Installation Manual AboveAir TM Technologies Split System Refrigerant Piping Guide Air Conditioners & Heat Pumps (DX System Piping) Refrigerant Piping Guide • Installation Requirements • Piping & Insulation • Pipe Routing • Sizing your line set - Suction or Discharge - Liquid - Risers Split Systems - Refrigerant Piping Guide AboveAir Ab bovveA Airr Te Technologies Tech chno ch no olo ogi giess gies Ver AboveAir A Ab ove ov e1.4 A r™- 07/29/2013 Ai Refrigerant Re efrrige iger eran a t Guide e 1 REFRIGERANT PIPING GUIDE Refrigerant Piping Guide This manual provides general recommenda ons and requirements for AboveAir Technologies split system refrigerant piping. Read through this manual carefully prior to beginning any installa on ac vity to guarantee that your installa on meets the requirements to ensure op mal unit performance. For systems with the condenser located below the evaporator (compressor located in the evaporator sec on), the maximum allowable ver cal component is 20 feet. Installation Considerations Long distances and eleva on changes can reduce the overall efficiency of refrigerant based systems. Extended piping runs increase the required line size, the cost of refrigerant piping and the amount of refrigerant required for the system. To minimize piping costs and maximize unit performance, it is recommended to select component placement to minimize the length of the piping run. Maximum Recommended Lengths For op mal unit opera on, a maximum total equivalent length (linear feet of horizontal pipe + linear feet of ver cal pipe + equivalent lengths of all fi ngs) of 150 feet is permissible. The allowed ver cal component varies depending on system configura on. InstallaƟons in excess of 150 total equivalent feet may void your compressor warranty. For systems with a condensing unit (compressors located with the condensing sec on) located above the evaporator, the maximum allowable ver cal component is 50 feet. For systems with a condensing unit (compressors located with the condensing sec on) located below the evaporator, the maximum allowable ver cal component is 50 feet. For systems with the condenser located above the evaporator (compressor located in the evaporator sec on), the maximum allowable ver cal component is 100 feet. For heat pump applicaƟons: Condensing and Evaporating secƟons flip funcƟonality during heaƟng operaƟon. Maximum verƟcal run allowance is determined by the worst case condiƟon. Piping and Routing Use Type L or K copper refrigerant grade piping for all refrigerant lines. Securely mount all refrigerant lines to the building structure with brackets intended for use with refrigerant/copper piping. Where refrigerant lines pass through walls or floors, provide a sleeve to prevent the line from rubbing. Route piping through chases, ceiling plenums, wall cavi es, conduit, or similar protected areas to minimize the possibility of damage to the piping. Slope all refrigerant piping in the direc on of flow at 1/4” 2 AboveAir™ Refrigerant Guide Refrigerant Piping AboveAir Technologies REFRIGERANT PIPING GUIDE per ten feet: slope the liquid line towards the evaporator, the hot gas discharge line towards the condenser, and/or the suc on line towards the compressor. Piping should be installed without sags or bends. excess of 150°F. Insula on is not required. Insula