ROAD SPEEDING FINES WORK DOUBLED 1500 FT WHEN WORKERS PRESENT SPEED LIMIT * Shoulder Pavement (To Become Permanent LIMIT ** XX When Shoulder Pavement Called For In Plans) DOUBLED LIMIT WHEN WORKERS ROAD 500’ 1500’ Shoulder 6’ Min. 500’ 200’(Min.) 200’(Min.) 6’ Min. (Temp.) 200’(Min.) 2’ (Min.) 500’ 500’ ** *** Alignment In Conformance * SPEED END LIMIT With Roadway Plans PHASE I SPEED ROAD WORK XX ROAD WORK LIMIT LIMIT ROAD XX WORK 500’ 1500’ ** SPEED 2640’ 2’ (Min.) (See Step 2) ROAD 640’ (See Step 2) 2640’ ** 500’ 1 MILE 200’ (Min.) 500’ 640’ WORK ** Proposed 4-Lane Roadway Temporary PRESENT ** NEXT X MILES ROAD WORK XX 500’ XX ROAD WORK END 4’ SPEED 4’ SPEEDING FINES SPEED NEXT X MILES XX WORK 1500 FT 1 MILE 1. Maintain two-lane two-way traffic over existing pavement. Construct new roadway within the proposed 4-lane limits, excluding the friction course. Sign as shown if roadway construction area falls within 15’ of existing pavement edge. When the construction area falls more than 15’ from the existing pavement edge, traffic shall be controlled in accordance with Index No. 601 or 602. 2. Construct shoulder pavement to provide two-lane two-way traffic over shoulder and existing pavement during ROAD WORK Phase II roadway construction. For lane width requirements see Index No. 600. Signing as shown, with the near ROAD 1500 FT WORK 1500’ zone modified in accordance with Index No. 603, to be in place prior to shoulder pavement construction. 1 MILE SPEED ROAD LIMIT SPEED LIMIT WORK END ** SPEEDING FINES ROAD WORK XX * SPEED DOUBLED XX 1000 Feet ** WHEN WORKERS LIMIT PRESENT XX 200’(Min.) 500’ 500’ ** ROAD WORK 500’ 500’ 500’ White Reflectorized Pavement Markings 500’ NEXT X MILES 500’ 500’ 500’ 640’ 2640’ 500’ 100’ C: \d\projects\standards\roadway\00600-s\00640-01. dgn 100’ Double Yellow Reflectorized Pavement Markings 500’ 100’ 2640’ 640’ 500’ 500’ 500’ 500’ 500’ Transition ** * ROAD WORK SPEED LIMIT ROAD 1000 Feet XX WORK 1 MILE 500’ Transition 100’ 500’ 500’ ** 200’ ROAD WORK SPEEDING FINES 500’ (Min.) NEXT X MILES ** SPEED *** END DOUBLED LIMIT WHEN WORKERS XX PRESENT SPEED ROAD WORK LIMIT ROAD XX WORK PHASE II 1500 FT 1. Remove existing pavement marking in areas of diversion and remark as shown, install warning devices and resign as shown. Traffic to be controlled in accordance with Index No. 607. For lane width requirements see Index No. 600. sm 970re SYMBOLS * Required For Projects > 2 Miles 2. Route through traffic to temporary and existing pavement. ** Required Only When Construction Zone Speed Reduced Below Existing Sign With 18" x 18" (Min.) 3. Construct transitions, excluding friction course. Orange Flag And Type B Light Posted Speed Prior To Construction LEGEND *** When Other Construction Or 6: 39: 43 PM Phase I Construction Channelizing Device (See Index No. 600) Note: See Sheet 2 for General Notes. Phase II Construction Maintenance Operations Occur Within 1 Mile, Sign(s) To Be Omitted And Signing To Be Coordinated In Phase III Construction 6/24/2013 Work Zone Sign Accordance With Index No. 600. LAST REVISION 07/01/09 REVISIO N Lane Identification + Direction of Traffic DESCRIPTION: INDEX FDOT 2014 CONVERTING TWO LANES TO FOUR LANES DESIGN STANDARDS DIVIDED, RURAL NO. 640 SHEET NO. 1of 2 ROAD WORK 1000FT SPEED SPEEDING FINES LIMIT END ROAD ROAD XX ROAD WORK CLOSED CLOSED ROAD SPEED WORK LIMIT ROAD SPEED WORK LIMIT 1500FT XX 1 MILE XX DOUBLED WHEN WORKERS ** ROAD WORK ** ** NEXT X MILES 500’ PRESENT 500’ 500’ 500’ 500’ 500’ 500’ 640’ 2640’ * 100’ 200’ 2640’ 500’ 640’ 500’ 