01.
2.
3.
i
r-...EVALUATION REPORT
I
Provincial Highways Division Larkano
N.I.T No. TC/G-55/ 1775 dated: 14.12.2016
Name of Procuring Agency
Tender Reference No
Tender Description /
Name of Work / Item
W/R OF ROAD FROM LARKANO TO SONO
JATO1 VIA MAHAR WADA ROAD MILE: 0/0-3/0
= 4.83 KMS.
4.
5.
Method Procurement
Tender Published
6.
Total Bid Documents
Total Bid Received
Technical Bid Opening date
(If Applicable)
No. of Bid Technically qualified :(If Applicable)
Bid(s) Rejected
(If Applicable)
Financial Bid Opening date
Bid Evaluation Report
7.
8.
9.
10.
11.
12.
S.No:
Name of Firm
or Bidder
01
02
i
M/S. Shabir Ahmed
I
M/s. Oam Parkash
Not Applicable
18 Nos:
27.01.2017
Cost offered
by the
Bidder
Ranking
in terms
of cost
03
04
70,612,820
ls':
Lowest
Abbasi
2.
Single Stage - One Envelop Procurement.
18.12.2016
Daily News
20.12.2016
Daily Kawish
18.12.2016
Daily Intikhab
SPPRA Sr.No. 30837/2016.
37 Nos:
25 Nos:
Not Applicable
70,746,223
2nd':
Highest
I
Comparison with
Estimated cost
Reasons for
acceptance /
rejection
Remarks
05
06
07
A
= 13.90%above
B i). = 19.75%above
ii). = 17.50%above
iii). = 25.10%above
iv). = 21.80% above
v). = • At Par
A
= 14.05%above
B 1). = 20.30%above
Qualified as
per evaluation
Responsive and
lowest bid
recommended
for award of
work.
ii). = 17.90%above
criteria
criteria
Qualified as
per evaluation
Rejected
iii). = 25.75% above
iv). = 22.25% above
v). =
1% above
3.
M/s. Eid
Mohammad Brohi
70,821,201
3rd:
Highest
A
= 14.15%above
B i). = 20.45%above
ii). - 18%above
iii). = 25.90% above
Qualified as
per evaluation
criteria
Rejected
iv). = 22.50% above
v). = 1.50% above
( Contd: Page No.02).
( Page No.02).
S.No:
Name of Firm
or Bidder
Cost offered
by the
Bidder
Ranking
in terms
of cost
01
02
03
04
M/s. Abdul Jabbar
Abbasi
70,896,954
5.
M/s. J.S Constt: Co.
70,966,259
6.
M/s. Abbas & Co.
71,064,160
7.
M/s. S.M.Z Constt:
Co.
71,215,636
Comparison with
Estimated cost
I
tei I I igliest A
05
= 14.25%above
B i). = 20.60%above
ii). = 18.25%above
iii). = 26.05% above
iv). = 22.75% above
2% above
v). =
=
14.35%above
5th' Highest A
B i). = 20.75%above
ii). 18.35%above
iii). = 26.15% above
iv). = 22.90% above
v). = 2.25% above
6th' Highest A
= 14.50%above
B i). = 20.90%above
ii). = 18.60%above
iii). = 26.22% above
iv). = 22.95% above
v). = 2.50% above
7th: Highest A
14.75%above
B i). = 20.95%above
ii). = 18.85%above
iii). = 26.25% above
iv). = 22.98% above
v). = 2.75% above
Reasons for
acceptance /
rejection
Remarks
06
07
Qualified as
per evaluation
criteria
Rejected
Qualified as
per evaluation
criteria
Rejected
Qualified as
per evaluation
criteria
Rejected
Qualified as
per evaluation
criteria
Rejected
1
I
Signatures of the Members of the Committee
l
II
( Agfa Wahao Sahito )
_
..401811111•=imi.
Ift
A med
Assi ant Engineer,
Executive Engineer,
Public Health Engineering Division-I Provl: Highways Sub-Division
Larkano ( Member )
Larkano ( Member )
Abd://1 ajeed Panhyar )
tive Engineer,
Provincial Highways Division
Larkano ( Chairman )
Ex •
RC- PM (02 Weak 2016.17)
Estimate Techni6ily Sanctioned by Chief Engineer, Highways Sindh Sukkur.
No. CE/HWS/B/ 7944 dated: 7.7 .-el ".)--pl
7
COMPRATIVE STATEMENT
WIDENING / RECONDITIONING OF ROAD FROM LARKANO TO SONO JATOI VIA MAHAR WADA ROAD
Name of Work:-
MILE: 0/0-3/0 = 4.83 KMS.
Discription
S.NO:
M/s. Oam Parkash
M/s. Shabir Ahmed Abbasi
Estimated Cost
Rate
Rate
Amount
r
M/s. Eid Mohammad Brohi
A.-.
Rate
Amount
I
Amount
I
PART-A (Road Work)
1
Amount of Shedule B
2
Add:
3
Ded: Diff: Cost of Bitumen
14
57,377,165 I.
8,032,803 /-
% above
TOTAL
13.90 %above
(+)
7,975,426 /-
3,023,302 /-
3,023,302 /-
62,386,666 /-
62,329,289 /-
3,330,014 /-
3,330,014 /-
57,377,163 /-
57,377,165 /-
57,377,165 /14.05 %above
(+)
8,061,492 /-
t-
14.15 %above
(+)
8,118,869 /-
3,023,302 /-
3,023,302
/-
62,415,355 /- _
62,472,732
/-
PART-B-1 (984' Rft: Retaining Wall)
1
Amount of Shedule B
19.75 %above
2
(+)
657,678 /-
20.30 %above
(+)
675,993 /-
TOTAL
20.45 %above
(+)
680,988 /0 /-
0 /-
674,683 /-
Add: Cartage of Material
3,330,014 /-
3,330,014 /-
k------
3,987,692 /-
4,004,697 /- l
4,011,002
4,006,007 /-
/-
PART-B-II (6' Ft: Span Culvert)
1
17.50 %above
2
Add: Cartage of Material
(+)
90,562 /-
517,497 /-
517,497 /-
517,497 /-
517,497 /-
Amount of Shedule B
17.90 %above
(+)
92,632 1•
18 %above
(+)
93,149 /-
91,919 /-
TOTAL
609,400 /- I
608,059 /
219,924 /-
219,924 /-
....
/-
610,129 /-
610,646
219,924 /-
219,924 /-
PART-B-Ill (3' Ft: Span Culvert)
1
Amount of Shedule B
25.10 %above
2
Add: Cartage of Material
56,174 /-
TOTAL
276,098 /-
276,098
X4
r
1,104,400
(+)
55,201 /-
25.75 %above
(+)
56,630 /-
25.90 %above
(+)
56,960 I-
276,884
275,125 /275,125
X4
'1,100,500 /-
276,554 X 4
....--- 1,106,218 /-
/-
1,107,537 /-
276,884 X 4
Contd: P/2
P/2
S.NO:
Discription
10k
Nate
Amount
l
M/s. Eid Mohammad Brohi
N1/s. Oam l'arkash
\IJs. Shabir Ahmed Ahhasi
Estimated Cost
Amount
Rate
Amount
I
PART-B-IV (18' Dia l'ipe Culvert)
I
Amount of Shedule 8
21.80 ';,above
2
Add: Cartage of Material
22,384 /-
TOTAL
123,045 /-
123,045
X6
738,000
(+)
21,944 /-
22.25 %above
22,397 /-
(+)
X6
735,631 I"
22.50 %above
(+)
22,649 /-
123,310 /-
123,058 /-
122,605 /122,605
100,661 /-
100,661 /-
100.661 I•
100,661 /-
123,058 X 6
/1----- 738,348 /-
739,858
123,310 X 6
/-
PART-B-V (Miscellaneous)
1
Amount of Shedule B
1,851,650 /-
I %above
TOTAL
1,851,650 /-
1,851,650 /-
G.Total TOTAL
70,694,813 /-
70,612,820 /-
L851,650 /-
1,851,650 /-
1,851,650 /
18,517 /-
(+)
1,-
1.50 %above
(+)
27,775 /-
1,870,167 /-
1,879,425 I-
70,746,223 /-
70,821,201 /-
Contd: P/3
•
P/6
S.NO:
Discription
M/s. 8.81.Z Constt: Co.
Fstimated Cost
Rate
Rate
Amount
1
Amount
I
Rate
Amount
I
PART-B-IV (18' Dia Pipe Culvert)
1
Amount of Shedule B
100,661 /-
100,661 I22.98 %above
2
Add: Cartage of Material
22,384 /-
TOTAL
123,045 /-
123,045
X6
738,000
23,132 /-
(+)
123,793 /742,757 /-
123,793 X 6
PART-B-V (Miscellaneous)
1
Amount of Shedule B
1,851,650 /-
1,851,650 /2.75 %above
TOTAL
1,851,650 /-
G.Total TOTAL
G
70,694,813 /-
(+)
50,920 /-
1,902,570 /1
71,215,636 /-
1
1
Could: P/7
P/3
S.NO:
Rate
Amount
Rate
\ mount
Rate
Amount
I
M/s. Abbas & Co.
M/s. J.S Constt: Co.
M/s. Abdul Jabbar Abbasi
Estimated Cost
Discription
PART-A (Road Work)
1
Amount of Shedule B
2
Add:
3
Ded: Diff: Cost of Bitumen
14
8,032,803 /-
% above
TOTAL
(+)
14.25 %above
8,176,246 /-
57,377,165 /-
57,377,165 /-
57,377,165 I.
57,377,165 /-
1435 %above
(+)
8,233,623 /-
3,023,302 /-
3,023,302 /-
3,023,302 /-
62,386,666 I-
62,530,109 /-
62,587,486 1-
3,330,014 /-
3,330414 /-
14.50 %above
(+)
8,319,689 /3.023,302 /62,673,552
/-
PART-B-1 (984' Rft: Retaining Wall)
I
3,330,014 /
Amount of Shedule B
(+)
20.60 %above
2
685,983 /-
20.75 %above
(+)
TOTAL
20.90 %above
(+)
4,004,697 /-
4,015,997 /-
4,020,992 /-
517,497 /-
517,497 /-
695,973 /0 /-
0 /-
674,683 /
Add: Cartage of Material
690,978 /-
3,330,014 /-
4,025,987
/-
PART-B-Il (6' Ft: Span Culvert)
1
517,497 /
Amount o1 Shedule B
18.25 %above
2
1-,-)
94,443 /-
18.35 %above
1+1
94,%1 /-
517,497 /18.60 %above
(+)
96,254 /-
91,919 /-
Add: Cartage of Material
TOTAL
I
609,400 /- I
611,940 /-
612,458 /-
613,751 /-
219,924
219,924 /-
219,924 /-
219,924 /-
PART-B-III (3' Ft: Span Culvert)
1
Amount of Shedule B
26 tr,
2
2-6,a9 ,,
X4
(+)
57,290 /-
26.15 %above
(+)
57,510 /-
26.22 %above
(+)
57,664 /-
56,174 /-
Add: Cartage of Material
TOTAL
sib.% c
.