on is recommended where the hot pipe may present a hazard to the space occupants. Pipe Traps Use proper transi on fi ngs to transi on from evaporator and condenser stub out sizes to the refrigerant line sizes calculated herein. Piping Configurations Riser traps should be sizes as small as possible. Traps should be included in the pipe sizing calcula ons, if required. Traps should be provided as follows: Liquid Line - No traps required. AboveAir Units are customizable for a variety of configura ons. Split configura ons include: Remote Condenser: Compressors are located in the evaporator sec on. Discharge and liquid lines between the evaporator and condenser are required. Condensing Unit: Compressors located with the remote condensing sec on. SucƟon and liquid lines to between the evaporator and condensing unit are required. Each circuit in a mul -circuited unit will require its own set of lines for connec on. For example, a dual circuited condenser will require (2) discharge and (2) liquid lines for connec on to the evaporator sec on. Pipe Connections Braze all piping connec ons with a high quality, high temperature brazing compound of 15% silver suitable for use with the refrigerant used in your unit and in accordance with all local, na onal and ASHRAE code requirements. Take care to avoid introducing debris to the piping system. Run dry nitrogen through the piping con nuously during the brazing process to minimize contamina on and ensure joint quality. Pipe Insulation Pipe insula on materials should be provided as required by the project documents and local codes. Piping should be insulated in accordance with the following: Liquid Line - Opera ng temperatures for the pipe will typically be in the range of 110-120°F. Insula on is recommended on external installa ons and where piping is routed through non-condi oned spaces or where the hot pipe may present a hazard to the space occupants. Suc on Line - Typical temperatures are in the vicinity of 40-50°F. Insula on is required to prevent condensa on, minimize temperature loss to the environment, and prevent refrigerant from flashing. Hot Gas Discharge Line - Typical temperatures may be in Suc on Line - Provide ver cal risers with a trap at the bo om of the riser and an inverted trap at the top of the riser. Hot Gas Discharge Line - Provide ver cal risers with a trap at the bo om of the riser and an inverted trap at the top of the riser. In addi on to these requirements, any vapor riser not sized for 1,000 fpm minimum pipe velocity must be trapped every 20 feet. Traps may be omi ed for risers less than 5 feet in height. Filter Driers Your unit was shipped with filter-drier(s) either installed in the evaporator sec on or filter-drier(s) shipped loose with the system. If the filter-drier was not factory installed, it must installed in the liquid line as close to the evaporator secon as possible. Refer to the labeling on the device and ensure that it is installed with the proper orienta on to the flow. For mul -circuited units, each liquid line must have its own filter-drier. Riser Sizing Vapor piping must be sized to maintain a minimum velocity of 1,000 fpm for oil transport. Refer to Table 6b (R-410a) or Table 7b (R-407c) for the maximum pipe sizes to maintain this velocity; if your horizontal piping run is larger than the