City Of Meridian – Building Services 33 E. Broadway, Suite #102 Meridian, ID 83642 (208)887-2211 Fax (208)887-1297 www.meridiancity.org Floodplain Development Permit Attach Review fee of $25.00(Non-Refundable) Complete the blanks that apply to your property and project. Call David Miles at (208) 898-5500, ext. 1383 if you have questions about the required information. SECTION A: SUBJECT PROPERTY INFORMATION APPLICANT NAME: EMAIL: APPLICANT ADDRESS: PHONE: OWNER NAME: OWNER ADDRESS: PHONE: CITY: STATE: ZIP: LEGAL ADDRESS OF SUBJECT PROPERTY: SECTION B: PROPOSED PROJECT INFORMATION DESCRIPTION OF THE PROPOSED PROJECT (Check all that apply): mobile home/building. attached garage accessory structure new structure addition remodel fill excavation change of use redevelopment other (describe) EXISTING USE (Check One): residential non-residential mixed-use vacant ground PROPOSED USE (Check One): residential non-residential mixed-use other If non-residential or mixed-use, describe in more detail: CRITICAL FACILITY? Yes No TYPE OF FOUNDATION (Check One): other (describe) slab-on-grade basement crawl space REMODELS and ADDITIONS ONLY: COST OF IMPROVEMENT FOR THIS PROJECT: (Submit an itemized cost list of the improvements) VALUE OF EXISTING STRUCTURE: (Submit Assessor’s or appraiser’s valuation of the structure) P.E. / P.L.S Stamp Required Here: SECTION C: FLOODPLAIN DESIGN INFORMATION ALL ELEVATIONS ARE REPORTED ON THE NAVD 88 FLOODPLAIN SOURCE NAME: IS A FLOODWAY DELINEATED IN THE FLOOD INSURANCE STUDY (FIS): FEMA BASE FLOOD ELEVATION (BFE): Yes No _________________ SOURCE OF BFE DETERMINATION: ____________________________ POST DEVELOPMENT BFE: ____________________________________ This is required when there is not a floodway delineated by the FIS. (Attach hydraulic analysis to support determination) SECTION D: FLOODPLAIN DESIGN REQUIREMENTS STRUCTURE IS: Elevated Vented N/A Other IF OTHER, DESCRIBE METHOD USED: BENCHMARK USED: ELEV OF BENCHMARK: LOWEST EXISTING GROUND ELEV: HIGHEST EXISTING GROUND ELEV: LOWEST FINISHED GROUND ELEV: HIGHEST FINISHED GROUND ELEV: __ LOWEST FLOOR ELEVATION [Refer to City Code §10-6-5(A)(2)]: (Drawings shall illustrate elevations of BFE, lowest floor and any crawl space conditions) ELEVATION OF GARAGE SLAB: _____________ LOWEST ELEVATION OF UTILITY EQUIPMENT (Electrical and Mechanical): ENCLOSED AREA (not elevated): _ sq. ft. NUMBER OF VENTS: ___AREA OF VENTING: sq. in. City Code 10-6-5 contains construction regulations which exceed FEMA minimum standards. Please review City Code prior to completion of application. For Structures: Attach building plans showing foundation design, flood elevation, floor elevations, HVAC elevations, size and location of vents, floodproofing design, and other relevant information. (Complexity of project may require data referenced on multiple sheets) For Site Work: Attach site and grading plans and other relevant information. For development proposed in a Floodway: Attach No-Rise Certificate and documentation of hydraulic analysis Include copies of other permits and approvals required (404/401, NPDES, Irrigation District, etc.) As Engineer/Land Surveyor of Record I certify that these plans & building design are in accordance with all requirements of the special construction to mitigate flood damage of new structures and/or substantial improvements located in the Meridian Floodplain Overlay District per the following: 1. The Federal Emergency Management Agency (FEMA) National Flood Insurance Program (NFIP) regulations (44 CFR Parts 59-78 including Technical Bulletins TB 1 through TB 11. 