276,098 /1,104,400
277,214
X4
1,108,857 I-
277,588 I.-
277,434 /-
277,214 /-
I
277,434 X 4
1,109,737 /-
277,588 X 4
1,110,352 /-
P/4
S.NO:
Katc
M/s. Abbas & Co.
M/s. J.S Constt: Co.
M/s. Abdul Jabbar Abbasi
Estimated Cost
Discription
\ mount
_
Rate
I: ,te
Amount
I
Amount
I
PART-B-IV (18' Dia Pipe Culvert)
1
100,661 /-
Amount of Shedule B
22.75 %above
2
123,045
X6
22,900 /-
22.90 %above
(+)
23,051 /-
22.95 %above
(a)
23,102 /-
22,384 /-
Add: Cartage of Material
TOTAL
(+)
100,661 /-
100,661 /-
100,661 /-
I
123,561 /-
123,045 /738,000
123,561 X 6
741,368 /-
123,763 /-
123,712 I123,712 X 6
742,274 /-
742,576
123,763 X 6
/-
PART-B-V (Miscellaneous)
1
Amount of Shedule B
1,851,650 /-
1,851,650 /2 ''.above
(+)
37,033 /-
1,851,650 /-
1,851,650 /2.25 %above
(.)
41,662 /-
2.50 %above
(+)
46,291 /-
TOTAL
1,851,650 /-
1,888,683 /-
1,893,312 /-
1,897,941 /-
G.Total TOTAL.
70,694,813 /-
70,896,954 /-
70,966,259 /- 1
71,064,160 /-
contd. l'';
P/7
FINANCIAL REVIEW
(A)
Total Cost As pers Estimate
70,694,813 /-
Lowes Tender Amount
70,612,820 /-
Excess over Estimate
81,993 /-
(Engrq-A
-IcIll &hal, Sahito)
Executive Engineer,
Public Health Engineering Division-I
Larkano
(Member)
Remarks:- The Bid offered by M/s. Shabir Ahmed Abbasi. is responsive and lowest hence
recommoended for approval.
hmed Abro
ngr: t
Assista t Engineer,
Provincial Highways Sub-Division
Larkano
(Member)
(Engr: Abd if ajeed Panhyar)
Exec ye Engineer,
Provincial Highways Division
Larkano
(Chairman)
Comp: 02 Work MO) 2016-17
P/7
FINANCIAL REVIEW
(A)
Total Cost As pers Estimate
70,694,813 I-
Lowes Tender Amount
70,612,820 /-
Excess over Estimate
Remarks:- The Bid offered by M/s. Shabir Ahmed Abbasi. is responsive and lowest hence
recommoended for approval.
81,993 /-
*"
(En r:
Wahab Sahito)
Executive Engineer,
Public Health Engineering Division-I
Larkano
(Member)
1,_
10=mo,
1,1siela •
ngr: • t • hmed Abro
Assist. t Engineer,
Provincial Highways Sub-Division
Larkano
(Member)
...
ajeed Panhyar)
(Engr: Abd
Exec ye Engineer,
Provincial Highways Division
Larkano
(Chairman)
Comp: 02 Work P/10) 2016-17
Office of the Executive Engineer, Provincial Highway Division Larkano
ATTENDANCE SHEELLI
NAME OF WORK:r
W/R of road from Larkano to Sono Jatoi via Mahar Wada road
mile: 0/0-3/0 = 4.83 Kms.
NIT No.TC/G-55/ 1775 dated: 14.12.2016
Tender issue upto dt: 26.01.2017
dt: 27.01.2017
Tender opening
The following Firm / Contractors are present at the time of issued / opening of
tenders in presence of tendering Committee.
S.No:
1.
Name of Firm
Signature
Name of Representative
M/s. Shabir Ahmed Abbasi
04114e4vc
2.
M/s. Oam Parkash
4747/
3.
M/s. Eid Mohammad Brohi
4.
M/s. Abdul Jabbar Abbasi
5.
6.
7.
lihk.
1111
II
40
M/S. J.S Constt: Co.
II. ccip
\V
ti
M/s. Abbas & Co.
't
M/s. S.M.Z Coritt: Co.
11
( Abd6,1
ab Sahito )
Executive Engineer,
Public Health Engineering Division-I
Larkano (Member)
_.---Nik
a_
-•
••
( Aft
med Abr
Assistant Engineer,
Provincial Highways Sub-Division
Larkano (Member)
ajeed Panhyar )
( Abd
E cutive Engineer,
Provincial Highways Division
Larkano (Chairman)
OFFICE OF THE
EXECUTIVE ENGINEER,
PROVINCIAL HIGHWAYS DIVISION LARKANO
Ph: 074-4058111
provincialhighwaysdivisionIrkegmail.com
E-mail.
Name of Work / Item :W W/R OF ROAD FROM LARKANO TO SONO JATOI VIA MAHAR
WADA ROAD MILE: 0/0-3/0 = 4.83 KMS.
MINUTES OF PROCUREMENT COMMITTEE
A meeting of the Procurement Committee was held on 27.01.2016 for
the bids called upon vide N.I.T No. TC/G-55/ 1775 dated: 14.12.2016. which was
chaired by the Executive Engineer, Provincial Highways Division Larkano /
Chairman Procurement Committee and held in his office while attended by the
following members of the procurement committee.
Mr. Abdul Wahab Sahito
1/Executive Engineer
Public Health Engineering Division-I
Larkano
2/-
Mr. Aftab Ahmed Abro
Assistant Engineer
Provincial Highways Sub-Division
Larkano
There were (37) thirty seven Nos. blank tenders sold, out of which
(25) twenty five Nos. were put in the Tender Box. After scrutinizing, (18) eighteen
Nos. tenders were rejected due to original Call Deposit of the required earnest
money was not furnished with the tender and others. Therefore (07) seven Nos.
tender were considered in the bidding process by the Procurement Committee as
detailed are shown in the Bid Evaluation Report / Comparative Statement. The
rates quoted by the bidders were announced formally in presence of the
participant / their representatives and accordingly recorded. There was no any
conditional Telegraphic tender received.
/11111
'AL
(Aft. • Ahmed Abro)
( Abd41114/ahaahito )
Assistant Engineer,
Executh;e Engineer,
Public Health Engineering Division-I Provl: Highways Sub-Division
Larkano (Member)
Larkano (Member)
ajeed Panhyar )
( Ab
E cutive Engineer,
Provincial Highways Division
Larkano (Chairman)
P/3
Sr.
Nos.
1.
2.
3.
4.
5.
6.
7.
8.
Eligibility / Qualification Criteria
Registration with Pakistan Engineering Council
in the relevant field of specialization with the
renewal of 2017 & the extent of tender amount of
each work.
Bio-data of Engineers & Technical staff working
with
the
firm
alongwith
Engineering
Qualification Certificate.
Documentary evidence for works executed and
certificate of satisfactory completion of works of
similar nature during last 3 years.
List of work in progress, indicating cost of each
work and copy of letter of award of work.
List of machinery and equipment available with
documentary evidence of its ownership, as
required under chapter 4.2 (j) as SPPRA,
certificate bank showing credit worthiness
alognwith Bank statement.
No conditional or telegraphic tender will be
entertained
In case the tenders remain un-responded, the
same will again be issued and opened in the
presence of the committee on the following date.
All the bids or proposal can be rejected at any
time prior to the acceptance of the bid or
proposals as per SPPRA Rules.
Recommendation:s• Out of 07 participatio
M/s. S.M.Z Constt: Co.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
11 are declared as substantially qualified bidder by the procurement committee as meet with minimum qualification /
eligibility criteria.
4. The lowest evaluated ad qualified bidder is M/s. Shabir Ahm d Abbasi. Government Contractor with bid /
1111
( A iAlVaLSahito )
Executive Engineer,
Public Health Engineering Division-I
Larkano
( Member )
me' Abro
Assista t Engineer,
Provincial High ays Sub-Division
Larkano
( Member )
'
ajeed Panhyar )
five Engineer,
E
Provincial Highways Division
Larkano
( Chairman )
( Abd
(E.B. Qualified ADP Work-02 P/6 21116-17)
OFFICE OF THE
EXECUTIVE ENGINEER, PROVINCIAL HIGHWAY DIVISION LARKANO.
No.TC/G-55 / 11 C /of 2016
Phone No. 074-40;8111
Larkano dated: i
.—
NOTICE INVITING TENDERS.
6
Tenders arc invited from interested persons / suppliers / contracts / companies / firms on standard
Bidding Documents Forms for Procurement of the following work as per SPPRA Rules 2010.
Sr. No.
I Name of Scheme
I
Bid Security 4°..
(in Rupees)
LIST ATTACHED SEPRATELY
Estimated Cost
Tender Fee
Time Allowed
(or completion
TERMS & CONDITIONS
1.
3.
The intending participants can purchase the blank bid documents on payment of tender fee not
re fundable from this office for each work from the date of publication upto 09.01.2017 01,00 P,M,
The tender will be received back on 10.01.2017 upto 01.00 P.M and will be opened on same date
10.01.2017 ac 2.00 P.NI in the presence of intending contractors arc their authorized representatives.
Eligibility condition for intending participants are as under:IL
ii).
iii).
iv).
v).
vi).
vii).
Sr. No.
Registration with Pakistan Engineering Council in the relevant field of specialization with the
renewal of 2017 of work & the extent of tender amount of each work.
Bio-data of Engineers & Technical staff working with the firm alongwith Engineering
Qualification Certificate.
Documentary evidence for works executed / works in progress and certificate of satisfactory
completion of works of similar nature during last 3 years.
List of work in progress, indicating cost of each work and copy of letter of award of work.
List of machinery and equipment available with documentary evidence of its ownership, as
required under chapter 4.2 (j) as SPPRA, certificate bank showing credit worthiness alognwith
Bank statement.
No conditional or telegraphic tender will be entertained.
In case the tenders remain un-responded, the same will again be issued and opened in the
presence of the committee on the following date.
Issue of Blank Tenders
2
11.01.2017 TO 26.01.2017
Received of Tender
3
27.01.2017 0.100 P.M
Opened of Tender
4
27.01.2017 0 3.00 P.M
viii).
4.
5.
6.
7.
S.
9.
10.
11.
