos de desembarque:
Transportation is made by owned that transport the tilapia alive in tanks with numbered seals to only
processing plant (C.I. Piscicola Botero SA)
El transporte se realiza mediante camiones propios que llevan la tilapia viva en tanques con sellos
numerados a una única planta de proceso (C.I. Piscícola Botero SA)
-
Opportunity of substitution of certified with non-certified product within the unit of certification./ Oportunidad
de substitución de producto certificado con producto no certificado dentro de la unidad de certificación
There is not opportunity of substitution, only certified products will be produced by the legal entity and even
there are more tilapia producers in the surroundings all traceability documentation indicates raw material
origin and certification status.
No existe oportunidad de substitución, la entidad legal solo producirá productos certificados y
aunque existen más productores de tilapia en las cercanías toda la documentación de trazabilidad
indica la procedencia de la materia prima y el estado de certificación.
-
Point from which Chain of Custody certification is required./ Punto donde se requiere certificación de cadena
de custodia.
The MSC chain of Custody certification for ASC products is required at the point of download at processing
plant after harvest and transportation.
La certificación MSC cadena de custodia para productos ASC es requerida en el punto de entrega
en la planta de proceso después de la cosecha y transporte.
2.7 Evaluation results/Evaluación de resultados
See audit checklist attached / Ver checklist de auditoría adjunto
2.8 Findings/Hallazgos.
After the review of evidence for settling and action plans for non-confomities, it is recommended that the client can
continue with the ASC certification.
C.I. Piscicola Botero S.A. maintains the ASC certification; not any non-conformities were found on this Surveillance
audit.
C.I. Piscícola Botero S.A. mantiene la certificación ASC; ninguna no conformidad fue encontrada en esta
auditoría de vigilancia.
2.9 Non-conformity report(s)/Reporte de No Conformidades
Not any non-conforming was detected during the inspection. Ninguna No conformidad ha sido detectada durante la
inspección.
2.10 Confidential annexes/Anexos confidenciales
There are no confidential annexes to this audit/ No hay anexos confidenciales a esta auditoría.
ASCCRPT.F01(05)
Page (Página) 14 of (de) 14
ASC audit checklist
ASCASS-TIL.F02(04)
Reportnumber:
1.1 Client contact data
CU number:
Company name:
Contact person:
Address:
Postal code:
City:
Country:
Telephone number:
e-mail:
1.2 Audit information
Date of last external audit:
Audit date:
Full name of the lead auditor:
842703-ASC-2016-01-RR
842703
C.I Piscícola Botero S.A.
Yuli Hernández
Ensenada Piedras Gordas, Represa Betania, Municipio de Hobo, Vereda Vilaco
N/A
Hobo, Huila
Colombia
(+57) 3143935915
[email protected]
23-Feb-15
24-Feb-16
Jose Renato Recalde (RR)
Audit team:
N/A
Type audit:
1.3 Scope of ASC
Announced/Unannounced
Standard Version: ASC Tilapia Standard_v1.0
Specie: Oreochromis niloticus
Scope:
Production units
Production
Company name
units
PRD 065679
Initial/Surveillance/Recertification
C.I Piscicola Botero
S.A.
Address and GPS coordinates
847806E-78298N; 847774E-782766N;
847832E-782954N; 847733E-782819N;
847923E-782968N; 847747E-782887N;
847964E - 782916N; 847721E -782920N
Receiving water body
Province
(Department)
Country
Products
Betania Dam
Huila
Colombia
Oreochromis
niloticus
Changes since last audit Recycling material point
1.4 Other information
Brand name of the company:
Mention other existing certification schemes of licensee:
Lead Auditor: Jose Renato Recalde
C.I Piscícola Botero S.A.
BAP (2 stars)
Company representative: Yuli Hernández
2. ASSESMENT OF ASC TILAPIA STANDARDS
Scope: Species of the Family Cichlidae commonly referred as Tilapia (Oreochromis niloticus, O. mossambica, O. aureus and O. hybrids)
PRINCIPLE 1. OBEY THE LAW AND COMPLY WITH ALL NATIONAL AND LOCAL REGULATIONS
Compliance
1.1 Criteria: Evidence of legal complianceCompliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
1.1.1
a. Maintain copies of applicable land and
Indicator: Presence of
water use laws.
documents proving
compliance with local and
national authorities on land
and water use (e.g., permits,
evidence of lease,
concessions and rights to
land and/or water use)
b. Maintain original lease agreements or
land titles on file.
Requirement: Yes
Applicability: All Farms,
Farm-Wide
c. Keep records of inspections for
compliance with national and local laws
and regulations (only if such inspections
are legally required in the country of
operation).
d. Obtain permits and maps showing that
farm does not conflict with national
preservation areas
a. Keep records of tax payments.
Indicator: Presence of
documents proving
compliance with all tax laws
1.1.2
Requirement: Yes
Applicability: All Farms,
Farm-Wide
A. Review compliance with applicable land
x
and water use laws.
B. Confirm client holds original lease
agreements or land titles.
x
C. Review inspection records for
compliance with national and local laws
and regulations (as applicable).
x
D. Verify facility does not conflict with
national preservation areas.
x
A. Verify client has records of tax payments
x
to appropriate jurisdiction(s).
Finding
codes of documents that proving: Memorandum, Fishery and Aquaculture legislation order for Betania Dam Law 13,
1990; General fishery clauses , agreement 030 2005 Law 1152 May 2007; Resolution 2438 September 18, 2009
superficial water concession (only one time, no expiration date); Resolution 2439 September 18, 2009, it is granted a
transfer for occupation of water stream; Resolution 1947-0 September 8, 2008 permission of water stream occupation;
Procedure to modify Aqua culture permission December 06, 2011; resolution 003506 September 22 2009, it is granted
Aquaculture Permisssion for Red Hybrid Tilapia and Silver Tilapia to Sociedad Piscicola Notero S.A.; Resolution ICA
004121 October 30, 2009 Registration to Sociedad Piscicola Botero S.A. as fish producer for human consumption to
exportation.
Issue and expire date: issue July 22, 2010 (Land titles)
lease agreements/land titles code: Public Notary document number 1804
holding time: Not applicable for land titles, document with no expiration date.
inspection record code: April 24, 2015 ICA (Colombian Agricultural Institute) ; July 06, 2015 AUNAP (National Authority
of Aquaculture and Fisheries ; July 1, 2015 AUNAP, November 27, 2015 AUNAP inspection; December 11, 2015
inspection date:April 24, 2015; July 06, 2015 July 1, 2015 ; November 27, 2015, December 11, 2015.
entity that conducted the inspection: ICA and AUNAP
Is there extist any confict?No, Hydrographic Betania Map; this only shows Betania Dam premises.
codes of documents that proving:c. No codes only hydrographic map provided by ICA.
tax payments code: tax for repopulation AUNAP (National Authority of Aquaculture and Fisheries) payment fulfilled at
Agrarian Bank of Colombia, operational code 185744689, December 29, 2015; trimester payment to CAM as
contribution for cultivation permit of Piscicola Botero S.A. last payment December 29, 2015 (Independent Regional
Corporation of the Upper Magdalena River) receipt number 30202; payment total suspended solids and BOD Quotas to
CAM invoice number 003623 December 24, 2015; Contribution to CAM, deposit to savings account number
07673582634, beneficiary document number 800255580; payment per semester to CAM for Betania Dam occupation
(period April to June 2015) invoice number 226662; Payment total suspended solids and BOD quotas to CAM invoice
number 003470 August 18, 2015; Revenues declaration to DIAN form 110, document number 1110603389907 year
2014, declaration 2015 due date is not up; Payment to CAM for use of water well (only for domestic use) invoice number
212118 period July - September 2014 paid on February 05, 2015; Payment to CAM Betania dam occupation invoice
number 222938; Water well concession payment to CAM April 17, 2015 copy of receipt.
record date: December 29, 2015, December 24, 2015, August 18, 2015, February 05, 2015, April 17, 2015.
1.1.2
Indicator: Presence of
documents proving
compliance with all tax laws b. Maintain copies of tax laws for
jurisdiction(s) where company operates.
Requirement: Yes
B. Confirm client has a basic knowledge of
tax requirements for farm.
x
Applicability: All Farms,
Farm-Wide
c. Register with national or local
authorities as an “aquaculture activity".
Indicator: Presence of
documents proving
compliance with all labor
laws and regulations
1.1.3
Requirement: Yes
Applicability: All Farms,
Farm-Wide
1.1.4
a. Maintain copies of national labor codes A. Confirm client has specified
and laws applicable to farm.
documentation.
x
x
b. Keep records of farm inspections for
B. Review inspection records for
compliance with national labor laws and
compliance with national labor laws and
codes (only if such inspections are legally
codes (as applicable).
required in the country of opera)
a. Obtain permits for water quality
Indicator: Presence of
impacts where applicable.
documents proving
compliance with regulations
or permits concerning water
quality impacts
b. Comply with all discharge laws or
regulations.
Requirement: Yes
Applicability: All Farms,
Farm-Wide
C. Verify client is registered with local or
national authorities.
A. Verify that client obtains permits as
applicable.
B. Review evidence of compliance with
discharge laws or regulations.
x
does client have knowledge?: Revenue service tax, land occupation tax, payment for repopulation CAM (annual)
codes of documents that proving: tax for repopulation AUNAP (National Authority of Aquaculture and Fisheries)
payment fulfilled at Agrarian Bank of Colombia, operational code 185744689, December 29, 2015; trimester payment to
CAM as contribution for cultivation permit of Piscicola Botero S.A. last payment December 29, 2015 (Independent
Regional Corporation of the Upper Magdalena River) receipt number 30202; payment total suspended solids and BOD
Quotas to CAM invoice number 003623 December 24, 2015; Contribution to CAM, deposit to savings account number
07673582634, beneficiary document number 800255580; payment per semester to CAM for Betania Dam occupation
(period April to June 2015) invoice number 226662; Payment total suspended solids and BOD quotas to CAM invoice
number 003470 August 18, 2015; Revenues declaration to DIAN form 110, document number 1110603389907 year
2014, declaration 2015 due date is not up; Payment to CAM for use of water well (only for domestic use) invoice number
212118 period July - September 2014 paid on February 05, 2015; Payment to CAM Betania dam occupation invoice
number 222938; Water well concession payment to CAM April 17, 2015 copy of receipt.
Is client registered? resolution 003506 September 22 2009 it is granted Aquaculture Permisssion for Red Hybrid Tilapia
and Silver Tilapia to Sociedad Piscicola Notero S.A.
Code of records related to taxs: tax for repopulation AUNAP (National Authority of Aquaculture and Fisheries) payment
fulfilled at Agrarian Bank of Colombia, operational code 185744689, December 29, 2015; trimester payment to CAM as
contribution for cultivation permit of Piscicola Botero S.A. last payment December 29, 2015 (Independent Regional
Corporation of the Upper Magdalena River) receipt number 30202; payment total suspended solids and BOD Quotas to
CAM invoice number 003623 December 24, 2015; Contribution to CAM, deposit to savings account number
07673582634, beneficiary document number 800255580; payment per semester to CAM for Betania Dam occupation
(period April to June 2015) invoice number 226662; Payment total suspended solids and BOD quotas to CAM invoice
number 003470 August 18, 2015; Revenues declaration to DIAN form 110, document number 1110603389907 year
2014, declaration 2015 due date is not up; Payment to CAM for use of water well (only for domestic use) invoice number
212118 period July - September 2014 paid on February 05, 2015; Payment to CAM Betania dam occupation invoice
number 222938; Water well concession payment to CAM April 17, 2015 copy of receipt.
record date: December 29, 2015, December 24, 2015, August 18, 2015, February 05, 2015, April 17, 2015.
