PB Minutes 7/6/16 Town of Wallkill PLANNING BOARD MINUTES July 6th, 2016 Members in Attendance: Gary Lake, Tom Hamilton, Bill Capozella, A.Guattery, Jim Keegan D. Dulgarian Also in Attendance: Absent : C. Najac Dick McGoey, Consulting Engineer, Gardiner Barone, PB Attorney PLEDGE OF ALLEGIANCE 7:30 PM – MEETING OPENED G. Lake Welcome to the Town of Wallkill Planning Board. We have three public hearings tonight. If you would like to speak fill out a blue card and we will call your name. There are no zoning board updates From our liaison since there was not meeting since our last one. I’ll have Marylynn read the notice as It appeared in the paper. Mid City Site Plan Revision (fence) & Lot line (38-2-2.1 & 1)516/518 Rt. 17M # 28-16 M. Hunt Town of Wallkill Planning Board notice of Public Hearing. Notice is hereby given that a public hearing of the Planning Board of the Town of Wallkill, Orange County NY will be held at the Town Hall, 99 Tower Drive, Bldg. A Middletown NY in said Town on the 6th day of July at 7:30 pm or as soon thereafter as the matter can be heard that day on the application of Mid City Transit Corp. 518 State Rt. 17M Middletown NY 10940 for approval of a site plan for the installation of a chain link fence located at 518 Rt. 17M and Beakes Ave in Middletown NY AKA (38-2-2.1 & 1) under Section 249-26 and 249- 40 of the zoning law of the Town of Wallkill. All parties of interest shall be heard at said time and place. I rec’d his mailings. G. Lake Thank you – name for the record. T. Depuy Tom Depuy representing Mid City. Basically we are proposing is that this was their employee parking area and we are going to put a fence around the area move the employee parking across the street . We are going to fence this area in and install a new catch basin where all the drainage comes together. We will regrade that area and resurface it. Basically we are going to run the fence line up the property line on the corner, kitty corner as a requirement of the zoning, we will be heading down here and selectively removing trees. We were out in the field with Mr. McGoey and marked each tree. The minimal tree removal thru the area and there is a slight expansion here, we put some gravel here and the maximum area in that area is 10’ in width. We are also proposing some tree cleaning. It is illustrated here but we will be more selective depending on if there is any openings in the chain link fence installation. G. Lake Thank you. We have been working on this since they began to move the parking across the street – I’ll go thru the board first (all members stated after PH). Motion to open this PH at 7:34 pm M. Hunt G. Tilden 1 PB Minutes 7/6/16 G. Tilden Hello- I live on the corner of Breslin and Beakes. My main concern is noise. What they could do is put a solid fence, maintenance free & vinyl. Something that would deflect some of the noise. It goes on all day long and sometimes from 11, 12 or 2 in the morning. It’s been 3 in the morning several times. Buses come in and I sleep with earplugs and it wakes me up. That is one concern. Between Breslin St. and the bus company. The other concern is will there be no parking signs put back up. I can’t tell you how many times I have gone to cut my lawn and I can’t because someone is parked on it. they were taken down 2-3 years ago when they redid the storm drains and were never put back up. R. McGoey Is that on Beakes? G. Tilden Yes, on Beakes. Also because they had a shortage in parking they were parking in between that lot that’s between Mid City and Breslin. I wanted to ask about the pines that are being put up. If I am facing that fence are they in front or behind the fence? R. McGoey In front of the fence. G. Tilden I saw 9 of them on the site plan? I know this is probably a different meeting that probably took place but I am curious as to the 139 car parking lot. Will there be fencing around that also? G. Lake We will come back to that. G. Tilden I looked over the site plan details for landscaping across the street. I’m sure it will be taken care of but I did not see anything at ground level or street level along the road as far as fixing up that area or putting grass or whatever. G. Lake You are talking across the street now? G. Tilden Directly across the street from my house. G. Lake You are talking the parking lot? G. Tilden Beakes. Yes, that is the parking lot. The 139 car parking lot directly across the street from my house on G. Lake Ok. I will talk quickly about the parking lot and then will turn the rest over to the engineers. The parking lot across the street as you already notice is being worked on now. We spent a lot of time trying to make sure that would be pleasant to the eye for the neighborhood. We felt that was an important part as people came up North St./17M. We put extra demands on them. I think for a parking area you will find it to be one of the most