Methyl Bromide Purge Graph bin G6 Date:20 /8/16 Bin

EPL Number:
EPL Holder:
EPL Name Of
Facility:
EPL Website
Link:
Monitoring
Frequency:
Date Published:
1296
GRAINCORP OPERATIONS LIMITED
NEWCASTLE GRAIN TERMINAL, DENISON STREET, CARRINGTON NSW 2294
http://www.epa.nsw.gov.au/prpoeoapp/Detail.aspx?instid=1296&id=1296&option=licen
ce&searchrange=licence&range=POEO licence&prp=no&status=Issued
Every Fumigation
28/09/2016
Methyl Bromide Purge Graph bin G6
Date:20 /8/16 Bin:
4.8
4.6
4.6
4.4
4.2
Grams
4
0.836
0.911
1.051
1.086
1.142
1.032
0.4
10.40AM
10.45AM
10.50AM
10.55AM
11.00AM
11.05AM
0.004
0.000
0.000
12.05PM
Time
Grams Per Cubic Meter Of Methyl Bromide
Grams Per Cubic
Meter Of
Methyl Bromide
4.4
4.6
4.8
4.6
4.2
4
0.4
Grams Per
Second Of
Methyl
Bromide
0.836
0.911
1.051
1.086
1.142
1.032
0.004
0.000
0.000
0.000
Sample Time
Volumetric
Flow Rate
(Metres per
second)
10.40AM
10.45AM
10.50AM
10.55AM
11.00AM
11.05AM
12.05PM
0.19
0.198
0.219
0.236
0.272
0.258
0.01
Quantity Of
Quantity Of
Date Of
Time Of
Fumigant Used Grain (Tonnes) Fumigation
Fumigation
5kg
197
19/08/2016
15.25PM
Start
Complete
Duration Of
Vent Stack Used Ventilation
Ventilation
Ventilation
Date /Time
Date /Time
(Hours)
Vent stack 1 20-8-1610.40AM22-8-1608.30AM
36
Fumigator
Jason Neill
Exposure Time
(Hours)
19
Grams Per Second Of Methyl Bromide
The maximum
The maximum velocity
fumigation
from vent stack during
concentration rate in
ventilation must not
silo must not exceed:
exceed:
10g/m³ of Methyl
0.495 metres per
Bromide; Compliance
second of Methyl
Yes/No
Bromide; Compliance
Yes/No
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
0.000