TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY

A
B.2
C
C
D
D
EUH-3
119A
1
200
CFM
8"ø
EF-6
AC-1
SPRINKLER
CLOSET
123
200
90
CFM
U
M
BREAK
ROOM
DD
10"x8"
EXTERIOR
STORAGE
200
COIL-1
20"x14"
245
CFM
123
535
119
CFM
DN
JC
50
CFM
WOMEN'S
SHOWER
35
WOMEN'S
WASH 10"x8"
ROOM
50
160
CORR
CFM
115
3
3
EF-3
T
4
8"Ø FLUE VENT THRU ROOF
WITH VENT CAP (TYP.3)
150
CFM
LOUVER
LOUVER STORAGE
112
M
M
INSTALL WASTE OIL
HEATERS AT 12"-0"
AFF. (TYPICAL)
9
BAY 3
BAY 4
BAY 5
103
104
105
126
4"Ø FLUE VENT
UP THRU ROOF
WITH VENT CAP
UP
285
TOOL
ROOM
FD
T
H2
EF-7
FD
DN
6"x4"
BATTERY
OEDW/
ROOM
WMS
108
6/4 UP TO
MEZZANINE
EWH-1
FD
EF-5
BAY 4
104
107
4"Ø FLUE VENT
THRU ROOF WITH
VENT CAP (TYP.4)
1/2"ø
10"ø
1/2"ø
4
IRH-3
REEL-2
8"ø
12"ø
42/30
OUTSIDE AIR
INTAKE
LOUVER
FD
FD
GAS
DETECTION
STROBE/HORN
ALARM
ISSUED
FOR BIDDING
66/30
OUTSIDE AIR
INTAKE
LOUVER
01/05/12
SHEET TITLE
MECHANICAL FLOOR
PLAN
T
PROVIDE BACKDRAFT DAMPER AT
FAN DISCHARGE AND 36/36
EXHAUST LOUVER, TRANSITION
FROM FAN TO LOUVER
6
IRH-3
GENERAL NOTES:
1. ALL EXPOSED CONTROL WIRING SHALL BE IN CONDUIT.
2. ALL WIRING AND EQUIPMENT SHALL MEET THE REQUIREMENTS OF NFPA
70 NEC. ARTICLE 511 - COMMERCIAL GARAGES, REPAIR AND STORAGE.
3. PROVIDE ONE Y-KIT AND DIESEL CANE FOR VEHICLE EXHAUST SYSTEM.
4. REFER TO ARCH ELEVATIONS FOR MECH PENETRATION LOCATIONS.
5. ALL EXPOSED DUCTWORK SHALL BE FIELD PAINTABLE.
INSTALL INFRARED HEATER
AT A 45° TILT
106
4"Ø COMBUSTION
AIR INLET WITH
WALL CAP (TYP.4)
#
66/30 OUTSIDE AIR INTAKE LOUVER
MEZZANINE MECHANICAL PLAN
FIRST FLOOR MECHANICAL PLAN
SCALE: 1/8" = 1'-0"
B
SCALE: 1/8" = 1'-0"
D
14"ø
1
2
8"ø
1
C
REEL-1
8"ø
REEL-3
A
TCC/SHORE
TRANSIT BUS
MAINTENANCE
FACILITY - PHASE II
VEF-1
VEHICLE TAILPIPE EXHAUST FAN
MOUNTED ON PLATFORM
DISCHARGE THRU SIDE WALL
IRH-1
6
OIL /
FLUID
EUH-2
STORAGE
MOUNT TO BUILDING STRUCTURE WITH RIGID SUPPORTS,
MOUNT 16'-0" AFF. COORDINATE INSTALLATION WITH
OVERHEAD DOOR AND TRACK. SEE ARCHITECTURAL
PLANS FOR MORE INFORMATION. (TYPICAL)
06/28/2012
105
T
IRH-2
102
7
12"x12" EXHAUST AIR
DISCHARGE LOUVER
30756
EXPIRATION DATE:
DATE:
FD
12"X12" EXHAUST AIR
DISCHARGE LOUVER
6
WOH-1
BAY 2
T
6"x6"
6/6 UP TO
MEZZANINE
LICENSE NUMBER:
BAY 5
8
IRH-1
MECHANICAL
OEDW/
WMS
6"x6"
EF-7
3/4"ø
INSTALL INFRARED HEATERS
AT 21'-0" AFF. (TYPICAL)
103
EUH-1
T
6"X6" DOWN TO MECHANICAL
ROOM W/ FD AT FLOOR
1/2"ø WOH-3
BAY 3
WOH-1
109
GAS DETECTION
SYSTEM CONTROLLER
3/4"ø
IRH-2
102
EF-5
T
31855 TRI-COUNTY WAY
SALISBURY, MD. 21804
BAY 2
EF-4
3/4"ø
3/4"ø
GUH-1
H2 MOUNTED 1'
BELOW CEILING
124
WOH-3
PROFESSIONAL CERTIFICATION. I
HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR
APPROVED BY ME, AND THAT I AM
A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND.