attractive ones when you see the lights, the landscaping etc. it won’t look like a mall parking lot. I don’ t have anything here tonight for that because I did not expect to talk about it. Again, I think anybody in that area should be very pleased with the final project. the gentleman that does own that land has many projects in Town and they are all good jobs so my confidence is quite high. To answer your question, he is adding landscaping in the back. I don’t think he is doing white vinyl to make it more quiet, maybe a few more pine trees? G. Tilden Pine trees take time to grow. G. Lake What kind of trees are you putting in? 2 PB Minutes 7/6/16 T. Depuy White pine and some other evergreens, 6-8’. A decent size. G. Lake We normally don’t debate, we take your information but I want to give you what is going to be done. Tom – can you answer some of the questions he had. T. Depuy We are proposing 6 to 8 foot high evergreens and some white pines and Norway spruces. We are proposing the fence to be black vinyl with black posts to blend into the background. It’s chain link with no slats – just the pine trees. G. Lake as far as the no parking signs along Beakes, we will send something to the DPW. That is their department. Marylynn has made a note and will inform them tomorrow. Anybody else want to speak? If not, motion to close this PH at 7:43 pm. Tom/Andy 6 ayes. D. Dulgarian What are we looking at for the height of the fence? Is it 6’ and 3’? T. Depuy We had indicated at the previous meeting that we are going to be 6’ but at the one corner is in a residential and we are showing it as 3’. We are going to the ZBA to ask for a variance to increase that to 6’. D. Dulgarian so tonight you are looking for approval for the 6’ and the 3’? Hopefully you will be granted 6’ variance before you actually put it up? T. Depuy Yes, correct. D. Dulgarian I think it’s an improvement over what is there now. I understand the growth needed for the company and have no issues. The neighbor bought up a good issue with the screening. For my knowledge, these buses run at 2 a.m.? T. Depuy They return at that time – they are out on trips. Dan/Mid City Basically with the addition of the parking lot we already have a part that is planned to avoid putting the buses in reverse and using back up beepers. We will try to have 2 rows that are for the late buses to come in and out of. We do have handful of buses that have late night sports trips and such. They can just pull in and park, we can put our trip buses for weekends and at night in certain sections to avoid the back up noise. D. Dulgarian T. Depuy Is that a note you can put on the plan? Yes, we will have a designated late night drop off area. D. Dulgarian Again, I like the project. Dick, I will put the rear screening in your hands. I would like to see it be as effective as possible. I know in the past we have done a mound and then the landscaping to gain some privacy and quiet. Whatever you decide. J. Keegan I agree that it is an improvement. I agree with the no parking signs around Beakes. Other than that I have no issues. 3 PB Minutes 7/6/16 B. Capozella I think Mr. Tilden bought up a good point about the noise in the area. We did mention the landscaping trying to reduce it. I think it is something that could be revisited. I know on the plan it says selected trees. In other words, they are going to plant the trees and protect the area and give you as much noise break as possible. As long as it is on the plan we can revisit it and say it’s not enough, it’s not working. .. I understand your concern. The trees will grow out but not immediately. A.Guattery I agree, it’s a good example of a business trying to be a good neighbor. Mid City buses are in and out all the time and it can get noisy. Perhaps the pines could be staggered along Breslin and get a few more in as we get up to Beakes. You have 4 that you are showing along the residential lot, maybe Tom could stick 3 in between them staggered to get them to grow out quicker. T. Depuy We could propose an add’l 3-4 trees in that area. A Guattery I think Mid City is showing that they want to be a good neighbor. When all is said and done we can keep everyone in the neighborhood happy. I have nothing else. T. Hamilton I agree with the staggering of the pines. The parking, the main reason the lot is across the street is that the employees can park in the new lot and should not be on the streets any more. That is what the new lot is for – to stop that from happening. R. McGoey You have some planting along Beakes? T. Depuy Yes, I had put a note on there - we have some proposals from some landscapers and we will meet the 249 rule and detail that. G. Lake Ok – you need to add a few trees and if any of them die they need to be replaced. We have been talking about placing something on plans for replacement of landscaping. I would like to see something on