indicated pipe size, use the value from the table for the risers. Note that this may increase system pressure drop and degrade unit performance - long risers should be avoided, if possible. Flooded Condenser Sizing Pipes from a remote flooded condenser to a receiver should be sized for a maximum of 100 fpm. Refer to Table 6c (R-410a) or Table 7c (R-407c) for the required pipe sizes for maximum liquid line sizes. Refrigerant Piping AboveAir Technologies AboveAir™ Refrigerant Guide 3 REFRIGERANT PIPING GUIDE Pipe Sizing Method Pipe sizing is based on the method detailed in the 2010 ASHRAE Refrigera on Handbook. The following charts and recommenda ons are provided for your convenience - AboveAir Technologies recommends all refrigerant pipe sizes be calculated by an engineer in accordance with the latest ASHRAE Refrigera on sizing guidelines. To begin the calcula on, circle the refrigerant type in Table 1 below. Note the unit tonnage from the unit’s nameplate and the number of refrigera on circuits. Divide the unit tonnage by the number of circuits to determine the tons per circuit. All of the subsequent calcula ons in this sec on will be based on tons per circuit. Table 1 - Tonnage per Circuit Refrigerant Type R-407c R-410a Unit Tonnage Number of Circuits Tons per Circuit To determine the pipe size to be used for installa on, the total equivalent length must be determined. The following tables will lead you through the itera ve process of determine the total equivalent length and unit pipe sizes. To begin the process, record the total length of piping to be installed (horizontal + ver cal) in Table 2 below. To make an ini al es mate of pipe sizes, mul ply this value by 1.5 and record the value under the total equivalent length column. Table 2 - Initial Pipe Size Estimates Line Type Liquid Suc on Discharge Total Length Total Fi ng Alx = Equivalent lowance Length x 1.5 = x 1.5 = x 1.5 = Ini al Pipe Size The ini al pipe size can be looked up in either Table 6a (R-410a) or Table 7a (R-407c). To look up the line size, round the total equivalent length up to the next 25 feet. Locate the Tons per Circuit in the column at the top, then follow down to this total equivalent length. Record the values for the ini al pipe sizes for your applica on in Table 2 above. Note: The following steps are an iteraƟve process and may need to be conducted more than once. It is recommended that you copy the next page to allow for one or more addiƟonal iteraƟons. In Table 3, record the actual quan ty of fi ngs to be installed on all applicable line types. Using the Ini al Pipe Sizes recorded in Table 2, look up the equivalent fi ng lengths in Table 4. For each line type, mul ply the quan ty of fitngs by the equivalent fi ng lengths. Record this value as indicated in the table, then add the values as indicated to determine the total equivalent fi ng lengths for each line type. Record these values in i, ii, or ii as applicable. 