Reducing CSOs in the Big Apple NYC’s Green and Gray Approach 2017 Wet Weather Partnership Workshop Indianapolis, Indiana May 4, 2017 Peter J. Young, PE, Vice President – Hazen and Sawyer Keith Mahoney, PE, Director – NYCDEP Kevin Clarke, PE, Portfolio Manager – NYCDEP New York City Wastewater Infrastructure DEP Provides Wastewater Services to NYC 1.3 billion gallons of wastewater treated each day 14 wastewater treatment plants 95 pumping stations 7,500 miles of sewer pipes Over 495 combined sewer overflow (CSO) discharges Major Historical Timeline for Wastewater Infrastructure OMB = Office of Management and Budget Historical Investment and CSO Reduction Over Time CSO Capture: Current = 80%1 Future Estimate = 82%2 Note: Dashed lines reflect estimated future cost and CSO volume reduction associated with implementation of the Long Term Control Plans, which are currently under development. Future CSO control will be a combination of storage and disinfection projects, with the exact volume to be developed during the LTCP process. 1) April 2015 CSO Annual Best Management Practices (BMP) Report 2) 2030 LTCP Baseline Scenario for Grey & Green Infrastructure Estimate Fecal Bacteria (Summer Geometric Means) 2014 1985 Fecal Coliform Bacteria: < 100 cfu/100 mL 100 – 200 201 – 2,000 >2,000 Data from Harbor Survey Program. Dissolved Oxygen (Summer Average for Bottom Waters) 1985 Dissolved Oxygen: 2014 ≥ 5 mg/L 4.0 – 4.9 3.0 – 3.9 < 3.0 Data from Harbor Survey Program. Capital Expenditures NYC Income Levels and Poverty Rates Median Household Income (MHI) % of Residents Living Below Federal Poverty Level United States $53,675 15.5% NYC $52,996 20.9% Bronx $33,712 31.6% Brooklyn $47,966 23.4% Manhattan $76,089 17.6% Queens $57,241 15.2% Staten Island $71,121 14.5% Source: U.S. Census Bureau 2014 ACS 1-Year Estimates. While NYC MHI is comparable to national average, cost of living and housing burden for NYC residents is generally much higher ~21% of NYC population (>1.7 million people) lives below the federal poverty level ~19% of elderly population lives in poverty Average Wastewater Bill Compared to HH Income INCOME BRACKET % of Households Less than $20,000 22% $20,000 to $39,999 18% $40,000 to $59,999 14% $60,000 to $74,999 9% $75,000 to $99,999 11% $100,000 to $199,999 18% $200,000 or more 8% • Currently ~27% of households (HH) pay 2% of income or more on wastewater/sewer bill • Estimating modest future rate and income increases (based on costs in the CIP and historic Consumer Price Index data, respectively), this could increase to 40% in 2025 Avg. Wastewater Bill Compared to HH Income Average Wastewater Bill/MHI % of Household (HH) estimated to be paying more than 2% of HH income on Wastewater Services* 2016 1% 27% 2025 1.5% 40% *Source: USEPA “Combined Sewer Overflows: Guidance for Financial Capability Assessment and Schedule Development” (1997) Long Term Control Plan (LTCP) 2012 CSO Consent Order Builds upon success of 2005 CSO Consent Order • Over 120 Consent Order milestones previously achieved • Recommended plans from 11 Waterbody Watershed Facility Plans are incorporated • Projects about 90% of the NYC waterbodies will attain existing standards LTCP Submittal Dates CSO Watershed LTCP Status Alley Creek APPROVED Westchester Creek Submitted Hutchinson River APPROVED Flushing Creek APPROVED Bronx River APPROVED Gowanus Canal APPROVED Coney Island Submitted Flushing Bay APPROVED Jamaica Tributaries & Bay Due June 2017 Newtown Creek Due June 2017 Citywide Due December 2018 DEP’s Financial Commitment to CSO Reduction DEP is currently in the midst of an unprecedented period of investment to improve water quality in New York Harbor, including $4.2B of existing CSO commitments. Over $2B have been incurred to date. Financial Commitment NYC’s CSO Program Waterbody Watershed Facility Plans and other CSO Projects $2.7 Billion Green Infrastructure Program $1.5 Billion Approved LTCPs Additional Spending* $1.6 Billion TOTAL $5.8 Billion *Additional Spending associated with approved LTCPs to date, further spending to be determined. Rainfall Selection for Model Updates Evaluated a comprehensive range of rainfall data: Historical data range: 42 years from 1969 to 2010 Only four representative rainfall gauges with continuous data within this time frame: Central Park, LGA, JFK, and EWR Selected 2008 JFK rainfall as the most representative of average annual rainfall across all four gauges over the 42-year period Model Calibration & Updates Receiving Water Quality Model calibrated with Harbor Survey and LTCP sampling data Landside InfoWorks Model calibrated with LTCP flow and sampling data Future wastewater flows based on 2040 population projections InfoWorks based on revised impervious areas Screening of alternatives based on 1-yr data (JFK 2008 “Typical Year Rainfall”) Selected Plan Model runs based on 10-yr data (2001 to 2011) to address elevated rainfall amount due to climate change 5-Year Moving Average LTCP Typical Year Rainfall (JFK 2008 – 46.3 inches) Standard for WWFP (JFK 1988 – 40.6 2002-2011 10-Year Water Quality Period for Selected Plan inches) CSO Mitigation Toolbox INCREASING COMPLEXITY Source Control Additional Green Infrastructure High Level Sewer Separation (HLSS) INCREASING COST System Optimization Fixed Weir