that. Any problems with Dick’s comments? I think we need to talk about the sidewalk connecting along 17M. I see on this plan it is down here. Do you have a safe way to get the people onto your property? T. Depuy We had a meeting. On the adjacent property where they are doing the parking they are going to have a sidewalk along Beakes with a crosswalk across at the intersection. It’s not happening on our side, its on the other side. G. Lake I realize that – I’m just reviewing the whole scheme. We want to make sure we meet the safety for everybody. I have nothing else. T. Hamilton On that landscaping note it should state that the ones that do not survive thru the winter will be replaced at the next growing season. T. Depuy Ok. G. Lake Motion for a neg dec/Part 3 EAF – Bill/Jim. D. DULGARIAN J. KEEGAN B. CAPOZELLO A GUATTERY AYE AYE AYE AYE 4 PB Minutes 7/6/16 T. HAMILTON G. LAKE AYE AYE. Motion for a lot line consolidation. Andy/Tom. D. DULGARIAN J. KEEGAN B. CAPOZELLO A GUATTERY T. HAMILTON G. LAKE AYE AYE AYE AYE AYE AYE Motion for Site plan approval subject to all comments in the neg dec. Andy/Jim D. DULGARIAN J. KEEGAN B. CAPOZELLO A GUATTERY T. HAMILTON G. LAKE AYE AYE AYE AYE AYE AYE 12th Rock Ministry Site Plan/Special Use Permit – Mt. Hope Rd. (69-1-64.2 & 64.3 ) # 34-13 M. Hunt Town of Wallkill Planning Board notice of Public Hearing. Notice is hereby given that a public hearing of the Planning Board of the Town of Wallkill, Orange County NY will be held at the Town Hall, 99 Tower Drive, Bldg. A Middletown NY in said Town on the 6th day of July at 7:30 pm or as soon thereafter as the matter can be heard that day on the application of 12th Rock Ministries for Subdivision approval, Site plan and special permit use approval of a 91,700 indoor recreational sports facility with a food service area located on Pocatello Rd. O.C. Rt. 11 on Tax lot 69-1-64.2 and 64.3 under Section 249-20 of the zoning law of the Town of Wallkill. All parties of interest shall be heard at said time and place. I rec’d his mailings. J. Samuelson Jay Samuelson, Engineering Properties. What we have here is 2 parcels that total about 93 acres. One is 86 and the 2nd lot is 5. We are going to be doing a SD and adding about 8.5 acres to the 5 acre lot. The indoor recreation will consist of 4 hardwood basketball and volleyball courts, one turf field and an indoor running track. There will be associated locker room facilities, offices and a small food service area. Access will be obtained from Pocatello Rd. (County Rt. 11) directly opposite the firehouse entrance on the other side. It’s Mt. Hope Rd. Originally the traffic was designed to gain access off Eggerton Ave. Our initial application was heard by the School District and the Fire District and thru conversations we reoriented the project to have a main access off of Mt. Hope Rd. with emergency access only out to Eggerton Rd. there will be a gate at Eggerton Rd. which will have a Knox box for the Fire Dept. the only time it will be used is to allow traffic to exit on weekends during large events. The other thing was the parking. At this point we are proposing to pave 301 spaces along the front and side of the building. In the rear we are proposing to land bank 325 parking spaces. In land banking we will construct that area as if we were going to pave it. We will not put the final asphalt on it, we will put topsoil and seed. At some point in time if the need arises they can strip the topsoil etc. we can support parking for overflow for the few large events that they may have. There is an existing berm along the school property that we will be maintaining and landscaping. This is the area, 13.5 acres – there is an existing berm here next to the school which we will be landscaping and maintaining. One of the existing barns which is in good shape is going to be maintained and used for storage by the applicant. There will be no public access to that building. 5 PB Minutes 7/6/16 G. Lake Ok I’ll go thru the board before Public (all board members stated after the PH) Motion to open this PH at 7:55 pm. M. Hunt Andy Warren. A Warren Actually my concern was addressed. I’m with the School District, President of the Board right now. You guys should know we met with the applicant and engineer just voiced our concern which was the main access coming off Pocatello. We had a similar concern as the Fire Dept. It sounds like they have met that concern so we are satisfied. G. Lake Thank you. Motion to close this PH at 7:58 pm. Tom/Jim. 6 ayes. Dicks comments –any problems? J. Samuelson We met with Dick in a workshop. We have gone over a few of the items. Most of the items on his comment letter have been addressed in this submission. I just rec’d SWWP comments today that I will address. The rest of them I have no issues with. G. Lake How about the OC DPW? J. Samuelson I sent the plans and copies of the traffic