Code of records related to all labor laws and regulations: Internal Regulaion at Piscícola Botero S.A., it is mentioned
labor codes applicable to the exploitation.
record date: February 2, 2009 (date of Internal regulations for Piscicola Botero S.A. submission)
Was there a inpection related to labor laws?: According to record of visit no inspections so far; legal representative
explained, there is only visits from Ministry of Labor Affairs when there is a complaint from the workers.
entity that conducted the inspection: N/A
code of inspection records: N/A
inspection date: N/A
does client have permits?: Resolution 2439 September 18, 2009 it is granted a transfering of occupation of water stream
permission ; Resolution 1947-0 September 8, 2008 permission of water stream occupation
codes of documents that proving:Resolution 2439; Resolution 1947
entity related: CAM (Upper stream Magdalena Comission
Law regulation number:No discharge laws applicable to the exploitation, no discharge on the production, tilapia cages
on a water dam. Only law applicable to them; Water stream occupation.
Is in compliance?: Yes, C.I. Piscicola Botero S.A. is in compliance according to Water Stream occupation permission.
1.1.4
documents proving
compliance with regulations
or permits concerning water
quality impacts
Requirement: Yes
Does client have any water analysis record?:Yes, Lab results Construcsuelos Suministros Ltda,
Record code: Lab result number M1468 ; M1469
record date:January 18, 2016; January 17, 2016
x
entity that performs the analysis: Lab results Construcsuelos Suministros Ltda, accredited by IDEAM (Institute of
Hydrology, Metereology and Environmental Studies.
PRINCIPLE 2. MANAGE THE FARM SITE TO CONSERVE NATURAL HABITAT AND LOCAL BIODIVERSITY
Compliance Finding
2.1 Criteria: Site information
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Was the "receiving Water Information Checklist" used before the onsite audit?: yes , evidence on-site inspection the
water monitoring daily plan ; it is registered; Dissolved oxygen, pH, temperature, Secchi Disk
Indicator: Site location,
a. Complete the Receiving Water
A. Do not schedule on-site audit of client
use date of checklist: January to December 2015
history and stewardship
Information Checklist in Audit Reference 2
x
until checklist review is complete.
activities matrix located in (Table 1 in Appendix 1 of the Standard).
Appendix 1, Table 1 is
completed and validated
What documents were sent to CB?: water monitoring daily plan
B. Review client submission for
2.1.1
Sending date: January 2016
b. Submit checklist and attachments to CB completeness, accuracy, and currency of
x
Requirement: Yes
before the on-site audit.
information. Request clarification if
needed.
Applicability: All Farms,
sources of confirmation: Excel worksheet
C. Verify client information by crossFarm-Wide
checking with independent sources (e.g.
x
local authorities).
2.2 Criteria: Presence of natural or established
Compliance
tilapiaCriteria
species(Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Finding
tilapia cultured is established and naturally reproducing in the receiving waters of the operation on or before 1 January
2008?: Fishery and Aquaculture Organization Plan on Betania Dam (Plan de Ordenamiento de la Pesca y la Acuacultura
a. Collect documentary evidence that
A. Review evidence for compliance with the
en el Embalse de Betania)
cultured species was established in
Requirement.
Acceptable documentary
sources of confirmation:Fishery and Aquaculture Organization Plan on Betania Dam (Plan de Ordenamiento de la Pesca
receiving waters on or before 1 January
evidence: peer-reviewed literature;
y la Acuacultura en el Embalse de Betania) 2005; On the organization plan it is cited by Cala (1992); Cala & Bernal (1997)
2008, or
verifiable Environmental Impact
Indicator: Demonstration
and Macelan and Cala (1997) recognized species presented on Betania Dam such as Silver Tilapia ( Oreochromis
Collect first hand accounts showing
Assessment; and government certification.
x
that the tilapia species
niloticus)
evidence for natural reproduction of
Acceptable first hand accounts: community
cultured is established[1]
tilapia species in receiving waters on or
testimonials and direct evidence for
and naturally reproducing in
before 1 January 2008.
multiple size classes of tilapia species in
the receiving waters[2], of
Submit evidence with checklist (Audit
receiving waters captured with cast nets,
the operation on or before 1
Reference 2).
trapping devices or fishing.
January 2008[3]
2.2.1
Common water body at Betania Dam; not particular water receiving body.
Requirement: Yes
b. If system does not have receiving
B. If system does not have receiving waters
waters according as defined in this
according as defined in this requirement,
Applicability: All farm
requirement [2] then the requirements of Auditor response to 2.2.2 is “not
locations outside Africa (see Indicator 2.2.1 are not applicable.
applicable” (NA).
2.2.2), Farm-Wide
Is water discarged into municipal water? Not any water discharge from production systems to municipal waters.
C. If water is discharged into municipal
what are the devices/mechanism used to eradicate/eliminate macro-biological organisms such as fish:
c. If water is discharged into municipal
water systems, show that there is a
water systems, show that there is a
mechanism for treating effluent to
mechanism for treating effluent to
eradicate/eliminate macro-biological
eradicate/eliminate macro-biological
organisms such as fish. Review evidence to
organisms such as fish.
confirm compliance.
Applicability: All Farms,
Farm-Wide
c. Maintain records of monitoring and
compliance with discharge laws and
regulations as required
C. Verify that records show compliance
with discharge laws and regulations.
[1] “A non-indigenous species is considered established if it has a reproducing population within the basin, as inferred from multiple discoveries of adult and juvenile life stages over at least two consecutive years. Given that successful establishment may
require multiple introductions, species are excluded if their records of discoveries are based on only one or a few non-reproducing individuals whose occurrence may reflect merely transient species or unsuccessful invasions.” (National Oceanic and
[2] “Receiving water” is defined as all distinct bodies of water that receive runoff or waste discharges, such as streams, rivers, ponds, lakes and estuaries (adapted from World Health Organization). This does not include farm-constructed water courses,
Footnote
impoundments or treatment facilities.
Footnote
Footnote [3] Where there are no-discharge systems, or no discharge to receiving waters, requirements 2.2.1 and 2.2.2 are not applicable.
2.2.2
a. Collect documentary evidence that
cultured species and strain was present in
receiving waters on or before 1 January
2008 or
Collect first hand accounts showing
Indicator: In Africa,
evidence for natural reproduction of
demonstration that the
tilapia species and strain in receiving
tilapia species and strain
cultured is established and waters on or before 1 January 2008.
naturally reproducing in the Submit evidence with checklist (Audit
Reference 2)
receiving waters of the
operation or before 1
January 2008
b. If system does not have receiving
waters as defined in this Requirement
Requirement: Yes
[2]then the requirements of Indicator
2.2.2 are not applicable.
Applicability: Farms located
in Africa only (see 2.2.1),
Farm-Wide
c. If water is discharged into municipal
water systems, show that there is a
mechanism for treating effluent to
eradicate/eliminate macro-biological
organisms such as fish.
A. Review evidence for compliance with the
Requirement.
Acceptable documentary
evidence: peer-reviewed literature;
verifiable Environmental Impact
Assessment; and government certification.
Acceptable first hand accounts: community
testimonials and direct evidence for
multiple size classes of tilapia species in
receiving waters captured with cast nets,
trapping devices or fishing
Production system located at Betania Dam, Colombia.
B. If system does not have receiving waters
according as defined in this requirement,
Auditor response to 2.2.2 is “not
applicable” (NA).
Production system located at Betania Dam, Colombia.
C. If water is discharged into municipal
water systems, show that there is a
mechanism for treating effluent to
eradicate/eliminate macro-biological
organisms such as fish. Review evidence to
confirm compliance.
Production system located at Betania Dam, Colombia.
2.3 Criteria: The effects of eutrophication
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
Instruction to Clients for Indicator 2.3.1 - Diurnal Difference in Dissolved Oxygen (DDDO)
a. Collect ≥12 months of DDDO samples if
farm was built after December 2009
A. Do not schedule on-site audit until client
x
(farms built before December 2009 need provides baseline DDDO data.
only 6 months of data).
2.3.1
Indicator: The percent
change in diurnal dissolved
oxygen of receiving waters
relative to dissolved oxygen
at saturation for the water’s
specific salinity and
temperature
Requirement: ≤ 65%
Applicability: All Farms,
Farm-Wide
No
Finding
Has client provided DDDO data before the audit?: yes, excel worksheet available during the audit
How old are this data: Starting February 28, 2015 and final water registry December 30, 2015
b. Calibrate all equipment at the
frequency and by the method
recommended by the manufacturer.
Calibrate daily if there is no
manufacturer's recommendation
Date of the last calibrate: February 24, 2016
method and frecuency: Oxyguard Polaris 2 (self calibration on screen showed the moment of calibration or when the
probe needs to be changed. pHmeter calibrated using pattern solution.
responsible for calibration: Alexander Perdomo (Production Manager)
B. Verify that client calibrates equipment as
x
required.
c. Adjust DO at saturation to reflect
temperature, salinity and altitude during
calibration or in calculations (see Audit
Reference 6).
C. Verify that client adjusts for
temperature, salinity and altitude through
calibration or in calculations (Audit
Reference 6).
No necessity of temperature, salinity and altitude adjustment
d. Calculate DDDO using equation 1 (Audit
Reference 6) and oxygen saturation
values (Audit Reference 5). Enter DDDO
values into Water Quality Monitoring
Matrix (Audit Reference 4).
D. Review Water Quality Monitoring
Matrix. Verify that all DDDO measurements
x
from the receiving water comply with the
Requirement.
DDDO value was calculated?: yes, February 28, 2015, 17.88; March 31, 2015, 7.21; April 28, 2015, 2.40; May 26, 2015;
39.03, June 26, 2015; 18.33; July 28, 2015, 8.64; August 29, 2015, 14.99; September 30, 2015, 24.89; October 29, 2015,
23.50; November 30, 2015; 10.61; December 30, 2015; 6.40
DDDO values: February 28, 2015, 17.88; March 31, 2015, 7.21; April 28, 2015, 2.40; May 26, 2015; 39.03, June 26, 2015;
18.33; July 28, 2015, 8.64; August 29, 2015, 14.99; September 30, 2015, 24.89; October 29, 2015, 23.50; November 30,
2015; 10.61; December 30, 2015; 6.40
Requirement: ≤ 65%
Applicability: All Farms,
Farm-Wide
e. Calculate average annual DDDO for the
prior 12-month period. Enter result into E. Review monitoring matrix and confirm
Water Quality Monitoring Matrix (Audit that mean annual DDDO ≤ 65 %.
Reference 4).
f. Arrange to take DO measurements
while the auditor is at the farm
x
F. Witness client measuring DO. On-site
values should fall within range of farm data
x
for DDDO. If an out of range measurement
is observed, raise a non-conformity.
2.4 Criteria: Water quality in oligotrophicCompliance
receiving waters
Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Instruction to Clients for Indicator 2.4.1 - Upper Limit of Secchi Disk Visibility (SD)
a. Collect ≥12 months of SD readings at
RWFA station (for first audits, farm must
have ≥ 6 months of data). Enter SD values
into Water Quality Monitoring Matrix
(Audit Reference 4).
Indicator: Secchi disk
visibility[4] limit above
which production is not
certifiable
2.4.1
Is the DDDO calculated less than 65%?: Yes, Average; 15.81
A. Review matrix to verify that average
annual SD < 10 m. If average annual SD
equals or exceeds 10 m, production is not
certifiable.
all values are whitin range?:Yes, result withiin range.
Yes
x
b. Arrange to take SD measurements at
B. Witness client measuring SD. Repeat the
RWFA during the audit of the farm. The
SD measurement yourself at the same time x
auditor will witness and replicate your SD
and location. Record both sets of values.
measurements.
No
Finding
Is the avarege anual or semiannual less than 10m? Yes, at RWFA (average value starting from February 28 2015 up to
December 30 2015, sample once every month) 64.55 cm (0.65 m)
Average anual or semiannual: Annual average at RWFA; 64.55 cm (0.65 m)
value by client: At RWFA; time, 04:02 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m
value by auditor: At RWFA; time, 04:05 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m
Requirement: 10 meters
Applicability: All Farms,
Farm-Wide
-
C. Calculate percent error of farm data
using Equation 2 (Audit Reference 6). If <
5% difference is observed between auditor
and farm min and max SD readings, then
accept the annual average from farm data.
If > 5% difference is observed between
auditor and farm min and max SD readings,
then raise a non-conformity (see Audit
Reference 3).
