Key Noise Sensitive Receiver Proposed LNG Terminal Site Existing Black Point Power Station m Ni 0 Meters 200 ad oad Lun g Fabrication Yard and Barging Point (Expected to be decommissioned by end of 2006) Kwu Tan R Black Point Headland ´ Ro oad Yun g Lo ng R W an N1 Lung Kwu Sheung Tan 400 Figure 5.3a Location of Noise Sensitive Receiver at Black Point File: EIA_Docu-set2/0018180_ASR_bp.mxd Date: 03/10/2006 Environmental Resources Management
© Copyright 2026 Paperzz