Aircraft Carriers – Enduring and Transformational RDML Tom Moore PEO Aircraft Carriers 8 March 2012 NAVSEA: Statement A: Approved for Release. Distribution is unlimited. PEO Aircraft Carriers Aircraft Carrier Program of Record Fiscal Year CARRIER 11 USS ENTERPRISE (CVN 65) 12 13 Decommi 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 RCOH Inactivati RCOH USS JOHN C. STENNIS (CVN 74) I RCOH USS HARRY S TRUMAN (CVN 75) RCOH USS RONALD REAGAN (CVN 76) RCOH USS GEORGE H. W. BUSH (CVN 77) CVN 82 41 42 Inactivation USS GEORGE WASHINGTON (CVN 73) CVN 81 40 Inactivation USS THEODORE ROOSEVELT (CVN 71) RCOH CVN 80 39 Inactivation USS CARL VINSON (CVN 70) JOHN F. KENNEDY (CVN 79) 38 Inactivation USS DWIGHT D. EISENHOWER (CVN 69) GERALD R. FORD (CVN 78) 37 Inactivation USS NIMITZ (CVN 68) USS ABRAHAM LINCOLN (CVN 72) 36 RCOH RCOH Construction Construction Construction Construction Construction CVN 83 Construction CVN 84 Construction FORCE STRUCTURE 11 11 10 10 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 10 11 8 March 2012 PEO Aircraft Carriers 2 Carriers – Enduring and Transformational • ENTERPRISE will be 51 at her FY13 inactivation • NIMITZ-Class: 500 carrier-years, serving over 84 years, from 1975 until 2059 • Only 42% through the service life of the NIMITZ Class – 290 carrier-years remaining Years of Service Life 8 March 2012 RCOH 0 5 10 15 20 25 30 35 40 45 PEO Aircraft Carriers 50 3 Evolution of NIMITZ Class Aircraft 1975 Today Tomorrow • F-4J • A-6E • A-7E • SH-3 • RA-5 • E-2B • EA-6B • F/A-18E/F • F/A-18 A/F • MH-60R/S • E-2C • EA-6B • F-35C • F/A-18E/F • EA-18G • E-2D • MH-60R/S • UCLASS Unmanned Carrier-Launched Airborne Surveillance and Strike System 8 March 2012 PEO Aircraft Carriers 4 Refueling Complex Overhaul Program (RCOH) Mid-life recapitalization depot availability to accomplish… • Refueling of the ship’s reactors • Warfighting modernization • Repairs of ship systems and infrastructure …so the aircraft carrier may adapt to future mission requirements and meet continued service life requirements Typical RCOH Execution Breakdown Nuclear Plant Propulsion Requirements: 36.0% Non- Propulsion Modernization: • Refuel Reactors • Propulsion Plant Mods • Propulsion Plant Repairs 22.5% • Warfighting • Interoperability • Air/Ship Integration Non-Nuclear Non-Propulsion Overhaul: Requirements: • Class Maintenance Plan • Infrastructure • Repairs 41.5% 5 8 March 2012 PEO Aircraft Carriers 5 Ford Class Program History Milestone 0 Approval March 96 Defense Acquisition Board Oct 98 authorized: Evolutionary 2 Step Program CVNX-1 CVNX-2 – Large Deck (75 Aircraft) – New Nuclear Propulsion and Electric Plant Design – Evolutionary Acquisition Strategy (CVNX-1→ CVNX-2) Milestone I Approval 15 Jun 00 CVNX-1 Construction Contract Award FY06 – Delivery FY13 OSD/NAVY Review Program Decision Memorandum signed 12 Dec 02 – Pull Forward Technologies Intended for CVNX-2 into the first ship – Designates Program as CVN 21 Revised Acquisition Strategy Milestone ‘B’ – April 04 Construction Preparation Contract Awarded – 3rd Quarter FY04 Lead Ship Construction Contract Award FY07 – Delivery FY14 2006 Defense Budget EMALS Sortie Rate New Hull Improved Weight/KG Changed the Program Transformational – Single Leap CVN 78 Changed the Program Final 2006 Defense Budget Delays CVN 78 and CVN 79 one year – Expands Construction Preparation Contract to include 2007 – Lead Ship Construction Contract Award FY08 – Delivery FY15 FY07 NDAA Contract Authorization FY07 National Defense Authorization Act Authorizes the Navy to Enter into Construction