Typical schematic layout for an Elephant friendly SOLAR borehole installation (Refer to Drwg 509/3/S/01 for construction detail) Concrete reservoir Reservoir outlet pipe Reservoir scour / overflow pipe. End + - 15 meters away from reservoir Pipe to water troughs. + - 60 meters away Saunders diaphragm valve Overflow pipe Elephant wall. 5 m radius Pipe to tap stand 5000 L PE tank A A Borehole installation 25 mm W/meter Entrance 800 mm wide 50 mm ϕ brass gate valve & by-pass pipe work Inlet pipe 5000 L Poly E tank concrete or stone wall (elephant wall) Overflow pipe Steel tank stand NGL Borehole installation Scale: Not to scale Concrete foundation for elephant wall Borehole Foundation block Section A -- A Concrete foundation for steel tank stand Notes: 1. All pipes & pipe fittings connecting direct to Poly E tanks shall be of HDPE type. No GMS or aluminum fittings allowed 2. All pipes and fittings embedded in soil shall be HDPE type or Denso wrapped as specified