Market Trials Structured/Unstructured Test Scenario Detail: 21– RTBM Capacity Scarcity Shortages Southwest Power Pool, Inc. Revision History Date or Version Number 1.0 July 1, 2013 1.1 September Author SPP Operations Change Description Comments Initial Version SPP Operations Market Trials Structured/Unstructured Test Scenario Detail 2 Southwest Power Pool, Inc. Table of Contents Revision History ...........................................................................................................................................2 1.0 Scenario Details ...................................................................................................................................4 1.1 Scenario Description ........................................................................................................................ 4 1.2 Expected Results............................................................................................................................... 4 2.0 Market Participant Activities ............................................................................................................7 2.0.1.1 MPs with Resources ..................................................................................................................7 3.0 SPP Activities and Procedures ..........................................................................................................7 3.1 Production-Like Activities ............................................................................................................... 7 3.2 Scenario-Specific Activities .............................................................................................................. 7 3.3 SPP Automated Procedures ............................................................................................................. 7 4.0 Additional Requirements & Considerations ..................................................................................7 4.1 Additional Components Required ................................................................................................... 7 4.2 Additional Considerations ............................................................................................................... 7 4.3 Demand Curve Background ........................................................................................................... 87 Market Trials Structured/Unstructured Test Scenario Detail 3 Southwest Power Pool, Inc. 1.0 Scenario Details 1.1 Scenario Description RTBM Operating Reserve scarcity pricing will be invoked by the following conditionssub scenarios: 1. 2. 3. 4. 5. 6. 7. 8. System-wide OR shortage only System-wide OR shortage, Zonal OR shortage System-wide OR shortage, System-wide REGUP shortage System-wide REGUP shortage, Zonal OR shortage System-wide OR shortage, System-wide REGUP shortage, Zonal OR shortage Zonal OR shortage only System-wide REGUP shortage only System-wide REGDN shortage only Scarcity pricing results from a capacity shortage on either a Reserve Zone basis or system-wide basis. Capacity shortages do not include shortages of Operating Reserves relating to insufficient ramping capability. These conditions will be invoked sequentially in 4 hour blocks starting on 9/23 through 9/26. 9/27 will be reserved for retesting of any condition that was not observed. The scenario schedule will be executed as described below: Sub-Scenario 1 2-a* 2-b* 3 4-a* 4-b* 5-a* 5-b* 6-a* 6-b* 7 8 Date 24-Sep 24-Sep 24-Sep 24-Sep 24-Sep 24-Sep 24-Sep 25-Sep 25-Sep 25-Sep 25-Sep 25-Sep Time (CPT) 0900 1000 1100 1200 1300 1400 1500 0900 1000 1100 1200 1300 * a-Zones 1 and 2 * b-Zones 3 and 4 1.2 Expected Results Following execution of the RTBM SCED, LMPs and MCPs will be communicated to the Market Participants. Market Trials Structured/Unstructured Test Scenario Detail 4 Southwest Power Pool, Inc. To ensure rational pricing of cleared Operating Reserve products, the SCED algorithm will include product substitution logic as follows: (i) (ii) (iii) Any Regulation-Up Offers remaining once the Regulation-Up Requirement is satisfied may be used to meet Contingency Reserve requirements if Regulation-Up Offer is more economic or is required to meet the overall Operating Reserve requirement; Any Spinning Reserve Offers remaining once the Spinning Reserve Requirement is satisfied may be used to meet Supplemental Reserve requirements if Spinning Reserve Offer is more economic or is required to meet the overall Operating Reserve requirement; The product substitution logic ensures that within each reserve zone the MCP for Regulation-Up is always greater than or equal to the Spinning Reserve MCP and that the Spinning Reserve MCP is always greater than or equal to the Supplemental Reserve MCP. For this scenario, even with product substitution, there will be a shortage of operating reserve cleared. If there is an Operating Reserve shortage, Scarcity Pricing will be invoked as described under Section 4.1.5 of the Integrated Marketplace Protocols. All applicable demand curves will be applied to the LMP when the next additional MW of energy causes an increase in the corresponding shortage conditions. This logic explains the application of the zonal and system-wide Demand Curves. For this scenario, we will look at the following, with the assumption that there is no capacity shortage: 1. System-wide OR shortage only a. System-wide OR Demand Curve of $1100 applied to all reserve zones i. REGUP MCP: greater than or equal to $1100/MW ii. SPIN MCP: greater than or equal to $1100/MW iii. SUPP MCP: equal to $1100/MW iv. REGDN MCP: less than or equal to Regulation-Down demand Curve 2. System-wide OR shortage, Zonal OR shortage a. System-wide OR Demand Curve of $1100 applied to all reserve zones b. Zonal OR Demand Curve of $1100 applied to the zone in which the Zonal OR requirement was not met (in addition to the System-wide OR Demand Curve) i. REGUP MCP (shortage zone): greater than or equal to $2200/MW ii. SPIN MCP (shortage zone): greater than or equal to $2200/MW