All the bids or proposal can be rejected at any time prior to the acceptance of the bid or
proposals as per SPPRA Rules.
Pakistan Engineering Council license is not mandatory for the works upto 4.00 million.
Registration with Income Tax Department (NTN Certificates), Income returns should be provided and
copy of C.N.I.C.
The bidder should have Registrations with the Sindh Revenue Board.
Undertaking on Affidavit that the firm is not involved in any litigation or had not abandoned any work
in the Department.
The bidders should submit earnest money as showing against each work in shape of Call Deposit
prepared from any scheduled bank in favour of the undersigned.
Affidavits to the effect that the firm / contractor have not been blacklisted previously by any executing
agency.
Affidavits to the effect that all documents / particulars / information furnished are true and correct. In
case of (togas /Tempered or false information / Certificate is provided by the company / firm shall be
liable to be black listed at any stage.
In case of firm, list of partners / partnership deed, giving full particulars of directors / proprietors or
other connected alongwith power of attorney. In case of being sole proprietors, such undertaking on
affidavit be furnished.
Could: l'/2
•
12.
13.
14.
15.
16.
17.
I'/2
Details of owner alongwith CNIC on Judicial Stamp paper, A representative should have authority on
Judicial Stamp Paper from owner and participation.
Call Deposit (Earnest money) will be refunded to the unsuccessful bidder(s) after issuance of Letter of
Award to the successful Bidder.
The tender should be submitted alongwith the above required documentation / information, if such
lacks the tender will not be consider by the procurement committee and no excuse will be consider even
if the work is in hand for execution .
Bid Documents arc available on deposition of non refundable price of Rs:3000/=
Bid validity 90 days.
In case of Public Holiday or the undersigned remains out of head quarter, the tenders will be opened on
the next working day.
---44
Executive .n
er,
Provincial Highways Division
Larkano
Copy fonvarded with compliments to the:.1. Chief Engineer, Highways Department Sukkur, for favour of information please.
-1. Superintending Engineer, Provincial highways Circle Larkano, He is requested to kindly accord necessary
approval of the N.I.T.
.1. Director Information Public Relation Department (Advertisement) alongwith spare copies of advertisement
for publication in leading news papers.
Secretary 1.T Department Government of Sindh, Sindh Secretariat Building No.6, 1.0: floor Karachi.
.1. Director (C.B) Sindh Public Procurement Regulatory Authority Government of Sindh Block 8-A, Sindh
Secretariat 4-B Court road Karachi for favour of information.
.1. Assistant Engineers Provincial Highways Sub-Division Larkano / Shandadkot for information and
immediately they are requested to submit the estimate and schedule "B" of the works immediately for
taken further necessary action.
.1. Divisional Head Draftsman / Head Clerk for information.
.1. Copy for NOTICE BOARD.
Executive
eer,
Proviacia4-Highways vision
Larkano
•
LIST OF WORKS
1
•
S.No:
Name of work
1
Widening / Re-habilition of
Mahar Wada to Larkana Khairpur
road via 57 Regulator
2
W/R of road from Larkano to
Sono jatoi via Mahar Wada road
5.00 Kms.
Estimate
Cost.
Earnest
Money
Tender
fee
Time allowed
for completion
Requirement
valid nc,
85.000
4% of Bid
Price
3000/=
12 months
74.000
4% of Bid
Price
3000/=
12 months
Execut
Provincial llighw,
La rkano
cer,
wision
Registration in
Category C-4
(CEOI & CE10)
of the year 2017
Valid PEC
Registration in
Category C-4
(CE01 & CE10)
of the year 2017
•
....
.
....
;
:'
•.$(1
..Aciff
...,
.."
(0: ).,
..•,,'
...
074405.1111:;;
No RIV..55'1775%42016
Losicano
' .....1- le ' • ..: , _
ohlid
NW 14.12401,
iaraid
, 2.. i .14eC11-r; G. -, /..1rs,- 64,10;21.,,
,..:iat-L:oto.A.srritos
.,:......,3,;,:4:<.")fitfi;)-1."//:54,-,f...A./;•:::1.Cf,
1:,,,:
,.. ,..-i ......4
,x-'
(:1;-e
._
al: Non ,,t'S lt5 001 j'fb..f.i.d:a./e 1
egviis,'‘..
(1:01)C-1,1•Af
i,144/,:vijiirC..•57
,,-1../
,..-"}-;
r1C
41,1
:2017,,Ii..
.112 3011" 1,11 74.030 ,/trpriPleriCe 2
CT121)C.4,0f
,
445
811A5.01:n..14,
4.:JA,C(Cr.10.0
4`41otP.I'TC
Yif LW,. j :0,4s:::.er 6:.z.iz .1,1 .A.....;:1—o Zd, o1
S
-,..7.-.C_ ii,....42:,,-(4.0,400.:7407.01-7017._6.1-,f-tot:t,
•1 --i;)(4.,./: ei”,•Jes...4.-4,01.06,..-110-07-7017,:i: 0:
.(.._1,.,./4.,. n: 4.9.,..,:h, i ma1-2017S,r,ftAraieS,..,..N.If
01
..122:4:: ;it
.1
...444r
h.7,t.ii:..z,
';‘.. 1.)
,;,!=l-t.t...,12/..17'.Avrfi iti4 a:017
..f...1.q11V:L4,441,......A.-1r.:?'ff1e..r.t.4-'
od.J.:Jtv,,,...v,.....14.(1.,,,,,A.z.....,-„(...g.r, 0,7
kt....-i,"...:1',,,,,:::,p.,,,..z..45:,-.....:::....A.c.:, (.7
.....j.../...!:,,A.L.:4-.....s:,1_,r,,,..:LsppRA.,_:07„;:.-/
rLI,,',..-?.ii z.:.::_:.;1 $...:- Go
,...c.,44,,,V,-1,,,,:::;,•,,,t,„-J2.,,,),-,,,71-;,:::: (.,$)
u:d1r2-4-4.f.4 ,,
a&(6:4
$.1 ,-,S.:4.:
.i.vt,g:.,$.
4
4
3
2
2741.2017
27-01.2017
t,..n1:tgt 4......)/
4 oi :o0;,....at
11.01.2017
26.01-20171-
1
•SPiRA GAO
:(.4!
-5-c=t,k57-'111.4i
oi
os
r
s.c&d:,1/4,11
-;:%/..erif-L•1•K.--1,11 07
,LA
r4,,
cat
44-4.--,-1
,1,-001
-g:r
tg
%
fer
i:
r
...P7
°iir
ar..
:::1":
1
•;:
f4
i0
;09
10
/ZrZtr?..e:e
11
1. rj:eurh.1:0:14
1
Lit
,1 '0
/4
12
Ve II
I
14
15
Lf47:::?'
(6
11,. :67
INF-ItRY Ne•At74/ 36
:anima
8 3 9
8 A••".....c, • ,A
Official Website of Sindri Public Procurement Regulatory Authority , SPPRA
1441C.41,-011
11,...t.
N......•••11
•...9.11.6.110
y r‘sa.•
Iv. • • y
Search Tenders Archieve By City Names click here
tandem
Evaluallon Reports
• Serial No.
City (e.g sukkurt
Black Iwtart rams
Advance Search
SPPRA ID
Tender Title
Committer.
subrmt
Advertise Date
romp% Documents
Month/Year
Policy ImInsclions
1 Failed to connect to MySOL: " mysati_connect_error();
trmrlew Panel
Upload
SPPRA Tender ID
( OVA/ Ii
Tender nth,
Download
On
Conhpinclum
Advartla• Data Closing Date
Ihuldmp
I
ROM11
MO/ Notices
le V, SCX, • 'N141
alt ca
.4
pc•Afi,..47%,,,,
IS-124.03
to Ore 2016
r 09 Jan 2017
n.ri:rry
Not,fiCA:10ii%
rm.:0,mm.i rian•
niaristic:
I own
Users Online 18
Policy Letter
Added 01 Aug
2016
111..rie
%PPR..
P..• . ...
Act Jan
5..t,
rrr• wrrw•rr
Intnov.t...A1P,LitlAn
20(71 2016 Smith Public Procurement Regulatory Authority . All right rimerved.
PGrasirxIllgov.pkitonder)listory php?Scarcllf3y= id&tx lSearch= 30837Edt F rcrn Date= 8listmcnth= le.listyear = 2008
prIn
(,.4,.I Is
W., MI..
Vat All
0
GOV ERN M ENT OF SI N 12).1.1
WORKS ( SEItV I C tS t:)L rA ItTNI LENT
'rite ChIelErtgloctfr
51.a ....;Igiz•
SUBJECT:
ADP NO. 2,16,
..c../ RECONT_PITIONING_OV_AQAp_
FRONT
p
-.00.KNI LARKAN• TO SONIC) ATO1 'VIA NI:kI-CAR .WADA II.Q.62
ZICZT LARRANO1
.
,-.• ,
j4
,•
Silnal011 Of the Government of Sindh, S:hereby aci:foti.le.L1 to.' the,;.iss.u. iyiy;c0:131
Administrative .App. roval
in respect Of scheme cited xs subject at the;APP.m.v!Nt
cof:t of Ns.72,436 (13 eli(iA#!ti
th, rwil i'vtillkul
Foul I lwidred & .11ti rt 1. CI
s: • lis...ittit.itia Clt11,41::The
sciionie tv.is ..ipprut.k%! by 11),, I:11)w', in it..
..L. moeting hold . 011•19.09-20.16
.
; r;1•01- ..
Subsequently of fice memuratt'clu
• . •;•,':ak..;
-• - - -,
4,,.:',
ni issued bt. the W&S Departmvnt on1-.07
"
.
1
.
.
'
2
.......
.4,1*"...,i‘.,.1‘1,e'-:
..:1;.(3
H/2-102,116 (2
,
016-17) '\A/ DDWP The pl.)n;.)otirod Of the scheolt: ittE5t,..1 th.t7e'e.valfriK-;1:.',t'l.;.i,i.:',;1,.':.:.
Th.z exdiin;,'olv ed iviii be ciebited to the Ilead. a- 'Atcp4
nt
,
rA-Eccinornics .- \ fh irs (Co.!) i 0
045..
Construction & Transport- - 0)5'4.1 Rozik.l.trort5port.!0452022',:`,'",
1-iip,-hwilys Road and irici,
,-,,Qs.
....': •':.' .. '
•
.
All tht.? required coda! forni
-alities (v.; laid down in ti)i
arid4.-41i1;1.ane;
Depai . client's instructions must bo followed by the-cectioting
dgenc
•
•—
-V-777-
4
datC1 1 the, 23"NO
",n. 11/2- 1 / 1 (• 116-17) .111/1'1)11' 1'
..•.py
'It
I It.