4 AboveAir™ Refrigerant Guide Refrigerant Piping AboveAir Technologies REFRIGERANT PIPING GUIDE Table 3 - Fitting Equivalent Lengths Liquid Line x Value from Table 7 for ini- = al pipe size 90° 45° x = (a) x = (b) Traps x = (c) Fi ng Type Quan ty Total Liquid Fi ng Equivalent Length (a + b + c) = Suc on Line Total Fi ng Equivalent Length x = (d) x = (e) Traps x = (f) Total Suc on Fi ng Equivalent Length (d + e + f) = Hot Gas Discharge Line (ii) 90° 45° x = (g) x = (h) Traps x = (i) Total Suc on Fi ng Equivalent Length (g + h + i) = Pipe Size 3/8 1/2 5/8 3/4 1 1/8 1 3/8 1 5/8 2 1/8 (i) 90° 45° Table 4 - Fitting Equivalent Lengths Fi ng Type 90° 45° Trap 0.9 0.7 2.3 1.0 0.8 2.5 1.2 0.9 2.9 1.4 0.9 3.2 2.0 1.4 4.9 2.5 1.8 6.0 2.8 2.2 6.8 3.5 2.8 8.7 (iii) Record the total line length and the total equivalent fi ng lengths (i, ii, and iii) calculated in Table 3 in Table 5 below. Add these two values together to determine the total equivalent length. Using Table 6a (R-410a) or Table 7a (R-407c) and the procedure described previously, record the pipe sizes in Table 5. Table 5 - Calculated Pipe Size Line Type Liquid Suc on Discharge Total Length + + + + Fi ng Equivalent Lengths = (i) = (ii) = = (iii) Total Equivalent Length Pipe Size Note: this calculaƟon should be repeated with the new line size as a new iniƟal value if there are significant changes in the line size. Use the pipe size calculated in Table 5 instead of the iniƟal pipe size and recalculate Tables 3 and 5. Refrigerant Piping AboveAir Technologies AboveAir™ Refrigerant Guide 5 REFRIGERANT PIPING GUIDE Table 6a - Refrigerant Line Sizing Charge for R-410a Total Line Type Equivalent 1 1.5 Length 25 Liquid 3/8 3/8 (7.6 m) Suc on 1/2 1/2 Discharge 3/8 1/2 50 Liquid 3/8 3/8 (15.2 m) Suc on 1/2 5/8 Discharge 1/2 1/2 75 Liquid 3/8 3/8 (22.9 m) Suc on 1/2 5/8 Discharge 1/2 1/2 100 Liquid 3/8 3/8 (30.5 m) Suc on 5/8 5/8 Discharge 3/8 5/8 125 Liquid ** 3/8 (38.1 m) Suc on ** 3/4 Discharge ** 5/8 150 Liquid ** 3/8 (45.7 m) Suc on ** 3/4 Discharge ** 5/8 ** Installa on not recommended. 2 2.5 3/8 5/8 1/2 3/8 5/8 5/8 3/8 3/4 5/8 3/8 3/4 5/8 3/8 3/4 5/8 1/2 3/4 5/8 3/8 5/8 1/2 3/8 3/4 5/8 3/8 3/4 5/8 1/2 3/4 5/8 1/2 7/8 3/4 1/2 7/8 3/4 3 Tonnage per Circuit 4 5 6 3/8 1/2 5/8 3/4 5/8 5/8 3/8 1/2 3/4 7/8 5/8 3/4 1/2 1/2 3/4 7/8 3/4 3/4 1/2 1/2 7/8 7/8 3/4 3/4 1/2 1/2 7/8 1 1/8 3/4 7/8 1/2 5/8 7/8 1 1/8 3/4 7/8 1/2 3/4 5/8 1/2 7/8 3/4 1/2 1 1/8 3/4 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 1/8 7/8 1/2 7/8 3/4 1/2 7/8 7/8 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 1/8 1 1/8 5/8 1 1/8 1 1/8 7.5 8 10 15 5/8 7/8 3/4 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 1/8 1 1/8 5/8 1 1/8 1 1/8 3/4 1 3/8 1 1/8 5/8 7/8 3/4 5/8 1 1/8 7/8 5/8 1 1/8 1 1/8 5/8 1 1/8 1 1/8 5/8 1 3/8 1 1/8 3/4 1 3/8 1 1/8 5/8 1 1/8 7/8 5/8 1 1/8 1 1/8 5/8 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 1/8 1 1/8 3/4 1 1/8 1 1/8 3/4 1 3/8 1 1/8 7/8 1 3/8 1 3/8 7/8 1 5/8 1 3/8 7/8 1 5/8 1 3/8 Table 6b - Maximum Riser Size for oil return (R-410a) Line Type Discharge Suc on 1 3/8 1/2 1.5 2 2.5 3/8 1/2 1/2 5/8 3/4 7/8 3 5/8 7/8 Circuit Tonnage 4 5 6 5/8 3/4 7/8 1 1/8 1 1/8 1 1/8 7.5 7/8 1 3/8 8 7/8 1 3/8 10 1 1/8 1 5/8 15 1 3/8 2 1/8 Table 6c - Flooded Condenser to Receiver Sizing (R-410a) 1 3/8 6 1.5 1/2 2 1/2 AboveAir™ Refrigerant Guide 2.5 5/8 Circuit Tonnage 3 4 5 6 7.5 5/8 3/4 3/4 7/8 1 1/8 8 1 1/8 10 1 1/8 15 1 3/8 Refrigerant Piping AboveAir Technologies REFRIGERANT PIPING GUIDE Table 7a - Refrigerant Line Sizing Charge for R-407c Total Equivalent Line Type 1 1.5 Length Liquid 3/8 3/8 25 Suc on 1/2 5/8 (7.6 m) Discharge 3/8 1/2 Liquid 3/8 3/8 50 Suc on 5/8 3/4 (15.2 m) Discharge 1/2 1/2 Liquid 3/8 3/8 75 Suc on 5/8 3/4 (22.9 m) Discharge 1/2 5/8 Liquid 3/8 3/8 100 Suc on 3/4 3/4 (30.5 m) Discharge 1/2 5/8 Liquid ** 3/8 125 Suc on ** 3/4 (38.1 m) Discharge ** 5/8 Liquid ** 3/8 150 Suc on ** 7/8 (45.7 m) Discharge ** 5/8 ** Installa on not recommended. Tonnage per Circuit 2 2.5 3 4 3/8 3/8 3/8 1/2 5/8 3/4 3/4 7/8 1/2 5/8 5/8 5/8 3/8 3/8 1/2 1/2 3/4 3/4 7/8 1 1/8 5/8 5/8 3/4 3/4 3/8 1/2 1/2 1/2 3/4 7/8 7/8 1 1/8 5/8 3/4 3/4 7/8 1/2 1/2 1/2 1/2 7/8 7/8 1 1/8 1 1/8 3/4 3/4 3/4 7/8 1/2 1/2 1/2 5/8 7/8 1 1/8 1 1/8 1 1/8 3/4 3/4 7/8 7/8 1/2 1/2 1/2 5/8 7/8 1 1/8 1 1/8 1 1/8 3/4 3/4 7/8 7/8 5 6 7.5 8 10 15 1/2 7/8 3/4 1/2 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 3/8 1 1/8 5/8 1 3/8 1 1/8 1/2 1 1/8 3/4 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 3/8 1 1/8 5/8 1 3/8 1 1/8 5/8 1 3/8 1 1/8 5/8 1 1/8 7/8 5/8 1 1/8 7/8 5/8 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 5/8 1 1/8 5/8 1 1/8 7/8 5/8 1 3/8 1 1/8 5/8 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 5/8 1 1/8 5/8 1 1/8 7/8 5/8 1 3/8 1 1/8 3/4 1 3/8 1 1/8 3/4 1 5/8 1 1/8 3/4 1 5/8 1 3/8 3/4 1 5/8 1 3/8 3/4 1 3/8 1 1/8 3/4 1 5/8 1 1/8 7/8 1 5/8 1 3/8 7/8 2 1/8 1 3/8 7/8 2 1/8 1 3/8 7/8 2 1/8 1 5/8 10 1 1/8 1 5/8 15 1 3/8 2 1/8 Table 7b - Maximum Riser Size for oil return (R-407c) Line Type Discharge Suc on 1 3/8 5/8 Circuit Tonnage 1.5 2 2.5 3 4 5 6 1/2 1/2 5/8 5/8 3/4 7/8 7/8 3/4 7/8 7/8 1 1/8 1 1/8 1 3/8 1 5/8 7.5 7/8 1 5/8 8 1 1/8 1 5/8 Table 7c - Flooded Condenser to Receiver Sizing (R-407c) 1 3/8 1.5 1/2 2 1/2 2.5 5/8 Circuit Tonnage 3 4 5 6 7.5 5/8 3/4 3/4 7/8 1 1/8 Refrigerant Piping AboveAir Technologies 8 1 1/8 10 1 1/8 15 1 3/8 AboveAir™ Refrigerant Guide 7 Innovative HVAC Solutions Ceiling Air Conditioners SpotCool ™ - 2x4 T-Bar “Spot-Cooler” Comfort & Precision Ceiling Mounted A/C’s HK ™ Horizontal - Hi-Static Ducted “Same- 2x4 “Spot-Cooler” Ceiling Mounted A/C’s (1 to 3 Tons) Ducted “Same-Face” Ceiling Mounted A/C’s (1 to 30 Tons) Face” Comfort & Precision Ceiling Mounted A/C’s HK-OA ™ - Horizontal Up to 100% DOAS HighPercentage Outside Air Ceiling Mounted A/C’s Floor Air Conditioners VK™ Vertical - SCAV, Vertical Floor Mounted Self-Contained & Split Comfort Constant Air Volume and Variable Air Volume (VAV) A/C’s & Heat Pumps VK-OA ™ - Vertical Up to 100% DOAS High- Per- Comfort - Packaged & Split Vertical Floor Mounted Air Conditioners (1 to 30 Tons) Precision - Vertical Floor Mounted Computer Room Air Conditioners (1 to 30 Tons) centage Outside Air Vertical Floor Mounted A/C’s MissionCritical ™ - Precision Vertical Floor Mounted Computer Room A/C’s VK™ Console - Vertical Floor Console Mounted Self-Contained & Split A/C’s & Heat Pumps Remote Heat Rejection FluidCool ™ - Indoor & Outdoor Remote Glycol Drycoolers PumpAll ™ - Single, Dual & Triplex Standard & VK-ConsoleTM - Up-Flow & Down-Flow Floor Console Mounted Air Conditioners (1 to 5 Tons) Remote Air Cooled Condensers, Condensing Units & Glycol Drycoolers (1 to 180 Tons of THR) Single & Dual Glycol Pump Packages (1/2 to 50 HP) Variable (VFD) Speed Glycol Pump Packages www.aboveair.com 8 5179 Mountville Road Frederick, Maryland 21703, U.S.A. Phone: 301-874-1130, Facsimile: 301-874-1131 AboveAir™ Refrigerant Guide Email: [email protected] Copyright 03/13 Specifications are subject to change without notice. AboveAir Technologies
© Copyright 2026 Paperzz