Northridge California State University, Northridge Jolene Koester, President University History California State University, Northridge was created in 1956 to meet the need for higher education in the San Fernando Valley. It began instruction with 800 students in 14 temporary buildings as the San Fernando Valley campus of Los Angeles State College of Applied Arts and Sciences. The campus separated from its parent institution on July 1, 1958, and, as San Fernando Valley State College, its growth matched that of the mushrooming suburban valley population it served. In 1972, in recognition of its evolution from a small branch campus to a major educational institution, action of the legislature, the governor, and the trustees named it California State University, Northridge. were demolished: Parking Structure C, University Tower Student Apartments, South Library, Fine Arts, and the west wing and the two upper floors of the east wing of the Oviatt Library. The five replacement buildings are the Art and Design Center addition, Manzanita Hall (College of Arts, Media and Communication), University Hall (new administration building), Sequoia Hall (College of Health and Human Development/Technology Center), and the reconstructed east and west wings of the Oviatt Library. The master plan also includes the development of the 65-acre north campus area to accommodate a biotech research and development complex under a public/private partnership. Growing demand in the region created the Ventura OffCampus Center in the northern section of the San Fernando Valley in 1974. Legislation enacted in 1997 gave the Ventura Off-Campus Center permanent facilities in the state-owned former Camarillo Developmental Center, now California State University, Channel Islands. Students who were enrolled at the Center through fall 2001 now attend the CSU Channel Islands campus, but will graduate with a CSU Northridge diploma. The Center is closed to new students. In November 2001, the university was able to report to the trustees the completion of all earthquake-related building repairs and replacement facilities. CSU Northridge now returns its focus toward planning for capital infrastructure improvements: the renovation of its academic buildings built in the 1960s to accommodate the more vigorous program expectations of the 21st century and the construction of academic support facilities to provide for its outstanding academic programs. The university’s eight colleges center about a quadrangle where California native trees and landscaping are featured. The focal point of the quad is the Oviatt Library with its grand stairway and terraced, landscaped seating areas. Smaller quadrangles and semi-private courtyards enhance the major campus buildings and strengthen their individual identity. The organization of the campus environment is further defined by pedestrian promenades, each lined by a different tree species. The January 1994 Northridge earthquake caused extensive damage to campus facilities. Repairs and strengthening of facilities throughout the campus were completed with funding provided by the Federal Emergency Management Agency and the state Office of Emergency Services. In May 1998, the campus master plan was revised to document the demolition of severely damaged facilities and include the locations of replacement buildings. The following buildings California State University, Northridge Master Plan Enrollment: 25,000 FTE Master Plan approved by the Board of Trustees: March 1963 Master Plan Revision approved by the Board of Trustees: July 1965, September 1968, May 1971, March 1972, February 1973, July 1974, July 1976, October 1976, February 1979, May 1982, November 1985, July 1986, November 1986, July 1987, March 1988, July 1988, June 1989, September 1989, March 1990, September 1993, May 1998 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 16A. 17. 18. 20. 21. 22. 22A. 23. 24. 25. 26. 27. 29. 30. 31. 32. 34. 35. 36. 38. 39. 40. 41. 43. 44. 45. Manzanita Hall Music Nordhoff Hall Science I & II University Hall Sierra Hall Sierra Tower Jerome Richfield Hall Student Services Engineering University Club Greenhouse Volatile Storage Sundial Fountain Track and Field Kinesiology Kinesiology Addition Speech Drama Addition Center for Communication Studies Oviatt Library Addition Public Safety Science III & IV Science Addition Lecture Halls University Student Union Corporation Yard Addition Business Administration/Economics and Education Engineering Addition Student Housing Sequoia Hall University Village Apartments Botanical Garden Art Gallery Conference Center Sierra Center Physical Education Courts Corporation Yard Planetarium Bookstore Faculty Office Building Jeanne M. Chisholm Hall Art and Design Center 46. 47. 48. 49. 50. 52. 53. 54. 55. 56. 61. 71. 72. 73. 76. 78. 78A. 79. 80. 81. 82. 83. 86. 87. 88. 92. 96. 97. 98. 99. 115. 201. 202. 