:1(,:tion to:
torx;ircif:d p k r friforcif..r.:(0)
(t)ev.), i'l:frionin;,.
Thc
Oc.-1):Irtrurfo, Gco,%:rnittent. or SitIcth,
2. The Chief Engineer (i-1kgh.....;tvs) Sinc111. Sti!-:1,-.1.11. it. rnzty
noV-A
rarer
MI:: :1./1 dues not con:Vitttte (ma atopnnicil /LT
Estirtica.:. The final re51.3,1,14:ubtitty
provulcd ztt thr? kinigh Cc
for the ratcs hes !.nth the authorini competent to czecord the.
tke
Tcchr::cal Sanctiwg t l r eictaii ,,s1.irricate (Mg SCrufirlizi-ld
light of" the decision taken by Cite competent authority
also
Th(• authoritti acf.-or(h ,t3 Technit_:•al Sanctiotc
t;ft, sit' , of work closely "Z (..:s preViVZ!
ILL.
a.boue estimate provides for confingerzcies and work
citarge.'s, csuligisiwient tentatively.
3. Thy Dirccvn. General (DesIgn.), Works
Cr..-./..cr:I.rn ,!nr. of F3indh.
a..
Services Dep:irment..,
Scction Officer (DEV- II1), Finance Department, Government of
Narachi.
The ,•. *-3ection Officer (Budget EL Accounts), Works
Decay !Brent Governirtery. of Sindil, Karachi.
Ser:ides
5. The Director of Accounts (Inspection), Finance Department;
Government of Sindh, Karachi.
'1311((>0 16
(GHULAM
SECTION OFFICER (HIqHWAYS4)
FOR SECRETARY TO,goyvtigt,INDH
Section officer
TYork.s tfc. Services Depit,
Sirldit.
GOT!, Of
BID EVALUATION REPORT
01,
2.
3.
Provincial Highways Division Larkano
N.I.T No. TC/G-55/ 1775 dated: 14.12.2016
Name of Procuring Agency
Tender Reference No
Tender Description /
Name of Work / Item
WIDENING / RE-HABILITION OF MAHAR
WADA TO LARKANA KHAIRPUR ROAD VIA
700 REGULATOR ROAD MILE: 0/0-3/7.
4.
5.
Method Procurement
Tender Published
6.
7.
8.
Total Bid Documents
Total Bid Received
Technical Bid Opening date
(If Applicable)
No. of Bid Technically qualified :(If Applicable)
Bid(s) Rejected
(If Applicable)
Financial Bid Opening date
Bid Evaluation Report
9.
10.
11.
12.
S.No:
Name of Firm
or Bidder
01
02
1.
Cost offered
by the
Bidder
I
M/s. Al-Asad
03
I
Single Stage — One Envelop Procurement.
18.12.2016
Daily News
20.12.2016
Daily Kawish
18.12.2016
Daily Intikhab
SPPRA Sr.No. 30837/2016
36 Nos:
26 Nos:
Not Applicable
Not Applicable
21 Nos:
27.01.2017
Ranking
in terms
of cost
Comparison with
Estimated cost
04
05
880,14,414
lowest
Traders
2.
M/s. Mohammad
Ramzan & Co.
882,12,390
2nd':
Highest
3.
M/s. Zahid Ali Jatoi
882,48,487
3rd:
Highest
= 13.85%above
A
B i). = 20.50%above
ii). = 16.60%above
iii). = 17.95%above
iv). = 17.25% above
v). = 22.40%above
vi). = At par
A
= 14.05%above
B i). = 21.05%above
ii). = 17%above
iii). = 18.50%above
iv). = 18.50% above
v). = 22.90%above
1%above
vi). =
= 14.08%above
A
B i). = 21.08%above
ii). = 17.05%above
iii). = 18.75%above
iv). = 18.75% above
v). = 22.95%above
vi). = 1.95%above
Remarks
Reasons for
acceptance /
rejection
I
06
1
07
Responsive
Qualified as
per evaluation and lowest bid
recommended
criteria
for award of
work.
Qualified as
per evaluation
criteria
Rejected
Qualified as
per evaluation
criteria
Rejected
( Contd: Page No.02).
d-\v‘i
`1
"--
I
( Page No.02).
S.Nos
Name of Firm
or Bidder
Cost offered
by the
Bidder
01
02
03
4.
M/s. Tarique
Hussain & Co.
882,36,376
5.
M/s. M.B Builders
882,83,773
Ranking
in terms
of cost
Comparison with
Estimated cost
Reasons for
acceptance /
rejection
Remarks
04
05
06
07
Qualified as
per evaluation
criteria
Rejected
Qualified as
per evaluation
criteria
Rejected
I
= 14.10%above
Highest A
B i). = 21.10%above
ii). = 17.08%above
iii). = 18.80%above
iv). = 18.80% above
v). = 22.98%above
vi). = 1.60%above
= 14.12%above
5th' Highest A
B i). = 21.12%above
ii). = 17.10%above
iii). = 18.85%above
iv). = 18.85% above
v). = 23%above
1.65%above
vi).
4th:
Signatures of the Members of the Committee
(Af
hmed Abro)
( Abdul toSahito )
Executive Engineer,
Assist t Engineer,
Public Health Engineering Division-I Provl: High ays Sub-Division
Larkano ( Member )
Larkano ( Member )
( Abdul jeed Panhyar )
e Engineer,
Exec
Provincial ighways Division
Larkano ( Chairman )
ITC. P/2 (02 Work 2016471
imate Technically Sanctioned by Chief Engineer, highways Sindh Sukkur.
No. CE/HWS/DB/ 225 dated: 27.01.2017.
COMPRATIVE STATEMENT
Name of Work:-
WIDEINING / RE-HABILITATION OF MAHAR WADA TO LARKANA KHAIRPUR ROAD VIA 700 REGULATOR
ROAD MILE: 0/0-3/7.
Discription
S.NO.: I
I Estimated Cost
Rate
Rate
Amount
I
M/s. Zahid Ali Jatoi
M/s. Mohammad Ramzan & Co.
M/s. Al-Asad Traders
Rate
Amount
I
Amount
I
PART-A (Road Work)
1
2
3
14
74,535,457 /-
74,535,457 I-
Amount of Shedule B
10,434,964 /-
% above
Ded: Diff: Cost of Bitumen
TOTA I.
13.85 %above
(+)
10,323,161 /-
3,904.633 /-
3,904,833 /-
81,065,588 /-
80,953,785 /-
1,352,647 /-
1,352,647 /-
74,535,457 /-
74,535,457 /14.05 %above
(+)
-
10,472,232 /-
14.08 %above
(*)
10,494,592 /-
3,904,833 /-
3,904,833 /-
81,102,856 /-
81,125,216 /-
1,352,647 /-
1,352,647 /-
PART-B O. 400' Rft: Retaining Wall
I
Amount of Shedule B
20.50 %above
2
(+)
TOTAL
21.05 %above
(.)
284,732 /-
21.08 %above
(.)
285,138 /-
0 /-
0 /-
0 /-
1,636,317 /- I
1,629,940 /-
1,637,379 /-
1,637,785 /-
1,319,864 /-
1,319,864 /-
1,319,864 /-
1,319,864 /-
283,670 /-
Add: Cartage of Material
277,293 /-
PART-8 ii). 10' Rft: Bridge
I
Amount of Shedule B
16.60 %above
2
Add: Cartage of Material
TOTAL
(+)
219,097 /-
1 7 ".”.Ibove
(*)
224,377 /-
17.05 %above
(+)
225,037 /-
223,692 /I
1,544,241 /- _
1,538,961 /-
1,543,556 /- 1
1,544,901 /-
PART-B iii). 6' Ft: Span Culverts
1
Amount of Shedule B
517,624 /-
517,624 /17.95 %above
2
Add: Cartage of Material
TOTAL
(+)
92,914 /-
517,624 /18.50 %above
(+)
95,760 /-
517,624 /18.75 %above
(+)
97,055 /-
94,799 /I
612,423 /-
610,538 /- _
613,384 I-
614,679 /-
.7)
( ,,ntd:
P/2
•
to
s•
l'/2
S.NO:
M/s. Al-Asad Traders
Estimated Cost
Discription
Rate
Amount
I
Nt's Zahid Ali latoi
M/s. Mohammad Ramzan & Co
Rate
R.ite
Amount
I
Amount
PART-B iv). 3' Ft: Span Culverts (02 Nos.)
I
329,996 /-
Amount of Shedule B
329,996 /17.25 %above
2
387,898
X2
56,924 /-
18.50 %above
(+)
61)349 /-
18.75 %above
-
61,874 /-
57,902 /-
Add: Cartage of Material
TOTAL
(4)
329,996 /-
329,996 /-
I
775,796
391,045 I-
386,920 /-
387,898 /186,920
A2
773,841 /-
391,045 X 2
782,091 /-
391,870 /783,741 /-
391,870 X 2
PART-8 v). 18" Dia Paipe Culvert (05 Nos.)
Amount of Shedule B
100,662 /-
100,662 /22.40 %above
2
Add- Cartage of Material
23,015 /-
TOTAL
123,677 /-
123,677
X5
618,385
( 1)
22,548 /-
22.90 %above
(+)
616,051 I-
23,052 /-
22.95 %above
(...)
23,102 /-
123,714 /-
123,210 /123,210 X 5
100,662 /-
100,662 /-
123,714 X 5
618,568 /-
123,764 /618,820 /-
123,764 X 5
PART-B vi). Miscellaneous.
I
Amount of Shedule B
1,894,922 /-
1,894,922 /-
1,894,922 /-
1 %above
AtPar
(+)
18,949 /-
1,894,922 /-
1.50 %above
(+)
28,424 /-
TOTAL
1,894,922 /-
1,894,922 /-
1,913,871 b'
1,923,346 /-
G.TOTAL
88,146,987 /-
88,018,037 /-
88,212,390 /-
88,248,487 /-
(
•
P/3
Discription
S.NO:
\1/s. M. 1; 1;trildcr,
M/s. Tarique Hussain & CO.
Estimated Cost
Amount
0.1h.
Amount
Rate
PART-A (Road Work)
1
Amount of Shedule B
74,535,457 /-
2
Add:
10,434,964 /-
14
%above
I )1..d: Diff: Cost of Bitumen
TOTAL
74,535,457 /-
74,535,457 /14.10 %above
(+)
10,509,499 I-
14.12 %above
(4.)