5
CO NO2
WASH
BAY
WH-1 (SEE PLUMBING
PLANS)
MECHANICAL
MEZZANINE
STORAGE
3/4"ø
8
126
WOT-2
PROJECT TITLE
8"ø
T
WOT-1
WOH-2
6
6"x4"
WOP-1
111
CFM
112
T
EF-1 & EF-2
1/2"ø
T
INSTALL GAS UNIT
HEATERS AT 8'-0"
AFF. (TYPICAL)
6"X4" DOWN TO BATTERY
ROOM W/ FD AT FLOOR.
VEST
160
CFM
116A
CU-1
IRH-4
285
30
CFM
101
T
10"x8"
ADMIN 150
ASSIST CFM
1/2"ø 3/4"ø
BAY 1
110
WASH
BAY
14"x10"
110
101
WASH
BAY
MECHANICAL
MEN'S
45
SHOWER
355
CFM
190
CFM
4
U
113
5 EF-2
EF-1 5
BAY 1
5
WOH-2
WASH
BAY
MECHANICAL
190
CFM
CFM
116
U
T
OFFICE
(ROY)
114
6"x4"
U
AC-1
10"x6"
IRH-4
MEN'S
WASH
ROOM45
T
GUH-2
GUH-1
MACINTOSH ENGINEERING
CONSULTING STRUCTURAL ENGINEERS
2133 STERLING AVENUE, UNIT #11
GEORGETOWN, DE 19947
(302) 448-2000 FAX: (302) 448-2001
10"x12"
INSTALL INFRARED
HEATER AT A 45° TILT
REEL-4
14"x10"
118
4"Ø FLUE VENT UP
PARTS
MEZZANINE
150
CFM
MORABITO CONSULTANTS, INC.
CONSULTING STRUCTURAL ENGINEERS
952 RIDGEBROOK ROAD, SUITE 1700
SPARKS, GLENCOE, MARYLAND 21152
(410) 467-2377
CFM
117
GUH-2
2
6"x4"
U
125
T
45
CFM
117ACFM
UP
M EF-3 5
U
10"x10"
121
12"x14"
PARTS
STORAGE
3205 Randall Parkway, Suite 211
Wilmington, NC 28403
910.341.7600
www.beckermorgan.com
U
3
4"Ø FLUE VENT
UP THRU ROOF
WITH VENT CAP
Salisbury, MD
312 West Main St, Suite 300
Salisbury, MD 21801
410.549.9100
Wilmington, NC
160
CFM
2
LOUVER
309 S Governors Ave
Dover, DE 19904
302.734.7950
10"x10"
DD
FARE
COLLECTOR
OFFICE 16"x8"
42/24 OUTSIDE AIR INTAKE LOUVER
475
CFM
475
CFM
123A
Dover, DE
1
10"x10"
16"x8"
120
18"x16"
EXTERIOR
STORAGE
24"x12" EXHAUST AIR
DISCHARGE LOUVER
10"x10"
24"x12" OUTSIDE AIR
10"x10"
INTAKE LOUVER
M
FARE FARE
DROP DROP
WALL CAP
COLLECT
122
A
B
ISSUE BLOCK
DRAWING NOTES:
1. INTERLOCK MOD WITH EF-1 & EF-2.
2. INTERLOCK MOD WITH VEF-1.
3. INTERLOCK MOD WITH EF-3.
4. 6/6 TRANSFER GRILLE ON EACH SIDE OF WALL.
5. EXHAUST FAN INSTALLED IN CLERESTORY WALL. SEE ARCHITECTURAL
DRAWINGS FOR CLERESTORY DETAILS.
C
D
6. MOUNT THERMOSTAT ON INSULATING SUB BASE.
7. 8/8 TRANSFER GRILLE ON EACH SIDE OF WALL.
8. PROVIDE 5'-0" LONG SIDE SHIELD EXTENSION AT LOCATIONS OF ADJACENT
LIGHT FIXTURES. REFER TO ELECTRICAL DRAWINGS FOR EXACT LOCATIONS OF
LIGHT FIXTURES.
9. 3"Ø PVC VENT AND 3"Ø PVC COMBUSTION PIPE UP TO CONCENTRIC VENT
TERMINATION THRU ROOF. INSTALL PER WATER HEATER MANUFACTURER'S
INSTRUCTIONS.
N
2
12.21.2001
FIRE SPRINKLER ADDITION
1
Mark
11.4.2011
CODE REVIEW COMMENTS
Date
Description
Revision Schedule
Project Number
2009145.00
Date
01/05/12
Scale
Drawn By
1/8" = 1'-0"
PMC
Checked By
DC
M200
© ALLEN & SHARIFF ENGINEERING, LLC JOB# 1031029
1/4/2012 2:11:27 PM \\Salisbury.allenshariff.com\today\Jobs 10\1031029 TCC Bus Facility\Active\1031029 MEP.rvt
B
B.2
ERV-1
A
B