2. The City of Meridian Municipal Code section 10-6 “Flood Damage Prevention”. SIGNATURE: _________________DATE:__________________ PROFESSIONAL OF RECORD LICENSE # SIGNATURE: _________________DATE:__________________ OWNER FLOODPLAIN USE PERMIT: APPROVED: DENIED: PERMIT #___________ SIGNATURE OF FLOODPLAIN ADMINISTRATOR: ____________DATE:_________ COMMENTS: FINAL ELEVATION CERTIFICATE APPROVAL: ___________________ DATE: _____________________ SUBSTANTIAL IMPROVEMENT DETERMINTATION: (>50% of Value or > 20% finished area) Yes No N/A ** PLEASE NOTE**: Permit ‘Approved’ status covers review of design application. Two Elevation Certificates will be required during construction to verify ‘Floodplain Design’ Sections C & D criteria have been achieved: -Initial Elevation Certificate required after footing forms are set and prior to approval of foundation inspection. -Final Elevation Certificate required after all flood related construction is completed and prior to C of O. If you have questions or need assistance filling out forms, Contact Meridian Public Works Department (208) 898-5500 Environmental Divison Meridian City Hall, Suite 204 33 E. Broadway Avenue Meridian, Idaho 83642 Public Works Department Environmental Division _________________________________________________________________________ PROCEDURAL NOTICE: Floodplain Development Elevation Certificates Date: November 18, 2011 Floodplain Elevation Certificates – Update To: Building Contractors, and Design Professionals The Federal Emergency Management Agency (FEMA) regulates local communities and their participation in floodplain administration under the National Flood Insurance Program (NFIP). Local communities are required to administer floodplain regulations, including oversight and management of construction and development of sites located within the Special Flood Hazard Areas (SFHA) as defined by FEMA Flood Insurance Rate Maps. Elevation Certificates are FEMA’s documenting source to verify that construction of a structure has been built to sufficient elevation standards which meet local and federal ordinance requirements. The City of Meridian has updated its floodplain administration procedures, regulated by Meridian Municipal Code (MMC) §10-6, to match FEMA’s requirements of providing elevation certificates at critical times of the construction process. Elevation certificates are now required to be completed by a licensed professional engineer or land surveyor at both the following times in the construction phase: a. The interim elevation certificate is required to be completed and provided to the City inspection staff prior to approval of the foundation inspection. b. The final elevation certificate is required to be completed and provided to the City inspection staff after all elements of construction, which may be effected by flooding (including electrical, mechanical, etc.), are completed and prior to a Certificate of Occupancy (CofO) being granted. (marked "Building Under Construction" on FEMA Form 81-31) (marked "Finished Construction" on FEMA Form 81-31) FEMA form 81-31 is the elevation certificate form and required to be fully complete including the following: 1. Items that do not apply on the form should be completed with “n/a”. 2. Line items in Section C. (Items C1 and C2a, b, d, e, f, g will always be complete for projects in the City of Meridian, other items may be applicable depending on the specific project.) 3. Per MMC §10-6-5, all crawlspace ground is to be at a minimum elevation of the Base Flood Elevation plus one foot (BFE + 1’). See form 81-31 item C2a. 4. Per MMC §10-6-5, the first (lowest) finished floor is to be at a minimum elevation of the Base Flood Elevation plus two feet (BFE + 2’). See form 81-31 item C2b. **See below for location on FEMA form 81-31 where items 2, 3, 4 apply** For additional information or questions, please contact David Miles, Floodplain Administrator at (208)489-0383. Ph: 208.898-5500 www.meridiancity.org Fax 208.898-9551 Rev: 1/2014 U.S. DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency National Flood Insurance Program ELEVATION CERTIFICATE OMB No. 1660-0008 Expires March 31, 2012 Important: Read the instructions on pages 1-9. SECTION A - PROPERTY INFORMATION For Insurance Company Use: A1. Building Owner’s Name Policy Number A2. Building Street Address (including Apt., Unit, Suite, and/or Bldg. No.) or P.O. Route and Box No. Company