10,524,407 /-
3,904,833 /-
3,904,833 /-
3,904,833 /-
81,065,588 /-
81,140,123 /-
81,155,031 I-
1,352,647 /-
1,352,647 /-
1,352,647 /-
PART•13 O. 400' Rft: Retaining Wall
Amount of Shedule ti
21.10 %abovo
Add. Cartage of Material
TOTAL
,•1
285,409 /-
21.12 %above
(+)
285,679 /-
0 /-
0 /-
1,636,317 /- I
1,638,056 /-
1,638,326 /-
1,319,864 /-
1,319,864 /-
1,319,864 /-
283,670 /-
PART-8 ii). 10' Rft: Bridge
1
Amount of Shedule B
17.08 %alio( e
2
Add: Cartage of Material
TOTAL
(.)
225,433 /-
17.10 %above
(+)
225,697 /-
223,692 /1,543,556 /- I
1,545,297 /-
1,54.5,561 /-
517,624 /-
517,624 /-
PART-8 iii). 6' Ft Span Culverts
1
Amount of Shedule B
517,624 /18.80 %above
2
Add: Cartage of Material
TOTAL
(.)
97,313 /-
18.85 %above
(+)
97,572 /-
94,799 /612,423 /- I
614,937 /-
615,196 /-
( ontd:
P/4
Discription
S.NO: I
I
\Vs M.B Builders
M/s. Tarique Hussain & CO.
Estimated Cost
Kale
Kate
Amount
-II
T: 0,
Aniiiiinl
I
I
\ !noun!
PART-B iv). 3' Ft: Span Culverts (02 Nos.)
1
---,
Amount of Shedule B
18.80 %above
2
(+)
18.85 %above
62,039 /-
(+)
62,204 /-
57,902 /-
Add: Cartage of Material
TOTAL
387,898
329,996 /-
329,996 /-
329,996 /-
I
775,796
X2
392,200 /-
392,035 /-
387,898 /392,035
X2
392,200 X 2
784,070 /-
784,400 /-
PART-B v). 18" Dia Palpe Culvert (05 Nos.)
1
Amount of Shedule 0
22.98 %above
2
Add: Cartage of Material
23,015 /-
TOTAL
123,677 /-
123,677
X5
618,385
100,662 /-
100,662 /-
100,662 /(+)
23 %above
23,132 /-
(+)
123,814 /-
123,794 /123,794
X5
23,152 I-
618,971 /-
123,814 X 5
619,071 /- _
PART-B vi). Miscellaneous.
1
Amount of Shedule B
1.60 %above
TOTAL
(+)
_
1.65 %above
30,319 /-
31.266 /-
88,283,773 /-
88,236,376 /-
88,146,987 /- _
(+)
1,926,188 /-
1,894,922 /-,
1,894,922 /-
G.TOTAL
1,894,922 /-
1,894,922 /-
1,894,922 /-
FINANCIAL REVIEW
\I
Total Cost As pers Estimate
88,146,987 I-
Lowes Tender Amount
88,018,037 I-
Savings over Estimate
Remarks:- The Bid offered by M/s. Al-Asad Traders. is responsive and lowest hence recommoended for
approval.
128,950 /-
4XIMPA
41
)1
);\'S
(Engrt/achtl ahab Sahito)
Executive Engineer,
Public Health Engineering Division-I
Larkano (Member)
8"
m=16
(Engr: A t 1. Ahmed Abro)
Assista Engineer,
Provincial Highways Sub-Division
Larkano (Member)
(Engr: A
1 Majeed Panhyar)
Ex. utive Engineer,
Provincial Highways Division
l
Larkano (Chairman)
ump 07 Work P011 X/16.17
OFFICE OF THE
EXECUTIVE ENGINEER,
PROVINCIAL HIGHWAYS DIVISION LARKANO
Ph: 074-4058111
E-mail. provincialhighwaysdivisionIrkegmail.com
•
Name of Work / Item :WIDENING / RE-HABILITION OF MAHAR WADA TO LARKANA
KHAIRPUR ROAD VIA 700 REGULATOR ROAD MILE: 0/0-3/7.
MINUTES OF PROCUREMENT COMMITTEE
A meeting of the Procurement Committee was held on 27.01.2016 for
the bids called upon vide N.I.T No. TC/G-55/ 1775 dated: 14.12.2016. which was
chaired by the Executive Engineer, Provincial Highways Division Larkano /
Chairman Procurement Committee and held in his office while attended by the
following members of the procurement committee.
Mr. Abdul Wahab Sahito
1/Executive Engineer
Public Health Engineering Division-I
Larkano
2/-
Mr. Aftab Ahmed Abro
Assistant Engineer
Provincial Highways Sub-Division
Larkano
There were (36) thirty six blank tenders sold, out of which (26)
twenty six Nos. were put in the Tender Box. After scrutinizing, (21) twenty one
No. tenders were rejected due to original Call Deposit of the required earnest
money was not furnished with the tender and others. Therefore (05) five Nos.
tender were considered in the bidding process by the Procurement Committee as
detailed are shown in the Bid Evaluation Report / Comparative S tement. The
rates quoted by the bidders were announced formally in p ence
was
participants / their representatives and accordingly recorded. T
conditio 1 / Telegraphic tender eived.
(Afta
med Abro)
ito
iA
t
Assis nt Engineer,
Executive Engineer,
Public Health Engineering Division-I Provl: Highways Sub-Division
Larkano (Member)
Larkano (Member)
Pieter ADP Work 02 TC.P/ 2.2016.171
( Ab 1 Majeed Panhyar )
Executive Engineer,
Provincial Highways Division
Larkano (Chairman)
I
Office of the Executive Engineer, Provincial Highway Division Larkano
131
ATTENDANCE SHEET
NAME OF WORK:-
1
Widening / Re-habilition of Mahar Wada to Larkana Khairpur
road via 700 Regulator road mile: 0/0-3/7.
NIT No.TC/G-55/ 1775 dated: 14.12.2016
Tender issue upto dt: 09.01.2017
Tender opening
dt: 27.01.2017
The following Firm / Contractors are present at the time of issued / opening of
tenders in presence of tendering Committee.
S.No: .
1.
2.
3.
4.
5.
Name of Firm
Name of Representative
Signature
•
M/s. Al-Asad Traders
a.
M/s. Mohammad Ramzan & Co.
•
M/s. Zahid Ali Jatoi
/
M/s. Tarique Hussain & Co.
if
ige2,7
M/s. M.B Builder
( AbiftWahab Sahito )
Executive Engineer,
Public Health Engineering Division-I
Larkano (Member)
( A b Ahme. A*)
Assis ant Engineer,
P ovincial Highways Sub-Division
Larkano (Member)
( Abdu b ajeed Panhyar )
Exe we Engineer,
Provincial Highways Division
Larkano (Chairman)
OFFICE OF THE
EXECUTIVE ENIGNEER, PROVINCIAL HIGHWAYS DIVISION LARKANO
1.
2.
Sr.
Nos.
1.
2.
3.
4.
5.
6.
7.
8.
BIDDER'S ELIGIBILITY / QUALIFICATION REPORT
Provincial Highways Division Larkano
WIDENING / RE-HABILITION OF MAHAR WADA TO LARKANA KHAIRPUR ROAD VIA 700
REGULATOR ROAD MILE: 0/0-3/7.
Name of Procuring Agency:Tender Description / Name
Work / Item
M/s. Al-Asad Traders
Eligibility / Qualification Criteria
MIs. Zahid Ali Jatoi
i M/s. Mohammad Ramzan & CO.
......
Registration with Pakistan Engineering Council
in the relevant field of specialization with the
renewal of 2017 of work & the extent of tender
amount of each work.
Bio-data of Engineers & Technical staff working
with the firm alongwith Engineering
Qualification Certificate.
Documentary evidence for works executed and
certificate of satisfactory completion of works of
similar nature during last 3 years.
List of work in progress, indicating cost of each
work and copy of letter of award of work.
List of machinery and equipment available with
documentary evidence of its ownership, as
required under chapter 4.2 (j) as SPPRA,
certificate bank showing credit worthiness
alognwith Bank statement.
No conditional or telegraphic tender will be
entertained
In case the tenders remain un-responded, the
same will again be issued and opened in the
presence of the committee on the following date.
All the bids or proposal can be rejected at any
time prior to the acceptance of the bid or
proposals as per SPPRA Rules.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
A
Contd: P/2
•
P/2
ii
Sr.
Eligibility / Qualification Criteria
M/s. Tarique Hussain & Co.
Nos.
1.
2.
3.
4.
5.
6.
7.
8.
M/s. M.B Builders
j
Registration with Pakistan Engineering Council in
the relevant field of specialization with the renewal
of 2017 of work & the extent of tender amount of
each work.
Bio-data of Engineers & Technical staff working
with the firm alongwith Engineering Qualification
Certificate.
Documentary evidence for works executed and
certificate of satisfactory completion of works of
similar nature during last 3 years.
List of work in progress, indicating cost of each
work and copy of letter of award of work.
List of machinery and equipment available with
documentary evidence of its ownership, as required
under chapter 4.2 (j) as SPPRA, certificate bank
showing credit worthiness alognw ith Bank
statement.
No conditional or telegraphic tender will be
entertained
In case the tenders remain un-responded, the same
will again be issued and opened in the presence of
the committee on the following date.
All the bids or proposal can be rejected at any time
prior to the acceptance of the bid or proposals as per
SPPRA Rules.
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Recommendation:• Out of 05 participation all are declared as substantially qualified bidder by the procurement committee as meet with minimum • ualification /
eligibility criteria.
• The lowest evaluated a ualified bidder is M/s. Al-Asad aders, Government Contractor with bid / offered
1
( Mgil t&) iliSahito )
Executive Engineer,
Public Health Engineering Division-I
Larkano
( Member)
4.1:1'111
1\1
14i
0.1...
• • if•--...•
,
•
, • me. • . ,
Asst ant Engineer,
Provincial Hi ways Sub-Division
La kano
( Member)
jeed Panhyar )
( Abdul
Exec. we Engineer,
Provincial Highways Division
Larkano
( Chairman )
Mil. Qualified ADP Work-02 P/2 2016-171
-.
GOVERNMENT OF SINDH
WORKS & SERVICES DEPARTMENT
To, •
The Chief Engineer (Highways),
SUKKUR
SUBJECT: ADP NO. 2486 (2016-17) "WIDENING / RECONDITIONING OF ROAD
FROM MAHAR WADA TO LARKANO KHAIRPUR ROAD VIA 700
REGULATOR (6.20 KMS1 (DISTRICT LARKANA)"
Sanction of the Government of Sindh, is hereby accorded to the issuance of
Administrative Approval in respect of scheme sited as subject at the approved estimated
cost of Rs.88.913 (Eighty Eight Million Nine Hundred & Thirteen Thousand Only). The
scheme was approved by the DDWP in its meeting held on 29-09-2016 at Karachi.