Percent error between auditor and farm lectures: Not applicable, both values, either Client´s or auditor´s were the same
Anual average: Annual average at RWFA; 64.55 cm (0.65 m)
Min value: Minimum value at RWFA 30 cm (0.30 m) detected on June 26/2015, July 28/2015 and December 30, 2015
Max value: Maximum value at RWFA 1.20 m (detected on October 29, 2015)
Annual average accepted: Yes, Annual average at RWFA; 64.55 cm (0.65 m). Data obtained from client´s worksheet and
cross checked on physical registries (Physical-chemical parameters monthly sample)
Instruction to Clients for Indicator 2.4.2 - Decision about Oligotrophy using SD
2.4.2
a. If auditor measurement shows SD > 5.0
Indicator: Compliance with m and annual mean SD < 5.0 m, then (see
next column -->)
standards 2.4.3. & 2.4.4.
when Secchi disk visibility[4]
b. If auditor measurement shows SD > 5.0
≤ 5.0 meters
m and annual mean SD > 5.0 m, then (see
next column -->)
Requirement: Yes
c. If auditor measurement shows SD ≤5.0
m and annual mean SD < 5.0 m, then (see
Applicability: All Farms,
next column -->)
Farm-Wide
A. If auditor measurement shows SD > 5.0
m and annual mean SD < 5.0 m, then
Proceed to Indicator 2.4.3 and 2.4.4
Auditor measurement at RWFA time, 04:05 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m (< 5m ) and
client´s 2015 mean value at RWFA; 64.55 cm (0.65 m)
B. If auditor measurement shows SD > 5.0
m and annual mean SD > 5.0 m, then stop
Auditor measurement at RWFA time, 04:05 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m (< 5m ) and
client´s 2015 mean value at RWFA; 64.55 cm (0.65 m) (< 5 m)
C. If auditor measurement shows SD ≤ 5.0
m and annual mean SD < 5.0 m, then stop
d. If auditor measurement shows SD ≤ 5.0 D. If auditor measurement shows SD ≤ 5.0
m and annual mean SD > 5.0 m, then (see m and annual mean SD > 5.0 m, then
next column -->)
Proceed to Indicator 2.4.3 and 2.4.4.
x
Auditor measurement at RWFA time, 04:05 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m (< 5m ) and
client´s 2015 mean value at RWFA; 64.55 cm (0.65 m) (<5 m)
Auditor measurement at RWFA time, 04:05 PM, Lat: 2.653427°N, Long: 75.442831°W 570.0 m, SD 1.10 m (< 5m ) and
client´s 2015 mean value at RWFA; 64.55 cm (0.65 m) (< 5 m)
2.4.3.
A. Take duplicate water sample at RWFA.
a. If required under Indicator 2.4.2, collect Have sample analyzed by a qualified
x
water samples at RWFA. Determine total independent laboratory for total
phosphorus concentration.
phosphorus concentration (for handling,
Indicator: Total phosphorus
see Indicator 2.5.1)
concentration limit in
receiving waters[4]
B. Calculate percent error of farm data
using Equation 2 (Audit Reference 6). If >
Requirement: ≤ 20 µg/L
b. Report results to CB.
5% difference is observed between auditor x
data and farm min/max, raise a nonApplicability: All Farms,
conformity (see Audit Reference 3).
Farm-Wide
c. Analyze total phosphorus
concentrations in all subsequent water
C. Verify that samples from receiving
x
samples from monthly water quality
waters comply the Requirement.
monitoring. Continue until instructed
otherwise by the CB.
Indicator: Chlorophyll a
concentration limit in
receiving waters[4]
2.4.4
Requirement: ≤ 4.0 µg/L
Applicability: All Farms,
Farm-Wide
A. Take duplicate water sample at RWFA.
a. If required under Indicator 2.4.2, collect Have sample analyzed by a qualified
water samples at RWFA. Determine
independent laboratory for chlorophyll a
chlorophyll a concentration.
concentration (for handling, see Indicator
2.5.1)
b. Report results to CB.
Independent laboratory; Construcsuelos Suministros Ltda. accredited by IDEAM (Institute of Hidrology, Metereology and
Environmental Studies) ISO 17025 total Phosphorus 0.01 mg/l P (0.00001 µg/L P)
Value registered by client is same as independent lab no applicable for error percentage calculation
Values registered by client starting from February 28, 2015 up to December 30, 2015 0.01 mg/L P (10 µg/LP), values are
recorded on the template Monthly water quality sampling
Independent laboratory; Construcsuelos Suministros Ltda. accredited by IDEAM (Institute of Hidrology, Metereology and
Environmental Studies) ISO 17025 total Chlorophyll a; 0.15 mg/L Chlorophyll a at RWFA (0.00015 µg/L Chlorophyll a)
x
B. Calculate percent error of farm data
using Equation 2 (Audit Reference 6). If >
5% difference is observed between auditor x
data and farm min/max, raise a nonconformity (see Audit Reference 3).
c. Analyze chlorophyll a concentrations in
all subsequent water samples from
C. Verify that samples from receiving
monthly water quality monitoring.
waters comply the Requirement.
Continue until instructed otherwise by the
CB.
Chlorophyll a client´s mean value 2015; 5.60 mg/L Chlorophyll a (0.0056 µg/L Chlorophyll a); auditor´s value 0.15 mg/L
chlorophyll a (0.00015 µg/L Chlorophyll a); due to the fact the farm does not perform this analysis with an independent
laboratory, value reported by farm could not be verified as Chlorophyll a .
Minimum value of Chlorophyll a reported by the client; 0.337 mg/L (0.000337 µg/L Chlorophyll a) registered on April 28,
2015 and maximum value 21.5 mg/L Chlorophyll a (0.0215 µg/L Chlorophyll a) and mean value 2015 5.6 mg/L
Chlorophyll a (0.0056 µg/L Chlorophyll a), these values complied with requirement on the standard ≤ 4 µg/L Chlorophyll
a.
x
Footnote [4] Measurements shall be taken at the Receiving Water Farm Afar (RWFA) sampling station. See Appendix II for RWFA definition.
2.5 Criteria: Receiving water monitoringCompliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Instruction to Clients for Indicator 2.5.1 - Water Quality Monitoring
a. Conduct ≥6 months of water quality
monitoring before first audit.
A. Do not schedule the on-site audit until
client has monitoring dataset.
b. Complete the Water Quality
Monitoring Matrix (Audit Reference 4)
and submit to CB.
B. Review Matrix to verify that client
monitored all required parameters at the
required frequency.
c. Calibrate all equipment at the
frequency and by the method
recommended by the manufacturer.
Calibrate daily if there is no
manufacturer's recommendation.
Indicator: Receiving water
quality monitoring matrix
completed and validated
(Appendix II)
2.5.1
Requirement: Yes (6 months
data, pre-audit, required)
Yes
No
Finding
x
Information dataset period: February 28, March 31, April 28, May 26, June 26, July 28, August 29, September 30,
October 29, November 30, December 30 2015
x
Parameters monitored: Dissolved oxygen mg/L (ppm), Oxygen saturation %, temperature °C, pH, phosphate ppm (mg/L),
nitrate ppm (mg/L), nitrite (mg/L) ppm, ammonia-nitrogen ppm, Salinity ppt, turbidity cm, turbidity NTU, conductivity,
chlorophyll a ppm
frequency: once every month
C. Verify that client calibrates equipment as
x
required.
Date of the last calibration: February 24, 2016
Method and frecuency: Oxygen meter (self calibration-equipment Oxyguard Polaris 2, equipment indicates on display
the moment probe needs to be checked, pH meter standard method with pattern solutions and nitrate, nitrite,
ammonia, phosphate, water sample kit with indicators
Responsible for calibration: Alexander Perdomo, Production Manager
Indicator: Receiving water
quality monitoring matrix
completed and validated
(Appendix II)
2.5.1
D. Witness client conducting water quality
monitoring. Repeat on-site measurements
x
at the same time and location. Record both
sets of values.
Auditor witnessed client conducting water quality monitoring? Yes, morning and afternoon sampling with pHmeter,
Oxyguard, and water quality kit
Samples taken sent to: water samples conducted independently by Construcsuelos Suministros Ltda. accredited by
IDEAM (Institute of Hidrology, Metereology and Environmental Studies) ISO 17025
e. Collect water samples and prepare
them for shipment as applicable
E. Collect duplicates of water samples for
independent analyses performed by either
the CB or an independent laboratory (i.e.
not by farm staff). At a minimum, the
x
independent analyses shall include
determination of: chlorophyll a (ug/L),
phosphate-phosphorus (ug/L), ammonianitrogen (ug/L), and turbidity (NTU). Keep
samples in a sealed cooler at < 10⁰C.
Parameters in criteria tested? Yes, Dissolved oxygen mg/L (ppm), Oxygen saturation %, temperature °C, pH, phosphate
ppm (mg/L), nitrate ppm (mg/L), nitrite (mg/L) ppm, ammonia-nitrogen ppm, Salinity ppt, turbidity cm, turbidity NTU,
conductivity, chlorophyll a ppm
f. Perform routine analysis of water
samples (i.e. done in the same manner as
for previous months of water quality
monitoring).
F. Keep samples under auditor control until
analyses are complete or until samples are
x
placed into custody of a qualified
independent laboratory.
Samples storage: Samples taken and stored directly by Construcsuelos Suministros Ltda. accredited by IDEAM (Institute
of Hidrology, Metereology and Environmental Studies) ISO 17025
Date of sending: February 24, 2015
g. Record values for each parameter and
submit results to CB.
G. Calculate percent error of farm data
using Equation 2 (Audit Reference 6). If >
5% difference is observed between auditor x
and farm data, raise a non-conformity (see
Audit Reference 3).
Requirement: Yes (6 months
data, pre-audit, required)
Applicability: All Farms,
Farm-Wide
2.6 Criteria: Wetland conservation
Indicator: Hectares of
allowable wetland[5]
conversion since 1999[6]
2.6.1.
d. During the audit of the farm, arrange to
conduct water quality monitoring. The
auditor will witness and replicate water
sampling
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Yes
A. Evaluate whether there is evidence for
a. Provide a map delineating all wetlands
any wetland conversion occurring within a
currently within a 5-km radius of the farm
5-km radius of the farm since 1999.
Farm reading: At RWFA; 4:02 PM (Lat, 2°65´34.27´´N; Long, 75°44´28.31´´W) DO 9.0 mg/L, T°C 32, Oxygen Saturation
132%, pH 9.22, SD 1.10 m. 5:41 AM, pH 4.3, Ammonia 2 ppm, Phosphate 0.5 ppm, Nitrate 15 ppm, Temp 27.7°C, DO 2.5
ppm, 37% Oxygen Saturation, Nitrite 0.5 ppm
Auditor reading: At RWFA; 4:02 PM (Lat, 2°65´34.27´´N; Long, 75°44´28.31´´W) DO 9.0 mg/L, T°C 32, Oxygen Saturation
132%, pH 9.22, SD 1.10 m. 5:41 AM, pH 4.3, Ammonia 2 ppm, Phosphate 0.5 ppm, Nitrate 15 ppm, Temp 27.7°C, DO 2.5
ppm, 37% Oxygen Saturation, Nitrite 0.5 ppm
Error %: Not applicable
No
Finding
Wetland conversion since 1999? Hidrology map of Betania Dam issued by CAM; there is no evidence of wetlands on the
area
Source of confirmation: Hidrology Map of Betania Dam
Near wetland: Not applicable
Requirement: 0 ha
B. Evidence shows that farm siting or
related activities have resulted in loss of
Wetland conversion since 1999?Hidrology map of Betania Dam issued by CAM; there is no evidence of wetlands on the
Applicability: All Farms,
wetland habitat since 1999, then the client
area.
Farm-Wide
is not certifiable.
[5] “Wetland is defined as lands where saturation with water is the dominant factor determining the nature of soil development and the types of plant and animal communities living in the soil and on its surface.” (United States Environmental Protection
Footnote
Agency)
b. Prepare a map showing pre- and post1999 wetland coverage at farm site.