NAIC Number City State ZIP Code A3. Property Description (Lot and Block Numbers, Tax Parcel Number, Legal Description, etc.) Building Use (e.g., Residential, Non-Residential, Addition, Accessory, etc.) Long. Horizontal Datum: NAD 1927 NAD 1983 Latitude/Longitude: Lat. Attach at least 2 photographs of the building if the Certificate is being used to obtain flood insurance. Building Diagram Number_____ For a building with a crawlspace or enclosure(s): A9. For a building with an attached garage: sq ft a) Square footage of attached garage sq ft a) Square footage of crawlspace or enclosure(s) b) No. of permanent flood openings in the crawlspace or b) No. of permanent flood openings in the attached garage enclosure(s) within 1.0 foot above adjacent grade within 1.0 foot above adjacent grade c) Total net area of flood openings in A8.b sq in c) Total net area of flood openings in A9.b sq in d) Engineered flood openings? Yes No d) Engineered flood openings? Yes No E A4. A5. A6. A7. A8. SECTION B - FLOOD INSURANCE RATE MAP (FIRM) INFORMATION B4. Map/Panel Number B5. Suffix B2. County Name B3. State PL B1. NFIP Community Name & Community Number B6. FIRM Index Date B7. FIRM Panel Effective/Revised Date B8. Flood Zone(s) B10. Indicate the source of the Base Flood Elevation (BFE) data or base flood depth entered in Item B9. FIS Profile FIRM Community Determined Other (Describe) B9. Base Flood Elevation(s) (Zone AO, use base flood depth) Memo Items 3,4 Yes No M B11. Indicate elevation datum used for BFE in Item B9: NGVD 1929 NAVD 1988 Other (Describe) B12. Is the building located in a Coastal Barrier Resources System (CBRS) area or Otherwise Protected Area (OPA)? Designation CBRS OPA Memo Item 2Date SECTION C - BUILDING ELEVATION INFORMATION (SURVEY REQUIRED) SA C1. Building elevations are based on: Construction Drawings* Building Under Construction* Finished Construction *A new Elevation Certificate will be required when construction of the building is complete. C2. Elevations – Zones A1-A30, AE, AH, A (with BFE), VE, V1-V30, V (with BFE), AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO. Complete Items C2.a-h below according to the building diagram specified in Item A7. Use the same datum as the BFE. Memo Item 4 depending on Vertical Datum Benchmark Utilized Memo Items 3,4 depending on configuration. Conversion/Comments construction configuration. Check the measurement used. a) b) c) d) e) f) g) h) Top of bottom floor (including basement, crawlspace, or enclosure floor) Top of the next higher floor Bottom of the lowest horizontal structural member (V Zones only) Attached garage (top of slab) Lowest elevation of machinery or equipment servicing the building (Describe type of equipment and location in Comments) Lowest adjacent (finished) grade next to building (LAG) Highest adjacent (finished) grade next to building (HAG) Lowest adjacent grade at lowest elevation of deck or stairs, including structural support . . . . . feet feet feet feet feet meters (Puerto Rico only) meters (Puerto Rico only) meters (Puerto Rico only) meters (Puerto Rico only) meters (Puerto Rico only) . . . feet feet feet meters (Puerto Rico only) meters (Puerto Rico only) meters (Puerto Rico only) SECTION D - SURVEYOR, ENGINEER, OR ARCHITECT CERTIFICATION This certification is to be signed and sealed by a land surveyor, engineer, or architect authorized by law to certify elevation information. I certify that the information on this Certificate represents my best efforts to interpret the data available. I understand that any false statement may be punishable by fine or imprisonment under 18 U.S. Code, Section 1001. Check here if comments are provided on back of form. Certifier’s Name License Number Title Company Name Address City Signature FEMA Form 81-31, Mar 09 Were latitude and longitude in Section A provided by a licensed land surveyor? Yes No State Date PLACE SEAL HERE ZIP Code Telephone See reverse side for continuation. Replaces all previous editions
© Copyright 2026 Paperzz