500’ 500’ * 500’ 500’ SPEEDING FINES ROAD WORK Double Yellow ** NEXT X MILES ** XX WORK XX SPEED WHEN WORKERS PRESENT LIMIT ROAD WORK White Reflectorized Pavement Markings XX 1500FT WORK Yellow Reflectorized Markings (Double Yellow ROAD 1 MILE ** END LIMIT LIMIT ROAD *** 600’ (Min.) Pavement Markings ROAD DOUBLED 500’ Reflectorized SPEED SPEED 600’ (Min.) In No Passing Zones As Directed By Engineer) WORK 1000FT PHASE III 1. Remove temporary marking from the existing pavement and temporary shoulder pavement. Mark pavement, install warning devices and resign as shown. Traffic to be controlled in accordance with Index No. 607. For lane width requirements see Index No. 600. 2. Route through traffic to newly constructed roadway. 3. Resurface or reconstruct existing pavement including required shoulder pavement and friction course. * Required For Projects > 2 Miles PHASE IV ** Required Only When Construction Zone C: \d\projects\standards\roadway\00600-s\00640-02. dgn 1. Reroute through traffic as shown in Phase II. Signing to be as shown in Phase II. Speed Reduced Below Existing Posted Speed Prior To Construction 2. Construct friction course over pavement constructed in Phases I and II. *** When Other Construction Or Maintenance Operations Occur Within 1 Mile, Sign(s) To GENERAL NOTES Be Omitted And Signing To Be Coordinated 1. Existing signs and pavement markings that conflict with 5. For speed sign applications, see ’Regulatory Speed In Accordance With Index No. 600. construction signing and marking shall be obliterated or In Work Zones’ Index No. 600. removed. 6. For reflectorized raised pavement marker SYMBOLS 2. Lane widths for maintenance of two-way traffic should desirably be equal to lane widths of the existing facility, Sign With 18" x 18" (Min.) Orange Flag And Type B Light Channelizing Device (See Index No. 600) applications, see ’Pavement Markers’ Index No. 600 and Index No. 17352. but lanes shall be not less than 10’ in width. When one-lane one-way operations are necessary, a minimum width of 12’ LEGEND 7. Additional barricades, signing lighting or other shall be maintained and traffic controlled in accordance traffic controls shall be provided for limited work with Index Nos. 603 and 607. Minimum width for the areas in accordance with other applicable TCZ temporary shoulders is 6’. Indexes. Phase I Construction Phase II Construction Phase III Construction sm 970re 3. Within the lateral transitions, the maximum spacing between Type III Barricade 8. When a side road intersects the highway within the Type I or Type II barricades or vertical panels or drums TTC zone, additional TTC devices shall be placed in shall be based on the speed limit as follows: 15’ up to 25 accordance with other applicable TCZ Indexes. MPH; 30’-40 MPH; 50’ for 45 MPH or greater. 6: 39: 45 PM Work Zone Sign 9. Provisions approved by the Engineer shall be made The maximum spacing between warning devices used for for the removal of storm water from the delineation between the travel way and construction area is roadway(s) during construction. Lane Identification + Direction of Traffic 50’ for Type I or Type II barricades or vertical panels or drums. 10. For general TCZ requirements and additional 6/24/2013 information, refer to Index No. 600. 4. Warning devices shall be in conformance with ’Dropoffs In LAST REVISION 07/01/09 REVISIO N Work Zones’, see Index No. 600. DESCRIPTION: INDEX FDOT 2014 CONVERTING TWO LANES TO FOUR LANES DESIGN STANDARDS DIVIDED, RURAL NO. 640 SHEET NO. 2 of 2
© Copyright 2026 Paperzz