Parallel Interceptor / Sewer CSO Relocation Gravity Flow Tipping to Other Watersheds Pumping Station Modification Water Quality / Ecological Enhancement Floatables Control Dredging Outfall Disinfection Retention Treatment Basin (RTB) Treatment Satellite: Centralized: Storage Bending Weirs Control Gates Pump Station Expansion Flow Tipping with Conduit / Tunnel and Pumping Dissolved Oxygen Improvement Flushing Tunnel High Rate Clarification (HRC) WWTP Expansion In-System Shaft Tank Tunnel Alley Creek LTCP Recommended Plan: Disinfect at the Existing 5 MG CSO Retention Facility during Recreational Season (May 1st – Oct 31st) Approved March 7, 2017 Benefits: Reduce bacteria load to creek Avoid structural modifications to existing tank Challenges: Control of residual chlorine Total Capital Cost / Annual O&M: $7.6 Million / $250,000 Hutchinson River LTCP Recommended Plan: Divert flow to Outfall HP-024 Extension Provide Floatables Control Disinfect 50 MGD in Recreational Season (May 1st thru Oct. 31st) Approved March 7, 2017 Benefits: Reduces bacteria load to river from seasonal disinfection Provides floatables control Avoid construction of costly retention tank Challenges: Solids deposition in outfall Permitting of new outfall Total Capital Cost / Annual O&M: $90 M / $1.25 M Flushing Creek LTCP Recommended Plan: Recreational Season Disinfection at Tank, DC 5, and Regulator TI-09 Provide Floatables Control at DC 3 and Regulator TI-09 Approved March 7, 2017 Benefits Challenges Construction O&M Cost Outfall TI-010 Outfall TI-011 • Provides disinfection of tank bypass flows • Provides disinfection of CSO discharge • Disinfection equipment can be installed at existing site • Potential residual chlorine issues • Maximizes use of existing infrastructure TI-010 • Potential residual chlorine issues $2 Million $5 Million $350,000 / Year $300,000 / Year TI-011 Bronx River LTCP Recommended Plan: Hydraulic Relief (HP-007 & HP-009) Floatables Control (HP-011) HP-007 Approved March 7, 2017 Outfall HP-007 Benefits Challenges Construction O&M Cost • CSO volume reduction Outfall HP-009 • CSO volume reduction Outfall HP-011 • CSO volume reduction • Provides floatables control • Need to maintain hydraulic neutrality • Proximity to parkland/shoreline • Need to maintain hydraulic neutrality HP-009 $111 Million $53,000 per Year HP-011 Flushing Bay LTCP Recommended Plan: 25 MG CSO Storage Tunnel Approved March 7, 2017 Conceptual layout only – final site selection to be performed under the Facility Plan Phase Total Capital Cost: $670 M (Ingraham’s Site) or $829 M (Luyster Creek Site) Green Infrastructure 24 Green Infrastructure Program Timeline 2010 – NYC Green Infrastructure Plan Laid framework to use green infrastructure to manage 1” (2.5 cm) of stormwater runoff from 10% of impervious surfaces in combined sewer areas by 2030. 2012 – Amended Consent Order DEP and NYS Department of Environmental Conservation (DEC) signed an historic agreement to incorporate a green and grey adaptive management approach into the CSO program. Benefits of Green vs Grey Investments 26 GI Application Rates and Milestone Schedule DEP has committed to spend $1.5 billion in green infrastructure projects through 2030. 10% Overall Goal: To manage 1” of stormwater runoff from 10% of impervious surfaces in combined sewer areas by 2030 9% 8% Initial 1.5% 7% Additional 2.5% 6% Additional 3.0% Final 3% 5% 4% 3% 2% 1% 0% 2010 2015 2020 2025 2030 NYC Green Infrastructure Program City Sidewalks City Streets Grant Program for Private Property Owners Public Property Retrofits Right of Way Bioswales Priority Areas and Area-wide Approach The Area-wide Approach allows OGI to: • Focus resources on selected CSO tributary areas (Priority Areas) • Saturate these CSO tributary areas with as much GI as practical • Achieve efficiencies through standard designs, specifications and procedures Newtown Creek, NCB-015 Area-wide Contract Public Property Retrofits Schoolyard Retrofits Before After Green Infrastructure Grant Program DEP provides funding for the design and construction of “green infrastructure” or stormwater management practices that detain or retain stormwater runoff from impervious surfaces such as parking lots, rooftops and internal walkways. Brooklyn Navy Yard: Rooftop Farm Queens College: Rain Garden/Pavers Bishop Loughlin: Green Roof Lenox Hill House: Green Roof NYRP: Rain Garden/Pavers Osborne Association: Blue/Green Roof LTCP Process and Public Involvement LTCP Due Existing Information Review Data Collection & Analysis Modeling Alternatives Development & Evaluation LTCP Alternatives Meeting Kickoff Meeting ONGOING PUBLIC / STAKEHOLDER INPUT Typical timeline for this process ranges from 12 to 24 months, depending on the water quality and complexity of the waterbody/watershed. DEC Review Final Plan Review Meeting Ongoing LTCP Public Participation Program GOAL Raise awareness, foster understanding, and encourage input on LTCP development Activities: Annual citywide public meetings rotating across boroughs Local public meetings in each watershed and existing forums Meeting with key stakeholders and organizations Briefings with elected officials and their staff Communication Tools: Program Website Social Media Advisories & Notifications
© Copyright 2026 Paperzz