SR 520 construction activities on Lake Washington Laurelhurst Union Bay Montlake Cut West side staging area Marsh Island Foster Island Lake Washington Temporary work bridge P West Connection Bridge Month 2015 New floating bridge 520 Montlake Legend Structures to avoid P Active construction zones; no access Medina Madison Park Log boom Exclusion zone do not enter: underwater hazard P 520 Existing floating bridge No public parking Canoe/kayak suggested route West Approach Bridge North construction East navigation channel West navigation channel West side staging area Union Bay Exclusion zone ’ 150 New, permanent navigation channel ’ 150 Active construction zone 520 Marsh Island 94’ 43’ 520 Union Bay 520 55’ 188’ 58’ 150’ Buoy Buoy For more information: Phone: 206-708-4657 (24-hour construction hotline) Email: [email protected] Web: www.wsdot.wa.gov/proects/SR520Bridge/BridgeAndLandings/DrawspanInfo.htm This document is for illustration purposes only and is not intended for navigational use. April 2016
© Copyright 2025 Paperzz