Subsequently office Memorandum issued by the W&S Department on 18-11-2016 vide No.
H/2-102/16 (2016-17) AA/ DDWP. The plan period of the scheme is upto three years.
The expenditure involved will be debited to the Head of Account
04-Economics Affairs (Capital) 045-Construction & Transport - 0452 Road Transport-045202
Highways Road and Bridges.
All the required codal formalities as laid down in this regard and Finance
Department's instructions must be followed by the executi
encies.
( AIJAZ • HMED MEMON )
SECRETARY 0 GOVT. OF SINDH
LO. No. FD(DEV-III)
?(-3:77 )--)0/6--,9 Karachi, dated the P_ /a— 2016.
A copy is forwarded to the Accountant General, Sindh, Karachi for
information and necessary action.
S ECT1CN CO kilawforEvim)
FINANCE DEPARTMENT
GOVERNMENT OF SINDH
I . •
No. 1-1/2-102/16 (16-17) AA/DDWP
Karachi, dated the, 2"1 December, 2016.
f
A copy is forwarded for information & necessary action to:
1. The Additional Chief Secretary (Dev.), Planning & Development
Department, Government of Sindh, Karachi.
•
2. The Chief Engineer (Highways) Sindh, Sukkur it may please noted
that:
iv.
This A.A does not constitute and approval of the rates
provided in the Rough Cost Estimate. The final responsibility
for the rates lies with the authority competent to accord the
Technical Sanction to detail estimate duly scrutinized in the
light of the decision taken by the competent authority.
v.
The authority according Technical Sanction should also
examine the site of work closely so as prevent excessive
costing.
vi.
The above estimate provides for contingencies and work
charges, establishment tentatively.
3. The Director= General. Design)„ .Works & Services Department,
Government of Sindh, Karachi.
4. The Section Officer (DEV-III), Finance Department, Government of
Sindh, Karachi.
5. The Section Officer (Budget & Accounts), Works & Services
Department, Government of Sindh, Karachi.
6. The Director of Accounts (Inspection), Finance Department,
Government of Sindh, Karachi.
y
i )/94/6,
(GHULAM SHABBIR SHAH)
SECTION OFFICER (HIGHWAYS-I)
FOR SECRETARY TO GOVT. OF SINDH
leeliesr; Officer (High Way.'
Works ct Services Dept,
Govt. of Sindh.
ll—..-...m..
0 I TICT 01. .1111.
zap
4124. 4.
4
j
E XI. UT IV li 1liN (-24 N. EER.
.,194. )\/lN(.1/\LIIIGHWY
A 1)IVISION IANKANO.
v.W
l
k:,_...,
,,f l'ilt!ntLNt)..0711-!105S1,11
.
1115.hil 20I(
.11'Not.litiolcil 1 (I r• I2 0- 284 6
Nit.li7C ';'./
I
NOTICE INVITING TENDERS.
,
Tenders are invited from interested persons / suppliers / coittracts•/ companies / firms on standard
Bidding Documents Forms (or Procurement of the following work as per SI'PRA Rules 2010.
Sr. No.'
I
Name of Scheme
I•stimaled Cost
LIST Al 'I
I
Bid Sectirily
1(tivees)
Time A Mimed
vier
fender her
SITItIVITI.1'
TERMS & CONDITIONS
1.
2.
The intending participants can purchase the blank bid documents on payment of tender (i.i•
refundable from this office for each work from the date of publication (two 09.(11.2017 o,_-1.00 P.M.
The tender will be received back on 10.01.2017 upto 01.00 P.M and will be opened on ,.rate dale
1.0 01.2017 0.! 2,00_P.M in the presence of intending contract o rs are their authorized representatives.
Eligibility condition for intending participants are as under:i).
ii).
iii).
iv).
Registiation with Pakistan Engineering Council in the relevant field of specialization (sith the
renewal of 2017 of work & the extent of tender amou•it ol each work.
Itio-data of Engineers Si. Technical staff working with the firm alongwithaig.; neeving
Qualification Certificate.
Documentary evidence for works executed / works in progress and certificate of sal isl.r.ior,
completion of works of similar nature during last 3 years.
List of work in progress, indicating cost of each work and copy of letter of award of work.
v).
List of machinery and equipment available with documentary evidence of its ownership, as
required under chapter 4.2 (j) as SPPRA, certificate bank showing credit worthiness alogn with
Bank statement.
vi).
No conditional or telegraphic tender will be entertained.
vii).
In case the tenders remain un-responded, the same w;11 again be issued an:I opCo.nl in the
presence of the committee on the following date.
Issue of IiI.rnk I enders
11.111. 21117 1(1 24,01.21117
viii).
Received ul I ender
()pencil ill 1-.1.1el
?7.01.21117,...111.;
t;, .111:7•• 1.11.1r.x;
All the bids or proposal can be rejected at any time prior to the acceptance of the bid of
proposals as per SPPRA Rules.
4.
Pakistan Engineering Council license is not mandatory for the works (lino 4.00 million.
5.
Registration with Income Tax Department (N FN Certificates), Income returns should be pro% idea and
copy of C.N.I.C.
6.
7.
The bidder should have Registrations with the Sindh Revenue Board.
Undertaking on Affidavit that the firm is not involved in any litigation or had not abandoned any work
in the Department.
The bidders should submit earnest money as showing against each work in shape of Cal. Deposit
•
9.
prepared from any scheduled bank in favour of the undersigned.
Affidavits to the effect that the firm / contractor have not been blacklisted previously by any ,:xecuting
agency.
10.
Affidavits to the effect that all documents / particulars information furnished are Imo anti
case of Bogus / Tempered or false information / Certificate I. pmvided by the cnmpany r (int, shall be
liable to be black listed at any stage.
11.
In case of firm, list of partners / partnership deed, giving tali particulars of directors / pru:trietors ur
other connected alongwith power of attorney. In case of bi:111)•. Snit' pruprielurs, such undertaking tilt
•
affidavit be furnished.
(..ontd. P/2
nc ar
6
Advertisement Section
Information Department
Govt. of Sindh, Karachi
M ini )0 t.111)
,t ,, . ii •• .1:.t I; t! ' ft 1 ti •
N:r:
r3;•: 1..' ir: ,..
()!)1'a•
il iiI.- - .
• .....\7;
i
1
I
:::
c•,.
11
l'/2
12.
Details of owner alongwith, CNIC on Judicial Stamp ('aper, A reiiicsentative should liave authinity un
• Judicial Stamp Paper from owner and participation.
13.
Call Deposit (Earnest money) will be refunded to the unsuccessful biditerk) suffer issuance of (.chat nl
14.
Award to the successful Bidder.
The tender should be submitted alongwith the above iequired documental
15.
16.
17.
/ information, it such
lacks the tender will not be consider by the procurement committee and no excuse will be consider even
if the work is in hand fur execution .
Bid Documents are available on deposition of nun refundable price of Rs:3000/=
Bid validity 90 days.
In case of Public lloliday or the undersigned remains out of head quarter, the tenders will be opened on
the next working day.
Executive Engineer,
Provincial I lighways Division
1..irKano
Copy forwarded with compliments to the:1. Chief Engineer, I lighways Department Sukkur, (or favour of information please.
.1- Superintending Engineer, Provincial highways Circle Larkano, Ile is requested to kindly accord necessary
approval of the
Director Information Public Relation Department (Advertisement) alongwith spare copies of advertisement
for publication in leading news papers.
.1. Secretary LT Department Government of Sindh, Sindh Secretariat Building No.6, V: flour Karachi.
.1. Director (C.10 Sindh Public Procurement Regulatory Authority Government of Sindh Block 8-A, Sindh
Secretariat 4.11 Court road Karachi for favour of information.
.1. Assistant Engineers Provincial Highways Sub-Division I.arkano / Shandadkot (or information and
immediately they are requested to submit the estimate and schedule "Il" of the works immediately foi
taken further necessary action.
.1. Divisional I lead Draftsman / I lead Clerk for information.
.1. Copy for NOTICE BOARD.
.xecu
f.nb leer,
Provincial Highways Division
b
erkano
NUJ
•g
•
L1 .11 01: woR Ks )
O.
Estimate
Cost.
Name of work
Earnest
Titfl' llotved
Motley
for completion
Requirement
I
VaIRI 161 (
Widening / e-Imbilition of
Mahar 1Vada to Larkana Khairpur
road via 57 Regulator
111X)
.1"..til Bid
Price
tttt Ill
MOW,
12
his
ti - I
III & CI 10,
,...o
VAle(I
W/R of road from Larkano to
2
So.
Sono Jaloi via Nlahm
Reitislraliott III
7.1.000
'WOW
12 moinths
ui till'
c
Frovint
\v‘iv,.. Division
.orkano
INII•INew 01 Wolk .1111.101
Category C-1
1(:1•111& C1-.110
5.00 K ms.
yedr 21117
Official Website of Sind') Public Procurement Regulatory Authority SPPRA
Home
SPPRA Notifications
Tenders
Evaluation Reports
SPPRA Board
SPP Act 2009
Ammendments
SPP Rules 2010
SPPRA Team
Contact Us
Search Tenders Archieve By City Names click here
•
Senal No.
City (o.g sukkur)
Black Listed Firms
Advance Search
SPPRA ID
•
Tender Title
submit
Committoe
Advertise Dale
Sample Documents
MontIVYear
Policy Instructions
1 2 3 4 5 6 7 8 9 10 11 Failed to connect to MySOL.
myscili_connect_error().
Review Panel
Upload
Corrigendum
S. No.
SPPRA Tender ID
Tender Title
Download
Ott
Adverleno Dale I Clonong Dole
R•rnarl.
/511D7 Notices
Capacity Building
feed to convect to 647501. •
Downloads
21474 6 3047tu ntivs in
31401
Gallery
WIIHtLD
seed to connect to 04 SOL
214 0163640.PPRA 10
31213
11411111CILD
30 Jet 201/
14
7.1s 2017
it I„113 71/11
ITN Asa
Pomo..
v"soe_connsct_wicvn.
..nrk
LAAkAAA
1741.1017
It Jan 7017
tie rub
It I. A
U. tot/ MIT
PST 00TH SOD
Site Statistics
Faded to correct to *SOL •
214741136475PPRA IV
31201
Login
I4 it , •
3041-2017
M T MTN 5/10
Notifications
Procurement Plans
n9101._,Onn•nt_onottl.
Liekona
WI TVOIL LI)
linteenn
evsok_cervwct_orroi(l.
1.04. CS
NASIPABAO I.A.11)(7.71A
17414017
le Jew 2077
51 Jed 201/
12-01.2011
12 len 2017
07 7049 2411 7
I eke to ca. roc1 10 AA 501. •
mysaL_Conwat 1_00001,
ows.