Contracts for First Three Ships of CVN 78 Class – Authorizes Four-Year Funding for First Three Ships of CVN 78 Class FY08 DAB PR DD&C Contract Award OSD (AT&L) Acquisition Decision Memorandum of 6 Aug 2008 authorizes CVN 78 to enter the production phase – Detail Design and Construction Contract awarded 10 Sep 2008 GERALD R. FORD (CVN 78) Replaces USS ENTERPRISE (CVN 65) 8 March 2012 PEO Aircraft Carriers 6 Why the Ford Class? NIMITZ-Class Focused Investment Increased Flexibility Increased Capability CVN 78-Class Increased Affordability • Greater operational availability • 3X electric plant capacity • Sortie Generation Rates increased by 25% • $5 B TOC reduction • 500-900 billet reduction • Flexibility of open architecture • Restoration of Service Life Allowances (Wt/Kg) • Integration of future air platforms • • • • • Reduced construction costs • Maintenance requirements reduced by 30% • Product Model Design Survivability improvements Damage Control improvements Improved ship self-defense Increased magazine and AVGAS storage • Interoperability (IER) NIMITZ Is a 40 Year-old Design That Constrains the Ability to Transform 8 March 2012 PEO Aircraft Carriers 7 NIMITZ Class to Ford Class NIMITZ Class (CVN 77) Ford Class (CVN 78) Catapults 4 x Steam 4 x EMALS Arresting Gear & Barricade 4 x MK7-4 3 x Adv Arresting Gear 4 x 200,000 lbs Hyd 3 x 200,000 lbs Hyd 205,000 ft² 214,000 ft² 3 Bays 2 Bays Cabled-Electric 9 x 10,500 lbs Adv Weapons Elev 11 x 24,000 lbs ~ 1225 ft 390 ft ~ 12,500 ft² / 650 seats 260 ft² / 32 seats (2) A4W (2) A1B Rotating AN/SPS-48, 49, 67, 73 AN/SPN-43 ATC, AN/SPQ-9B Phased Array MFR/VSR 5,922 4,660 5 2 Messrooms 11 rooms 7 rooms Air Conditioning Capacity 4,800 tons 9,900 tons Distillers Reverse Osmosis 400,000 GPD 500,000 GPD $32B (FY 04 $) $27B (FY 04 $) Ship Manning 3291 2491 Airwing Manning 2270 1786 120/ day sustained; 192 surge 160 /day sustained; 270 surge Aircraft Elevators Flight Deck Hangar Deck Weapons Elevators Horizontal Weapons Movement Distance Messing Area Consumed by Weapons Production (ft²/seats) Reactors Radars Accommodations Galleys Fresh Water Generation Total Ownership Cost (50 Years) Sortie Rate 8 March 2012 PEO Aircraft Carriers 8 Gerald R. Ford Class Integrated Island Smaller Island Re-Positioned Aft & Outboard Dual Band Radar New Propulsion/Electric Plant Mast with Joint Clamp Precision Antenna Approach and Landing System All Electric Aux Services Zonal Electrical Distribution System New Propulsion Plants Improved Weapon & Material Handling Advanced Weapons Elevators Heavy Underway Replenishmen t Plasma Arc Waste Destruction System Enlarged Flight Deck Footprint “Pit Stop” Advanced Arresting Gear Aircraft Elevators (3) Stbd Sponson Redesign Enhanced Flight Deck Hangar Bays (2) #4 Catapult Unrestricted 8 March 2012 Electromagnetic Aircraft Launching System (4) Improved Survivability Evolved Sea Sparrow Missile Enhanced Ship Self Defense PEO Aircraft Carriers 9 Gerald R. Ford Class Ship Construction As of February 2012 8 March 2012 PEO Aircraft Carriers 10 CVN Construction History 60 Ford Class NIMITZ Class Flight I – Stick Build 3 CVNs in 7 Yrs Flight II – Modular Build; 5 CVNs in 13 Yrs Flight III – Bulbous Bow; Other upgrades 2 CVNs in 6 Yrs 50 53.5 45.9 45 40.3 40 39.2 38 Target Area 36.2 34.4 33.7 34.4 33.2 32.9 31.2 30 Production 10 6 Years Between Designs 20 5 Years Between Designs 5 Years Between Designs Engineering 9.2 7.8 2.3 4.5 4.1 2.8 5.8 5.1 3.7 2.2 Target Area 2.1 0 68 8 March 2012 69 70 71 72 73 74 75 76 77 78 79 PEO Aircraft Carriers 11
© Copyright 2026 Paperzz