report 4/21/16. I have not heard from them yet. We had met with them informally before we came to the PB and showed them the project. they did not come up with any major concerns at that time. Just told us to submit plans and a traffic report for that area. G. Lake I thought you mentioned at WS that you might need a turning lane? Maybe I’m thinking of the wrong project or different applicant. J. Samuelson Not on this project. G. Lake Is there anything else in Dick’s comments? Unfortunately without anything in writing from the County we can’t act. We will ask you to waive the 62 day time frame (OK) and then when you get the info from the County and it gets back to us we can see if we agree with it. there might be something that we see that might change everything. R. McGoey is OC Health Dept going to review the plans? J. Samuelson That is the problem I have. I would like to get the Health Dept. to review the water main ext. but I can’t without a neg dec. or preliminary. G. Barone Because this is not a Type 1 we can neg dec it with the understanding that they will have to address OC DPW comments or concerns. J. Samuelson We are committed to answering any commentsconcerns they have. G. Barone Then we can give them preliminary so they can start working with the Dept of Health. I don’t see a legal barrier to that. 6 PB Minutes 7/6/16 G. Lake As long as the understanding is there that between preliminary and final that if there is a drastic change the preliminary goes away. I don’t want to be caught in something I can’t get out of. J. Samuelson Yes, and I agree. D. Dulgarian I am for the banked parking. Although the entrance, intersection won’t be used often it probably can be intense at times, especially in the winter months when it’s dark out. I would be interested in seeing the County comments on it. I do have concerns on that. On the Eggerton side is it all paved? J. Samuelson No we are going to end the paving at the end of the building and then it will be gravel out to Eggerton from there. A gravel emergency access road out to Eggerton. D. Dulgarian Yes, but you will use that at big events and weekends? J. Samuelson right, if they have them during the winter they will have to clear the snow off the entire field areas. If they do, it will all have to be cleared for parking and emergency access as well. D. Dulgarian J. Samuelson D. Dulgarian Ok, do you own this property:? The contract should be finalized in August. Are you running this as a business or ministry? Is there a tax break? Gregg Jalosinksy Hello, Gregg with 12th Rock Ministries and no we are not running it as a ministry. It is a completely separate business operation so it’s not tax free. D. Dulgarian I’m good for now. If Tad is comfortable with preliminary I’m ok as well. J. Keegan I agree with Dougs comments and most likely they will have events all year round and they will need to keep that cleared all year round. I think it’s a good project. B. Capozella I’ve given my opinion before – I love the project and am all for anything for the kids. My only concern has been since the beginning of the project – the exit coming out of there. I think at this point I’ve said enough about it and would love to see what the County has to say about it. Once we get their report back maybe Sells can look at it. I know we have the traffic study here that talks about the number of trips and so forth based on the Goshen Facility. Right now it looks great; obviously you don’t tell it could be a number of trips that would reduce it to a C. I like to have the facts in front of me instead of scattered over the pages. Maybe have Sells look at this and make his comments and go from there. A Guattery I agree, the project in itself is very good but we need to see traffic numbers. It’s important and I know the County will make the rules on whether or not a light go in. It’s all about safety for everyone. We certainly understand the schools position. We need to make sure we protect everyone. On that note I really agree 100% on banking for the parking. I have a problem with the gravel emergency access road. It does not just snow it rains here and will turn into a mud pit. It won’t do us any good if we set it up and cover it with topsoil and grass. I would like to see that better defined. J. Samuelson The emergency access road will be 20’ wide and will be no topsoil or grass that will be just the item. This includes the bus parking in the back – that will all be gravel all the time. 7 PB Minutes 7/6/16 T. Hamilton on that emergency lane where you are stating the gravel you have to make sure the lane is left open for the emergency crash gate. It has to be stipulated where they are going to park to leave the access lane open. G. Lake Ok. You have no problem with Dick’s comments (no). We are going to move forward and ask the board to give you preliminary but I really want it understood that