203. Art and Design Addition Satellite Union & Recreation Center Instructional Green Space Baseball Field Softball Field Brown Center Physical Therapy Center Language, Speech and Hearing Center Auditorium University Student Union Addition University Student Union Expansion Athletics Office Central Plant Master Distribution Facility Media Entertainment Center Office Buildings (2) Research and Development Buildings (3) Research and Development Buildings Parking Structure Parking Structure Parking Structure Parking Structure Parking Structure Substation Cooling Tower Stellar Observatory Monterey Hall Addie L. Klotz Student Health Center Bookstore Addition Children’s Center Preschool Laboratory Delmar T. Oviatt Library Sagebrush Hall Bank Building President’s Residence LEGEND Existing Facility / Proposed Facility Note: Building numbers correspond with building numbers in the Space and Facilities Data Base (SFDB) Five-Year Capital Improvement Program 2003/04 through 2007/08 (Dollar in 000’s) Northridge State Funded Project CAT 2003/04 36 II PWC 14,557 152 IB 180 II PWC 45,350 E 3,500 0 IB PWC 16,917 E 1,768 Sierra Hall/Tower Reno. 0 IB PWC 39,636 E 1,460 Jerome Richfield Reno. 0 IB PWC 12,991 E 1,295 Music Building Reno. 0 IB PWC 14,275 E 1,805 Nordhoff Hall Reno. & Add. 10 IB PWC 26,254 E 2,880 Preschool/Child 75 II PWC 5,666 E 179 N/A IB PWC 37,798 Science I & II Replace., 2004/05 2005/06 2006/07 E 2007/08 Funds to Complete FTE 939 Ph. I Addition Science I & II Replace., PWC 61,829 E 6,490 Ph. II Performing Arts Center ◊ Science I & II Replace., Ph. III Development Laboratory Site Development, Utilities & Cogeneration Plant Totals $282,702 453 $14,557 $61,829 $62,267 $67,841 $76,208 $12,887 Nonstate Funded Project FTE CAT 2003/04 2004/05 Parking Structure II (2,000 Spaces) Pkg PWC 19,000 Parking Structure III (2,100 Spaces) Pkg PWC 19,500 Performing Arts Center ◊ Oth Totals $39,243 2005/06 2006/07 2007/08 E $0 $38,500 $0 ◊ This project is dependent upon state and nonstate funding. All out year projects require review and comparison to the CSU cost guide. A = Acquisition P = Preliminary Plans W = Working Drawings C = Construction E = Equipment Nonstate CAT codes: Aux = Auxiliary/Foundation Hou = Housing Oth = Other Pkg = Parking Stu = Student Union $0 Funds to Complete 743 $743 $0 Northridge State Funded Capital Outlay Program Projects in Budget Year Science I and II Replacement, Phase I Addition PWC $14,557,000 This project is the first of three phases for a new facility for the department of science and mathematics. The project will replace the existing Science I and II buildings of 105,000 ASF/170,000 GSF and also accommodate growth. The existing buildings were built in the late 1950s for the initial engineering and science programs. A new engineering building was built in 1964. Science programs such as biology, geology, physics/astronomy, and chemistry moved into buildings that are still outfitted for engineering. Science has seen remarkable changes, and the current laboratories are not configured to teach a modern-day program. Existing fume hoods, mechanical systems, electrical systems, and fire/life safety systems do not comply with current codes. The buildings do not meet ADA standards and current code for adequate restrooms for both sexes. Both the science and mathematics programs require larger classrooms to accommodate lower division students, which will be accomplished in this project. This project will also provide new faculty office space to consolidate offices for the mathematics department, which now are scattered in several buildings. The first phase is an addition of 32,300 ASF/ 50,300 GSF to accommodate 2,790 (net 36) FTE in lecture space, and 45 (net 2) faculty offices for the mathematics and science programs that will address campuswide deficiencies. Subsequent phases of construction will build a laboratoryintensive facility to replace Science I, and then Science II. The future cost for equipment is $939,000. Future Projects (2004/05–2007/08) Science I and II Replacement, Phase II This project will construct a 95,300 ASF/159,000 GSF facility in the second of three phases to replace the existing Science I building and to accommodate growth. This building was built in the late 1950s for the initial engineering program. Existing fume hoods, mechanical systems, electrical systems, and fire/life safety systems do not comply with current codes and accessibility standards. This facility will consolidate laboratories for the chemistry, biology, and physics programs, build additional faculty office space, and replace the existing vivarium in Science II with an expanded code-compliant facility. When this facility is completed, the vivarium will vacate existing space in Science II. This facility will provide for a net capacity of 100 FTE in lecture space, 52 FTE in laboratory space, and 15 faculty offices. The project includes cost for temporary laboratory space in trailers to accommodate programs in Science I. Performing Arts Center This project will build a visual and performing arts center. The 100,000 ASF/163,000 GSF facility will provide a 1,600-seat auditorium, a 200-seat black box theater, and a 100-seat recital and lecture hall accommodating 180 FTE, as well as ancillary support space for rehearsal and production. Parking will be provided nearby. This project is dependent upon state and nonstate funding. Science I and II Replacement, Phase III This project will construct a 29,900 ASF/47,600 GSF facility in the last of three phases to replace the existing Science II building and to accommodate growth. This building was built in the late 1950s for the initial engineering program. Science programs such as biology, geology, physics/astronomy, and chemistry moved into buildings that are still outfitted for engineering. Existing fume hoods, mechanical systems, electrical systems, and fire/life safety systems do not comply with current codes and accessibility standards. This facility will build specialized instruction laboratories for the chemistry, biology, and physics programs, and 90 (net 55) faculty offices. The project includes costs for temporary space in trailers to accommodate programs in Science II while the new building is constructed. Sierra Hall/Tower Renovation