iii. SUPP MCP (shortage zone): equal to $2200 iv. REGUP MCP (sufficient zone): greater than or equal to $1100/MW v. SPIN MCP (sufficient zone): greater than or equal to $1100/MW vi. SUPP MCP (sufficient zone): greater than or equal to $1100/MW vii. REGDN MCP: less than or equal to Regulation Down demand Curve 3. System-wide OR shortage, System-wide REGUP shortage a. System-wide OR Demand Curve of $1100 applied to all reserve zones b. System-wide REGUP Demand Curve of $600 applied to all reserve zones (in addition to the System-wide OR Demand Curve) i. REGUP MCP: greater than or equal to $1700/MW ii. SPIN MCP: greater than or equal to $1100/MW iii. SUPP MCP: greater than or equal to $1100/MW iv. REGDN MCP: less than or equal to Regulation Down demand curve Market Trials Structured/Unstructured Test Scenario Detail 5 Southwest Power Pool, Inc. 4. System-wide REGUP shortage, Zonal OR shortage a. System-wide REGUP Demand Curve of $600 applied to all reserve zones b. Zonal OR Demand Curve of $1100 applied to the zone in which the Zonal OR requirement was not met (in addition to the System-wide REGUP Demand Curve) i. REGUP MCP (shortage zone): greater than or equal to $1700/MW ii. SPIN MCP (shortage zone): greater than or equal to $1100/MW iii. SUPP MCP (shortage zone): greater than or equal to $1100/MW iv. REGUP MCP (sufficient zone): greater than or equal to $600/MW v. SPIN MCP (sufficient zone): less than or equal to Operating Reserve demand curve vi. SUPP MCP (sufficient zone): less than or equal to Operating Reserve demand curve vii. REGDN MCP: less than or equal to Regulation Down demand curve 5. System-wide OR shortage, System-wide REGUP shortage, Zonal OR shortage a. System-wide OR Demand Curve of $1100 applied to all reserve zones b. System-wide REGUP Demand Curve of $600 applied to all reserve zones c. Zonal OR Demand Curve of $1100 applied to the zone in which the Zonal OR requirement was not met (in addition to the System-wide OR Demand Curve and REGUP Demand Curve) i. REGUP MCP (shortage zone): greater than or equal to $2800/MW ii. SPIN MCP (shortage zone): greater than or equal to $2200/MW iii. SUPP MCP (shortage zone): equal to $2200/MW iv. REGUP MCP (sufficient zone): greater than or equal to $1700/MW v. SPIN MCP (sufficient zone): greater than or equal to $1100/MW vi. SUPP MCP (sufficient zone): greater than or equal to $1100/MW vii. REGDN MCP : less than or equal to Regulation Down demand curve 6. Zonal OR shortage only a. Zonal OR Demand Curve of $1100 applied to the zone in which the Zonal OR requirement was not met i. REGUP MCP (shortage zone): greater than or equal to $1100/MW ii. SPIN MCP (shortage zone): greater than or equal to $1100/MW iii. SUPP MCP (shortage zone): greater than or equal to $1100/MW iv. REGUP MCP (sufficient zone): less than or equal to Operating Reserve demand curve. v. SPIN MCP (sufficient zone): less than or equal to Operating Reserve demand curve. vi. SUPP MCP (sufficient zone): less than or equal to Operating Reserve demand curve. vii. REGDN MCP: less than or equal to Regulation Down demand curve 7. System-wide REGUP shortage only a. System-wide REGUP Demand Curve of $600 applied to all reserve zones i. REGUP MCP: greater than or equal to $600/MW ii. SPIN MCP: less than or equal to Operating Reserve demand curve. iii. SUPP MCP: less than or equal to Operating Reserve demand curve iv. REGDN MCP: less than or equal to Regulation Down demand curve 8. System-wide REGDN shortage only a. System-wide REGDN Demand Curve of $600 applied to all reserve zones Market Trials Structured/Unstructured Test Scenario Detail 6 Southwest Power Pool, Inc. i. REGDN MCP: greater or equal to $600/MW *** Scenarios 1 through 8 assume the system is not capacity constrained with respect to the system RegDN requirement 2.0 Market Participant Activities 2.0.1.1 MPs with Resources Market Participants activities will be same as base scenario. Market Participants can observe LMPs and MCPs via user interfaces. 3.0 SPP Activities and Procedures 3.1 Production-Like Activities 1. Operators will track and exercise the tools to monitor MP performance. Calls will not be made. 3.2 Scenario-Specific Activities 1. 2. 3. 4. Potential overrides necessary to ensure adequate data exists for the scenario: Ensure subset of resources are offered in to supply Operating Reserves as defined in Section 1.2. Ensure Reserve Zone Limits are established Ensure Reserve Zone and System-Wide OR Requirements create a variety of shortage conditions. 3.3 SPP Automated Procedures Desk procedures for RTBM and Gen Dispatch Operations 0841PCS00001 4.0 Additional Requirements & Considerations 4.1 Additional Components Required None Applicable 4.2 Additional Considerations SPP staff will document the results of the scenario. This documentation should include, but is not limited to, the following: What was the status of MP participation? Did MPs submit all data as requested? What was the quality of the data? How much manual intervention was required by SPP for the input data due to lack of MP participation, quality of data, etc? What were the results of the scenario? Did the results reflect the expected outcome? How much manual intervention was required by SPP to execute the market and achieve a solution? Were the results posted to the MPs by the pre-determined deadline? Market Trials Structured/Unstructured Test Scenario Detail 7 Southwest Power Pool, Inc. 4.3 Demand Curve Background A Demand Curve is a series of quantity/price points used to set Operating Reserve Market Clearing Prices when there is a supply shortage of Operating Reserve and to set LMPs when there is shortage of capacity to meet Energy requirements. There are three sets of Demand Curves that apply on a system-wide basis and a Reserve Zone basis: (1) Operating Reserve; (2) Regulation-Up; and (3) Regulation-Down. The price point for each Demand Curve is (1) Operating Reserve = $1100; (2) Regulation-Up = $600; and (3) Regulation-Down = $600. Market Trials Structured/Unstructured Test Scenario Detail 8
© Copyright 2026 Paperzz