if the County comes back those modifications must be done between preliminary and final. J. Samuelson I need a permit from them to get my driveway so i will do what they ask for. G. Lake Ok, just want to make sure the Town is protected. I don’t want 2-3 years down the road people beating us over the head. Motion for a neg dec/part 3 EAF subject to all comments including OCDPW- Jim/Doug. T. Hamilton Tad, can we put the stipulation that it is subject to receiving favorable… G. Barone Any comments from the County, DPW, Board of Health will need to be addressed or it may warrant changing or revisiting the SEQRA determination. G. Lake Right. Marylynn, please call the roll. D. DULGARIAN AYE J. KEEGAN AYE B CAPOZELLA AYE A GUATTERY AYE T. HAMILTON AYE G. LAKE AYE Motion for preliminary SD and SP/SUP subject to same – Andy/Tom. Marylynn please call the roll. D. DULGARIAN AYE J. KEEGAN AYE B CAPOZELLA AYE A GUATTERY AYE T. HAMILTON AYE G. LAKE AYE Thank you. Enterprise Site Plan/Special Use Permit – 285 Rt. 211e (50-1-24) # 81-13 M. Hunt Town of Wallkill Planning Board notice of Public Hearing. Notice is hereby given that a public hearing of the Planning Board of the Town of Wallkill, Orange County NY will be held at the Town Hall, 99 Tower Drive, Bldg. A Middletown NY in said Town on the 6th day of July at 7:30 pm or as soon thereafter as the matter can be heard that day on the application of Franco Fidanza, 281 Rt. 211e LLC, 265 Rt. 211e LLC and ERAC PO Box 4830 Middletown NY 10941 for amended sit e plan approval for a rental car business for property located at 265 rt. 211e west of Certified Drive, AKA Section 50-Block 1, Lot 24 under Section 249-40 of the zoning law of the Town of Wallkill and Local Law # 10 of 2016 of the Town of Wallkill. All parties of interest shall be heard at said time and place. I rec’d his mailings. 8 PB Minutes 7/6/16 F. Finia My name is Frank Finia I am with Enterprise Rental Car. We are looking to open a location at 265 Rt. 211 in Wallkill. We are on the other side of Town for over 20 years and are looking to expand the operations to this side of Town. We have met with the Board numerous times and believe we have addressed the items. G. Lake They have been to the Town Board and the Town Board added this use to the zoning as an allowable use. That is why they are not going to the ZBA. Motion to open this PH at 8:12pm. Motion to close this PH at 8:13 pm. Bill/Tom 6 ayes. Do you have any problem with the comments? D. Mcgoey He should not. He can straighten them out before I sign the maps. D. Dulgarian The 30 places, 25 are in the back on the other property? (yes) The parking lot on the right side of the building – that is not constructed yet, is it? Next to the bank. F. Finia Yes, I believe it is. D. Dulgarian F. Finia You guys are going to maintain 30 cars? I think it’s 20.. but yes we will. D. Dulgarian No issues. I’m good. All other Board members stated no issues. G. Lake Motion for a neg dec/part 3 EAF subject to comments. Andy/Bill. D. DULGARIAN AYE J. KEEGAN AYE B CAPOZELLA AYE A GUATTERY AYE T. HAMILTON AYE G. LAKE AYE Motion for site plan/special use permit subject to same. Tom/Andy. D. DULGARIAN AYE J. KEEGAN AYE B CAPOZELLA AYE A GUATTERY AYE T. HAMILTON AYE G. LAKE AYE Welcome to Wallkill! Church of Emmanuel Site Plan (Extension to Final Cond. Approval) – 481 Cottage St. Ext. (40-1-21.2) # 74-13 C. Mead Carlos Mead representing the Iglesia Emmanuel this evening. I am here to answer any questions you may have. G. Lake C. Mead You are here for an extension. Any particular reason why? We lost our Pastor and are reorganizing. It is taking longer than we expected. 9 PB Minutes 7/6/16 G. Lake Ok. I’ll go thru the board. (all board members stated no issues.) Motion for one year extension to final conditional approval. Bill/Andy 6 ayes. Fini 2 lot Subdivision - Hill Rd. (60-1-28.3) # 41-15 J. Pfau Joe Pfau appearing for the applicant. As you recall we were at the PB months ago and referred to the Town Board for OAD. We recd that approval and are back here and hoping to schedule a PH. G. lake How long ago was this subdivided? J. Pfau I would have to check but it is well over 10 years. G. Lake If it was over 10 years we don’t need a public hearing. What you did in Goshen is in the Town of Goshen, not Wallkill. We believe you don’t need the Public Hearing. We understand that Goshen maintains that for you. (all of it). If Goshen is going to continue it’s up to them but if they don’t someone has to maintain it. Just for the safety factor and the future get together with Mr. Barone and straighten that out. G. Barone Was this sent to OCP? G. Lake I believe it was. J. Pfau That is the only comment we didn’t address. R. McGoey You also need an easement across lot # 1. Access and maintenance. G. Lake What else will he need? J. Pfau We made our submission to KC Engineering. D. Dulgarian No further SD