Footnote [6] The year Ramsar contracting parties adopted strategic framework for the development of the Ramsar List
PRINCIPLE 3. CONSERVE WATER RESOURCES
Compliance
3.1 Nutrient utilization efficiency
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
3.1.1
Indicator: The total amount
of phosphorus added to the
culture system per metric
ton of fish produced per
year. Use equations from
Appendix III.
a. Calculate total weight of feed used.
Keep invoices.
A. Review invoice to confirm the total
weight of feed used
x
b. Calculate total weight of all fish
purchased. Keep invoices.
B. Review invoices to confirm the total
weight of fish purchased.
x
Finding
Were the invoices checked? Yes, date May 5, 12, 2015 code N.- FAN-160322; FAN-1161030
Code of checked invoices:FAN-160322 (C. Maxi-Peces 38 1.8 mm E, C. Maxi Peces 38 2.5 mm E. C. Maxi Peces 32 3.5 m
E. ; C Maxi Peces 32 4.7 mm); C.Maxi - Peces 38 1.8 mm, C. Maxi-Peces 32 4.7 mm E., C. Maxi - Peces 32 7.0 mm E).
SOLLA June 26, 2015 Remission n.- 19100 9937 Mojarra 45% Ext 40 Kg 1.5 mm ; June 16, 2015 remission n.- 191002397
Mojarra 45% Ext , Mojarra 45% Extruded
Total weight of feed used : 3,661.8 Kg
Were the invoices checked?:yes, remission May 22, 2015 0138 (120,000 fingerlings) June 25, 2015 remission n.- 0144
60,000 fingerlings
Code of checked invoices:Remission n.- 0138 (May 22, 2015); Remission n.- 0144 (June 25, 2015)
Total weight of all fish purchased:2,296 g (2.296 Kg)
3.1.1
Indicator: The total amount
of phosphorus added to the
culture system per metric
c. Calculate total weight of fish produced. C. Review invoices to confirm the total
ton of fish produced per
Keep invoices for all fish sold or shipped. weight of fish sold or shipped.
year. Use equations from
Appendix III.
x
Were the invoices checked? Yes, remission LAG N.- 4860 number of kgs 3,013 Kgs (May 22, 2015); Remission LAG N.4861 May 22, 2015 3,012 Kgs; June 25, 2015 remission LAGN.- 4985 2,967 Kgs, Remission LAG N.- 4986 June 25, 2016
3,768 Kgs
Code of checked invoices:LAG N.- 4860, LAG N.- 4861 (May 22, 2015); LAGN.- 4985, LAG N.- 4986 (June 25, 2015)
Total weight of all fish produced: 2569.67 MT
x
Farm provided signed letter from feed manufacturer stating phosphorus content and nitrogen of the feed?: January 19,
2016 signed by Juan Jose Uribe Montoya (operational Manager) . February 2, 2016 (SOLLA) signed by Juan Jose Jaramillo
Nutrition Director
Phosphorus content: Tilapia Start-up meal phosphorus 1.30% Nitrogen 7.20%; Tilapia Start up extruded Phosphorus 1.20
% Nitrogen 7.20%; Maxi-peces 38% Phosphorus 1.10% Nitrogen 6.10%; Maxi-peces 32% phosphorus 1.00%, Nitrogen
5.10%, Maxi-Peces 28% Phosphorus 1.00% Nitrogen 4.50 Peces 25% Phosphorus 1.00%, Nitorgen 4.00%. SOLLA; Mojarra
45% Ext Phosphorus 1.2 Nitrogen 7.2;
Letter date signature: (Contegtral) January 19, 2016. February 2, 2016 (SOLLA)
Requirement: ≤ 27 kg
Applicability: All Farms, Unit
d. Obtain a signed letter from feed
of Certification Only
D. Confirm that a letter from the feed
manufacturer stating phosphorus content
manufacturer states phosphorus content.
of the feed.
e. Complete nutrient budget worksheet
(Audit Reference 8).
E. Review nutrient budget worksheet for
accuracy
F. Confirm that total phosphorus does not
exceed the requirement
Farms without post-culture treatment for Farms without post-culture treatment for
phosphorus
phosphorus
-
3.1.2A
Indicator:The total amount
of phosphorus released
from the culture system per
metric ton of fish produced
per year. Phosphorus
loading will be either
calculated using equations
from Appendix III or
measured in effluent
if there is post-culture
treatment.
Is the nutrient budget worksheet completed and accurate?: Yes, calculations and invoices reviewed during inspection.
x
Does the added total phosphorus exceed 27 kg?: No, 7.11 Kg P/MT Fish Produced
Total added phosphorus: 7.11 Kg P/MT Fish Produced
x
Yes
a. Calculate total weight of feed used.
Keep invoices.
A. Calculate total weight of feed used. Keep
x
invoices.
b. Calculate total weight of all fish
purchased. Keep invoices.
B. Calculate total weight of all fish
purchased. Keep invoices.
No
Were the invoices checked? Yes, date May 5, 12, 2015 code N.- FAN-160322; FAN-1161030
Code of checked invoices:FAN-160322 (C. Maxi-Peces 38 1.8 mm E, C. Maxi Peces 38 2.5 mm E. C. Maxi Peces 32 3.5 m
E. ; C Maxi Peces 32 4.7 mm); C.Maxi - Peces 38 1.8 mm, C. Maxi-Peces 32 4.7 mm E., C. Maxi - Peces 32 7.0 mm E).
SOLLA June 26, 2015 Remission n.- 19100 9937 Mojarra 45% Ext 40 Kg 1.5 mm ; June 16, 2015 remission n.- 191002397
Mojarra 45% Ext , Mojarra 45% Extruded
Total weight of feed used : 3,661.8 Kg
Were the invoices checked?:yes, remission May 22, 2015 0138 (120,000 fingerlings) June 25, 2015 remission n.- 0144
60,000 fingerlings
Code of checked invoices:Remission n.- 0138 (May 22, 2015); Remission n.- 0144 (June 25, 2015)
Total weight of all fish purchased:2,296 g (2.296 Kg)
x
Were the invoices checked? Yes, remission LAG N.- 4860 number of kgs 3,013 Kgs (May 22, 2015); Remission LAG N.4861 May 22, 2015 3,012 Kgs; June 25, 2015 remission LAGN.- 4985 2,967 Kgs, Remission LAG N.- 4986 June 25, 2016
3,768 Kgs
Code of checked invoices:LAG N.- 4860, LAG N.- 4861 (May 22, 2015); LAGN.- 4985, LAG N.- 4986 (June 25, 2015)
Total weight of all fish produced: 2569.67 MT
Requirement:≤ 20 kg
3.1.2B
c. Calculate total weight of fish produced. C. Review invoices to confirm the total
Applicability: Farms with no Keep invoices for all fish sold or shipped. weight of fish sold or shipped.
post-culture treatment for
phosphorus, Unit of
Certification Only. Clients
d. Complete nutrient budget worksheet
D. Review nutrient budget worksheet for
may omit/delete pricing
(Audit Reference 8)
accuracy.
details from purchase
documents.
E. Confirm that phosphorus released does
not exceed requirement.
Farms with post-culture treatment for
Farms with post-culture treatment for
Indicator: The total amount
phosphorus
phosphorus
of phosphorus released
from the culture system per f. Complete steps a-d (above) for
F. Complete steps A-D (above)
metric ton of fish produced Indicator 3.1.2A.
per year. Phosphorus
g. Describe method for treatment (e.g.
loading will be either
sludge removal for fertilizer, water
G. View evidence for effective post-culture
calculated using equations
treatment facilities, etc.) and means of
treatment.
from Appendix III or
quantifying phosphorus capture.
measured in effluent if there
is post-culture treatment.
Requirement:≤ 20 kg
Applicability: Farms that use
post-culture treatment for
phosphorus, Unit of
x
Is the nutrient budget worksheet completed and accurate?: Yes, calculations and invoices reviewed during inspection.
x
Does the released total phosphorus exceed 20 kg?: No, 7.11 - 7.5 = 1.9 Kg P/MT produced per year
Total released phosphorus: 1.9 Kg P/MT produced per year
x
Yes
x
Finding
No
Finding
Steps A-D completed? Calculations performed according to the standard.
Describe the post culture treatment: No postculture treatment, culture on water dam at cages.
3.1.2B
metric ton of fish produced
per year. Phosphorus
loading will be either
calculated using equations
from Appendix III or
measured in effluent if there
is post-culture treatment.
Requirement:≤ 20 kg
Applicability: Farms that use
post-culture treatment for
phosphorus, Unit of
Certification Only. Clients
may omit/delete pricing
details from purchase
documents.
h. Keep records of the quantity of
phosphorus captured by treatment.
H. Review records for phosphorus capture.
Phosporus before treatment: No postculture treatment, culture on water dam at cages.
Phosporus after treatment:
Records reviewed:
i. Subtract net phosphorus captured in
treatment facility from total output of
phosphorus, expressed as kg P/mt fish
produced over prior 12-month period
I. Review calculations for accuracy.
Was the value correctly calculated?: No postculture treatment, culture on water dam at cages.
Value in kg P/mt fish produced over prior 12-month period:
-
J. Confirm that the total amount of
phosphorus released does not exceed
requirement.
Does the released total phosphorus exceed 20 kg?: No postculture treatment, culture on water dam at cages.
Total released phosphorus:
a. Calculate total weight of feed used.
Keep invoices.
Indicator: Calculation and
b. Calculate total weight of all fish
verification of the total
purchased. Keep invoices.
amount of nitrogen applied
to the culture system. Use
equations from Appendix III.
3.1.3
Requirement: Measured in
kg nitrogen/mt fish/year
A. Review invoices to confirm the total
weight of feed used.
x
B. Review invoices to confirm the total
weight of fish purchased.
x
c. Calculate total weight of fish produced. C. Review invoices to confirm the total
Keep invoices for all fish sold or shipped. weight of fish sold or shipped.
Applicability: All Farms, Unit
of Certification Only
Clients may omit/delete
pricing details from
d. Obtain a signed letter from feed
purchase documents.
D. Confirm that a letter from the feed
manufacturer stating nitrogen content of
manufacturer states nitrogen content.
the feed.
e. Complete nutrient budget worksheet
(Audit Reference 8)
a. Calculate total weight of feed used.
Keep invoices.
Indicator: Calculation and
verification of the total
amount of nitrogen released
from the farming activity.
Use equations from
b. Calculate total weight of all fish
Appendix III.
purchased. Keep invoices.
3.1.4
Requirement: Measured in
kg nitrogen/mt fish/year
Applicability: All Farms, Unit
of Certification Only
Clients may omit/delete
pricing details from
purchase documents.