This project will renovate the building systems of Sierra Hall and Sierra Tower and remodel the academic facilities and faculty offices. This building, which was constructed approximately 40 years ago, has never gone through a major renovation. The facility requires reconfiguration to support modern instructional needs. Jerome Richfield Renovation This project will renovate the instructional spaces and faculty offices, providing additional lecture and laboratory space. This building (#8), which was constructed in 1963, has never undergone a major renovation or renewal of building systems. Future Projects (2004/05–2007/08) (continued) Music Building Renovation This project will renovate the building systems and remodel the instructional spaces, the performance and practice space, and the faculty offices for the music department. This building (#2), which was constructed in 1960, has never undergone a major renovation or renewal of building systems. Nordhoff Hall Renovation and Addition This project will renovate and modernize the existing 47,800 ASF/82,700 GSF building (#17) to correct health and safety code compliance. The existing large and small theater rigging and lighting systems require an upgrade for safety and program needs. The renovation will include the conversion of faculty offices to single-station offices and increase capacity by 10 FTE in UD laboratory space. The project will also provide additional space (19,300 ASF/25,700 GSF) for program needs. Preschool/Child Development Laboratory This project will provide 7,800 ASF/12,000 GSF of new laboratory, classroom, administrative, and faculty office space for the child development and family environmental sciences departments (#99). These functions are currently located in two converted residences constructed in the 1940s, before the campus was established, and do not meet program needs and current building codes. This project will provide facilities to accommodate 25 FTE in lecture space, 50 FTE in laboratory space (25 LD/25 UD), and 5 faculty offices. Site Development, Utilities and Cogeneration Plant This project will reduce hazardous traffic conditions through the implementation of a campus circulation system. The utilities infrastructure component will construct a cogeneration power plant and upgrade the campus infrastructure related to sanitary sewers, storm drains, landscape irrigation, and natural gas. Many of these systems, which were installed 30-40 years ago, are in need of replacement or are undersized and unable to meet current demands. Related to both the site development and utilities components, this project will also include the replacement of overhead power lines with underground duct banks. Nonstate Funded Capital Outlay Program Projects in Budget Year None Future Projects (2004/05–2007/08) Parking Structure II (2,000 Spaces) This project will construct a new structure on the western side of campus (#79). The structure will be built over existing surface parking, and will provide 2,000 parking spaces, for a net increase of 1,500 spaces. Funding will be provided by campus parking reserves and a future bond sale supported by campus parking fees. Proceeding with this project depends on demonstrated demand, as shown by a parking study and upon meeting appropriate construction and program standards, which includes the development of a viable financial plan of the campus parking program. Parking Structure III (2,100 Spaces) This project will construct a new structure on the eastern side of campus (#80). The structure will be built over existing surface parking and will provide 2,100 parking spaces, for a net increase of 1,500 spaces. Funding will be provided by campus parking reserves and a future bond sale supported by campus parking fees. Proceeding with this project depends on demonstrated demand, as shown by a parking study and upon meeting appropriate construction and program standards, which includes the development of a viable financial plan of the campus parking program. Performing Arts Center This project will provide part of the equipment for the visual and performing arts center. The 100,000 ASF/163,000 GSF facility will build a 1,600-seat auditorium, a 200-seat black box theater and a 100-seat recital and lecture hall accommodating 180 FTE, as well as ancillary support space for rehearsal and production. This project is dependent upon state and nonstate funding. Previous Five-Year Capital Improvement Program 1998/99 through 2002/03 (Dollars in 000’s) Northridge State Funded Project 1998/99* Telecommunications Infrastructure Bus./Adm./Econ. & Education C 1999/00 2000/01 W 220 C 4,658 C 6,142 E 363 2001/02 700 Corporation Yard ◊ University Instructional Equipment FEMA Earthquake Matching Funds E 5,215 PWC 9,000 Engineering Renovation, Phase II Totals 2002/03 PWC 14,739 $41,037 $700 $6,362 $5,021 $14,215 $14,739 Nonstate Funded Project 1998/99 Corporation Yard ◊ PW 1999/00 2000/01 2001/02 351 University Club PWCE 4,578 Alumni Center at Sierra Hall Cmplx. PWCE 6,500 Western Ctr. for Adaptive Aquatics PWCE 2,425 University Student Union Reno. PWCE 14,000 Parking Structure I (1,391 Spaces) PWC 14,000 Visual and Performing Arts Center Totals 2002/03 PWC $50,391 $351 $4,578 $22,925 * Initial facility for Northridge Off-Campus Center is being reported under CSU Channel Islands ◊ This project was state and nonstate funded. A = Acquisition P = Preliminary Plans W = Working Drawings w = Small “w” required for ADA, code compliance, plan check, etc. C = Construction E = Equipment $14,000 8,537 $8,537
© Copyright 2026 Paperzz