21n t463917,11 11A
51165
OAT.* 10
MT
tEli.
11T 01)1 SAD
Usors Online 31
02-Aug-I6 Wank?
AG
11500
MTh 'MTH 5/19'
tan.) to c /doted to MySt7t.
N1/?do
nry ten_concect_enott)
14
II I
21174656075914107 ID
31170
1±)
et111411:LO
Filed to coon./ to *SOL •
214 746364 7:119991. .0
07 I on .roll
I Llo A,
te I
M.........
net std_connec
11 Jan 2017
161t
06 fee 2017
NO SOrt SOD*
16.10 to connect to 6475,71. '
2 le 7.91364 7te199•A .0
Mooed.
sql,cadoct_ottott I.
17 Jan 2017
01014011
09 Jan 2017
21 ri.e
2017
PAIN WI TN 5000
7oI40 to cooneci 10 AtSOL
21401636473P1v4A 10
31100
mnagELD
13
11E1k CI
LARKANA
31129
W1119.1,10
tO
Ititt
LARK,.
11414317
WI 71091.0
Feb /Alt
It Feb RP. Al
2011
ny1NIL.40.14.1_01,0.1).
fere,
•
LaMar.
0541.2017
05 Jan 7017
77 Jr, 2017
04-01-10 1 7
04 Jan 1017
23 Jr. J0t7
011
NIT WI Di SOD
odd to connect to 64/501. •
2117453617:A.1VA ID
31062
WIT.1LLO
..I0000MIOCI11.70,11
II1 It, 14
lo‘ana
16N. AO
MT *7TH 5130
Peeve to connect td k450t •
2 In tntl 1447544.MA
12 Jan 201?
NIT 171//660)
OuOtatiOnS
31162
1241.7.011
Iu
30670
tee
Popov.
revsok_conwact_eworiL
IA I. .7
•
less..
•
Jett 41117
9.1
76.11.1011.
to Dec 7019
17 Jr. 7011
ti
15.12.2016
14.009' 2016
09.Jitn 2017
• 1114 410
15.17-2016
II Otn. 2016
O
1 1..0 :01 /
li it. AO
C.6.17.10 , 6
a nti 1019'
01
Aar wilti 500
.,F41441l0 co...1 to Sa7501- •
.1•401_connoct_owOrtk
10111.
-
011
*764710
HT
Wiv7580
•
feet/ to caned to 4.07501 '
7 te74/136475111.11A III
30636
tisinsruti
50750
7 te 74636afr.rev.A IO
rn, adt_vann.K Lend()
1101.0•
1,11! .7.
4
L.—,
MT MTN SOO
$ OW to onned to 0450( •
,wrsekvemovioworti
tplAvww.ppr asindh.gov.pk/tenderhistory.php?SearchEity= city&txtSearch= larkana&dtFromDate=&listmonth. l&listyear = 2008
jup
1/5
ti
011P
REVISED ANNUAL PROCUREMENT PLAN 2016-47
" PROVINCIAL HIGHWAYS DIVISION LARKkiVO.
Sr.
No:
Description of Procurement
Quantity
(Where
applicable)
s......
01
02
03
Estimated
unit cost
(Where
applicable
Millions/
04
Funds
allocated.
I
05
Scope of
Funds
(ADPs Non
ADPs)
06
10:
Quarter
I
07
Remarks
Timing of Procurement
Proposed
Procurement
Method
OS
I
rd:
3,1:
Quarter
Quarter
09
10
4*:
Quarter
I
11
.
I
12
Construction of Larkana Naudero
road Circular road to connect
Indus Highway (N-33) at Larkana
1
By Pass road mile: 0/0-1/4 (320'
Rft: Pre-stressed Bridge over Rice
174.3141
57.00
58.93
15.00
11.500
13.00
ADP
No.2674
Canal i/c Masonry structure)
• (ADP NO. 2674)
Rehabilitation and Widening
of Road from Naudero Chowk
City Larkana to river Indus
2 Protective Bund via village
Masuhab and Akil road 0/0-3/6
= 6.00 Kms. (i/c M.Structure)
(ADP 2685)
Construction of Road From
Arija Bye Pas to Gud Purani
3 To Yar Mohammad Hulio
Along Path of Glipsy Minor
Mile: 0/0-0/5 (i/c M.Structure)
ADP No.
2685
ADP No.
2675
National
completive
bidding among
PEC Registered
Bidders
--do--
7.500
--do-
6300
M&R of road from C.M.0 Bridge
4
to Kamber Railway Phattak along
1.P of Rice Canal =1.S0 Kms.
29.000
29.000
M&R
--do--
29.000
Full funded
released
Scheme shall
be completed
during CFY
2016-17
Con td: P/2
P/2
Description of Procurement
Sr.
No:
_
Md.-.R of road from Pakho to Gogharo
road mile: 0/0-3/0 (in portions)
Estimated
unit cost
(Where
applicable
Millions)
Quantity
(Where
applicable)
03
02
01
J.
I
..
I
04
17.174
Funds
allocated.
I
03
17.174
Scope of
Funds
(ADPs Non
A DPs)
.
I
06
M&R
Proposed
Procurement
Method
I
07
National
completive
bidding among
PEC Regi!.:ored
C
1 b
1":
1 Quarter
'
08
II
17.174
Bidder-
M&R of road from Ratodero
Chandni Chowk to Ratodero
Shikarpur road mile: 0/0-1/2
15.887
15.887
M&R
--do--
13.887
7.
Mit.R of road from Dokri to Badeh
via Dokri By Pass road mile: 0/0-6/0
(in portions)
13.500
13.300
M&R
--do--
13.500
8.
village
Sanwa! Khan Jarwar road mile:
12.113
12.113
M&R
--do--
12.113
8.336
8.336
M&R
--do--
8.336
6
I
'Timing of Procurement
2.4:
Quarter
09
!
3,4:
I Quarter
l'
10
Remarks
4th:
Quarter
11
12
Full funded
released
Scheme shall
be completed
during CFY
2016-17
\l&R of road from Garhi Khuda
Bux
Bhutto
Nlazar
to
0/0-1/2
9.
\l&R of road from Shandadkot host
Ali banglot. road upto Public School
mile: 0/046
Contd: P/3
•
•
r,
P/3
...—.....
Sr.
No:
— _
.
Description of Prucureme
Quantity
(where
Estimated
Funds
Scope of
Proposed
unit cost
allocated.
Funds
Procurement
applicable)
(Where
applicable
(ADPs Non
Method
ADPs)
Millions)
01
02
1
03
04
1
05
1
06
1
07
Remarks
;' Timino
0 of Procurement
-
1
1-:
2'4:
3,e:
Quarter
Quarter
Quarter
OS
1
09
1
4th:
Quarter
1
10
11
M&R of road from Larkana Phull
completive
6.740
6.740
M&R
via Samtia Street mile: 0/0-0/5
bidding among
12
Full funded
released
National
10. road to connect Larkana Pir Sher road
1
Scheme shall
6.740
be completed
PEC Registered
during CFY
Bidders
2016-17
M&R of Re-decking of Slab 45' Rft:
11.
Bridge along from %Vagan to Warah
4.500
4.500
ez.R
--do--
4.300
0.252
0.252
M&R
--do--
0.252
85.000
31.000
74.000
15.500
point mi le: 9/0
M&R of Repair of 4' Rft: Span
12.
Culvert, via Mirokhan Arzi Bhutto
road s' mile: 210
Widening /
14
Re-habil ition
01
Mahar Wada to l arka n I: h a irpu r
road via 57 Regulator
W/R of road
13 Sono Jatoi
5.00 Knis.
ADP
N o.2486
--do--
from 1 arkano to
via \lahar Wada road
ADP No.
2465
--do-
Provincial :hways Division
.:rkano
:1 I) I' .5..
.!2
\•s.
I
or_A
J, .3
5j =Li
/1-4011111 ..,,,04.7CA-S5•11/Siol 20I6
J=-;-3I4.
Die4114-12-2016
okiiissi* alba JOiti:i
in 016
4,4--.47-1 v4.-4 4-.,-.-•144-4•4Ag
.n44 44'2010 1J..0
:AO/ p4-4; v44,4).14,-.4,44.4
Art/
..44643 )4+7 441.1y1.4-. Jell•
AL /.. Ai•
Ai.)
,661 ve
4144
cti
c.0,
if 2017J.. I.4.. 12 3000 v....14.1 j 63.000 etkri ,,IS 6, .4. .1
01...4 .0.
C-4 4„.6,W*
3 7 tekr 1.,, Jour,'
ICt10 t CE011
et elm-kr-wit+ •
PEG ....1,u.4
,A•44•4.11.S.4 0 2.11
v..1+,
a 2017.11. 1..,.12 3000 A..14.4 74.000 ,,...... „AS ,6.6.71 .2
C-4 41,116;
.til•.--4 A!
1J.I 41,6•4111.1.04,
(Ci N' CM
)1 j.44 se! tth.00.1
PEC ,...1 lak A
•),44.A. 5.00
•
VA1.0. ...,
.11.11.410,,./1 01,4• affik• I. 41. U•
1,i. 3.4J0
„A )1, la
011 - 01 - 20
:6
:21
1.00
jj 2:00 •••41,o• 10-01
1.,,,L1.4.a...;
.1.1-u V). .4,9.../!J•
1,41,
444
tA
.3
.1440 ir4A,440.,,A.444.4-..1-1444:4-•▪ 444.-444
:444,-.441-4444,"2017?•4414L.0 4,4 4.04,04seA44
•••CA-I.I .3.44.4144144".•
!MA
4
4oti t
Dr6)
34.9* .4* 01-•
•;
Z./J;
.v
e-v•uvavi
4.21i);o: .1.0! 4,0%
.44eAL•19.•oe Zrir
.4+44.0•9*
3.6u14;
AA .1/04 a"lottle; t1.1JA • .1 41.g. .vi
QA.;
•
`AA 1. "\fr'."
itilf I IA
il4
. 37.0.4t.3.04;
. • . 74•.../".6.0•3
27-01-2017
sx,,,,,,,,,:
iP
1.1. .rt
No..PvilNot nly.ta."‘t otSe d4.I.01-A,,I
27-01-2017
„„r, WO 44.•
Mt V;
°A1./:.304:614.0* .00 1
A•9
,Ar 11-01-2017
.1
4,6426-01-2017
41.1.
vt. J vow 4 &',',r•
•e;#4,4.A. 4t.ott *OS
4,56 41. 4.00 ,,..111,,,J-.,311...6...„1,,J,11.4
val
•
44.4.1.4 4••••
r0;
.A.49.3.A.