Were the invoices checked? Yes, date May 5, 12, 2015 code N.- FAN-160322; FAN-1161030
Code of checked invoices:FAN-160322 (C. Maxi-Peces 38 1.8 mm E, C. Maxi Peces 38 2.5 mm E. C. Maxi Peces 32 3.5 m
E. ; C Maxi Peces 32 4.7 mm); C.Maxi - Peces 38 1.8 mm, C. Maxi-Peces 32 4.7 mm E., C. Maxi - Peces 32 7.0 mm E).
SOLLA June 26, 2015 Remission n.- 19100 9937 Mojarra 45% Ext 40 Kg 1.5 mm ; June 16, 2015 remission n.- 191002397
Mojarra 45% Ext , Mojarra 45% Extruded
Total weight of feed used : 3,661.8 Kg
Were the invoices checked?:yes, remission May 22, 2015 0138 (120,000 fingerlings) June 25, 2015 remission n.- 0144
60,000 fingerlings
Code of checked invoices:Remission n.- 0138 (May 22, 2015); Remission n.- 0144 (June 25, 2015)
Total weight of all fish purchased:2,296 g (2.296 Kg)
x
Were the invoices checked? Yes, remission LAG N.- 4860 number of kgs 3,013 Kgs (May 22, 2015); Remission LAG N.4861 May 22, 2015 3,012 Kgs; June 25, 2015 remission LAGN.- 4985 2,967 Kgs, Remission LAG N.- 4986 June 25, 2016
3,768 Kgs
Code of checked invoices:LAG N.- 4860, LAG N.- 4861 (May 22, 2015); LAGN.- 4985, LAG N.- 4986 (June 25, 2015)
Total weight of all fish produced: 2569.67 MT
x
Farm provided signed letter from feed manufacturer stating phosphorus content and nitrogen of the feed?: January 19,
2016 signed by Juan Jose Uribe Montoya (operational Manager) . February 2, 2016 (SOLLA) signed by Juan Jose Jaramillo
Nutrition Director
Phosphorus content: Tilapia Start-up meal phosphorus 1.30% Nitrogen 7.20%; Tilapia Start up extruded Phosphorus 1.20
% Nitrogen 7.20%; Maxi-peces 38% Phosphorus 1.10% Nitrogen 6.10%; Maxi-peces 32% phosphorus 1.00%, Nitrogen
5.10%, Maxi-Peces 28% Phosphorus 1.00% Nitrogen 4.50 Peces 25% Phosphorus 1.00%, Nitorgen 4.00%. SOLLA; Mojarra
45% Ext Phosphorus 1.2 Nitrogen 7.2;
Letter date signature: (Contegtral) January 19, 2016. February 2, 2016 (SOLLA)
E. Review nutrient budget worksheet for
accuracy.
x
A. Review invoices to confirm the total
weight of feed used.
x
B. Review invoices to confirm the total
weight of fish purchased.
x
Is the nutrient budget worksheet completed?: Yes, completed according to calculations on standard.
Total N input: 55.29 Kg N/MT Fish produced
Were the invoices checked? Yes, date May 5, 12, 2015 code N.- FAN-160322; FAN-1161030
Code of checked invoices:FAN-160322 (C. Maxi-Peces 38 1.8 mm E, C. Maxi Peces 38 2.5 mm E. C. Maxi Peces 32 3.5 m
E. ; C Maxi Peces 32 4.7 mm); C.Maxi - Peces 38 1.8 mm, C. Maxi-Peces 32 4.7 mm E., C. Maxi - Peces 32 7.0 mm E).
SOLLA June 26, 2015 Remission n.- 19100 9937 Mojarra 45% Ext 40 Kg 1.5 mm ; June 16, 2015 remission n.- 191002397
Mojarra 45% Ext , Mojarra 45% Extruded
Total weight of feed used : 3,661.8 Kg
Were the invoices checked?:yes, remission May 22, 2015 0138 (120,000 fingerlings) June 25, 2015 remission n.- 0144
60,000 fingerlings
Code of checked invoices:Remission n.- 0138 (May 22, 2015); Remission n.- 0144 (June 25, 2015)
Total weight of all fish purchased:2,296 g (2.296 Kg)
verification of the total
amount of nitrogen released
from the farming activity.
Use equations from
Appendix III.
3.1.4
Requirement: Measured in
kg nitrogen/mt fish/year
c. Calculate total weight of fish produced. C. Review invoices to confirm the total
Keep invoices for all fish sold or shipped. weight of fish sold or shipped.
x
Were the invoices checked? Yes, remission LAG N.- 4860 number of kgs 3,013 Kgs (May 22, 2015); Remission LAG N.4861 May 22, 2015 3,012 Kgs; June 25, 2015 remission LAGN.- 4985 2,967 Kgs, Remission LAG N.- 4986 June 25, 2016
3,768 Kgs
Code of checked invoices:LAG N.- 4860, LAG N.- 4861 (May 22, 2015); LAGN.- 4985, LAG N.- 4986 (June 25, 2015)
Total weight of all fish produced: 2569.67 MT
d. Use equation from Audit Reference 6
to calculate total amount of nitrogen
released. D. Confirm calculation.
D. Confirm calculation.
x
Was the value correctly calculated?: yes, according to specifications on the standard.
Value in kg nitrogen/mt fish/year: 55.29 - 21.2 = 34.09 Kg N/MT Fish
e. Complete nutrient budget worksheet
(Audit Reference 8)
E. Review nutrient budget worksheet for
accuracy.
x
Applicability: All Farms, Unit
of Certification Only
Clients may omit/delete
pricing details from
purchase documents.
Is the nutrient budget worksheet completed and accurate?: Yes, calculations and invoices reviewed during inspection.
3.2 Groundwater salinization
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Finding
Indicator: Percent change in
Only applicable if brackish water is used for the culture of tilapia (if surface water used is less than 1,300 µS/cm or if initial well water measure is greater than 1,300 µS/cm – standard is not applicable and no nonspecific conductance of
a. Inform CB if brackish water is used for A. Confirm whether client uses brackish
freshwater from a drilled
water system conductivity:
tilapia culture (3.2.1 applies only to farms water for tilapia culture. If not, then auditor
well at the time of drilling
Brakish water?
and the time of audit. This is where surface water is > 1,300 µS/cm or response to 3.2.1B-E is “not applicable”
initial well water is < 1,300 µS/cm).
(NA).
required when freshwater
wells are used in
combination with brackish b. Show well locations on map of farm.
B. Confirm well locations.
Well locations are accurate in a map?
surface water for the culture
3.2.1
c. Record date of drilling and initial
of tilapia. Freshwater
C. Retain a record of location and initial
specific conductance (µS/cm) at each
Initial conductivity:
aquifers are defined as
specific conductance for wells.
well.
having a specific
D. Review updated measurements of
conductance less than 1,300
d. Measure specific conductance of all
specific conductance. Compare values to
Conductivity values range:
µS/cm.
wells less than 4 weeks before audit.
initial measurements taken from the same
Last conductivity data:
wells.
Requirement: ≤ 10 %
E. Verify that specific conductance at wells
There is change >10%:
did not change by > 10 %.
Applicability: Only farms
PRINCIPLE 4. CONSERVE SPECIES DIVERSITY AND WILD POPULATIONS
Compliance
Finding
4.1. Escapes from aquaculture facilities Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Indicator: Presence of net
Devices used (net mesh or grills/screens, barriers): nets (cages) internal net 1 inch mesh size; external protective net 2
mesh or grills/screens,
a. Install net mesh, screens and barriers in A. Inspect site to verify that net mesh,
x
inches and 4 to 5 meters deep
barriers on inlets and outlets required locales.
screens and barriers are in place.
devices details: nets (cages) internal net 1 inch mesh size; external protective net 2 inches and 4 to 5 meters deep
4.1.1
of culture vessels (e.g.,
tanks, ponds and raceways),
are the devices appropriated? Nets (cages)
b. Use meshes that are appropriately
B. Inspect site to verify meshes are
and mesh on all netted
x
Device size: internal net 1 inch mesh size; external protective net 2 inches and 4 to 5 meters deep
sized to retain stocked fish.
appropriately sized to retain stocked fish.
confinement units (e.g.,
Indicator: Presence of net
Is there a inspection program? Interaction plan with wild life code MPR 16 version 2 July 2015 (Environmental
mesh, or grills/screens and
Management Plan; Inspection program; Net inspection registry code RPR 20
permanent barrier
a. Establish program for regular
A. Inspect site to verify effectiveness of
Code of inspection program: RPR 20
inspection register recording
x
inspection of permanent barriers.
inspection program.
Inspection frequency: daily inspection (in the morning) sample January 6- 16, 2015
dates, findings and actions
Inspection responsible: Worker on the correspondent shift On the sample person responsible Wilmer Acosta (no longer
taken, including mitigation
working on the farm)
4.1.2
or fish containment
record dates: January 6-16, 2015
structure repairs
b. Record the dates, findings and actions
B. Review records.
x
Findings: (holes detected on the inspection from January 6-11, 2015)
taken in an 'Inspection Register'.
Actions taken : Repair hole with sawing
Requirement: Yes
c. Collect data for 6 months before first
C. Do not schedule the first audit until
Has the client submitted 6 months of data before the audit? Daily inspections raw data 2015 available during the
x
Applicability: All Farms,
audit.
client submits 6 months of inspection data.
inspection
Farm-Wide
a. Establish program for monitoring
escapes with trapping devices
4.1.3
Indicator: Presence of
trapping devices placed in
effluent/drainage canals or
in between cages to sample
for escapees, and a record b. Record all traps used, findings and
of findings and actions taken actions taken.
c. Collect data for 6 months before first
audit.
4.1.4
Indicator: In cage culture
systems, the minimum
distance between the
bottom of the cage and the
bottom of the receiving
Indicator: The minimum
percentage of males or
sterile fish in a culture unit
4.1.5
Requirement: 95 %
Applicability: Land-based
systems only, Farm-Wide
A. Inspect farm to verify that trapping
devices are used in an effective and
representative way for monitoring
escapees.
B. Review records
Is there a program for monitoring escapes? Yes, Net inspection registry code RPR 20
Trapping device: nternal net 1 inch mesh size; external protective net 2 inches and 4 to 5 meters deep
x
fequency: daily inspection of open points at net.
record dates: on december 2015, registry code changed numeber code RPR 49 version 3 actual date december 2015 we
see on the registry Net inspection registry (Date, Number of cage, finding, recommendation, inmediate corrective
actions and/or long term action
Findings: December 17 , 2015 cage n.- one hole of three sawing points and one of two recommendations check nets
Actions taken : net sawed
x
C. Do not schedule the first audit until
x
client submits 6 months of monitoring data.
CAGE SYSTEMS ONLY
A. For cage systems, confirm that distance
between cage bottom and bottom
sediment is ≥ 3 m.
Has the client submitted 6 months of data before first audit? Daily inspection program 2015 data avaialble during the
audit
Yes
No
Finding
receiving water body depth: 36 meters
cage depth: 3-5meters deep
Cage bottom and bottom sediment distance:31 meters
x
If the farm is a land-based system, the
client shall arrange to have tilapia
cultures sampled for percentage of male
fish (or sterile fish) as follows:
For land-based systems, the auditor shall
confirm that clients follow requirements
for determination of percentage of male
fish (or sterile fish) in culture
a. Select three (3) culture vessels at
random.
A. Verify samples were selected at random.
Selected by: Farm with production system on cages.
b. Capture 40 fish from each culture
vessel for a total of 120 fish.
B. Verify that fish originated from different
culture vessels.
Ponds selected: Farm with production system on cages.
c. Determine the number of fish in the
sample that are male (or sterile).
C. Verify method used to determine sex (or
sterility).
Method used: direct observation Farm with production system on cages.
d. Calculate the percentage of male fish
(or sterile fish) in culture.
D. Review results to confirm compliance
with the requirement.
% of male: Farm with production system on cages.
e. Alternate approach when farm has
fewer than 3 culture vessels: capture a
total of 100 fish and determine the
percentage male fish (or sterile fish).
E. As for 4.1.5D
farm with <3 ponds? Farm with production system on cages.
Yes
4..2. Transporting live tilapia
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
Indicator: Presence and
a. For transport of live fish to the farm
A. Inspect site to verify containers do not
evidence of use of fish
x
(e.g. fry), ensure that containers do not
provide escape paths for live fish
transport containers that
provide escape paths for fish.
transported to the farm.
have no escape path for fish
4.2.1
b. For transport of live fish away from the
B. Inspect site to verify containers do not
Requirement: Yes
farm (e.g harvested fish), ensure that
x
provide escape paths for live fish
containers do not provide escape paths
transported from the farm.
Applicability: All Farms,
for fish.
4..3 Transgenic fish
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
No
Finding
Finding
Fish tanks details: Transportation according to good practices on Aquaculture Production program code MPR 06 version
03 updated January 2016 page 7; transportation is accomplished from delivery area, it is accomplished with a car
supplied with 4 tanks with capacity 2,000 to 2,500 liters o fwater,, and pressed oxygen, through hoses it is distributed the
oxygen to the tank.
Number of fish tanks inspected: one (1) harvesting tank
Design is appropiate to prevent escapes?: it is appropriated to prevent escapes.
