West Clayton NCP – Stage 1 Citizens Advisory Committee Meeting #7 Preliminary Utility Servicing Summary Agenda • Water Distribution • Sanitary y Sewer • Stormwater Infrastructure West Clayton CAC #7 West Clayton NCP – Water Distribution Existing Water Network • Existing watermains: 100mm – 150mm dia. • Supply from Clayton Booster Stn – 115m Pressure Zone (PZ) • Water supply sources in area: • City’ss PRV at 72 Ave / 184 St (90m PZ) City Metro Vancouver’s Clayton Reservoir (90m PZ) City’s Clayton Booster Station (115m PZ) Interconnections 250mm watermain on 180 St, south of Fraser Hwy 300mm watermain on 182 St, south of Fraser Hwy West Clayton CAC #7 West Clayton NCP – Water Distribution Existing Water Network West Clayton CAC #7 West Clayton NCP – Water Distribution Water Servicing Objectives • Maximize area of 90m PZ • Use PRV at 72 Ave / 184 St until capacity reached • Utilize Metro Vancouver’s Clayton Reservoir for long-term supply • Utilize Clayton Booster Stn. Stn for supply to 115m PZ • Interconnect 90m zone south of Fraser Hwy (redundancy) • Consider future servicing of North Clayton NCP West Clayton CAC #7 West Clayton NCP – Water Distribution Proposed p Water Servicing g Strategy gy West Clayton CAC #7 West Clayton NCP – Water Distribution Water Network Constraints & Upgrades 90m Pressure Zone Reconfigure & upgrade PRV at 72 Ave & 184 St New 750mm watermain on 72 Ave (from reservoir to 188 St) for West Clayton y + North Clayton y NCP New 300mm watermain on 72 Ave (from 188 St to 184 St) for West Clayton NCP Connect to existing watermain (Fraser Hwy & 180/182 St) 115m Pressure Zone Upgrade watermain on 72 Ave (186 to 188 St) Add additional 300 L/s pump at Clayton Booster Stn West Clayton CAC #7 West Clayton NCP – Water Distribution Water Financial Summary DCC Eligible Projects / Costs $6.2 Million +/- DCC Revenue West Clayton CAC #7 $7.6 $ 6 Million o +// West Clayton NCP – Sanitary Sewer Existing Sewer System • No existing sewer in NCP area • 3 downstream connections: 1050mm North Cloverdale Trunk Sewer – 72 Ave / 177A St 300mm sewer – 182 St south of Fraser Hwy 300mm sewer – 184 St & 70 Ave • All sewers flow to North Cloverdale Lift Station • Cloverdale Trunk Sewer: Lift Station to Metro Vancouver West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Existing g Sewer System y West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Sewer Servicing Strategy • 95% of NCP to be serviced by y gravity g y • Extend 1050mm sewer / North Cloverdale Trunk Sewer (NCTS) from Fraser Highway / 72 Ave to 188 St / 80 Ave • NCTS to run along 7 to 10m contour: • Lots above NCTS to be serviced by gravity L t below Lots b l NCTS tto b be serviced i db by llow pressure sewer Lots near 184 St and 71 Ave can discharge south across Fraser Highway. West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Proposed p Sewer Servicing g Strategy gy West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Sanitary Sewer Phasing Constraints • Lots north of 71 Ave require NCTS extension before development NCTS extension across Fraser Hwy GVWD Watermain Relocation Right-of-way requirements / ALR / watercourse crossings • Lots on 74 Ave, east of 193 St : below-grade basements not se ceab e serviceable • North Cloverdale Lift Station existing capacity is fully committed West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Sanitary Sewer Upgrades • North Cloverdale Lift Station requires upgrades to service NCP (Qpeak = 496 L/s) • 1.4 km of downstream sewers require upsizing to service NCP • Additional upgrades would be required to service future North Clayton NCP F th Lift Station Further St ti Upgrade U d (Qpeak = 811 L/ L/s)) 800m of 600mm forcemain Additional 700m of downstream sewers West Clayton CAC #7 West Clayton NCP – Sanitary Sewer Financial DCC Eligible Projects / Costs $18.3 Million +/- DCC Revenue West Clayton CAC #7 $10 $ 0 Million o +// West Clayton NCP – Stormwater Existing Stormwater System • No storm sewer system in area • Ditches, culverts, creeks and ravine escarpment g lowlands,, Latimer Cr & North Cr • NCP drains to agricultural • Numerous tributaries & wooded areas West Clayton CAC #7 West Clayton NCP – Stormwater Existing g Drainage g System y West Clayton CAC #7 West Clayton NCP – Stormwater Stormwater / Watershed Constraints • Flooding g in lowland channels • Erosion of ravine streams • Maintaining groundwater recharge and pathways • Loss of habitat (forests, streams, etc.) • Habitat fragmentation West Clayton CAC #7 West Clayton NCP – Stormwater Stormwater Servicing Strategy • Clayton y Integrated g Stormwater Management g Plan ((ISMP)) • Minor system: storm sewers to convey 5-year flows • Major system: safe conveyance for 100-year flows • Stormwater ponds for storage and water quality (100-year) • Infiltration BMP’s in road right-of-way and on-lot Recharge groundwater Sustain creek baseflows Reduce erosion in ravines West Clayton CAC #7 West Clayton NCP – Stormwater Proposed p Stormwater Servicing g Strategy gy West Clayton CAC #7 West Clayton NCP – Stormwater Stormwater Servicing Strategy (cont’d) • 5 km of trunk sewers required q • 4 low-flow diversion structures proposed • Optimized & consolidate stormwater ponds: 2 ponds proposed Pond # 1 near Fraser Hwy & 72 Ave (0.3 ha) Pond # 2 near 184 St & 80 Ave (1.0 ha) • Lots near 184 St & 70 Ave can drain south across Fraser Highway • Creek setback & corridors incorporated into land-use plan • On-lot stormwater infiltration BMP’s West Clayton CAC #7 West Clayton NCP – Stormwater Financial DCC Eligible Projects / Costs $14.1 Million +/- DCC Revenue West Clayton CAC #7 $10.5 Million +/-
© Copyright 2026 Paperzz