3.64441 •
•,,•• 344 4,41.;P., 41-•
.4.041‘ I sel
v;"! •
44•6-10 .0.r" ‘41,1/4•43.•
▪
•
4
.5
.6
▪ :4
J.....A.A.,,h-4-4,J...)-(444.4.6
-40)* e-t•
y-+•!4'-1•%„a"
Ai if
r 440 Ju• A.; 44..
1"*.a
• vc
'4
avg.'4
:4
.9
3.44.4-4.4 01,44 "Air& :-.1444%.•-6"4.414.)1444‘.1-6A .441 4,
•
/1A,444.44 A 44-A ow
.6z44 i ...v.v....! • I I
J..; ."..rtg
a).46.0).:4.1 JAAru.1
vt AA.tod Jr
Jo.
•
A.A. .12
404 3.9..9...4 16
P‘J..(Alu4 oof
WI,,C3344;6.14
44344;i0J....1‘.4.09.4,.+1/422..R. .13
•4.1,
a ,,„r
''lx141
vu0•;
•
# i•
vt....4
4 AA
vg:41,f•Imga fy-6,1111..)."
• .0/1
:04L
../1:41.1; 90
.7, At
.14
"
0.P9.
i.i.4)S4 .0:410
3000 4.44,14
I1,,I.1
ce•-•• 4•10.
•
IS
V., A.', .16
AL4 .17
4,..144.A•
• .144u V44. y1;..4+; 04144
.•44;,4 ‘,0,4
ja-i (.1-1zilit
V2114
Ita
a h
INFIKRY.No:1024/2010
-411Ers:.
•;.r.
NITZEZEZEMEINIZZA,
gritriat
.444,0•044.:A 8 3 9 8 ,A
Op
cp.,ye 1!a wistA
-7.1ore,A.,:.
elf
16_
-z
,Pc1-711
/ 8/;i12 crowN'ot.iAr'' 10r
. '- .. h+ il 'A,: .
--s
. ' ' Ofr:riff";tffire:rt
9 l/PZ94-A2OUNI
re),93(13f_rliflo-,fq,00,•,4:."
'.."(Yvg
4:,. . 4,1
7or=y-iy-7.1717-
(it) er7q-relerro-rlitiye-nopfr71,4,7 -,/ ,,o))
(90 tilief'r06•Arn"114*.0l) 9(444Zrr'1000V454/TIANOPP-ThliAle7. ' YVIlarirl its ) :"giLir1/4.041'.10fri71/1"411111 111>A4"%kr7/e
,...r.riA-uico Nie•-,orcler.1.09r,..07,c-1-49,,,,w7,0)11,,4477
-,vci -'40-,eYr9r3,7,(to ,s i}.(yv.:•-iwyretri-rys-Drirc...--e,r7er
'!c I) 0.0,-..r141,,irkttfle-‘vylvtxtywver57,0ep,
; trii-u,
•
: 4/4"?Te'r•I'vrt(o'76)/-rft,"'YX/0/L)Vhor
o 0 0-.rei-Wiwzr-vrry.,frrrorfspka 0.1xin6)0-sIrr-iy4emeitlywonevi
orp.eryruprropl-t0 v(`.,49-7)7774)Imeitri-v.rotrrirvyy-1-779.z) -',..."1-179earY14r7VAP,Iirilee14erelv i(9) Voria.e.07717,1r)1Wprpoe.1-dyylylpsy(S) 1141,71eThee(171,17421nyieveapArrotr ;ley('
(t) tr-4151,1)".kriorrtorrocrte-wilryA.,14(IA) cl)tlYie/V411.0-'1(7.17.7,8)PaPrr7/1
OO•C•I)'LIOZ•t9Z
00:1/r
Lt0Z•.l•tt4
tkOZ.IIL f
LlOZ•t•LL J
•1
Z
C
1
:Iris...11
iid'
"etrOgre
?rain
,, . rie-7477(94 :r 747',-1
1
4,4•1uverZkre/A1)742,7riXfvr,
.
0.9 elivrercsrar-^7• e.4,404.2r-i-crve7,,Prrrs-yirpo-bYwr (A). ,iirwki-..IN-rpris•v,PN/r-7 7
, 0:371-..eva,
(A) ,s9.4.*-r:',1-,s:Nty,..-iA-71-0),ffGyz,cr-,:lri,s;101,5)%r(I0 /;:c-vr+ 7.'07 ATt.'"7 of?' 77 i7 ',7,64,74/i)
•••••-•••••
prco • (~7141..y7q-iworaierlr:•-tp,
,,j-scr,-/er).-fr
,-..,0.-e0/T5Y-971rwe
co .,05vose7or:orti
vw...cfreptort.,7v,-,
co, ?....-r.--77s.f..-ir.cr-+- . . . . . ..
L..../001.1..v7,7ewmA7A4streloctizt2-,
o-:Fo4.-i,oz:•c-6,-)607zYWY.Vfikutkezeoi:c•fv..
4,90.-r7owct oz- tip°,vIrf 7
. k'(t) vi7q-r-wer,i„rwzrrere 7e3sr qp,wry. frelm cirTfogg
qee
prpsv
n4:411,,f0O'S
Or
Z Kt r 4 1( r0 000YL ti,r0fr 0000
• ,
pwiswe
10-30 iff Ot••30
L VOL ZniPt-O•
'we
1,,pp7-y-ps,
v I0'30 v. Ot-30
4 licer1-1
sr
i mr/ )rf"i noose Vir 000c t I el oc 7,1,Pro•
r
....1"'
PP' ,e--)" e of'
•
,e-i'
Ill %VW er• —
03)
7,-N41
,4•VYTP,16'^-4,A.,,,rAirs-,4frkop>,-•frytiddsTo I ot 7.17.wcrqtrwzr,,,,
,c,
Orel 1171481.1r14
. 1! C:
Kfrys-ssi StLtiOtOZ nr,vr .0,91.0Z-Z1-1t
fryt t l9S01-110
try.191K>Crir i p I'-710;(flcr
t••
-
•
r•S
; 'T" '"'"2":r4 I
“;)--.' OFFICE OF THE EMECUTIVE ENGINEER PROVINCIAL HIGHWAY IIVISION LARKANO
• NOTICE INVITING TENDERS
Tenders are invited from interested persons I suppliers I contractors / companies / firms on Standard Bidding Documents Forms
for Procurement of the following work as per SPPRA Rules 2010.
ESTIMATED EARNEST TENDER TIME ALLOWED REQUIREMENT
S. NAME OF WORK
FEE
FOR COMPLETION
COST
MONEY
NO.
85.000
4% of
300W12 Months
Valid PEC Registration in Category C-4
1. WidenIng/Re-habilitation of Mahar Wada to Larkana
Bid Price
(CE-01 & CE-10) of the year 2017.
Khalrpur road via 57 Regulator.
4% of
300W12 Months
Valid PEC Registration in Category C-4
2. W/R of road from Lew° to Sono Jatoi via Mahar
74.000
Bid Price
Wada Road 5.00 Kms.
(CE-01 & CE-10) of the year 2017.
TERMS & CONDITIONS
1, The intended participants can purchase tho blank bid documents on payment of tender foo not refundable from this office for each
work from the date of publication up to 09-01-2017 at 1:00 p.m.
2. The tenders will be received back on 10-01-2017 up to 1.00 p.m. and wit be opened on same date 10-01-2017 at 2:00 p.m. in the
. presence of intending contractors are their authorized representatives.
3. Eligibility condition for intending participants are as under.i. Registration with Pakistan Engineering Council in the relevant field of specialization with the renewal of 2017 of work & the extent
of tender amount of each work.
ii. Bio data of Engineers and technical staff working with the firm along with Engineering Qualification Certificate.
iii. Documentary evidence of works executed/works in progress and certificate of satisfactory completion of works of similar nature
during last 3 years.
iv. List of works in progress Indicating cost of each work and copy of letter of award of work.
:* v. List of machinery and equipment available with documentary evidence of its ownership as required under chapter 4.2 (j) as
SPPRA, certificate of bank showing credit worthiness along with bank statement.
vi. No conditional or telegraphic tender will be entertained.
• vii. In case the tenders remain un-responded, the same will again be issued and opened in the presence of the committee on the
following date.
Sr. No. Issue of Blank Tenders
Received of Tender
Opened of Tender
1
11-01-2017 to 26-01-2017
27-1-2017 at 1:00 p.m.
27-01-2017 at 3:00 p.m.
, viii. All the bids or proposal can be rejected at any time prior to the acceptance of the bid or proposals as per SPPRA Rules.
4. Pakistan Engineering Council license is not mandatory for the works up to 4.00 million.
5, Registration with Income Tax Department (NTN Certificates) Income returns should be provided and copy of N.I.C.
6, The bidders should have Registration with the Sindh Revenue Board.
7. Undertaking on Affidavit that the firm is not involved in any litigation or had not abandoned any work in the Department.
8. The bidders should submit eamest money as shown against each work In shape of call deposit prepared from the scheduled bank
•: in favor of the undersigned.
9. Affidavit to the effect that the Firm/Contractor have not been black listed previously by any executing agency.
10. Affidavit with effect that all documents/particulars/information furnished are truo & correct. In case of Bogus/Tempered or false
• Information/Certificate is provided by the company/firm shalt be liable to be black listed at any stage.
11. In case of firm, list of partners/partnership deed, giving full particulars of director/proprietors of others connected along-with power
of attomey. ln.case of being sole proprietor such undertaking on affidavit be furnished.
12. Details of owner along with CNIC on Judicial Stamp Paper. A representative should have authonty on Judicial Stamp Paper from
owner and participation.
13. Call Deposit (Earnest Money) will be refunded to the unsuccessful bidder(s) after issuance of Letter of Award to the successful
Bidder.
14. The tender should be submitted along with the above required documentation/information, it such lacks the tender will not be consider
. by the procurement committee and no excuse will be consider even if the work is in hand for execution.
15: 'Bid Documents are available on deposition of non refundable price of Rs. 3000/-.
16. Bid validity 90 days.
17. In case of Public Holiday or the undersigned remains out of head quarter, the tenders will be opened on the next working day.
•
SAY NO TO CORRUPTION -,:i....=Y-',..",-',.;83901;Ci;Ii•A'44.-‘:1.)10,5e-n.:-%••-:INF/KRY-4824/16 c_...."-Ir -,,-;;'-' ---3 ui.Z.--..._ c., , ,r,_......
-• --1•.-,„ ... .-7:
Acab
>v&t,t)s e//:
2-LA -
•
ScU-
EXECUTIVE ENGINEER
PROVINCIAL HIGHWAY DIVISION LARKANO
/8-11)-1›614
)-7z- ,"1-