No
Finding
4.3.1
A. Review records to confirm compliance
with the requirement
x
Does client use transgeninc tilapia?:no, there was evidenc on June 2015, Piscícola Botero S.A. used fingerlings from a
different supplier (Piscicola Penjamo) June 16, 2015 remission number 113 invoiced quantity 100,000); June 16 , 2015
remission 113 (repeated) (invoiced animals 100,000) June 18, 2015 (invoiced number 100,000) remission number 117
Seedling supplier (name, addres and contact person): Piscicola Penjamo Ltda. Calle 6 N.- 9-48 phone; (+57) 8384101
email [email protected], Pomerania Farm, jurisdiction El Centro Hobo Huila
Records checked:here was evidenc on June 2015, Piscícola Botero S.A. used fingerlings from a different supplier
(Piscicola Penjamo) June 16, 2015 remission number 113 invoiced quantity 100,000); June 16 , 2015 remission 113
(repeated) (invoiced animals 100,000) June 18, 2015 (invoiced number 100,000) remission number 117
B. If the auditor suspects that transgenic
fish are in culture, test stock identity by
b. Purchase documents must confirm that
collecting 3 fish and sending to an ISO
culture stock is not transgenic.
17025 certified laboratory for genetic
analysis
x
Suspects of GMO? No suspect certificate issued by Piscicola Penjame on point 5; to produce fingerlings, their farm count
with 5,000 broodstock females and 2,000 broodstock male of Nile tilapia, natural organisms not genetically modified.
Sample result? No suspect of Genetically modified organisms.
a. Maintain records for the origin of all
Indicator: Allowance for the cultured stocks including the supplier
culture of transgenic tilapia name, address and contact person(s) for
stock purchases.
Requirement: No (None
allowed)
Applicability: All Farms,
Farm-Wide
4.4 Criteria: Predator control
Indicator: Use of lethal[7]
predator control
4.4.1
Requirement: No (None
allowed)
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
a. Prepare a list of all predator control
A. Predator control devices listed and site
x
devices and their locations
inspection for validation
B. Inspect sites to verify no use of lethal
predator controls.
No
x
Finding
Predator control: bird nets 2 inches mesh size and air canon
Is there evidence the using of lethal predator controls?: No use of lethal mechanisms during on-site inspection
Verified by: Jose Renato Recalde
Footnote [7] The use of lethal predator control is prohibited, unless a predator becomes impinged in netting and is required to be euthanized.
Instruction to Clients for Indicator 4.4.2 - Presence of IUCN Red List Species
4.4.2
a. Perform analysis. Record all IUCN red
Indicator: Mortality of IUCN
list species and farm-related threats. A.
red listed species
Repeat analysis to verify that client
obtained an accurate result.
Requirement: 0 (zero)
A. Repeat analysis to verify that client
obtained an accurate result.
x
b. If an IUCN Red List species is identified
in region of the farm (including receiving B. Verify that client takes appropriate
and source waters), take appropriate
precautions as required.
precautions
x
Applicability: All Farms,
Farm-Wide
PRINCIPLE 5. USE RESOURCES RESPONSIBLY
Compliance
5.1 Criteria: Use of wild fish for feed (fishmeal
and oil)
Compliance
Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Does the client have all IUCN red list species and farm-related threats?: There was available the IUCN red list species and
farm-related threats on the farm
The analysis was repeated again? Identified species Pandion haliaetus, Egretta Thulla; Casmerodius albus, Nycticorax
nycticorax, Butorides striatus, Chloroceryle americana, Pitangus sulfuratus, Caiman crocodrilus, Lontra longicaudis
Species detected: dentified species Pandion haliaetus, Egretta Thulla; Casmerodius albus, Nycticorax nycticorax,
Butorides striatus, Chloroceryle americana, Pitangus sulfuratus, Caiman crocodrilus, Lontra longicaudis. Document
revised; rapid guideline of native species and vulnerability grading according to IUCN code RPR 67 version 1 date of
revision February 2016; Pandion haliaetus (Migrate fisher eagle) least concern; Egretta thula, least concern, Ardea alba
least concern, Nycticorax nycticorax least concern, Butorides striatus (still not evaluated by the IUCN red list but it is
allocated on the life catalogue Butorides striatus (Linnaeus 1758), Chloroceryle americana least concern, Pitangus
sulfuratus neither on the IUCN red list nor on the life catalogue, Caiman crocodilus Low risk and least concern, Lontra
longicaudis near threaten.
Farm Threads: None, bird net is big enough to prevent any accidental trapment
Measure to prevent inpingment: Endemic species instructions; code EPR-02; Environmental Management Plan available
october 2015
Finding
a. Obtain a signed letter from feed
manufacturer stating percentage of fish A. Verify that values are stated in a letter
meal and/or fish oil (Audit Reference 9) in from the feed manufacturer.
feed used during the past 12 months.
x
letter available: Yes, CONTEGRAL S.A.January 19, 2016 ;
providers: CONTEGRAL; SOLLA utilizes fish catch byproducts, therefore, it is excluded from the calculations.
letter code and signature date:024007, January 19, 2016
values stated: Start-up tilapia meal ; fish meal 20% Fish oil 1.00%; Start-up tilapia extruded Fish meal 20% Fish oil 1.00%;
Maxi-peces 38% Fish meal 7% Fish oil 1.00%; Maxi-peces 32% Fish meal 6% Fish oil 1.00%; Maxi-peces 28% Fish meal 5%
Fish oil 1.00%; Peces 25% Fish meal 5%, Fish oil 1.00%
b. For FFER calculations, exclude fish meal
B. Verify client excludes rendered seafood
and fish oil derived from rendering of
byproducts from calculation of FFER
seafood
x
All rendered seafood by products were excluded to do the calculation? According to declaration; feed supplier,
CONTEGRAL does not use rendered seafood on the process, only SOLLA S.A.
c. Calculate FFER using equations in Audit
Applicability: All Farms, Unit
C. Verify that FFER calculations were done
Reference 6 (also Appendix IV of
of Certification Only
correctly.
Standard).
x
EFCR: 1.43
fish meal accumulate %:20%
fish oil accumulate %:1%
Calculation done correctly?yes, according to raw date presented on the audit.
x
FFER value: N/A 100% byproducts fish meal and oil 0.71
Is the value calculated less than 08? Yes, 0.71
Indicator: Feed Fish
Equivalence Ratio (FFER).
See Appendix IV for feed
calculations.
5.1.1
Requirement: ≤ 0.8
b. For FFER calculations, exclude fish meal
D. Confirm that FFER complies with the
and fish oil derived from rendering of
Requirement
seafood
5.1.2
a. Obtain a signed letter from feed
manufacturer identifying the origin
A. Verify that species used in fishmeal are
x
(genus, species and region harvested) of identified in a letter from the feed
Indicator: Allowance for the fish used in fish meal/oil (Audit Reference manufacturer
use of fishmeal and fish oil 9).
in tilapia feed containing
products from fisheries that
are listed on the IUCN’s Red
List or the species list
maintained by the
b. Determine if any of the species used in
Convention on the
fish feed are on the IUCN's Red List
B. Repeat search of IUCN database to verify
International Trade of
x
following the instructions given for
that client obtained an accurate result.
Endangered Species of Wild
Indicator 4.4.2.
Fauna and Flora
Requirement: None
Applicability: All Farms, Unit c. Determine if any of the species used in
of Certification Only
fish feed are listed by CITES as follows:
C. Repeat search of CITES database to
- go to http:
verify that client obtained an accurate
//www.cites.org/eng/resources/species.h
result.
tml
- select option "Species" and click "find it"
5.1.3
Indicator: Timeframe for
producers to source feed
containing fishmeal or fish
oil originating from fisheries
deemed sustainable by an
ISEAL member’s accredited
certification scheme
Requirement: 5 years
following the date of ISRTA
a. Prepare a policy stating the
organization's support of efforts to shift
feed manufacturers to an ISEALaccredited certification scheme for fish
meal/oil origins.
x
A. Verify that the client's policy supports
sustainable feed sourcing (e.g. programs at
x
http:
//www.isealalliance.org/portrait/full%20m
ember).
letter available:yes, Contegral January 19, 2016 signed by Juan Jose Uribe Montoya, Operations manager. SOLLA
February 2, 2016 letter signed by Juan Jose Jaramillo (Nutrition Director) no letter code only date.
letter code and signature date:Contegral letter code 024007 January 19, 2016 signed by Juan Jose Uribe Montoya,
Operations manager. SOLLA February 2, 2016 letter signed by Juan Jose Jaramillo (Nutrition Director) no letter code only
date.
species: Anchovy (Engraulis ringens) peruvian northern-central, Chilean Common Sardine (Strangomera bentinck)
Chilean regions V, Anchovy (Engraulis ringens) Chilean regions III and Yellowfin tuna (Thunnus albaceres) Panama
Eastern Pacific. SOLLA Chub mackerel (Scomber japonicus) Pacific southeast chilean fishery; Frigate tuna (Auxis thazard),
Picudillo (Decapterus macrosoma), Yellowfin tuna (Thunnus albacares) Eastern Pacific Central -Pacific Southeast) Culture
salmon (Oncorhynchus kisutch) Chile; However the raw material supplier for this company (Galdecun S.A.) has declared
using fishing by products to prepare fish meal and fish oil, respectively.
Has the client done the search of IUCN correctly?Both feed suppliers have performed IUCN analysis correctly and it was
verified by auditor accordingly.
Species listed: SOLLA S.A. Thunnus albacares (Yellowfin tuna) the IUCN grading is near threaten and Picudillo
(Decapterus macrosoma) has not been assessed yet. Contegral SA all species listed but Thunnus albacares are least
concern.
Has the client done the search of CITES correctly? Yes, both feed suppliers have included on their correspondent
declarations CITES analysis; SOLLA has declared on Chub mackerel, as not listed; raw material from SOLLA came from
fishery byproducts. On the case of CONTEGRAL, all species are declared as not listed as well; on crossed check revision,
auditor obtained same results as suppliers.
Species listed: Anchovy (Engraulis ringens) peruvian northern-central, Chilean Common Sardine (Strangomera bentinck)
Chilean regions V, Anchovy (Engraulis ringens) Chilean regions III and Yellowfin tuna (Thunnus albaceres) Panama
Eastern Pacific. SOLLA Chub mackerel (Scomber japonicus) Pacific southeast chilean fishery; Frigate tuna (Auxis thazard),
Picudillo (Decapterus macrosoma), Yellowfin tuna (Thunnus albacares) Eastern Pacific Central -Pacific Southeast) Culture
salmon (Oncorhynchus kisutch) Chile; However the raw material supplier for this company (Galdecun S.A.) has declared
using fishing by products to prepare fish meal and fish oil, respectively.
Does the client´s policy establish the using of feed from feed sustainable deemed by ISEAL? Yes, according to letter
signed by Client´s representative, they have clearly stated their compromise with the environment supporting efforts
feed suppliers are doing to utilize on the future fish meal and fish oil coming from fishery exploitation certified by ISEAL
letter signed by chief executive officer on February 04, 2016, letter has been delivered to both suppliers (CONTEGRAL
and SOLLA) accordingly,
5.1.3
Indicator: Timeframe for
producers to source feed
containing fishmeal or fish
oil originating from fisheries
deemed sustainable by an
b. Prepare a letter stating the
ISEAL member’s accredited organization's intent to source feed
certification scheme
containing fishmeal or fish oil originating
from fisheries deemed sustainable by an
Requirement: 5 years
ISEAL member’s accredited certification
following the date of ISRTA scheme by 19 December 2014
publication
c. Affirm support of the process through
Applicability: All Farms, Unit internal and external communications
of Certification Only
(e.g. correspondence with feed
manufacturers)
B. Obtain a copy of client's letter of intent. x
copy letter available: letter available, signed by Chief Executive Officer on February 04, 2016, it is clearly stated the
organization intent to source feed containing fish meal or fish oil originating from fisheries deemed sustainable by an
ISEAL member´s accredited certification scheme.