of these two lots(no.) I think it’s low use of the open area and have no problem. B. Capozella As long as the agreements in place – ROW /Easement. T. Barone Just the agreement to cover their access issues. G. Lake Motion for neg dec/part 3 EAF – Doug/Andy 6 ayes. Motion for SD approval subject to all comments. Tom/Andy –6 ayes. Crossview Realty 36 lot Subdivision – Final Approval 277 Scotchtown Collabar Rd. (19-1-10 and 3.2) # 16-10 MNTM Eng G. Lake MNTM Eng We are here for final conditional final. I’m assuming you are ready to go. I believe we have crossed our t’s and dotted our I’s. 10 PB Minutes 7/6/16 G. Lake It’s been around awhile. D. Dulgarian Wasn’t this a lot larger way back? We’ve e seen this a long time, no issues. G. Lake Yes, we tried to get the OC Trust involved in it and our trust but nothing. All board members stated no issues. G. Lake Good Luck. Motion for conditional final approval subject to all comments. Andy/Tom. 6 ayes. Caldor Indoor Self Storage Site Plan/Special Use Permit – 360 Rt. 211e (50-2-36) # 09-05 G. Lake This is an allowable use by the Town Board. The reason is retail is changing and this might be a way to take some of the larger spaces. D. Higgins Dave Higgins, Lanc & Tully Eng. WE were here in June and at that point in time the Town Board had not yet adopted the Local Law to allow the self-storage use. We have updated the plan since that time. I made a change in the plan. I will hand out some papers to show you exactly what we have done. Basically we were proposing the entrance to the office space in the front portion of the building and we had access to the storage areas with an overhead door and a keypad control on the side of the building behind the pizza place. Since then the owner have reviewed it and wanted to reconfigure some of the area they want to utilize. We have eliminated the office space previously shown in the front and we are still using the side behind the pizza place. Access of 14’ overhead sliding door for the storage area. The building is 2 stories. We also want to have the main entrance to the office space and add’l storage from the rear of the building. It would be to the left of the scuba shop. One of the comments at the last meeting was to try to improve the view from Carpenter Ave. We would like to make that our entry for the office space. We would clean up the façade in the back and also the side where they need the second entrance. We still have relocation and cleanup of the dumpsters. The crew was in the process of fixing the dumpster on the back end of the building. We also updated the table with the parking calcs. The s.f. is now at 33,520 total associated with the self-storage. The zoning notes have been updated to reflect the size of the structure and percentage of the building. We are making exterior improvements to the façade and sign. G. Lake Maybe between now and public hearing you can give us a sketch of what it will look like. I think it’s great to fix up the back side of the building. R. McGoey The back and the side. G. Lake And the dumpsters – I know we already talked about it and took pictures. So many good things have happened there. The dumpsters situation does not make sense anymore. A lot will lie with what that looks l like to me between now and PH. Nobody is an angel in retail and it’s not easy but we have so much good on this property…. R. McGoey The side of the building is trashy as well as the back. B. Middelman As far as the dumpsters we are trying everything that is in our control to fix it. They are promising to close the doors. We are dependent on kids that are taking out garbage. 11 PB Minutes 7/6/16 G. Lake I understand what a headache it is. I owned a small retail so I’m familiar with it. It’s the only thing that is bad out there. If your garbage guy is not willing to close them then get another one. The one that works for the Town closes the gates. I would think this is a good account and they would be concerned if you were going to take your business elsewhere. D. Dulgarian I have no problem with the use. I do feel strongly that the back entrance is a highly traveled road and even the entrance should have a reader board or more appealing, maybe some landscaping. The far corner of the lot still has concrete barriers – that should be filled in with grass or made to look like something, it’s messy. You have done a tremendous job but you need to concentrate on the rear of the building . It’s highly travelled and the entrance is easy to miss. That entrance should be spruced up with landscaping and signage. j. Keegan I prefer the office in the back and agree with Doug and Gary on the façade spruce up. B. Capozella cement areas. I like the use- spruce it up. BK on 211 has a nice little area they maintain. We prefer that over G. Lake Motion to set a PH on 8/17/16. Bill/Andy 6 ayes. MEETING ADJOURNED. 12
© Copyright 2026 Paperzz