C. Confirm client's support with
documented evidence (letters,
communications).
x
record code: Letter of commitment available and stamps from feed suppliers as part of the internal communications.
signature date: February 04, 2016
x
Species: CONTEGRAL; Anchovy (Engraulis ringens) peruvian northern-central, Chilean Common Sardine (Strangomera
bentincki) Chilean regions V, Anchovy (Engraulis ringens) Chilean regions III and Yellowfin tuna (Thunnus albaceres)
Panama Eastern Pacific. SOLLA Chub mackerel (Scomber japonicus) Pacific southeast chilean fishery; Frigate tuna (Auxis
thazard), Picudillo (Decapterus macrosoma), Yellowfin tuna (Thunnus albacares) Eastern Pacific Central -Pacific
Southeast) Culture salmon (Oncorhynchus kisutch) Chile; However the raw material supplier for this company (Galdecun
S.A.) has declared using fishing by products to prepare fish meal and fish oil, respectively.
Capture zone:peruvian northern-central, Chilean regions V, Chilean regions III, Panama Eastern Pacific. SOLLA; Pacific
southeast chilean fishery, Eastern Pacific Central -Pacific Southeast), Chile.
Scores: Peruvian northern-central; 1. ≥ 6, 2. 10.0, 3. ≥ 6, 4. ≥ 6, 5. ≥ 6; Chilean region V; 1. ≥ 6, 2. 10.0, 3. 10.0, 4. 8.7,
5. 7.8; Chilean regions III; 1 (Contegral) ; 1. ≥6, 2. 10.0; 3. 10.0, 4. 7.5, 5. 7.6; Panama Eastern Pacific; 1. ≥6, 2. ≥6, 3. ≥6,
4. 8.0; 5. 8.6. SOLLA;the raw material supplier for this company (Galdecun S.A.) has declared using fishing by products to
prepare fish meal and fish oil, respectively.
B. If any scores is < 6.0 then the feed does
not comply with the Requirement. If the
average score is < 6.0 then the feed does
not comply with the Requirement.
x
Individual score values: Contegral; Peruvian northern-central; 1. ≥ 6, 2. 10.0, 3. ≥ 6, 4. ≥ 6, 5. ≥ 6; Chilean region V; 1. ≥
6, 2. 10.0, 3. 10.0, 4. 8.7, 5. 7.8; Chilean regions III; 1 (Contegral) ; 1. ≥6, 2. 10.0; 3. 10.0, 4. 7.5, 5. 7.6; Panama Eastern
Pacific; 1. ≥6, 2. ≥6, 3. ≥6, 4. 8.0; 5. 8.6. SOLLA;the raw material supplier for this company (Galdecun S.A.) has declared
using fishing by products to prepare fish meal and fish oil, respectively.
average score value: Contegral >6; SOLLA Not applicable.
C. If an 'N/A' appears in the sock
assessment category then the feed does
not comply with the Requirement.
x
Is N/A appears in stock assessment? Not any N/A on contegral declaration; SOLLA only byproducts are used from their
fisheries.
Instructions:
a. Record FishSource scores for each
species from which fishmeal or fish oil is
derived.
5.1.4
Indicator: Prior to
achievement of 5.1.3, the
average FishSource score
characterizing the
b. Confirm that average score is ≥ 6.0 with
fishery(ies) from which the
no individual score < 6.0.
fishmeal or fish oil is
derived. See Appendix V for
explanation of FishSource
scoring.
c. Confirm that there is no 'N/A' in a stock
assessment category.
Requirement: ≥ 6.0 with no
individual score < 6.0 or an
N/A in the stock assessment d. If the species is not on the website it
category
means that a FishSource assessment is
not available. Contact FishSource via
Applicability: All Farms, Unit Sustainable Fisheries Partnerships to
of Certification Only
identify the species as a priority for
assessment.
A. Confirm that client has recorded scores
for each species. Repeat FishSource
analysis to verify that client obtained an
accurate result.
D. If the species does not have a FishSource
score then the fish feed does not comply
x
with the Requirement.
All species assessed by fish source?All declared species by Contegral were assessed; SOLLA raw material supplier
Galdecun S.A. has declared to use only byproducts on their production.
category
Applicability: All Farms, Unit
of Certification Only
e. In lieu of FishSource scores, a farm
undergoing a first audit may substitute a
signed letter of intent from their feed
manufacturer stating commitment to
provide feed complying with FishSource
scoring requirements. However at the
second audit, all farms shall demonstrate
that they have used feed that complies
with the FishSource scoring requirements
for a minimum of 6 months
E. Verify that client has manufacturer's
letter of intent as applicable to first audits.
Thereafter, client must demonstrate that all x
feeds used are in compliance with the
Requirement.
Criteria 5.2 Criteria: Preference for better
feed manufacturers
Compliance
Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
a. Compile a list of all feed suppliers with A. Review feed supplier list and cross-check
x
contact information.
against feed purchases.
b. Prepare a letter of intent to
preferentially source feed from suppliers B. Verify that client has prepared the letter
x
who have a traceability and sustainability (it must cover traceability; see Indicator
policy by 19 December 2011 (Audit
5.1.3B).
Reference 9; also see Indicator 5.1.3B)
5.2.1
Indicator: Timeframe for
producers to provide
evidence of preferential
sourcing of feed products
from feed manufacturers
c. Communicate your organization's policy C. Verify that client communicated policy to
x
that have a sustainable
to each feed supplier.
feed supplier
sourcing policy for feed
ingredients, and traceability
of feed ingredients
Requirement: 2 years
following the date that the
ISRTA are published
Applicability: All Farms, Unit
of Certification Only
Commitment letter available? Contegral letter available during the audit; January 19, 2016 aigned by Juan Jose Uribe
Montoya, Operations Manager, last page of the commitment letter, it is stated; Contegral as feed supplier, they
understand and it represents their intention to produce, under fish source requirements with fish meal and fish oil
higher than 6 as score. On the case of SOLLA there is the declaration by GALDECUN S.A. (raw material supplier to SOLLA
S.A.) stating on January 22, 2016; Galdecun S.A. through this certificate declares for the processing of fish meal and fish
oil, Galdecun S.A. utilizes raw material (fishery byproducts) coming from companies following the legislation and they
adjust to the criteria established by the Code of Conduct for Responsible Fishery or consequently these companies could
show, a commitment to fulfill the criteria, utilizing resources both efficient and sustainably, with a business culture
focusing on continuous improvement.
d. Request a traceability policy from each
D. Verify client requested documents from
x
feed supplier (or letter of intent to
each supplier.
establish one) before 19 December 2011.
Yes
No
Finding
Suppliers name: Contegral S.A. and SOLLA S.A.
Supplier address: 1. Neiva, Km 12, southern highway, Neiva-Colombia; 2. 42 street #33-80 Southern freeway, ItagüiColombia
Contact information: Contegral; Juan Jose Uribe Montoya (Operations Manager) Mobile; (+57) 3137185066,
[email protected] ; SOLLA; Juan Jose Jaramillo, NUtrition Director, phone (+57) 44448411
www.solla.com
Letter of intent to preferentially source available?: Yes, letter signed by Juan Jose Uribe Montoya (Operations Manager)
on January 19, 2016 stating Contegral is currently in process to request a certification for Aquaculture under BAP
guidelines, and it is establishing a sustainability policy which it´s been implemented on the present year 2016. Moreover,
the company counts with all the standards and requirements aiming to guarantee the fulfillment of all the basic points of
sustainability for the production of feed for tilapia. For SOLLA; GALDECUN S.A. (raw material supplier to SOLLA S.A.)
stating on January 22, 2016; Galdecun S.A. through this certificate declares for the processing of fish meal and fish oil,
Galdecun S.A. utilizes raw material (fishery byproducts) coming from companies following the legislation and they adjust
to the criteria established by the Code of Conduct for Responsible Fishery or consequently these companies could show,
a commitment to fulfill the criteria, utilizing resources both efficient and sustainably, with a business culture focusing on
continuous improvement.
Record date:January 19, 2016 (CONTEGRAL). For SOLLA January 22, 2016.
Have all suppliers recieved the organization's policy?Yes, letter of commitment by the client has been received by both
suppliers (CONTEGRAL and SOLLA)
Record date: February 04, 2016
Records requested documents from each suppliers: Yes, Yes, letter signed by Juan Jose Uribe Montoya (Operations
Manager) on January 19, 2016 stating Contegral is currently in process to request a certification for Aquaculture under
BAP guidelines, and it is establishing a sustainability policy which it´s been implemented on the present year 2016.
Moreover, the company counts with all the standards and requirements aiming to guarantee the fulfillment of all the
basic points of sustainability for the production of feed for tilapia. For SOLLA; GALDECUN S.A. (raw material supplier to
SOLLA S.A.) stating on January 22, 2016; Galdecun S.A. through this certificate declares for the processing of fish meal
and fish oil, Galdecun S.A. utilizes raw material (fishery byproducts) coming from companies following the legislation
and they adjust to the criteria established by the Code of Conduct for Responsible Fishery or consequently these
companies could show, a commitment to fulfill the criteria, utilizing resources both efficient and sustainably, with a
business culture focusing on continuous improvement.
Applicability: All Farms, Unit
of Certification Only
E. Verify client requested documents from
each supplier. Auditors shall allow clients
e. Request sustainability policy from each
one year (until 19 December 2012) to
feed supplier (or letter of intent to
demonstrate full compliance with 5.2.1c-e
establish one) before 19 December 2011
in accordance with forthcoming ASC
guidelines.
Sustainability and traceability policys available? Yes, Yes, letter signed by Juan Jose Uribe Montoya (Operations
Manager) on January 19, 2016 stating Contegral is currently in process to request a certification for Aquaculture under
BAP guidelines, and it is establishing a sustainability policy which it´s been implemented on the present year 2016.
Moreover, the company counts with all the standards and requirements aiming to guarantee the fulfillment of all the
basic points of sustainability for the production of feed for tilapia. For SOLLA; GALDECUN S.A. (raw material supplier to
SOLLA S.A.) stating on January 22, 2016; Galdecun S.A. through this certificate declares for the processing of fish meal
and fish oil, Galdecun S.A. utilizes raw material (fishery byproducts) coming from companies following the legislation
and they adjust to the criteria established by the Code of Conduct for Responsible Fishery or consequently these
companies could show, a commitment to fulfill the criteria, utilizing resources both efficient and sustainably, with a
business culture focusing on continuous improvement.
Record date: January 19, 2016 (CONTEGRAL). For SOLLA January 22, 2016.
x
5.3 Criteria: Energy use
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Indicator: Identification of
Instructions to Clients for Indicator 5.3.1 - Calculating Total Energy used by Farm
the energy sources and
5.3.1
calculation and verification a. Complete the Energy Budget
A. Verify that client completed the Energy
x
of total energy used at the Worksheet (Audit Reference 10).
Budget Worksheet.
culture facility
PRINCIPLE 6. MANAGE FISH HEALTH AND WELFARE IN AN ENVIRONMENTALLY RESPONSIBLE MANNER
Compliance
6.1 Criteria: Stocked tilapia recovery
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions) Yes
No
Instructions to Clients for Indicator 6.1.1 - Calculating Percent Recovery of Production Stages
A. Make sure client has collected 12
a. Collect 12 months of data on recovery
months of data on recovery before first
x
Indicator: Percent recovery before the first audit.
audit.
of fish stocked in production
stages after they have
b. If the farm proposes to modify the
attained a size of 100 grams formula for calculating percent recovery, B. Review justification for using an
x
6.1.1
submit written justification to the CB
alternate calculation if applicable.
Requirement: ≥ 65
before the first audit.
C. Review calculations and verify that
Applicability: All Farms, Unit c. Calculate percent recovery according to
client's production records support the
of Certification Only
the instructions above.
conclusions.
D. Verify that percent recovery complies
with Requirement.
Finding
Energy sources:ACPM, Electricity, gasoline; Consumption fuel (Diesel & gasoline); 10,218 gallons; 142,120 KwH (energy)
KJ / MT fish: 43,344,000,000
Finding
Has client collected 12 months of data? Yes, there is an excel wporksheet with 2015 breakdown production.
Stage where fish reach 100gr: Grow-out phase.
Estimated fish loss before 100 gr: 23.31%
#animals at 100g:3,125,071.25
#animals harvested: 2,359,089
Grow out survival average: 55%
Was the calculation done according the instruction:Yes according to calculation by Standard.
x
Percent recovery: 76.69%
x
Footnote [8] Recovery does not include recruitment of tilapia resulting from reproduction within the culture system.
6.2 Chemicals
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Yes
a. Prepare a list of all chemicals used on
the farm in the previous 12 months.
[Note: The TAD considers any substance A. Review list. Cross-check against
x
added by the producer to culture system - purchases (6.2.2) and health events (6.2.4).
aside from water and feed - to be a
chemical.]
6.2.1
b. Prepare a list of suppliers of all
Indicator: Allowance for the chemicals or therapeutants used.
use of chemicals and
therapeutants for disease
c. Prepare a list of all the countries where
and pest control that are
the product has been exported to in the
banned in the importing or
prior 12-month period
producing country
Requirement: None
Applicability: All Farms,
Farm-Wide
B. Review supplier list to identify the
country of origin for each chemical.
x
C. Review list and cross-check against
documentary evidence (e.g. sales
documents).
x
No
Finding
Is the list of all chemicals used on the farm in the previous 12 months?Yes, technical sheet of desinfectants available
during the audit; and on the correspondent warehouse.
The cross check was done correclty?: yes, on-site inspection to detect any presence of un-reported chemicals, not any
unreported chemicals used on the farm.
Suppliers name:Deter Rico product TIMSEN and ANFO CUAT (both disinfectants no antibiotics)
Supplier address:
Contact information:
Countries: United States (Miami-Costco)
6.2.1
Indicator: Allowance for the
use of chemicals and
therapeutants for disease
and pest control that are
banned in the importing or
producing country
Requirement: None
Applicability: All Farms,
Farm-Wide
6.2.2
d. Prepare a list of banned substances for
the producing and exporting country and
D. Review evidence and cross-check against
x
the national authority or regulating body
published information.
in producing country (contact information
required).
Is the list of banned substances available?:Yes, Veterinary Health Plan chart 11 Medicines which use it is banne
dcurrently on the rearing of Aquatic Animals In United States Cloramfenicol, clembuterol, Dietilstilbestrol (DES);
Dimetridazol, Ipronidazol, other Nitroimidazoles, Furazolidona, Nitrofurazona, others nitrofuranos, medicines based on
sulpamida, on livestock Sulfaetoxipiridacine, Fluoroquinolones, Glicopéptidos
The cross check was done correclty?:NO antibiotics used during 2015 however there is a health plan implemented on
the center.
e. Maintain records of voluntary and/or
mandatory chemical residue testing
conducted or commissioned by the farm
from prior 12-month period.
Records available?:No evidence of medicine supplied to the culture; however there is a registry implemented on the
farm medicine supplied code RPR 48 version 1 updated March 2015, the record title; Medicine supplied ´supply of
medicines to the animals lot on the station, will be formulates by the veterinarian.
Records dates: only visits by the veterinarian to the exploitation center; log file available during inspection. Registry of
Veterinarian visits last date of visit October 29 , 2015 ; activities accomplished take samples for Histopathology anaylsis
on cages 12 and 16 due to increase on mortalitites.
a. Maintain records for all purchases of
indicator: Allowance for the antibiotics (invoices, prescriptions).
prophylactic use of
antibiotics, prior to any
evidence of a disease
problem
b. Maintain a log of all health related
events. For each event record the
Requirement: None
duration and the requirements for use of
antibiotics or therapeutants (see also
Applicability: All Farms,
6.2.4)
Farm-Wide
E. Verify records.
A. Review purchase records and calculate
total amount procured by client. Inspect
storage area to verify quantities on site
Total purchased: No purchase of antibiotics at the moment, evidence; no therapeutants treatments at warehouse.
Previous inventory:
Invoices reviewed:
Records date:
Analized period stock:
Stock on site at audit:
NOTE:
B. Review log of health events to verify that
the quantity of antibiotic applied by the
client does not suggest prophylactic use
Antibiotic use is justified by a pathologic event? No purchase of antibiotics at the moment, evidence; no therapeutants
Total consumed:
Records reviewed:
dates:
Example:
C. Verification that antibiotics used are
c. Determine the total amount of
related to corresponding and current
antibiotics used in prior 12-month period
health-related events.
6.2.3
Indicator: Minimum hold
time required before any
water in which fish have
been fed with feed
containing methyl or ethyl
testosterone can be
released
Indicator: Health records
proving all therapeutants
were used or are being used
as prescribed by a veterinary b. Maintain all prescriptions for
B. Verify that therapeutants were used only
or accredited fish health
therapeutants for prior 12-month period. under prescription.
professional
Requirement: Yes
Applicability: All Farms,
Farm-Wide
Antibiotic use is justified by a pathologic event? No purchase of antibiotics at the moment, evidence; no therapeutants
Records reviewed:
dates:
Example:
This indicator applies only to farms where the hatchery is located at the grow-out site (e.g. the grow-out facility owns and operates the hatchery) and where the hatchery discharges into the receiving waters. During the
Does the Hatchery have the capacity to retain any water containing hormones for a period of ≥48 hours?: Only grow-out
phase is developed on the center being audited.
a. Hatchery facility must have the capacity
A. Inspect hatchery to verify effectiveness
Put details about the system to retain any water:
to retain any water that contains
of the systems to retain any water that
hormones for sex reversal for a period of
contains hormones for sex reversal.
Only grow-out phase is developed on the center being audited.
≥48 hours .
a. Keep a record of all therapeutants used
A. Review record of therapeutant usage.
for prior 12-month period.
6.2.4
x
Record available: No purchase of antibiotics at the moment, evidence; no therapeutants
Record date:
Cross check invoices and prescriptions (6.2.2) with therapeutants record:
Are all prescription for therapeutants for prior 12 month available?: No purchase of antibiotics at the moment,
evidence; no therapeutants presenc e during on-site inspection at chemicals warehouse, photgraphic evidence
Therapeutants used:
Were therapeuthants used only under presciption?
Documents to prove:
6.2.4
proving all therapeutants
were used or are being used
as prescribed by a veterinary
or accredited fish health
professional
Requirement: Yes
Applicability: All Farms,
Farm-Wide
c. If prescriptions are made by health
professionals who are not veterinarians,
obtain evidence of competency (e.g.
accreditation) in the diagnosis of fish
disease and drug therapy.
Indicator: Calculation and
verification of the total
a. Determine total amount of antibiotic
A. Verify against record of antibiotic use
amount of each antibiotic
used for prior 12-month period.
(see 6.2.2C).
(active ingredient) used per
mt fish produced per year.
b. Adjust total weight of antibiotic by the B. Verify fraction of active ingredient in
6.2.5
Requirement: Measured in fraction of active ingredient.
antibiotic with manufacturer's data.
kilograms of active
ingredient of individual
c. Determine total weight of fish
antibiotic/mt of fish
produced for prior 12-month period.
C. Verify that calculations are accurate.
produced/year
Calculate kg active ingredient/mt of fish
produced/year.
Applicability: All Farms,
6.3 Criteria: Mortalities
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Indicator: Presence of
A. Do site inspection to confirm there are
records demonstrating that
a. Ensure that fish mortalities are
no dead fish in cultures whose advanced
fish mortalities are removed
removed from cultures on a daily basis.
state of decomposition would suggest
consistently on a minimum
6.3.1
mortality is > 1 day
daily basis
B. Verify client's records show daily
b. Maintain records of daily removals of
Requirement: Yes
removals of fish mortality for prior 12fish mortalities.
month period.
Indicator: Evidence proving
acceptable disposal of dead
a. Prepare a farm policy that addresses all
fish, (i.e., landfill receiving
A. Review policy to verify it addresses all
requirements of the Standard in regards
receipts, sales receipts,
requirements of 6.3.2 of the Standard.
to the acceptable disposal of dead fish.
permits or approvals for
onsite burial, and assurance
if converted to animal meals
6.3.2
not destined for the culture b. Maintain records of mortality disposals B. Review disposal records to verify
of tilapia)
as evidence of compliance.
compliance.
Requirement: Yes
Applicability: All Farms,
Farm-Wide
6.4 Criteria: Fish health management
-
Is the person accredited to carry out prescriptions? Yes, veterinarian; Edgar Andres Pulido
Person name: Edgar Andres Pulido
Career: Veterinarian; National University of Colombia, 2000, Bogota
Put more details: Registered veterinarian; professional license N.- 8019 COMVEZCOL; graduated December 1, 2000
C. If a non-veterinarian wrote prescriptions,
confirm that the individual is qualified as an x
accredited fish health professional.
C. Do site inspection to confirm that farm
policy towards mortality is implemented
and mortality records are accurate.
Compliance Criteria (Required Client Actions) Auditor Evaluation (Required CB Actions)
Antibiotics used: No use of antibiotics at all
period:
Total consumed: No use of antibiotics at all
period:
Antibiotics used and fraction: No use of antibiotics at all
period:
Total antibiotic active ingredient used: No use of antibiotics at all
period:
Fish harvested:
Yes
No
Total weight calculated in kg active ingredient/mt of fish produced/year:
Finding
Mortality of more than 1 day observed? No mortality more than one day observed during the on-site inspection.
Contingency plan code MPR13 june 2015 Environmental management plan (contingency plan in case of massive
mortality on the center)
x
Records of daily mortality available: Daily mortality registry code RPR22 version 3 page 1 last date of anotation February
22-23 , 2016.
period:from January 01, 2015 to February 23, 2016
Dead fish disposal procedure: Animal Health Program MICA Management Plan code MPR11 version 01 May 2015, page
7
Way of Mortality disposal: Dying fish management during production; dying fish on the productive site are removed
daily duiring the morning or according to the necessitym, these are counted, registrated, on the daily mortality template
(RPR 07 & RPR 08) finally they are delivered to other companies to acquire daily mortality to generate other products
(fish meal) .
x
x
records checked: Aside daily mortality registry, there is a crtificate from Industrias de Harinas Carnicas del Huila S.A.S.
residues from the poduction during February 2015 up to date, they are received on the company to obtain fish meal.
records date: February 11, 2016
x
x
Yes
Disposal location: Harinas Carnicas del Huila S.A.S.
Disposal site complies with procedure?yes, it complais to standard
Describe observations:Certificate at the moment of inspection. Remission date February 25, 2016 delivery of 20
containers of mortality.
No
Finding
6.4.1
Indicator: Presence and
evidence of implementation
of a fish health plan that is
site-specific and contains
effective methods for 1)
Protecting the farm from
introduction of pathogens,
2) Preventing the spread of
pathogens within the farm
and to the receiving waters
and 3) Reducing the
potential for development
of disease resistance by
ensuring responsible
therapeutant use
Requirement: Yes
Applicability: All Farms,
Farm-Wide
a. Prepare a fish health plan that
addresses all requirements of the
Standard, including:
1) Protecting the farm from introduction
of pathogens,
2) Preventing the spread of pathogens
within the farm and to the receiving
waters, and
3) Reducing the potential for
development of disease resistance by
ensuring responsible therapeutant use
A. Review fish health plan to verify it
addresses all requirements of Indicator
6.4.1 of the Standard and that the plan is
site-specific.
x
Is there a fish health plan in farm? C.I Piscicola Botero S.A.; exploitation of Tilapia at Betania dam -Huila
Record date: 2012
Record code: No record code only year 2012
b. Obtain review and written approval of
the fish health plan by the farm's
veterinarian or health professional.
B. Confirm that the farm's veterinarian or
health professional has reviewed and
approved the fish health plan.
x
Who has reviewed the fish health plan?:Andres Edgar Pulido
Documents proving his qualifications:Professional license number 08019 COMVEZCOL (Veterinary Medicine and
zootechnicians Professional Bureau of Colombia)
C. Do site inspection to verify that fish
health plan is effectively implemented and x
understood by farm staff.
Document proving that fish health plan is effectively implemented and understood by farm staff:
Record date: May 16, 2015 training on good Aquaculture Practices and Hygine , record f trainings code RPR27 version 1
page 1
Who were the participants:Jeiber Javier Caro, JHon Edison Castillo, William Cerato, Orlando Ramos.